8-29-19 Update of Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| W911KB19B0002-0011_AMENDMENT.pdf | ||
| Amendment_0010.pdf | ||
| SF30.pdf | ||
| W911KB19B0002_Amend_08.pdf | ||
| B.01.03_AMENDMENT_07.pdf | ||
| Amendment_06.pdf | ||
| W911KB19B0002-0005.pdf | ||
| 19B0002-0004.pdf | ||
| 19B0002-0002_AMEND.pdf | ||
| W911KB19B0002_Amendment__1.pdf | ||
| W911KB19B0002_Print.pdf | ||
| Dwgs-JNU004-IFB_Half_Size_(11x17).pdf | ||
| W911KB19B0002_att.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AM#9 AURORA AND HARRIS HARBOR MAINTENANCE JNU004
JUNEAU, ALASKA
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 20.01 29
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
1.2.2 Environmental Protection
1.2.3 Contractor Generated Hazardous Waste
1.2.4 Land Application for Discharge Water
1.2.5 Pesticide
1.2.6 Pests
1.2.7 Surface Discharge
1.2.8 Waters of the United States
1.2.9 Wetlands
1.3 GENERAL REQUIREMENTS
1.4 SUBCONTRACTORS
1.5 PAYMENT
1.6 SUBMITTALS
1.7 ENVIRONMENTAL PROTECTION PLAN
1.7.1 Compliance
1.7.2 Contents
1.7.3 Appendix
1.8 PROTECTION FEATURES
1.9 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.9.1 Mitigation Measures During Pile Driving
1.9.2 Marine Mammal Watch During Dredging
1.9.2.1 Dredging with Crane-Operated Clamshell or Bucket
1.9.2.2 Dredging with Barge-Mounted Excavator
1.9.2.3 Best Management Practices During Dredging Activities
1.9.3 Transiting Vessels
1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
1.11 NOTIFICATION
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 AIR RESOURCES
3.1.1 Particulates
3.1.2 Odors
3.1.3 Sound Intrusions
3.1.4 Burning
3.2 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
3.2.1 Solid Wastes
3.2.2 Chemicals and Chemical Wastes
3.2.3 Contractor Generated Hazardous Wastes/Excess Hazardous
Section 01 57 20.01 29 Page 1
Materials
3.2.4 Fuel and Lubricants
3.2.5 Waste Water
3.3 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.4 BIOLOGICAL RESOURCES
3.4.1 Migratory Birds
3.5 PREVIOUSLY USED EQUIPMENT
3.6 MAINTENANCE OF POLLUTION FACILITIES
3.7 TRAINING OF CONTRACTOR PERSONNEL
3.8 POST CONSTRUCTION CLEANUP
3.9 Leaking Construction Equipment
3.10 ATTACHMENTS
ATTACHMENTS:
Marine Mammal Observation Form
-- End of Section Table of Contents --
Section 01 57 20.01 29 Page 2
SECTION 01 57 20.01 29
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands Delineation Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 328 Definitions of Waters of the United States
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 279 Standards for the Management of Used Oil
40 CFR 302 Designation, Reportable Quantities, and Notification
40 CFR 355 Emergency Planning and Notification
40 CFR 68 Chemical Accident Prevention Provisions
49 CFR 171 - 178 Hazardous Materials Regulations
Alaska Administrative Code
18 AAC 75 (Revised as of October 1, 2014) Oil and Other Hazardous Substances Pollution Control
Alaska Statutes
AS 46.03.755 Discharge Reporting
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human
Section 01 57 20.01 29 Page 3 life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
1.2.2 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.
The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.3 Contractor Generated Hazardous Waste
Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners,excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
1.2.4 Land Application for Discharge Water
The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.
1.2.5 Pesticide
Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.
1.2.6 Pests
The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.
1.2.7 Surface Discharge
The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers,creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.
Section 01 57 20.01 29 Page 4
1.2.8 Waters of the United States
All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328 .
1.2.9 Wetlands
Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with
WETLANDS DELINEATION MANUAL.
1.3 GENERAL REQUIREMENTS
Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. Comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.
1.4 SUBCONTRACTORS
Ensure compliance with this section by subcontractors.
1.5 PAYMENT
No separate payment will be made for work covered under this section.
Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations are the Contractor's responsibility. All costs associated with this section must be included in the contract price.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Environmental Protection Plan; G
1.7 ENVIRONMENTAL PROTECTION PLAN
Prior to commencing construction activities or delivery of materials to the site, submit an Environmental Protection Plan for review and approval by the Contracting Officer. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern must be defined within the Environmental Protection Plan as outlined in this section. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this
Section 01 57 20.01 29 Page 5 section, but are considered necessary, must be identified and discussed after those items formally identified in this section. Prior to submittal of the Environmental Protection Plan, meet with the Contracting Officer for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Plans. The Environmental Protection Plan must be current and maintained onsite by the Contractor.
1.7.1 Compliance
No requirement in this Section will relieve the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Protection Plan.
1.7.2 Contents
Include in the environmental protection plan, but not limit it to, the following:
a. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
d. Description of the Contractor's environmental protection personnel training program.
e. An erosion and sediment control plan.
f. Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site.
g. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.
h. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.
i. Drawing showing the location of borrow areas.
j. Include in the Spill Control plan the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68 , 40 CFR 302 , 40 CFR 355 , and/or regulated under
Section 01 57 20.01 29 Page 6
State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1 . Include in this plan, as a minimum:
(1) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual will immediately notify the Contracting Officer in addition to the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. Include in the plan a list of the required reporting channels and telephone numbers. This list shall include, but not necessarily be limited to, the Alaska Department of Environmental Conservation (ADEC) Area Response Team for Southeast Alaska at (907) 465-5340 during work hours, or at 1-(800)-478-9300 after hours. In addition to any and all other requirements, any spill amount must be reported in accordance with Discharge Notification and Reporting Requirements of AS 46.03.755 and 18 AAC 75 Article 3.
(2) The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
(3) Training requirements for Contractor's personnel and methods of accomplishing the training.
(4) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
(5) The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
(6) The methods and procedures to be used for expeditious contaminant cleanup.
k. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
l. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1 , a copy of the Material Safety Data Sheets (MSDS) and the maximum quantity of each hazardous material to be onsite at any given time must be included in the contaminant prevention plan. Update the plan as new hazardous materials are brought onsite or removed from the site.
m. A waste water management plan that identifies the methods and procedures for management and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, disinfection water, hydrostatic test water, and water used in flushing of lines. If a
Section 01 57 20.01 29 Page 7 settling/retention pond is required, the plan must include the design of the pond including drawings, removal plan, and testing requirements for possible pollutants. If land application will be the method of disposal for the waste water, the plan must include a sketch showing the location for land application along with a description of the pretreatment methods to be implemented. If surface discharge will be the method of disposal, include a copy of the permit and associated documents as an attachment prior to discharging the waste water. If disposal is to a sanitary sewer, the plan must include documentation that the Waste Water Treatment Plant Operator has approved the flow rate, volume, and type of discharge.
n. A historical, archaeological, cultural resources biological resources and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources and wetlands not previously known to be onsite or in the area are discovered during construction. Include in the plan methods to assure the protection of discovered resources, identifying lines of communication between Contractor personnel and the Contracting Officer.
1.7.3 Appendix
Attach to the Environmental Protection Plan, as an appendix, copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents.
1.8 PROTECTION FEATURES
This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, the Contractor and the Contracting Officer will make a joint condition survey. Immediately following the survey, the Contractor will prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report will be signed by both the Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor must protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.
1.9 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.9.1 Mitigation Measures During Pile Driving
The following mitigation measures apply to pile driving activities required for replacement of the Aurora Harbor Wave Barrier. For the purposes of this section pile driving also includes pile extraction activities which require the use of a vibratory or impact hammer.
a. All pile driving and pile extraction activities required for replacement of the Aurora Harbor wave barrier shall be performed when the water surface elevation is below the ground/rock surface at the pile location.
Section 01 57 20.01 29 Page 8
b. The contractor shall provide a Protected Species Observer (PSO) qualified to accurately identify and distinguish species of Alaska marine mammals.
c. The PSO shall have no other duties than to observe and report on the presence of marine mammals. The PSO shall be on site at all times immediately before and during pile driving.
d. The PSO shall be furnished with equipment such as binoculars, range finder and/or GPS, to determine the location of observed marine mammals and shall maintain radio communication with the construction foreman/superintendent at all times.
e. The PSO shall monitor a 150 meter (495 feet) exclusion zone around pile driving activities and shall be positioned such that the entire exclusion zone is visible. Pile-driving shall not be conducted when weather conditions or darkness restrict clear, visible observation of all waters within and surrounding the exclusion zone. Flood lighting may be utilized as long as the entire excusion zone is visible.
f. The PSO will monitor the exclusion zone for the presence of marine mammals for 30 minutes prior to the start any pile driving activities and/or when pile driving hammers have been idle for more than 30 minutes.
If any marine mammals are present within the exclusion zone, pile driving activities shall not begin until the marine mammals have been observed leaving the exclusion zone or no marine mammals have been observed in the exclusion zone for 15 minutes for pinnipeds (seals) or 30 minutes for cetaceans (whales, porpoises, dolphins).
g. Prior to the start of pile driving with an impact hammer, the contractor shall ramp up to full production by making an initial set of three strikes from the hammer at 40 percent energy, followed by a 30-second waiting period and then repeating the procedure two additional times.
h. During pile driving activities, the PSO will continuously monitor the exclusion zone for the presence of marine mammals. Pile driving activities shall be shut down if a marine mammal enters, or appear likely to enter, the exclusion zone. Pile driving shall not resume until the marine mammal is observed leaving the area or no marine mammals have been observed in the exclusion zone for 15 minutes for pinnipeds (seals) or 30 minutes for cetaceans (whales, porpoises, dolphins).
i. The PSO shall complete the attached "Marine Mammal Observation Form" each working day and shall document all marine mammal observations. These forms will be transmitted to the Contracting Officer's Representative by serial letter at the completion of pile driving activities.
1.9.2 Marine Mammal Watch During Dredging
1.9.2.1 Dredging with Crane-Operated Clamshell or Bucket
The contractor shall provide a dedicated Protected Species Observer (PSO)to monitor a 300 meter (approximately 1000 foot) exclusion zone around the dredging location and support equipment when dredging with a crane-operated clamshell or bucket. The PSO will monitor the exclusion zone for the presence of marine mammals for 30 minutes prior to the start any dredging activities and/or when dredging has not occurred for more
Section 01 57 20.01 29 Page 9 than 30 minutes. If any marine mammals are present within the exclusion zone, dredging activities shall not begin until the marine mammals have been observed leaving the exclusion zone or no marine mammals have been observed in the exclusion zone for 15 minutes for pinnipeds (seals) or 30 minutes for cetaceans (whales, porpoises, dolphins. Dredging activities shall be shut down if marine mammals enter, or appear likely to enter, the exclusion zone. Dredging activity shall not resume until the marine mammals have been observed leaving the exclusion zone or no marine mammals have been observed in the exclusion zone for 15 minutes for pinnipeds (seals) or 30 minutes for cetaceans (whales, porpoises, dolphins.
1.9.2.2 Dredging with Barge-Mounted Excavator
The contractor shall monitor a 50 meter (165 foot) exclusion zone around the dredging location and support equipment when dredging with a barge-mounted excavator. This monitoring may be performed by the standard crew of the dredge during the course of their duties. Dredging activities shall be shut down if marine mammals enter, or appear likely to enter, the exclusion zone. Dredging activity shall not resume until 15 minutes have elapsed since the last marine mammal sighting or the marine mammal is observed leaving the area.
AM#9...
1. 9. 2. 3 Best Management Pr act i ces Dur i ng Dr edgi ng Act i v i t i es
Dr edgi ng shal l be conduct ed so as t o mi ni mi ze t he amount of dr edge mat er i al and suspended sedi ment t hat ent er s Gast i naeu Channel . Measur es t o be empl oyed t o mi ni mi ze sedi ment l oss and t ur bi t y gener at i on i ncl ude:
• El i mi nat i ng mul t i pl e bi t es whi l e t he bucket i s on t he seaf l oor
• No st ockpi l i ng of dr edged mat er i al on t he seaf l oor
• No seaf l oor l evel i ng
• Sl owi ng t he vel oci t y ( i . e. , i ncr easi ng t he cycl e t i me) of t he ascendi ng l oaded cl amshel l bucket t hr ough t he wat er col umn
• Pausi ng t he dr edge bucket near t he bot t om whi l e descendi ng and near t he wat er l i ne whi l e ascendi ng
• Pl aci ng f i l t er mat er i al over t he bar ge scupper s t o c l ear r et ur n water
• I f dewat er i ng r unof f i s di schar ged f r om t he bar ge, s i l t s must be r emoved pr i or t o di r ect or i ndi r ect di schar ge t o Gast i neau Channel .
...AM#9
1.9.3 Transiting Vessels
Project vessels shall be limited to a speed of 8 knots, or the lowest speed above 8 knots consistent with safe navigation. Vessels shall not approach within 300 feet of a marine mammal to the extent practicable given navigational and safety constraints.
1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
Any deviations from the drawings,plans and specifications, requested by
Section 01 57 20.01 29 Page 10 the Contractor and which may have an environmental impact, will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.
1.11 NOTIFICATION
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental Protection plan. After receipt of such notice, the Contractor will inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 AIR RESOURCES
Equipment operation, activities, or processes will be in accordance with all Federal and State air emission and performance laws and standards.
3.1.1 Particulates
Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; must be controlled at all times, including weekends, holidays and hours when work is not in progress. Maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would cause the Federal, State, and local air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area.
Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. Provide sufficient, competent equipment available to accomplish these tasks. Perform particulate control as the work proceeds and whenever a particulate nuisance or hazard occurs. Comply with all State and local visibility regulations.
3.1.2 Odors
Odors from construction activities must be controlled at all times. The odors must be in compliance with State regulations and/or local ordinances and may not constitute a health hazard.
3.1.3 Sound Intrusions
Keep construction activities under surveillance and control to minimize
Section 01 57 20.01 29 Page 11 environment damage by noise. Comply with the provisions of the State of Alaska rules.
3.1.4 Burning
Burning is prohibited at the project site.
3.2 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
Disposal of wastes will be as directed below, unless otherwise specified in other sections and/or shown on the drawings.
3.2.1 Solid Wastes
Place solid wastes (excluding clearing debris) in containers which are emptied on a regular schedule. Handling, storage, and disposal must be conducted to prevent contamination. Employ segregation measures so that no hazardous or toxic waste will become co-mingled with solid waste.
Comply with Federal, State, and local laws and regulations pertaining to the use of landfill areas.
3.2.2 Chemicals and Chemical Wastes
Dispense chemicals ensuring no spillage to the ground or water. Perform and document periodic inspections of dispensing areas to identify leakage and initiate corrective action. This documentation will be periodically reviewed by the Government. Collect chemical waste in corrosion resistant, compatible containers. Wastes will be classified, managed, stored, and disposed of in accordance with Federal, State, and local laws and regulations.
3.2.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
Hazardous wastes are defined in 40 CFR 261 , or are as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178 . Take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. Segregate hazardous waste from other materials and wastes, protect it from the weather by placing it in a safe covered location, and take precautionary measures such as berming or other appropriate measures against accidental spillage. Storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178 , State, and local laws and regulations is the Contractor's responsibility. Dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Facility Environmental Office. Cleanup and cleanup costs due to spills are the Contractor's responsibility. The disposition of Contractor generated hazardous waste and excess hazardous materials are the Contractor's responsibility.
3.2.4 Fuel and Lubricants
Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with
Section 01 57 20.01 29 Page 12
40 CFR 279 , State, and local laws and regulations. Storage of fuel on the project site will be in accordance with all Federal, State, and local laws and regulations.
3.2.5 Waste Water
Disposal of waste water will be as specified below.
a. Waste water from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. Dispose of the construction related waste water off-Government property in accordance with all Federal, State, Regional and Local laws and regulations.
b. For discharge of ground water, the Contractor will obtain a State or Federal permit specific for pumping and discharging ground water prior to surface discharging.
c. Water generated from the flushing of lines after disinfection or disinfection in conjunction with hydrostatic testing will be discharged into the sanitary sewer with prior approval and/or notification to the Waste Water Treatment Plant's Operator.
3.3 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
If during excavation or other construction activities any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, all activities that may damage or alter such resources will be temporarily suspended. Resources covered by this paragraph include but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.4 BIOLOGICAL RESOURCES
Minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility in accordance with Federal, State, Regional, and local laws and regulations.
3.4.1 Migratory Birds
For more information, refer to the following Link:
//www.fws.gov/alaska/fisheries/fieldoffice/anchorage/pdf/vegetation_clearing.pdf
3.5 PREVIOUSLY USED EQUIPMENT
Clean all previously used construction equipment prior to bringing it onto
Section 01 57 20.01 29 Page 13 the project site. Ensure that the equipment is free from soil residuals, egg deposits from plant pests, noxious weeds, and plant seeds. Consult with the USDA jurisdictional office for additional cleaning requirements.
3.6 MAINTENANCE OF POLLUTION FACILITIES
Maintain permanent and temporary pollution control facilities and devices for the duration of the contract or for that length of time construction activities create the particular pollutant.
3.7 TRAINING OF CONTRACTOR PERSONNEL
The Contractor's personnel must be trained in all phases of environmental protection and pollution control. Conduct environmental protection/pollution control meetings for all personnel prior to commencing construction activities. Additional meetings must be conducted for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and avoiding pollution;
familiarization with statutory and contractual pollution standards;
installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of archaeological sites, artifacts, wetlands, and endangered species and their habitat that are known to be in the area.
3.8 POST CONSTRUCTION CLEANUP
The Contractor will clean up all areas used for construction in accordance with CONTRACT CLAUSE 52.236-12 CLEANING UP. Unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated.
3.9 Leaking Construction Equipment
Construction equipment shall not be operated if equipment is leaking fuel, oil, hydraulic fluid, or any other hazardous material. Equipment shall be inspected on a daily basis for leaks. If leaks are found the equipment shall not be used and shall be pulled from service until the leak is repaired.
3.10 ATTACHMENTS
(1) Marine Mammal Observation Form
Section 01 57 20.01 29 Page 14
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 57 20.01 29 - ENVIRONMENTAL PROTECTION |
| 01 57 20.01 29 - ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Environmental Pollution and Damage |
| 1.2.2 Environmental Protection |
| 1.2.3 Contractor Generated Hazardous Waste |
| 1.2.4 Land Application for Discharge Water |
| 1.2.5 Pesticide |
| 1.2.6 Pests |
| 1.2.7 Surface Discharge |
| 1.2.8 Waters of the United States |
| 1.2.9 Wetlands |
| 1.3 GENERAL REQUIREMENTS |
| 1.4 SUBCONTRACTORS |
| 1.5 PAYMENT |
| 1.6 SUBMITTALS |
| 1.7 ENVIRONMENTAL PROTECTION PLAN |
| 1.7.1 Compliance |
| 1.7.2 Contents |
| 1.7.3 Appendix |
| 1.8 PROTECTION FEATURES |
| 1.9 SPECIAL ENVIRONMENTAL REQUIREMENTS |
| 1.9.1 Mitigation Measures During Pile Driving |
| 1.9.2 Marine Mammal Watch During Dredging |
| 1.9.2.1 Dredging with Crane-Operated Clamshell or Bucket |
| 1.9.2.2 Dredging with Barge-Mounted Excavator |
| 1.9.2.3 Best Management Practices During Dredging Activities |
1.9.3 Transiting Vessels
| 1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS |
| 1.11 NOTIFICATION |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION |
| 3.1 AIR RESOURCES |
| 3.1.1 Particulates |
| 3.1.2 Odors |
| 3.1.3 Sound Intrusions |
| 3.1.4 Burning |
| 3.2 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL |
| 3.2.1 Solid Wastes |
| 3.2.2 Chemicals and Chemical Wastes |
| 3.2.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.2.4 Fuel and Lubricants |
| 3.2.5 Waste Water |
| 3.3 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.4 BIOLOGICAL RESOURCES |
| 3.4.1 Migratory Birds |
| 3.5 PREVIOUSLY USED EQUIPMENT |
| 3.6 MAINTENANCE OF POLLUTION FACILITIES |
| 3.7 TRAINING OF CONTRACTOR PERSONNEL |
| 3.8 POST CONSTRUCTION CLEANUP |
| 3.9 Leaking Construction Equipment |
| 3.10 ATTACHMENTS |