Fire Suppression IT&M Federal contract opportunity
Solicitation number
W911PT-18-Q-0046
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Appendix C-G

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression IT&M, newest first.
File Type Posted
Appendix_H,_Estimated_Work_Load_Data_Sheet.doc DOC document
Appendix_I,_DA_Form_3943_-_Annual_Dry_Pipe_Valve_Inspection_and_Tripping....pdf PDF
Appendix_J,_DA_Form_4005_-_Automatic_Sprinkler_&_Standpipe_Equipments_In....pdf PDF
Appendix_B,_QASP.DOC DOC document
Appendix_A,_Contractor_Asbestos_Notification_Record.doc DOC document
W911PT-18-Q-0046.pdf PDF
172120002_(SOW).docx DOCX document
SCSL_15-4143_REV_9.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C: Dry Pipe Systems Building Locations

Bldg Location Quantity Size Manufacturer Approx. Coverage (SF) 10 North End Basement 1

6 Inch 4 Inch

Firematic Viking 66,900 (Basement, 1st Floor, 2nd Floor, Attic)

21 East End, Basement Level 1 6 Inch Firematic 16,700 (Basement, 1st

Floor) 24 North End, Ground Floor 1 4 Inch Gem 11,800 (Basement, 1st

Floor, 2nd Floor, Attic) 38 Center Sprinkler Room 2

6 Inch 2-1/2 Inch

Victaulic 18,000

40-1 Security, Backroom 2 6 Inch Firematic 14,800 (1st Floor, 2nd

Floor, Attic) 40-2 Center, Sprinkler Room

Under Stairs 2 6 Inch Firematic 56,800 (1st Floor, 2nd

Floor, Attic) 40-2 Center, Sprinkler Room

Under Stairs 1 4 Inch Viking

40-3 Southeast, Sprinkler Room 3 6 Inch Firematic 52,200 (1st Floor, 2nd

Floor, Attic) 40-4 Health Clinic, Ladies Room 1 4 Inch Firematic 43,500 (1st Floor, Attic of

40-4, and 1st Floor, Attic of most of 40-5)

116 Northeast Corner 1 6 Inch Reliable (Deluge Type)

2,700

120 East Side, North and South 2 6 Inch Globe 96,600 (1st Floor, Mezzanine, 2nd Floor, 3rd

Floor) 124 First Floor, South Side

Corner Mech Room 1 6 Inch Firematic 18,600 (1st Floor, 2nd Floor, Rafters above 2nd Floor)

130 Center, East Side, Exterior Door

1 6 Inch Firematic 30,900

135 Center, East Side 1 6 Inch Firematic 41,300 (Only Some Bays)

145 Northeast, Northwest, Southeast, and Southwest

4 6 Inch Firematic 113,500

Total 27

Chapters 4 (General Requirements), 5 (Sprinkler Systems) and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.

APPENDIX C: Dry Pipe Systems Dry Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks

Frequency Component Tasks

Base Year, Option Year 1, and Option Year 2

1. Control Valves (locked or supervised)

1. Verify valve position.

2. Waterflow Alarm Devices 1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).

3. Dry Pipe Alarm Valve and Trim

1. Trip test. 2. Visually inspect exterior of valves, gauges, trim alignment. 3. Verify valve pressure and legibility of hydraulic nameplate.

4. Main Drain 1. Conduct main drain test to verify supply (valve position).

5. Fire Department Connection

1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions.

6. Dry Pipe Alarm Valve Enclosure Heating

1. Verify operability at beginning of heating season (for constant cold areas annually).

7. Low Temperature Alarm 1. Verify initiation and receipt of alarm at beginning of heating season.

8. Low Point Drains 1. Drain all low points to remove condensation prior to cold season.

9. Entire System Visually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares.

Option Year 2 (Only) 1. Control Valves/Quick Opening Devices

1. Full flow trip test. 2. Trip valve to verify operability. 3. Inspect internal condition before resetting and clean valve seat. 4. Check priming water level (before and after trip test).

Option Year 1 (Only) 1. Control Valves 1. Operate valve through entire travel to verify function. 2. Lubricate valve stem.

2. Quick Opening Devices 1. Test to verify operability.

3. Low Air Pressure Alarm 1. Test to verify initiation and receipt of supervisory alarm.

4. Automatic Air Pressure Maintenance Devices

1. Inspect to verify proper operation.

Base year 1. Strainers 1. Internal inspection and cleaning to verify condition.

APPENDIX D: Wet Pipe Systems

Building Location Quantity Size Manufacturer Approx. Coverage (SF)

15 Center West, In Break Room – Note:

Asbestos tile location diagram

1 8 Inch Viking (Alarm Valve)

23,000

20 First Floor, Locker Room 1 6 Inch American 3,200 (Two Bays Bottom Floor)

21 East End, Basement Level 1 4 Inch Rasco 3,300

25 First Floor, East Center Column F-0 1 4 Inch Central (Alarm Check)

28,800 (Some Bays First Floor, Some Bays Second Floor)

35 South Mechanical Room 2 8 Inch Gem, Model A 63,000 (35 Annex only, Most of First Floor, Most of Second Floor)

44 Basement, Mechanical Room 1 6 Inch Victaulic 62,000 (First Floor, Second Floor)

110 South West, Crane Repair Office 1 8 Inch Viking 16,900 (Only Some Bays, includes Dry Pre-Action System Over Substation)

110 North Wall 1 4 Inch Central 17,900 (Only Some Bays, and Butler Bldg)

112 Ground Floor, East Wall 1 4 Inch Viking (Alarm Valve)

3,400 (Some First Floor, All Second Floor)

114 West Wall 1

4 Inch 6 Inch

Victaulic 5,000

115 North Vestibule Closet South Mechanical Room Note: Asbestos Tile location Diagram

2 6 Inch Star 48,000

123 Northeast Cage 1 4 Inch Reliable (Alarm Valve)

125 East End of Building 1 6 Inch Viking (Alarm Valve)

39,500 (Offices, Common Space, Vestibule, Clean room, and Manufacturing space)

125 West End of Building 1 6 Inch Viking (Alarm Valve)

27,300 (Offices, Common Spaces, Bathrooms, and Mechanical Rooms)

153 East Side of Building 1 4 Inch 15,000

Total 17

Chapters 4 (General Requirements), 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition

APPENDIX E: Fire Pump Systems Wet Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks

Frequency Component Tasks

Base Year, Option Yr 1, and Option Yr 2

1. Control Valves (locked or supervised)

1. Verify valve position.

2. Waterflow Alarm Devices

1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).

3. Alarm Valve and Trim 1. Visually check exterior of valves, gauges, trim alignment. 2.

Verify valve pressure and legibility of hydraulic nameplate.

4. Main Drain 1. Conduct main drain test to verify supply (valve position)

5. Fire Department Connection

1. Verify accessibility and condition 2. If caps removed or missing, check for obstructions.

6. Entire System Visually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares. 6. Area susceptible to freezing.

Option Year 1 (only) 1. Control Valves 1. Operate valve through entire travel to verify function. 2.

Lubricate valves and stems to ensure operability.

Base Year 1. Alarm Valve 1. Clean and inspect internally to verify condition.

2. Anti-freeze Loops 1. Confirm correct solution mixture

Building Location Quantity Size Manufacturer Approx. Coverage (SF)

35 Mezzanine Deck Inside Mechanical Room

1 1000 GPM Fairbanks Morse Not Applicable

116 Inside Manhole Next To Building - *Confined Space Entry Permit Required

1 1000 GPM Allis Chalmers Not Applicable

Total 2

FIRE PUMP SUPPRESSION (IAW) NFPA FPC 25, Chapters 8 (Fire Pumps) and 12 (Valves, Valve Components, and Trim), latest edition. Requires written report of inspection on contractor standard form.

Fire Pump Inspection, Testing, and Maintenance Tasks

Frequency Component Tasks

Base Year and Option Year 2

1. Control Valve 1. Operate and lubricate valves to ensure operability.

2. Controllers 1. Calibrate pressure switches. 2. Exercise circuit breakers and switches to verify operability. 3. Inspect fuses.

3. Pumps 1. Check coupling alignment to ensure shaft aligned. 2. Check pump shaft end play. 3. Lubricate bearings. 4. Lubricate couplings. 5. Lubricate right-angle drives.

4. Fuel (Engine-Driven Pumps)

1. Sample fuel to verify quality.

5. Relief Valves 1. Calibrate valves.

6. Emergency Power Supply 1. Test to verify availability and capacity for pump motor.

Base Year, Option Year 1, Option Year 2

1. Pump 1. Conduct flow test to verify pump output.

APPENDIX F: Stand Pipe Systems

Building Location Quantity Size Manufacturer Approx. Coverage (SF)

25 Standpipe 1 4 Inch Not Applicable Vertical - East Stairwell, 2 Floors

110 Standpipe 2 4 Inch Not Applicable Horizontal – 1,244 LF each

135 Standpipe 2 4 Inch Not Applicable Horizontal – 605 LF each

Total 5

Chapter 6 (Standpipe and Hose Systems) of the National Fire Protection Association (NFPA) Fire Protection Code

(FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water‐Based Fire Protection Systems), latest

Edition.

APPENDIX F: Stand Pipe Systems Standpipe Systems Inspection, Testing, and Maintenance Tasks

Frequency Component Tasks

Base Year, Option Year 1, and Option Year 2

1. Hose Connection and Pressure Reducing Valves

1. Inspect for damage, leaking, missing caps, and obstruction.

2. Entire System Visually check: 1. Pipe hangers. 2. Connections for obstruction. 3. Piping for leaks. 4. Riser condition.

Option Year 1 (only) 1. Piping 1. Inspect for damage and pipe supports.

Option Year 1 (only) 1. Standpipe 1. Air test to ensure integrity.

APPENDIX G: Pre-Action Systems

Bldg Location Quantity Size Manufacturer Approx. Coverage (SF)

PRE_ACTION FIRE

PROTECTION

SYSTEMS

110 Bays F60 to F63 (southwest corner)

1 4 Inch Unknown 1,600

125 West End of Building 1 4 Inch Victaulic 17,000 (Clean Room and Mezzanine above Clean Room)

Total 2

Chapters 4 (General Requirements) and 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.

APPENDIX G: Pre-Action Systems Pre-Action Systems Inspection, Testing, and Maintenance Tasks

Frequency Component Tasks

Base Year, Option Year 1, and Option Year 2

1. Control Valves (locked or supervised)

1. Verify valve position.

2. Waterflow Alarm Devices 1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).

3. Pre-Action Valve and Trim 1. Inspect exterior of valves, gauges, trim alignment. 2.

Verify valve pressure and legibility of hydraulic nameplate.

4. Main Drain 1. Conduct main drain test to verify supply (valve position).

5. Fire Department Connection 1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions.

6. Valve and Riser Heated Enclosure (if provided)

1. Verify operability at beginning of heating season (for constant cold areas annually).

7. Low Temperature Alarm 1. Verify initiation and receipt of alarm at beginning of heating season.

8. Initiating Devices: Radiant Energy Detectors

1. Test to verify alarm initiation and receipt. 2. Verify no facility change which affects performance.

9. Entire System Visually check: 1. Pipe hangers. 2. Heads for obstruction.

3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares.

10. Pre-Action 1. Full flow

Option Year 1 (only) 1. Control Valves 1. Operate valve through entire travel to verify function. 2.

Lubricate valve stem.

2. Pre-Action Valve 1. Trip valve to verify operation. 2. Verify manual actuators (if provided). 3. Inspect internal condition and clean valve seat before resetting.

3. Low Point Drains 1. Drain all low points after pre-action valve trip test and before cold weather (if unheated area).

4. Air supply (if present) 1. Test automatic air pressure maintenance device. 2. Test low air supply alarm.

Base Year 1. Strainers 1. Clean and inspect interior to verify condition.