This solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for minor construction services at Anniston Army Depot in Anniston, Alabama. The contractor shall provide all labor, materials, equipment, and supervision required to repair, alter, or construct real property facilities and structures upon receipt of task orders. The base period of performance is one year with four optional one-year extensions. Questions are due by July 8, 2021 and proposals are due July 26, 2021. A site visit is scheduled for July 6, 2021. This is a 100% small business set-aside under NAICS 236210. The estimated total contract value including options is $75 million over five years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W911KF-21-R-0277-0002 released.pdf | ||
| Amendment W911KF21R0277-0001.pdf | ||
| Attachment 7_Wage Determination AL20210149.pdf | ||
| Attachment 6_Wage Determination AL20210105.pdf | ||
| Attachment 1_Performance Work Statement_ANAD SATOC.pdf | ||
| Attachment 10_Past Performance Evaluation Matrix.pdf | ||
| Attachment 2_Evidence of Authority to Sign Offers.pdf | ||
| Attachment 8_Past Performance Questionnaire.pdf | ||
| Attachment 5_Wage Determination AL20210084.pdf | ||
| Attachment 11_Technical Factor Evaluation Matrix.pdf | ||
| Attachment 9_Pricing Workbook.xlsx | XLSX spreadsheet | |
| Attachment 4_Contractor Request for Waiver Non-EPA Guideline Items.pdf | ||
| Attachment 12 - Use of Existing Government-Furnished Property.xlsx | XLSX spreadsheet | |
| Attachment 3_EPA Guideline Items.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Aw ard Task Order Contract (SATOC) Single Aw ard Task Order Contract: The Contractor shall provide, upon receipt of a task order, all w ork, materials, supplies, parts (to include system components), plant, supervision, labor, and facility and production equipment, except w hen specified as Government furnished, to repair, alter, or construct real property facilities and structures at Anniston Army Depot, Alabama IAW the Performance Work Statement.
1. Task orders w ill be placed on an as needed basis.
2. The Government intends to make one aw ard as a result of this solicitation.
3. This project is 100% set aside under the 8(a) Competitive Program for 8(a) contractors.
4. The value of this procurement w ith all option years is estimated at $15 million yearly or $75 million total cumulative expenditures for all aw ards during the life of the contract.
5. The North American Industry Classif ication System (NAICS) Code is 236210 w ith a $39.5 million size standard.
6. The successful offeror to this RFP shall be bonded before w ork is started. Performance and Payment Bonds must be received w ithin 10 days of contract aw ard.
SARA B. YOUNG 256-235-4746
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jun-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________26 Jul 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ACC-ANAD
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
256 235-6353FAX:TEL: 256 235-6231 TEL: FAX:
W911KF21R0277 96
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911KF21R0277
Section 00 10 00 - Solicitation
LOCAL NARRATIVES
Local Narratives
Narrative #1: HOURS OF OPERATION
WORK HOURS RECEIVING HOURS DAY(S) OF WEEK
7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, Federal Holidays
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand-Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions shall be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(4) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
Narrative #2: ATTACHMENTS. The following documents are incorporated as a part of this solicitation:
1. Performance Work Statement_ANAD SATOC
2. Evidence of Authority to Sign Offers
3. EPA Guideline Items
This procurement is an 8(a) set aside.
4. Contractor Request for Waiver Non-EPA Guideline Items
5. Wage Determination AL20210084
6. Wage Determination AL20210105
7. Wage Determination AL20210149
8. Past Performance Questionnaire
9. Pricing Workbook
10. Past Performance Evaluation Matrix
11. Technical Evaluation Matrix
12. Use of Existing Government-Furnished Property
Narrative #3: COEFFICIENT. The yearly proposed contractor coefficients in Attachment 9, Pricing Workbook, will be fixed for the life of the contract. The proposed coefficients will not be negotiated at the task order level.
Narrative #4: R.S. MEANS. Contractors shall use R.S. Means when developing quotes for pre-priced work, in accordance with paragraph C.2 of the Performance Work Statement.
Narrative #5: SITE INSPECTION ARRANGEMENTS. Offerors are urged and expected to inspect the facility/site where work is to be completed. An organized site visit is planned.
Details are listed below. Individual requests for site visits on dates other than that specified below will not be granted.
Organized Site Visit Scheduled For: July 6, 2021 @ 10:00 A.M.
Point of contact for the Site Visit is Sara Young, sara.b.young.civ@mail.mil
Contact Sara Young by e-mail no later than July 1, 2021 at 10:00 A.M. if you plan to attend this site visit.
Offeror’s planning to attend the Site Visit must submit on company letterhead the following information for each person attending the site visit:
Company Name:
Name of Visitor: Date of Birth: Citizenship:
Date of Visit:
Person to be visited:
Purpose of Visit:
Contractors who plan to attend the site visit shall be prepared to present their driver's license at time of entry. Security guards will perform a background check on each individual before entry.
Please plan accordingly as this can sometimes be lengthy if it is your first visit to Anniston Army Depot (ANAD).
Participants shall meet at the Anniston Army Depot, Main Gate Badge Office, 7 Frankford Ave., Anniston, AL 36201.
Narrative #6: QUESTION and ANSWERS. A question and answer period is available until COB on 8 July 2021. NO PHONE CALLS WILL BE ACCEPTED FOR ANY REASON. ALL QUESTIONS SHALL BE IN WRITING. Questions and answers will be provided as an amendment to the solicitation and posted publicly to sam.gov at the following website:
https://www.sam.gov. Questions that are received by this office after the deadline will be considered late and may not be answered. Questions regarding this solicitation should be directed to: Sara Young, sara.b.young.civ@mail.mil
Narrative #7: SYSTEM FOR AWARD MANAGEMENT (SAM). Contractors must be registered in the System for Award Management (SAM) database before an award will be issued and shall complete the electronic annual representations and certifications within SAM. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
Narrative #8: SBA Requirements.
In accordance with 13 CFR 124.501(g)(4), a firm must have a bona fide place of business in the applicable geographic area if the procurement is for construction. An 8(a) firm with its principal office or a bona fide office in Alabama, Mississippi, Georgia, Tennessee, or North Florida would be eligible to receive an 8(a) award for construction in Alabama.
Narrative #9: WAWF PROCEDURES. If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://piee.eb.mil/piee-landing/.
Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.
Go to DFAS on the web at: www/dfas.mil/money/vendor. THE FOLLOWING CODES
WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS
CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for
Invoice
SUPPLIES/
MATERIALS
(PRs that start with W31G1Y)
SERVICES/
EQUIPMENT
SUPPLIES/
MATERIALS
(PRs DO NOT that start with W31G1Y)
CONSTRUCTION
CAGE CODE
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in
Contractor/Offeror field of contract
ISSUE/ADMIN BY
DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF
W911KF
(Unless
Inspected by
DCMA)
W911KF
SHIP TO
(Supplies/Material s
Only)
W911KF
NOT
AVAILABLE
W911KF W911KF
ACCEPTOR
(Services/Equipment
Only)
NOT
AVAILABLE
W911KF
NOT
AVAILABLE
NOT AVAILABLE
Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
DELIVERY ORDER NUMBER (IF APPLICABLE):
EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)
CONTRACT
ADMINISTRATOR:
CONTRACTING OFFICER:
USER AND/OR INSPECTOR:
Narrative #10: FUNDS/ORDERING REQUIREMENTS. This acquisition is for a requirements type unfunded solicitation. Orders shall be placed on DD Form 1155. Funding will be provided on each individual Delivery/Task Order.
Narrative #11: AUTOMATED INSTALLATION ENTRY (AIE) BADGE. Contractors accessing Anniston Army Depot shall be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures to the badge office. A background check will be completed and approved/disapproved within 7-10 days. Once approved, the contractor can schedule an appointment for an AIE badge to be issued.
Narrative #12: WAGE DETERMINATION
(a) U. S. Department of Labor Wage Determination Number(s) AL20210084, AL20210105, AL20210149 dated January 1, 2021 is/are attached and made a part of this Solicitation. The Wage Determination(s) will be made a part of any resulting contract. However, if this solicitation includes the FAR Clause 52.222-48 entitled EXEMPTION FROM APPLICATION
OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS FOR
MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT-
CERTIFICATION (MAY 2014), and the contractor provides an affirmative certification therein, the Wage Determination(s) will not be made a part of any resulting contract.
(b) Any class of service employees which is not listed therein, but which is to be employed under this contract, shall be classified by the Contractor so as to provide a reasonable relationship between such classifications and those listed in the attachment, and shall be paid such monetary wages and furnished such fringe benefits as are determined by agreement of the interested parties, who shall be deemed to be the contracting agency, the Contractor, and the employees who will perform on the contract or their representatives. If the interested parties do not agree on a classification or reclassification which is, in fact, conformable, the contracting officer shall submit the question, together with his recommendation, to the Office of Government Contract Wage Standards, Wage and Hour Division, ESA, of the Department of Labor for final determination. Failure to pay such employees the compensation agreed upon by the interested parties or finally determined by the Administrator or his authorized representative shall be a violation of this contract. No employees engaged in performing work on this contract shall in any event be paid less than the minimum wage specified shall be in Section b (a)(1) of the Fair Labor Standards Act of 1938, as amended.
Narrative #13: OPTION YEARS. Contractor shall be notified at least sixty (60) days prior to expiration date of the contract if the Government intends to exercise its option to extend the contract for an additional year. In the event the Government fails to notify the contractor within the said sixty (60) days, but at a time less than sixty (60) days prior to the expiration date does notify the contractor that it intends to exercise the option to extend the contract for an additional year, the contractor will have the right to waive the sixty (60) day notice requirement and to perform under the option year contract.
Narrative #14: It is the Government’s intent to award ONLY one contract from this solicitation.
Narrative #15: COVID-19 COVID-19 is an infectious disease that has caused sickness and death around the world and in the United States of America. This disease is in the form of a virus and is primarily spread by person-to-person transmission. This narrative mandates actions to reduce the risk of spreading this virus.
Contract employees must comply with Federal (Center for Disease Control (CDC)) and State (Alabama Department of Public Health (ADPH)) guidelines related to, but not limited to, protective measure, reporting for duty, quarantine, and returning to work. Social distancing and covering the face, specifically, the mouth and nose to prevent the spread of viral aerosols, are avenues to limit the spread of the virus. In order to mitigate the spread of COVID-19 and to protect all personnel, ANAD has directed that all contractor personnel comply with the practices that have been recommended by the CDC, including, but not limited to washing your hands, not touching your face, and social distancing.
Personnel who are at least two weeks beyond a completed series of vaccine are no longer required to wear a mask or face coverings on depot. Personnel who are not fully vaccinated should continue to follow applicable DoD mask guidance.
If a contract employee is infected by COVID-19 and has performed work or delivered supplies to ANAD, the contractor shall notify the Contracting Officer immediately. Infected contractor employees may not return to ANAD until they are cleared to return to work by medical personnel in accordance with (IAW) ANAD COVID-19 Pandemic policy regarding the return to work of infected individuals. Contractors must continue to remain informed and comply with all current and future Commander directives and policies related to COVID-19 to ensure the safest, effective, and efficient workforce conditions.
Local Rules & Regulations
Narrative #16: IDENTIFICATION BADGES. The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work.
Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance.
Emergency badges will be issued on a case-by-case basis. Badges may be obtained from the Badge Office (BO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a. - State driver's license
b. - State identification card
c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification. Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check.
SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge Office (BO), Building 367, located at the main entrance to ANAD. NO
PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY
ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the Badge Office (BO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge Office (BO).
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.
Narrative #17: IDENTIFICATION BADGES. AMMUNITION LIMITED AREA.
Yes_X_, No ___ work to be performed in the Ammunition Limited Area (ALA). Contractors working within the ALA must abide by the above guidance plus the following additional requirements:
(1) The prime Contractor will be notified which persons are approved for access to the ALA.
Contractor personnel who are denied access based on the local background check will have the right to appeal to the DES. The Director's decision is considered the final action.
(2) No privately-owned vehicles (POV) are authorized in the ALA.
(3) Contractor-owned, rented, or leased vehicles which are construction-type (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES AND PERSONS SHALL BE SEARCHED UPON
ENTERING AND EXITING THE ALA.
(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DES and by disabling the vehicle (by removing the battery or some other method approved by DES).
(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the
ALA.
(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.
(7) The Contractor shall comply with the requirements of the Department of the Army Pamphlet 385-64, Safety, Ammunition and Explosives Safety Program, in effect on the date of the solicitation for this contract.
(8) The Prime contractor shall assure that each contract employee is instructed in the known potential hazards of fire, explosion, or toxic release hazards related to his/her job while working in the Ammunition limited Area, and the applicable provisions of the installation/contractor emergency action plans.
(9) The contractor will ensure that each employee requiring access to the ALA receives Explosives Safety brief from ANAD Safety Office at least annually.
(c) Contractor Vehicles in the AMMUNITION LIMITED AREA (ALA): The following rules apply to contractor vehicles in the ALA Area.
(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.
(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor; shall be construction type vehicles; shall be properly registered on Anniston Army Depot; shall have a placard with the name of the contractor affixed, and the contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (c)(4) below for definition of an acceptable document to the liability requirement.)
(3) Contractor Employees’ Privately-Owned Vehicles not included in (c)(2) above shall not be authorized in the restricted area.
(4) The documentation to satisfy the liability language in paragraph (c)(2) would be:
a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.
b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.
c. In the case of a vehicle leased by the contractor, evidence of insurance in the owner/lessor’s name and the contractor must sign a statement substantially as follows: “In consideration for allowing entry and use of the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or injury caused by the operation of this vehicle.”
Narrative #18: TRAFFIC. The Contractor shall be required to conform to Depot regulations concerning:
(1) Designated routes
(2) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor shall also ensure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(4) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
Narrative #19: TEMPORARY STRUCTURES. The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.
Narrative #20: FIRE PROVENTION AND PROTECTION. The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
Narrative #21: UTILITIES. Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
Narrative #22: LAND USE CONTROL. Contractors who shall be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.
Narrative #23: CELLULAR TELEPHONE USE. Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
Narrative #24: AIR EMMISSIONS. The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which shall produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.
Narrative #25: ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001. The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746. The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
Narrative #26: ANAD NETWORK. For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.
Narrative #27: SAFETY AND ACCIDENT PREVENTION. Contractors shall adhere to all safety rules and regulation of corrective actions, which shall be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company shall comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death. Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors.
Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.
Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.
The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A shall be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors.
Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.
The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.
Narrative #28: CONTRACTOR SAFTY PROGRAMS AND ACCIDENT PREVENTION PLANS. For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which shall be inherent in the project and how they shall control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.
(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:
a. Plan preparer
b. Plan approval, e.g., owner, company president, etc.
c. Plan concurrence (concurrence of other applicable corporate and project personnel
(contractor) such as their safety officer, project manager, or superintendent) (2.) BACKGROUND INFORMATION. List the following:
a. Contractor
b. Contract number
c. Project name
d. Brief description of the work to be performed and location
e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)
f. Listing of phases of work and hazardous activities requiring activity hazards analyses.
(3.) STATEMENT OF SAFETY AND HEALTH POLICY.
(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.
a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.
b. Lines of authority.
(5.) SUBCONTRACTORS AND SUPPLIERS.
a. Identification of subcontractors and suppliers (if known).
b. Means for controlling and coordinating subcontractors and suppliers.
c. Safety responsibilities of subcontractors and suppliers.
(6.) TRAINING.
a. List subjects to be discussed with employees in safety indoctrination.
b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).
c. Identify requirements for emergency response training.
d. Outline requirements (who attends, when given, who shall conduct etc.) for supervisory and employee safety meetings.
(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:
a. Who shall conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)
b. Any external inspections/certifications that may be required.
(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND
COMPLIANCE.
a. The company's written safety program goals, objectives, and accident experience.
b. A brief description of the company's safety incentive programs (if any)
c. Policies and procedures for holding managers and supervisors accountable for safety.
(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:
a. Exposure data (man hours worked)
b. Accident investigations, reports and logs
c. Immediate notification of accidents
(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE
CONDUCTED. This list is not all-inclusive, nor shall all topics apply to all contractors.
a. Hazard communication
b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)
c. Layout plans
d. Respiratory protection plan
e. Health hazard control program
f. Lead abatement plan
g. Asbestos abatement plan
h. Abrasive blasting
i. Confined space
j. Hazardous energy control plan
k. Critical lift procedures
l. Contingency plan for severe weather
m. Access and haul road plan
n. Demolition plan (engineering and asbestos survey)
o. Material handling equipment licensing
p. Plan for prevention of alcohol and drug abuse
q. Fall protection
(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.
Narrative #29: SEXUAL ASSUALT AND HARASSMENT IN THE WORKPLACE.
Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their shall, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR shall provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.
As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements shall not be adjusted for reasons related to an incident involving an offense by contractor employees.
In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:
If you believe you are a victim of sexual harassment:
It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.
Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.
Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened.
Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.
Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.
Follow whatever complaint procedures apply with your employer
If you witness sexual harassment or it is reported to you:
Report it to your supervisor
Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Mrs. Wendy Suttles, at (256) 240-3447.
Cooperate with any investigative agencies.
Narrative #30: CONTRACTOR OWNED PROPERTY. When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.
Narrative #31: CONTRACTORS TRANSPORT OF GOVERNMENT OWNED PROPERTY. If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.
INSTRUCTION TO OFFERORS
L.1 Instructions to Offerors
L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s) Competitive Acquisitions (FAR Provision 52.215-1) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal shall be contained in the proposal volumes set forth below.
Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The offeror's proposal, as required by this section, will be evaluated as set forth in Section M of this solicitation. The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals.
L.1.2 Minimum Acceptance Period.
This provision supersedes any language pertaining to the acceptance period that may appear elsewhere in this solicitation.
ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.
L.1.2.1 The Government specified minimum acceptance period of is 180 calendar days.
L.1.2.2 The offeror shall clearly state in its proposal Administrative Volume 4 the acceptance period.
Offerors may specify a longer acceptance period than the Government's minimum acceptance period stated above.
L.1.2.3 An offer allowing less than the Government's minimum acceptance period may be rejected.
L.2.1 Proposal Content
L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. Proposals not in English (American Standard) or in US Dollars may be rejected. The proposal shall include all information specified and shall address all requirements outlined in Section L. The offeror's proposal shall be submitted in the separate volumes and in the quantities as set forth below. Information submitted beyond the page limitations, as identified below, will not be evaluated and could be cause for rejection of your proposal. Cover/face pages, and indexes will NOT be counted toward the page limitations below. The offerors proposal shall consist of the following volumes:
Volume Number Title Qty Pages
Volume 1 Technical Factor 1 3 Volume 2 Past Performance 1 5 (Not including submitted contract PWS/SOW) Volume 3 Price 1 Unlimited Volume 4 Administrative 1 Unlimited
L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the volumes required, nor will it be evaluated. If a Proposal Executive Summary is submitted, it must be submitted as part of the Administrative volume above and it should be no more than four pages in length.
Note - Classified information shall NOT be submitted in response to this solicitation. Only unclassified proposal information shall be submitted and will be accepted.
L.2.1.3 Acceptable File Formats.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .