(No Collect Calls)b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
(SIGNATURE OF CONTRACTING OFFICER)
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
1. REQUISITION NUMBER
SEE SCHEDULE
W31G1Y
ANNISTON ARMY DEPOT
REQUISITION PROPERTY MGMT. DIV.
7 FRANKFORD AVENUE
ANNISTON AL 36201-4199
TEL: FAX:
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
Section SF 1449 - CONTINUATION SHEET
PROVISIONS
Attachment 2 Evidence of Authority to Sign Offers Attachment 3 EPA Guideline Items
Attachment 7 Request for Technical Literature Attachment 8 Wage Determination Attachment 9 DD Form 1423 Contract Data Requirement List
Attachment 10 DD Form 1664 Data Item Description
Offerors or quoters are urged and expected to inspect the site where the work will be performed.
An organized site visit is planned. Details are listed below. Individual requests for site visits on dates other than that specified below will not be granted.
Offeror/quoters planning to attend the Site Visit must submit on company letterhead the following information for each person attending the site visit:
Company Name:
Name of Visitor: Date of Birth: Citizenship:
Date of Visit:
Person to be Visited:
Purpose of Visit:
Each visitor must present photo identification as described in Local Clause 52.02114401(a)(2) entitled
Rules and
Send the above information to the attention of Larry Stephney by larry.d.stephney.civ@mail.mil.
Point of contact for the Site Visit is Larry Stephney, 256-235-6023
Participants will meet at the main gate checkpoint of Anniston Army Depot, Anniston, AL.
W911KF18Q0030
PROVISION #3: Contractor must submit technical literature. (see attachment)
PROVISION #4: Items quoted must meet or exceed the salient features listed in the statement of work. Technical evaluations will be performed. Contractor must show how your proposal meets each and every salient feature of the requested item.
PROVISION #5: Please provide your very best pricing when submitting your quote for this solicitation.
PROVISION #6: Quote must be submitted on Standard Form 1449. YOUR BID WILL BE
CONSIDERED TO BE NONRESPONSIVE IF THE SF FORM 1449 IS NOT SUBMITTED IN
ITS ENTIRETY. that fail to furnish required representations or information, or whom reject the terms and conditions of the request may be determined to be NON RESPONSIVE. It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you may be determined NON RESPONSIVE.
PROVISION #7: WAWF PROCEDURES
If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232- 7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/.
Ensure the Electronic Business POCs listed in the Central Contractor Registration (CCR) for your company are the same individuals that will submit invoices through WAWF before using WAWF.
CCR has been migrated to the System for Award Management (SAM) and accessible at www.sam.gov. For CCR access and navigation issues, follow the instruction provided at Guides and Helpful on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at: www/dfas.mil/money/vendor.THE FOLLOWING CODES WILL BE REQUIRED TO
ROUTE YOUR INVOICES AND ADDITIONAL EMAILS CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for
Invoice
SUPPLIES/
(PRs that start with W31G1Y)
SERVICES/
EQUIPMENT
SUPPLIES/
(PRs DO NOT that start with W31G1Y)
N
CAGE CODE
CCR Cage code listed in
Contractor/Off eror field of contract
CCR Cage code listed in Contractor/Of feror field of contract
CCR Cage code listed in
Contractor/Off eror field of contract
CCR Cage code listed in
Contractor/Offeror field of contract
ISSUE/ADMIN BY
DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF
W911KF
(Unless
Inspected by
DCMA)
W911KF
SHIP TO
s
Only)
W911KF
NOT
W911KF W911KF
ACCEPTOR
(Services/Equipment
Only)
W911KF
Type of Invoice COMBO 2 IN 1 COMBO N
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
DELIVERY ORDER NUMBER (IF APPLICABLE):
EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)
CONTRACT ADMINISTRATOR:
CONTRACTING OFFICER:
USER AND/OR INSPECTOR:
PROVISION #8: Contractor must accept Government Smart Pay Visa Credit Card or provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current.
COMPLETE THE FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.
Accept VISA? Yes_____ No_____ If no, EFT address: ________________________
Federal Tax Identification Number: __________________ Dun & Bradstreet Number (DUNS):__________________ CAGE Code: _____________ System for Award Management (SAM) Registration: Yes______ No_______ Expiration Date:__________
Vendor Contact Information: POC____________________________ Telephone:_______________________
FAX: ___________________________
Email:___________________________
PROVISION #9: The contractor shall comply with Resource Conservation and Recovery Act (RCRA) affirmative procurement (or 'buying recycled') requirements by giving preference in their purchasing process to products and practices that promote recycling and other environmentally friendly practices. The contractor is also responsible for insuring that all sub-contractors comply with Affirmative Procurement (AP) requirements. Except as specifically waived in writing, for reasons of price, performance or availability, any products in the attached EPA guideline items list provided by the contractor as part of the performance of this contract must meet the minimum percentage levels of recovered materials as specified to these standard contract terms and conditions. Please refer to the attached EPA list of designated recovered materials content products (attached). On completion of work, contractor shall actions taken under that specific order.
The contractor shall submit the attached "Contractor Request for Waiver for Non-EPA Comprehensive Guideline Items" (attached) as written documentation to support the decision not to acquire items meeting the minimum content levels, based on one of the three justifications below:
a. The product is not available from a sufficient number of sources to maintain a sufficient level of competition (i.
e., available from two or more sources) or is not available at a reasonable price.
b. The product is not available within a reasonable period of time.
c. The product does not meet the performance standards in applicable specifications or fails to meet reasonable performance standards of the agency.
See FAR clauses 52.223-4 and 52.223-9 for further guidance.
PROVISION #10: Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment.
PROVISION #11: Provide past performance proposal and evaluation information with your proposal. Reference 52.0000-4708.
PROVISION #12: Statement of Work, modifications to existing contracts and Provisions:
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Anniston Army Depot via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help des website.
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address:
http://www.ecmra.mil/
The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including subcontractors); (6) Estimated direct labor dollars paid this reporting period (including subcontractors);
(7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this report period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each requirement data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
Manpower Reporting CLIN description for each year and option year. Remember if your contract does not start on the FY, you will have an additional CMR CLIN:
This CLIN is used for pricing of the collection and reporting of Contractor Manpower Reporting data.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. FINAL payment may be withheld on this contract if the required data is not input into this collection site by 31 October (or end of contract if sooner). Notify the Contract Specialist listed on the contract award at block 16 when the information has been entered into the system. The Unit Identifier Code (UIC) for Anniston Army Depot is W0LXAA. Contractors may direct questions to the help desk at:
52.0000-4404 IDENTIFICATION OF CONTRACTOR EMPLOYEES
This requirement is only applicable to the Contractor when the Contractor has employees working on the Anniston Army Depot.
1. All contractors are responsible for obtaining/returning identification badges and/or vehicle decals required for the term of the contract or release of employee (see paragraph 2 on release of Contractor employee). See Local Rules and Regulations clause. All Contractor employees meeting with Government employees or attending meetings at Anniston Army Depot (ANAD) shall, at the beginning of the meeting, announce to all other attendees that they are Contractor employees, employed by (Name of Contractor/address), and the name of all other companies or individuals that currently employ them or that the Contractor employee currently represents. In addition, Contractor employees shall wear visible insignia that readily displays their company's name. This may be in the form of a hat or clothing bearing a company logo, a badge, etc. Also, all Contractor employees must identify themselves as Contractor employees when answering Government telephones, working in situations where their actions could be
(a) If the Contractor requires computer access for completion of the contract, Contractor shall provide a written request to Directorate of Contracting; the COR will provide the Security Investigation Information or Letter of Clearance to the Personnel Security Office, Security Management Office, ten (10) days prior to the requirement for computer access. If Contractor employees depart Anniston Army Depot prior to completion of contract, written notice must be made to Directorate of Contracting and Directorate of Information Management. At the completion of the contract, written notice must be given to Directorate of Contracting AND Directorate of Information Management before final payment will be made.
(b) Contractor must provide written notice to Directorate of Contracting AND Directorate of Emergency Services when Contractor employees are terminated before completion of contract. Written notice shall be provided to the Directorate of Contracting and Directorate of Emergency Services (DES) by the Contractor when the contract is complete.
2. Badges and vehicle decals should be returned when they expire at the end of the contract or upon employee termination, whichever comes first. When the contract number under which the badge was obtained is completed (date of last delivery or performance of last service), including any exercise of an option pursuant to the terms of the contract, the Contractor shall return the badges for all employees and vehicle decals to the DES and obtain a receipt for each within three (3) business days after ending date of contract. Contractor shall provide written notice to Directorate of Contracting, Directorate of Information Management (when access to Government computers required), DES, and Security Management Office when Contractor employees are terminated before the completion of the contract.
3. Failure to comply with the requirement in Paragraph 2 will be grounds for withholding any funds due the Contractor until badges are returned or paid for, notwithstanding any other clause or requirements in the contract.
Failure to comply may also be used as an adverse factor with respect to Contractor past performance in connection with award of future contracts to the firm.
4. If the Contractor obtains a new or follow-on contract for work at ANAD, Contractor shall obtain new badges for each employee indicating on the request the new or follow-on contract number and comply with the above. This paragraph does not apply under options.
5. Non-Disclosure Agreement: If access to nonpublic information is required, the Contractor and each Contractor employee working on ANAD shall sign a non-disclosure statement on their company's letterhead prior to commencing work under the contract or obtaining the badges required by Paragraph 1 above. There will be one non-disclosure statement for each employee. The non-disclosure statement shall be worded as stated in Paragraph 7 below.
6. The COR/Government POC shall coordinate the Contractor's badging process (schedule appointments with DES, etc.). The Contractor shall furnish (before initiating work under the contract) two copies of the non-disclosure statement for each Contractor employee to the COR/Government POC. The COR/Government POC shall maintain one copy and provide one copy to the Administrative Contracting Officer for inclusion in the official contract file.
7. Before any non-government employee can be given access to nonpublic information covered by the non-disclosure agreement, there must be a written agreement between the recipient Contractor and the owner of the proprietary information. A copy of this agreement must be made a part of the contract file.
Format for
CERTIFICATE OF NON-DISCLOSURE
I, ________________________________, an employee, authorized representative, and agent of _____________________________________________________________________________________, a contractor (hereinafter RECIPIENT) providing support services to Anniston Army Depot (hereinafter ANAD), and likely to have access to nonpublic information under contract number ______________________________, agree to and promise the following:
WHEREAS RECIPIENT is engaged in delivering support services to ANAD under contract; and WHEREAS it is the intention of ANAD to protect and prevent access to and disclosure of nonpublic information to anyone other than employees of the United States Government who have a need to know; and WHEREAS ANAD acknowledges that RECIPIENT will from time to time have or require access to such nonpublic information in the course of delivering the contract services; and WHEREAS RECIPIENT may be given or otherwise have access to nonpublic information while providing such services; and WHEREAS "nonpublic information" includes such information as proprietary information (e.g., information submitted by a contractor marked as proprietary), information marked as having restrictions on its use having Distribution Statements thereon per DoDD 5230.24, advanced procurement information (e.g., future requirements, statements of work, and acquisition strategies), source selection information (e.g., bids before made public, source selection plans, and rankings of proposals), trade secrets and other confidential business information (e.g., confidential business information submitted by a contractor), attorney work product, information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers), and other sensitive information that would not be released by ANAD under the Freedom of Information Act (e.g., program, planning and budgeting system information);
NOW THEREFORE, RECIPIENT agrees to and promises as follows:
RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;
RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information from Government employees;
As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information for any personal or other commercial purpose; and If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the contracting officer in writing as soon as possible.
The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, upon RECIPIENT leaving the contract.
RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this CERTIFICATE will subject the RECIPIENT and the RECIPIENT's employer to administrative, civil or criminal remedies as may be authorized by law.
RECIPIENT/AGENT: ______________________________ (signature)
PRINTED NAME: _____________________________
TITLE: ______________________________________
EMPLOYER/PRINCIPAL: _________________________________
(End of clause) Updated August 2005
52.0000-4706 ELECTRONIC SUBMISSION OF OFFERS
All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses will not be accepted. All solicitation responses must be submitted through the Federal Business Opportunities (FedBizOpps) Website, fbo.gov.
Offers submitted using any other means will not be accepted, unless stated otherwise in the solicitation.
FedBizOpps provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities and submit offers/bids online.
Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required.
Registration is completed by choosing the Register Now option on the fbo.gov webpage and following the steps.
If a format is other than Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft PowerPoint, or Portable Document Format (PDF), a "reader" must be provided. Offeror must insure its offer, in its entirety, reaches the Army Contracting Command-Warren, Anniston Army Depot (ANAD), before the time set for opening or closing of the solicitation.
Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.
Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:
a. The SF33/SF1449/SF18/SF1442 filled out and signed.
b. All applicable fill-in provisions from the solicitation must be completed.
c. Any other information required by the solicitation.
Lateness rules are outlined in the solicitation.
If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.
Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electron Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
Any bid bond required by this solicitation must be submitted with offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Warren, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.
(End of provision) September 2016
52.0000-4708 PAST PERFORMANCE PROPOSAL AND EVALUATION INFORMATION
1. The government will conduct a performance risk evaluation based upon the past performance of offerors and proposed major subcontractors as it relates to the probability of successfully performing the solicitation requirements.
2. Offeror shall submit with proposal the information listed below for RELEVANT PAST PERFORMANCE ON THREE (3) CONTRACTS performed within the past three (3) years prior to closing of this solicitation. For services, contractor shall have performed under each contract for a minimum of one (1) year within the past three (3) years. Each contract cited may be ongoing or complete provided it meets the one year performance criteria. For equipment or supplies, contractor shall have completed each contract within the past three (3) years.
3. For each contract, provide:
a. A description of your contract or subcontract (government or commercial). Government contracts are defined as those with the Federal government and agencies of state and local governments.
b. Name of contracting activity/commercial firm.
c. Contract Number.
d. Contract type (fixed price or cost reimbursable).
e. Total contract value.
f. Description of work/NSN, Part Number, Nomenclature.
g. Contracting officer/contract manager, telephone number, and email address.
h. Administrative contracting officer, if different from g. above, telephone number, and email address.
i. A brief summary of work performed under each contract cited.
j. Explanation of why contract or subcontract is considered relevant to proposed acquisition. If only a portion of cited contract is relevant, include in your explanation.
k. Information on problems encountered on the contract and actions taken to correct problems identified.
4. If offeror proposes use of major subcontractor(s) in performance of resultant contract, provide a description of the work to be performed (supplies or services) by each major subcontractor and the information specified above for each subcontractor identified as relevant to the work to be performed by the subcontractor. A significant or major subcontractor is that subcontractor expected to provide over 20 percent of the work effort or critical hardware, software, or services.
acquisition. The government will screen contract information provided by offeror and will remove from consideration those contract references that are clearly unrelated to the type of effort sought.
6. The government will consider this information in its evaluation of performance risk for offeror and proposed major subcontractors. The government will make a reasonable effort to consider information on the contracts cited for offeror and for each major subcontractor.
a. The government reserves the right to evaluate fewer than three (3) contracts for any contractor should we be unsuccessful in obtaining required information from sources cited. In that case, contractor (or subcontractor) will be evaluated on the information available.
b. Should the government receive information on more than three (3) contracts, selection of those to be considered in evaluation will be based on the criteria stated previously.
7. The government reserves the right to consider information from other sources in its evaluation.
8. See separate evaluation clause for specific factors, rating criteria, and relative importance of past performance evaluation for this acquisition.
(End of provision) Updated June 2007
52.0211-4202 TIME OF DELIVERY (OCT 1993)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Each _210 Days_after contract award_ CLIN0002 1 Each _210 Days_ after contract award
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Each _______________ CLIN0002 1 Each _______________
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or excludes weekends and U. S. Federal holidays.)
End of clause Updated June 2004
52.0211-4401 LOCAL RULES AND REGULATIONS
(a) Identification Badges: The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractor employees requiring access to Anniston Army Depot (ANAD) to engage in contract work are required to secure aCommon Access Card (CAC) and wear it as an employee identification badge while on depot. In the event an employee is not entitled to or authorized a CAC, a depot badge card may be obtained. A CAC or badge must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. An appointment to obtain a CAC or badge must be coordinated through the Contracting Office Representative (COR) and obtained from the Visitor Control Center (VCC)/Badge Office/ Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a - State driver's license b - State identification card c - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification.
Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency
Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) At least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, through the TAAS System, the name and social security number of all persons entering ANAD to perform contract work for the prime and any subcontractors. The COR will approve each individual. Once approval is received, the individual will make an appointment with the CAC office to obtain a CAC.
(4) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the VCC. NO
PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY
DEPOT. The prime contractor is responsible for checking with the VCC, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge or CAC. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.
(b) AMMUNITION LIMITED AREA (ALA). Contractors working within the ALA must abide by the above guidance as well as the following additional requirements:
(1) The prime Contractor will be notified which persons are approved for access to the ALA. Contractor personnel who are denied access based on the local background check will have the right to appeal to the DES. The Director's decision is considered the final action.
(2) No privately-owned vehicles (POV) are authorized in the ALA.
(3) Contractor-owned, rented, or leased vehicles which are construction-type vehicles (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES
AND PERSONS SHALL BE SEARCHED UPON ENTERING AND EXITING THE ALA.
(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DES and by disabling the vehicle by a method approved by DES such as removing the battery.
(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the ALA.
(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.
(7) The Contractor shall comply with the requirements of the Department of the Army Pamphlet 385-64, Safety, Ammunition and Explosives Safety Program, in effect on the date of the solicitation for this contract.
(8) The Prime contractor shall assure that each contract employee is instructed in the known potential hazards of fire, explosion, or toxic release hazards related to his/her job while working in the Ammunition limited Area, and the applicable provisions of the installation/contractor emergency action plans.
(9) The contractor shall ensure that each employee requiring access to the ALA receives Explosives Safety brief from ANAD Safety Office at least annually.
(c) Contractor Vehicles in the AMMUNITION LIMITED AREA (ALA): The following rules apply to contractor vehicles in the ALA Area.
(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.
(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor and shall be construction type vehicleswith a placard with the name of the contractor affixed. The contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (c)(4) below for definition of an acceptable document to the liability requirement.)
-Owned Vehicles not included in (c)(2) above shall not be authorized in the restricted area.
(4) The documentation to satisfy the liability language in paragraph (c)(2) would be:
a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.
b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.
the contractor must sign a statement sub the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or
(d) Hours of Work:
WORK HOURS RECEIVING HOURS DAY(S) OF WEEK
7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and Federal Holidays
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand- Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The writing by the Government. These interruptions will be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(e) Traffic: The Contractor will be required to conform to Depot regulations concerning:
(1) Designated routes
(2) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(f) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
(g) Temporary Structures: The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.
(h) Fire Prevention and Protection: The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
(i) Utilities: Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
(j) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.
(l) Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
(m) Air Emissions: The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency.
Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.
(n) ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001: The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.
The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
(o) Exercise Events: Contractors working on the installation are expected to participate in LEAN thinking, Value Stream Analysis, Rapid Improvement Events, and Six Sigma activities that may last from one to seven weeks in duration. These efforts, as defined below, are an integral part of the process improvements of ANAD on our journey toward building a LEAN manufacturing facility. The COR will provide detailed instructions when your involvement is required.
LEAN think the elimination of waste in every area of production including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.
A Value Stream Analysis (VSA) is an event that documents the current process, the planned future process and an action plan to get to the planned future process. The VSA normally last three to four days and includes representatives from all aspects of the process.
A Rapid Improvement Event is a seven-week process that focuses on events where teams of people from a broad range of parts of the business gather to streamline a process. The first three weeks are used to select an area and topic, create the team, and plan for the event. The fourth week is the actual event where waste is identified, removed, and changes to processes made. The last three weeks are to ensure changes are continuing to be used and process is working correctly.
Six Sigma is the leading quality improvement program for a rigorous and disciplined methodology that uses data and statistical analysis to measure and improve a company's operational performance by identifying and eliminating "defects" in manufacturing and service-related processes. Six Sigma differs from traditional quality improvement programs in its focus on input variables. While traditional process improvement methods depend upon measuring outputs and establishing control plans to shield customers from organizational defects, a Six Sigma program demands that problems be addressed at the input root cause level, thereby eliminating the need for unnecessary inspection and rework processes.
(p) ANAD Network: For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication. A CAC Card must be obtained for computer access.
(q) Safety and Accident Prevention: SAFETY AND HEALTH REQUIREMENTS:
Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for programs as may be necessar address the how the company will comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.
Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract.