W911KF24R0003 0001.pdf

PDF 588 KB Posted

Attached to
Rooftop Fall Protection Systems Federal contract opportunity
Solicitation number
W911KF-24-R-0003
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document is an amendment to a solicitation (W911KF-24-R-0003) for the installation of permanent rooftop fall protection systems on various buildings at the Anniston Army Depot. The key details are:

The purpose of this amendment is to answer industry questions, attach an updated Statement of Work and Price per Building attachment, and extend the solicitation closing date to May 13, 2024 at 10:00 AM CST. The updated Statement of Work provides details on the roofing types and parapet wall heights for the affected buildings. The government will accept alternate products if they are manufactured in the USA and meet the specified requirements. Past performance criteria and evaluation factors are clarified. The solicitation also specifies that freestanding guardrail systems inside the parapet walls are acceptable to avoid roof penetrations. All other terms and conditions remain unchanged.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

See page tw o.

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 4

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 29-Apr-2024

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W911KF24R0003

X 9B. DAT ED (SEE IT EM 11)

04-Apr-2023

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Apr -2024

CODE

ACC- ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

W911KF24R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NOTES

1. The purpose of this amendment is to answer industry questions, attach the updated statement of work to the solicitation, attach the updated price per building attachment and extend the closing date of the solicitation.

2. Industry questions submitted have been answered. The questions and answers are listed below.

3. The statement of work for this solicitation has been updated. The statement of work previously attached is no longer valid and is removed as an attachment from the solicitation. The updated statement of work is replacing the previous version and has been made as an attachment to this solicitation.

4. Attachment 3 Price Per Building_Rooftop Fall Protection has been updated. The previous version of this attachment is no longer valid and is removed as an attachment from this solicitation. The updated price per building sheet is replacing the previous version and has been made as an attachment to this solicitation.

5. The closing date of this solicitation is hereby extended to 13 May 2024 at 10 AM CST.

6. All other terms and conditions remain unchanged.

Question and Answers:

1. What are the deck types and ISO depth of the buildings listed below?

Building 2 Deck Type: Metal deck type with TPO roof.

ISO Depth: Less than 5” most are 2”- 3”.

Building 114 Deck Type: Metal deck type with TPO roof.

ISO Depth: Less than 5” most are 2”- 3”.

Building 126 Parapet wall height for cross over: (+/-) 42”.

Building 127 Deck Type: Metal deck type with TPO roof.

ISO Depth: Less than 5” most are 2”- 3”.

Parapet wall height for cross over: (+/-) 42”.

Building 130 Parapet wall height for cross over: (+/-) 42”.

Building 134 Parapet wall height for cross over: (+/-) 42”.

Building 135 Parapet wall height for cross over: (+/-) 42”.

Building 513 Deck Type: Metal deck type with TPO roof on 2 roofs, R-Panel on 1 roof, and standing seam on 1 roof.

ISO Depth: Less than 5” most are 2”- 3”.

2. Will the government consider an alternate to safety rail as if it is manufactured in the USA? All products have to be manufactured in the USA.

3. Will the government accept a bid outlining the alternate? Or would you prefer us to provide a base bid as specified with a deductive alternate? Government wants a base bid as specified with no alternate on all specifications in the Statement of Work.

4. In regard to questions submitted at the walkthrough, it was my understanding that other brands of fall protection systems would be approved. Will the specifications listed on the Statement of Work, specifically numbers 9 and 10 under point 5.9, still be required? Yes, other brands will be approved if the brand is (or equivalent) to what is listed in the Statement of Work and meets all specifications listed. Yes, all specifications listed in the Statement of Work are still required. All products must be manufactured in the USA.

5. Factor 3 Past Performance – Although our firm has completed various fall protection upgrade elements of work related to larger scopes not particularly directed as “fall protection projects”, does this mean that our bid has the potential to not be evaluated per factor 3 of the evaluation criteria and possibly deemed to not meet the standard? Does company personnel personal project experience meet the criteria if these projects were in fact “fall protection upgrade” specific projects if over 5 years? Past performance will be reviewed as stated in Attachment 4 Evaluation Criteria and Narrative NN0006.

6. What is the roof type of building 126 and building 127? Both buildings are thermoplastic polyolefin (TPO) roofs.

7. Is lightening protection required to be installed due to requirements stated in 9.3.5 for lightening protections plans/drawing? No, it is not required to be installed. This refers to if it gets damaged and has to be repaired or replaced then the government would need the plans and drawings.

8. What is the overall height and pitch of roof of building 135? Height is around 25 feet tall and the pitch is (half) .5/12.

9. What is the height of the crossovers, the fire wall, and overall height of building 134? (+/-) 42” on the height of the fire wall. The main part of building it around 25 feet tall and the upper part is around 40 to 50 feet tall.

10. On building 114, how does the system need to be attached to the perfin wall? This will be a change in the Statement of Work to not putting the handrails on the parapet walls but just using free standing railing inside the parapet walls that will just sit on the roof. This way we will eliminate any issues with attaching to building.

11. What is the seam spacing for building 474 and 475? 24” inch centers.

12. What is the requirements for the existing post at building 440? The existing posts on building 440 will be undisturbed. Contractor will remove existing fall protection cable from the post, leaving the post and then install new handrails around building.

13. To avoid issues with roof penetrations and roof warranties, would it be acceptable to install freestanding guardrail inside of the parapet (rather than on top)? Yes, we will be using freestanding railing instead of attaching it to parapet walls. This was updated in the Statement of Work.

14. If freestanding guardrail is not acceptable, can you provide details regarding the parapet dimensions and construction? Yes, freestanding guardrails will be acceptable.

15. What is the overall height of Building 114? Around 30 feet tall

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 06-May-2024 10:00 AM to 13-May-2024 10:00 AM.

(End of Summary of Changes)