Attachment_7__Request_for_Technical_Literature.pdf

PDF 13 KB Posted

Attached to
Synopsis, Water Jet Cutting Machines Federal contract opportunity
Solicitation number
W911KF-18-Q-0030
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Attachment 7 Request for Technical Literature

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Technical Literature

A.The bidder shall provide, with its bid, descriptive literature that has previously been used to market the proposed Water Jet System. The literature will be used to technically evaluate the bid and shall describe how the machining center meets requirements of the specification; specifically the paragraphs:

Ref. Paragraph Information Furnished

3.1. General Requirements:

3.1.1. Controlled Axis

3.1.2. Travel.

3.1.3. Cutting Area.

3.1.4. Abrasive Bulk Feeder .

3.1.5. High Pressure Water System

3.1.6. Complete Water Recycling System.

3.1.7. Abrasive Flow Monitoring Device

3.1.8. Hand Held Remote Control Pendant.

3.1.9. Main Tank

3.1.10. CNC Control System.

3.1.11. Abrasive Cutting Head .

b. The features, which must be addressed in the descriptive literature, are necessary to consider the bid responsive. If the bidder’s preprinted literature does not show all these features, the bidder must attach a letter of supplemental information to the literature describing in detail those required features.

c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.

d. Descriptive literature furnished under this solicitation that contains statements similar to ‘specifications are subject to change without notice’, ‘bid is subject to the following conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The government has no assurance the products offered will conform to the specification; therefore, the bid is not considered a firm bid and will not be considered for an award.

Request for Technical Literature

File details come from the government source that posted it.