W911KF-24-R-0003 Released.pdf

PDF 1 MB Posted

Attached to
Rooftop Fall Protection Systems Federal contract opportunity
Solicitation number
W911KF-24-R-0003
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document is a solicitation for a firm-fixed price construction contract to provide and install permanent rooftop fall protection systems on buildings at the Anniston Army Depot. The government intends to make a single award as a result of this 100% HUBZone set-aside solicitation, with an estimated value between $1,000,000 and $5,000,000. Key details include:

The contractor shall provide all material, transportation, labor, equipment, coordination, planning, and supervision necessary to purchase and install the rooftop fall protection systems. A pre-bid site visit is scheduled for April 17, 2024. Proposals are due by June 6, 2024. The contractor shall begin work within 10 calendar days of award and complete it within 180 calendar days. Offerors must submit past performance information, technical literature, and pricing by building using the provided attachments. Questions are due within 3 days after the site visit.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please see NARRATIVE NN0003: LIST OF ATTACHMENTS under the Local Narratives section of this solicitation.

1. The government intends to make one aw ard as a result of this solicitation.

2.This project is 100% set aside f or HubZone contractors.

3. The value of this procurement is estimated betw een $1,000,000 and $5,000,000 for al expenditures.

4. The North American Industry Classif ication System (NAICS) Code is 238160 w ith $19 million size standard.

5. Of feror is expected to examine the draw ings, specifications, schedule and all instructions. Failure to do so w ill be at Of feror's risk.

6. Pre-Bid Site Visit is scheduled for Apr il 17th, 2024 at 10:00 AM CST.

7. The successful offeror to this RFP shall be bonded before work is started. Performance and Payment Bonds must be received within 10 days of contract award.

KATHERINE B. FULLER 571-588-0962

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

04-Apr-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. ( Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442- 101 STANDARD FORM 1442 (REV. 4-85)

Presc ribed by GSA

FAR (48 CFR) 53.236-1( e)

11. The Contractor shall begin perf ormance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This per formance per iod is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to per form the w ork required are due at the place specified in Item 8 by ___________ local time ______________06 May 2024 (date). If this is a sealed bid solicitation, of fers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in f ull text or by reference.

D. Off ers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

ACC-ANAD

ANNI STON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNI STON AL 36201-4199

W911KF

PAGE OF PAGES

1 OF

CODE

(Ti tle, identi fying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

256 235-6353FAX:TEL: 256 235-6231 TEL: FAX:

W911KF24R0003 55

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to per form the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this off er is accepted by the Government in w riting w ithin ________ calendar days after the date off ers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required perf ormance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The of feror acknowledges receipt of amendments to the solicit ation -- give number and dat e of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or pr int)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherw ise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. ( Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Cont ractor is not required to sign this document. ) document and return _______ copies t o issuing office.) Cont ractor agrees Y our of f er on t his solicit ation, is hereby accept ed as t o t he items listed. This award con-t o f urnish and deliv er all item s or perf orm all work, requisitions identif ied sum mates the contract , which consists of (a) the Gov ernm ent solicit ation and on this f orm and any continuation sheet s f or t he consideration st ated in this y our of f er , and (b) this cont ract award. No f urther contractual document is cont ract. The rights and obligat ions of t he parties to this cont ract shall be necessary.

gov erned by (a) t his contract award, (b) t he solicitat ion, and (c) the clauses, representat ions, cer tif icat ions, and specif ications or incorporated by ref er-ence in or at tached to t his contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W911KF24R0003

Section 00 10 00 - Solicitation

LOCAL NARRATIVES

NARRATIVE NN0001:

This procurement is 100% set-aside for Historically Underutilized Business Zone (HUBZone) Small Business.

NARRATIVE NN0003: LIST OF ATTACHMENTS

The following documents are incorporated as a part of this solicitation:

1. Statement of work_Rooftop Fall Protection System

2. Drawings_ Rooftop Fall Protection Systems

3. Price Per Building_ Rooftop Fall Protection System

4. Evaluation Criteria

5. Request for Technical Literature

6. Past Performance Questionnaire

7. Evidence of Authority To Sign Offers

8. DD1423

9. DD1664

10. Wage Determination

NARRATIVE AS1003: SITE INSPECTION ARRANGEMENTS

Offerors are urged and expected to inspect the site where the work will be performed. This will be accomplished via an organized site visit. Individual requests for site visits on dates other than that specified below will not be granted.

In order to participate in the scheduled site visit, the below information must be provided for each attendee on company letterhead via e-mail to the ACC-ANAD POC three (3) working days prior to the below stated site visit date

Company Name:

Name of Visitor:

Date of Birth:

Social Security Number:

Citizenship:

Date of Visit:

Person to be Visited:

Purpose of Visit:

Participants shall meet at the Anniston Army Depot, Main Gate Badge Office (Building 367), Anniston, AL 36201 one (1) hour prior to the below stated site visit time. Upon arrival at the entry gate, each visitor must present photo identification so security can perform a background check on each individual before entry.

An organized site visit is scheduled for: Date April 17, 2024 Time 10:00 AM CST The ACC-ANAD POC for this site visit is the contract specialist.

Questions resulting from the site visit must be submitted to the contract specialist within three (3) working days after the site visit.

NARRATIVE NN0010: ADDENDUM TO FAR CLAUSE 52.212-1 INSTRUCTIONS TO OFFERORS--

COMMERCIAL ITEMS (DEVIATION 2018-O0018) (OCT 2018)

The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers.

NARRATIVE AS6311: ELECTRONIC CONTRACTING

All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses shall not be accepted. Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission. All solicitation responses must be submitted by email to the contract specialist.

It is the responsibility of the offeror to confirm receipt and ensure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation.

Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.

Offers submitted using any other means shall not be accepted, unless stated otherwise in the solicitation.

The System for Award Management (SAM) provides industry with a single point of access to all U.S. Army contract opportunities. Offerors must be registered in SAM and complete the electronic annual representations and certifications within SAM before being able to respond to a solicitation. In order to register in SAM, a Data Universal Numbering System (DUNS) must first be obtained. After contract award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page:

WWW.SAM.GOV.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

The applicable SF Form (SF33/SF1449/SF18/SF1442) filled out and signed.

All applicable fill-in provisions from the solicitation must be completed.

Any other information required by the solicitation.

It is offeror responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you shall be determined non-responsive.

PASSWORDS: If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

FILE VIRUSES: Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.” See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

BID BOND: Any bid bond required by this solicitation must be submitted with the offer. The properly completed original bid bond must be furnished to the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

NARRATIVE NN0004: CONTRACTOR PAYMENT

The contractor must accept payment by the Defense Finance Accounting Service (DFAS).

The order will be paid for by DFAS, you must submit your invoice through Wide Area Workflow (WAWF), accessible at https://piee.eb.mil/piee-landing/. Helpful information follows.

To obtain a CAGE code or for other assistance, contact the WAWF helpdesk at 1-866-618- 5988 Questions concerning payment should be directed to the responsible Defense Finance Accounting Services

(DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order.

You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL

EMAILS CORRECTLY THROUGH WAWF:

WAWF

Data/CODES

N eeded for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/ MATERIALS

(PRs that DO NOT start with W31G1Y)

CONSTRUCTION

CAGE CODE SAM Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN

BY DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY DODAAC

(If needed)

W31G1Y (Must have inspector code)

W911KF

W911KF

(Unless Inspected by DCMA)

W911KF

SHIP TO W911KF N/A W911KF W911KF

ACCEPTOR N/A W911KF N/A N/A

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

NARRATIVE LS7015: HQ-AMC LEVEL PROTEST PROCEDURES

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/ An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.

NARRATIVE CS1008: LOCAL RULES AND REGULATIONS

The following requirements apply to all contractors working inside the controlled area of Anniston Army Depot

(ANAD).

A. IDENTIFICATION OF CONTRACTOR EMPLOYEES

1. Contractors shall submit the name of a company point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office (ISMO) upon notification of contract award.

2. A blank SIOAN Form 380-2 will be provided to the contractor upon contract award. A completed and signed SIOAN Form 380-2 for each individual requiring ANAD access shall be submitted to the Directorate of Emergency Services (DES) so that a background check can be completed and an approval/disapproval provided within 7-10 days. Forms are to be submitted by one of the following methods:

Joint Personnel Adjudication System (JPAS) using the ANAD SMO code W0LXAA5 E-mail address usarmy.anad.tacom.list.main-gate-badge-office@army.mil

3. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the contractor or who hold a letter of intent to hire issued by the Contractor. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS

WILL BE CONDUCTED BY ANNISTON ARMY DEPOT.

4. Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

5. Derogatory information that may cause denial of an individual’s access to ANAD includes, but it not limited to, the following:

Criminal arrest information that causes the Installation Commander to determine that the individual presents a potential threat to good order, discipline, or health and safety on the installation.

The installation is unable to verify the individual’s claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

The individual has a current arrest warrant regardless of the offense or violation.

The individual is currently barred from entry to a Federal installation or facility.

The individual has EVER been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

The individual has a U.S. conviction for espionage, sabotage, treason.

The individual is a registered sex offender.

The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

The individual has been convicted of a felony firearms or explosives violation.

The individual has engaged in acts or activities designed to overthrow the U.S. government by force.

The individual is identified in the Terrorist Screening database as a known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

B. ANAD NETWORK ACCESS.

For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.

C. CONTRACTOR OWNED PROPERTY

1. When contractors bring in contractor owned property onto Anniston Army Depot for use in performing contracted work to repair, replace, or install, all contractor owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.

2. No unauthorized materials of any type may be brought onto or left unattended on the installation. Contractors must have a process in place to receive and store materials and have visibility of the location of those materials at all times while on ANAD. This includes construction materials, equipment, and miscellaneous items. This visibility/accountability of materials applies to the Contractor, its subcontractors, and its material suppliers.

3. All Contractor, subcontractor, and material supplier employees are prohibited from bringing personal belongings of any nature onto the installation if such items are to be left unattended at any time.

4. The Contractor is further required to have a plan of action for implementing these procedures and must submit it to the Contracting Officer upon request. This plan of action must include a provision for informing all employees and subcontractors of these procedures. The plan of action must also address monitoring and procedures the Contractor has in place to ensure compliance with this contractual provision.

5. Should the Contractor fail to comply with this mandatory contractual provision, the Contractor may be held responsible for all direct and indirect cost incurred by the Government in identifying, securing, segregating, removing, and otherwise properly disposing of improper or abandoned materials/equipment.

D. CONTRACTOR TRANSPORT OF GOVERNMENT OWNED PROPERTY

If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.

E. TRAFFIC

The Contractor shall conform to Depot regulations concerning:

1. Designated routes

2. Parking regulations

3. Insurance. See narrative entitled "Insurance Requirements (HS1001)"

4. Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition.

Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment.

However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

F. CAMERA USE:

Use of any camera, including cellular telephone cameras, is prohibited on this installation. Any camera illegally used on this installation is subject to confiscation Any violation may be punishable by fine or imprisonment or both.

To use any camera on ANAD, a camera pass and photographic permit must be obtained from the Depot Operations Office (DOO). A request must be made for possession or use of a company-owned camera; permits will not be granted for possession or use of a personal camera or for use of a cell phone camera on the depot. Requirements for photography must be included in the Statement of Work. The request for a permit must state the specific purpose, location, and expected distribution of photographs made on the installation. Such photographs will not be released or otherwise disclosed into the public domain without first completing the STA255 Form (OPSEC Review Certification) with the DOO, and obtain release authority from the Strategic Communications Office.

G. NOTICE TO CONTRACTOR: SEXUAL ASSAULT AND HARASSMENT IN THE WORKPLACE

Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.

As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.

In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises.

If you believe you are a victim of sexual harassment:

It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.

Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.

Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.

Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.

Follow whatever complaint procedures apply with your employer

If you witness sexual harassment or it is reported to you:

Report it to your supervisor Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Ms.

Wendy Suttles-walker, at (256) 240-3447.

Cooperate with any investigative agencies

H. TEMPORARY STRUCTURES:

The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.

I. FIRE PREVENTION AND PROTECTION:

The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

J. UTILITIES

Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

K LAND USE CONTROL

Contractors who will be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.

L. AIR EMISSIONS

The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.

M. ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001

The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.

The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.

N. CONTRACTOR SAFETY AND ACCIDENT PREVENTION

Contractors shall adhere to all ANAD safety rules and regulations.

Applicable Publication: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to FAR Clause 52.236-13 “Accident Prevention”, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials:

Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.

Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. The contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

The contractor shall safeguard and maintain all Government property, as well as, provide for the safety and wellbeing of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear, and hearing protection and shall be used and provided by contractor.

The Government reserves the right to conduct unannounced safety inspections at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. The contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. The contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.

O. CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS:

For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted by the contractor. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 calendar days after contract award. The contractor must have an approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed in section N.

1. SIGNATURE SHEET. This must include the title, signature, and phone number of the following:

Plan preparer Plan approver, e.g., owner, company president, etc.

Other applicable personnel plan concurrers (other corporate and project contractor personnel, such as their safety officer, project manager, or superintendent)

2. BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

3. STATEMENT OF SAFETY AND HEALTH POLICY.

4. RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

5. SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

6. TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.

7. SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

8. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

9. ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

10. PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED.

This list is not all-inclusive, nor will all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

11. Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

NARRATIVE CS1011: DEPARTMENT OF DEFENSE PREPAREDNESS TRAINING

This installation is subject to unannounced inspections and exercises that require practice evacuations of certain and/or all areas. Evacuation practices will be temporary in nature. Contractors will be required to participate in these practice evacuation exercises, as necessary, and the contract performance time may be extended to off-set the time lost because of the exercise, if required and approved by the Contracting Officer. This narrative should be taken into consideration during the preparation of bids/proposals since, other than appropriate time extensions, participation in such exercises will be at no additional cost to the Government.

NARRATIVE HS1001: INSURANCE REQUIREMENTS

A. In accordance with Insurance--Work on a Government Installation clause, FAR Reference 52.228-5, incorporated herein, the following amounts of insurance are required:

INSURANCE TYPE MINIMUM AMOUNT

Workers' Compensation and Employer's Liability $100,000.00 General Liability, Bodily Injury Liability $500,000.00 per occurrence Property Damage Liability $500,000.00 per occurrence

Automobile Coverages Liability $200,000.00 per person Bodily Injury $500,000.00 per occurrence Property Damage $ 20,000.00 per occurrence

B. A certificate of insurance, showing that the required amounts of insurance have been obtained, will be furnished.

Special attention is directed to the cancellation notice of the insurance certificate. The cancellation notice must state:

"In the event that this policy is cancelled or any material change in the policy is made that would adversely affect the interest of the Government, such change or cancellation shall not be effective for such period as may be prescribed by the laws of the state in which this contract is to be performed and in no event sooner than thirty (30) days after written notice thereof to the Contracting Officer."

NARRATIVE AS7526: NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION

(FPCON)

The contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

NARRATIVE CS6520: ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training. AT Level I awareness training is available at https://jkodirect.jten.mil Course #JS-US007-14.

NARRATIVE NN0006: PAST PERFORMANCE PROPOSAL AND EVALUATION INFORMATION

The government will conduct a performance risk assessment to be used to assist in determining responsibility in accordance with FAR 9.104.1 based upon the past performance of offerors and proposed subcontractors as it relates to probability of successfully performing the solicitation requirements. The offeror shall send past performance questionnaires (Attachment No. _ Past Performance Questionnaire) to at least three (3) vendors that you have performed RELEVANT PAST PERFORMANCE within the past three (3) years prior to closing of this solicitation.

The offeror shall send a copy of the past performance questionnaire directly to the appropriate PCO and/or COR.

The offeror shall request that these individuals complete the questionnaire and forward it electronically directly to the Government at, katherine.b.fuller2.civ@army.mil, as soon as possible and prior to the RFP closing date.

For services, contractor shall have performed under each contract for a minimum of one (1) year within the past three (3) years. Each contract cited may be ongoing or complete provided it meets the one year performance criteria.

For equipment or supplies, contractor shall have completed each contract within the past three (3) years. If offeror proposes use of major subcontractor(s) in performance of resultant contract, provide a description of the work to be performed (supplies or services) by each major subcontractor and the information specified above for each subcontractor identified as relevant to the work to be performed by the subcontractor. A significant or major subcontractor is that subcontractor expected to provide over 20 percent of the work effort or critical hardware, software, or services.

"Relevant past performance" is defined as performance similar in nature and in scope to work required by this acquisition. The government will screen contract information provided by offeror and will remove from consideration those contract references that are clearly unrelated to the type of effort sought. The government will consider this information in its evaluation of performance risk for offeror and proposed the government will make a reasonable effort to consider information on the contracts cited for offeror and for each major subcontractor.

A. The government reserves the right to evaluate fewer than three (3) contracts for any contractor should we be unsuccessful in obtaining required information from sources cited. In that case, contractor (or subcontractor) will be evaluated on the information available.

B. Should the government receive information on more than three (3) contracts, selection of those to be considered in evaluation will be based on the criteria stated previously. The government reserves the right to consider information from other sources in its evaluation.

C. The Government may utilize Federal awardee Performance and Integrity Information System (FAPIIS) and System for Award Management (SAM) to determine responsibility.

NARRATIVE NN0009: TECHNICAL LITERATURE AS SUPPORTING DOCUMENTATION

Technical literature must be furnished with the proposal. The literature must be identified to show the item in the offer to which it pertains. The technical literature is required to establish details of the products the offeror proposes to furnish for the purposes of proposal evaluation and award. Technical literature on the items proposed must explain in detail the functional capabilities, logical operation, exact speed and capacities, limits, configuration rules, features, interfaces, and other relevant features. Failure of the technical literature to show that the products offered conform to the specifications and other requirements of this Request for Proposal may cause rejection of the offer.

NARRATIVE NN0011: DISCLOSURE OF UNIT PRICE INFORMATION

Pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), this is notification of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Rooftop Fall Protection (Equipment)

FFP

The contractor shall provide a permanent rooftop fall protection system on the exterior of the identified buildings by Anniston Army Depot in accordance with the attached statement of work. The contractor shall provide pricing for the equipment for each building using attachment 3 (Price Per Building_Rooftop Fall Protection Systems) of this solicitation. The completed attachment shall be submitted with the response per the attached statement of work.

FOB: Destination

PSC CD: Z2JZ

NET AMT

0002 1 Lot Rooftop Fall Protection (Installation)

FFP

The contractor shall install permanent rooftop fall protection system on the exterior of the buildings identified by the Anniston Army Depot in accordance with the attached statement of work. The contractor shall provide pricing for the equipment for each building using attachment 3 (Price Per Building_Rooftop Fall Protection Systems) of this solicitation. The completed attachment shall be submitted with the response per the attached statement of work.

0003 14 Each Submittals

FFP

Contractor shall provide one hard copy and one electronic copy of all submittals listed under 9.3 of the attached statement of work to the COR, courtesy copying Contract Specialist., for review and approval per the timeline for each submittal.

All submittals shall be in PDF format as well as hard copies as required. This CLIN is NOT SEPARATELY PRICED, please DO NOT provide a price for this

CLIN.

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

JUN 2020

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.207-1 Notice Of Standard Competition MAY 2006 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-13 Time Extensions SEP 2000

52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.216-4 Economic Price Adjustment-Labor and Material JAN 2017 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-54 Employment Eligibility Verification MAY 2022 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-19 Compliance with Environmental Management Systems MAY 2011 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.228-2 Additional Bond Security OCT 1997 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-

O0016)

FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 (Dev) Performance and Payment Bonds-Construction. (Deviation

2020-O0016)

JUN 2020

52.228-16 (Dev) Performance and Payment Bonds-Other Than Construction (Deviation 2020-O0016)

APR 2020

52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-13 Notice Of Progress Payments APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984…

This is the start of the file's text. The full file is on GovTribe.