EIE394_AM02.pdf
PDF 9 MB Posted
- Solicitation number
- W911KB-18-R-0019
About this file
EIE394 AM02 Updated drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA-18-07-Det-tronics_EIE394_Redacted.pdf | ||
| AM03.pdf | ||
| Attch-EAL_Contractor_Sponsor_Form_201712.xlsx | XLSX spreadsheet | |
| Amendment_1_package-EIE394.pdf | ||
| 02_EIE394_Drawings_EN_RTA.pdf | ||
| A.07.23__18R0019-Final_EIE394_Solicitation.pdf | ||
| JA-07_Redacted_JA_Redacted.pdf | ||
| JA-06,_08-14_approved_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE394, F-35 Renovate 4-Bay Weather Shelter, Eielson AFB, Alaska
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. PROPOSAL DUE DATE IS EXTENDED TO: 22 January 2018 at 1400 hours ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.13, Proposal Submittals.
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0019
X 9B. DATED (SEE ITEM 11)
19-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jan-2018
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
EIE394 – AM#2
SUMMARY OF CHANGES
A. The following drawings were included in the original solicitation and are substituted for the superseded documents:
1. EIE394 – A-102
2. EIE394 – A-104
3. EIE394 – A-510
4. EIE394 – C-721
5. EIE394 – C-740
6. EIE394 – E-502
7. EIE394 – M-122
8. EIE394 – M-601
9. EIE394 – M-701
10. EIE394 – S-500
11. EIE394 – S-501
12. EIE394 – S-505
B. Added additional drawings for As-Built for Repair Hangar Doors Bldg 1335.
C. The following original specifications are revised as indicated:
1. 05 51 00 METAL STAIRS
a. Revised paragraph 1.2, SD-03 for DELETED TEXT.
b. Revised paragraph 2.2.2; 2.2.2.1; 2.2.2.2; 2.2.2.3; 2.2.2.4; 2.2.2.5; 2.2.2.6 for DELETED TEXT.
2. 08 11 13 STEEL DOORS AND FRAMES
a. Revised paragraph 1.2, SD-04 Design Data to add Design Analysis; G.
b. Added paragraph 1.4 QUALITY ASSURANCE.
c. Added paragraph 1.4.1 Design Data Requirements.
D. The following new specification is added to the project:
1. 02 82 14 HAZARDOUS MATERIALS ABATEMENT
2. 02 83 13.00 20 LEAD IN CONSTRUCTION
3. 02 84 16 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
E. The following documents were included in the original solicitation and are substituted for the superseded documents:
a. EIE394 Specification Table of Content
F. SECTION 00 11 00 – STANDARD FORM (SF) 1442
The required response date/time has changed from 19-Jan-2018 02:00 PM to 22- Jan-2017 02:00 PM.
(End of Summary of Changes)
UP
C
D
1 2 3 4 5
A-501 G4
FIRE
CORR.
JANITOR
SHOWER
VEST.
RESTROOM
RESTROOM
ELEC
106A
114A
0C
0B
3A
3B
110A
6B
MATCHLINE
MATCHLINE
0"
19' - 6"19' - 6"19' - 6"19' - 6" 78' - 0"
1 / A-103
1 / A-101
23' - 8" 9' - 6" A-501
B1
ENTRY
114 114B
WALK OFF GRILL SYSTEM (WO-1)
RELOCATE (E) BOLLARS TO HANGAR SIDE OF DOORS
METAL LOCKERS (22 COUNT) RELOCATE (E) BOLLARS TO HANGAR SIDE OF DOORS
2'
- 0
INFILL WALL
INFILL WALL
CORNER GUARDS, TYP.
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
NE
ER
DI
ST
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
ION
2 D (K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-102
PL
AN
S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
F I R
ST
F
LO
O
R P
LA
N
A
R
EA
B
1/4" = 1'-0"A2 LEVEL 1 - FLOOR PLAN - AREA B
KEY PLAN
CBA
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
(ROTATED)
SHEET NOTES:
1. SEE DETAIL SHEET A-501 FOR STRUCTURAL BRACING WALL
PENETRATION DETAILS.
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#2
/18
2 2
AD
D
ED
C
O R
N
ER
G U
AR
D
S
N O
TE
DN
DN
C
D
1 2 3 4 5
E1 A-301
A4 A-302
A1 A-302
F1 A-320
D1 A-320
0"
78' - 0" 19' - 6"19' - 6"19' - 6"19' - 6"
MECHANICAL
PLATFORM
A-320 D4
STAIR 1 (E)STAIR 2
1'
- 9
INSURE NEW DOOR SWING CLEARS NEW BRACE
200A
0B
INSTALL NEW GWB ON
BOTH SIDES OF (E) WALL
FRAMING TO MATCH
PARTITION TYPE A,
INSURE 1-HOUR RATED
ASSEMBLY, FROM SLAB
TO RATED CEILING.
CORNER GUARD, TYP.
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
ION
2 D (K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-104
PL
AN
S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
M
EC
H
AN
IC
AL
P L A
TF
O
R M
F L O
O R
P
LA
N
1/4" = 1'-0"A2 MECHANICAL PLATFORM - FLOOR PLAN
KEY PLAN
CBA
04 8 16268
SCALE: 1/8"=1'-0"
PLAN NORTH
(ROTATED)
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#2
/18
2 2
AD
D
ED
C
O R
N
ER
G U
AR
D
S
N O
TE
EXTEND ROOF MEMBRANE, AND
METAL LINER FULL DEPTH OF
CLAMPING RING AND SET IN WATER
CUT OFF MASTIC
ATTACH BOX TO ROOF DECK
WITH ANGLE
SUMP PLATE MOUNTED
TO TOP OF ROOF DRAIN
BOX
FILL BOX WITH SPRAY
FOAM INSULATION
OVERFLOW DRAIN, PROVIDED WITH
2" WATER DAM
SEE ELECTRICAL FOR HEAT
TRACE; EXTEND INTO DRAIN
5FT
PRIMARY DRAIN WRAP HEAT TRACE AROUND
SUMP BEFORE ROUTING DOWN
LEADER
EXISTING MTL DECK
WATER PROOF LINER
ROOF ASSEMBLY 2
HRV
REF.
MECH.
FLASHING
ROOF MEMBRANE;
WRAP DOWN CURB
1" RIGID INSULATION
SHEATHING
ROOF ASSEMBLY 2
SPRAY FOAM INSULATION
FRTW 2X BLOCKING
PARAPET CAP TYP.
EXISTING WALL
SUBSTRATE
ROOF MEMBRANE
ROOF PENETRATION BOOT
EXISTING LIGHT FIXTURE
SS BOOT CLAMP
SECONDARY STORM
COLLAR
SEAL PENETRATION AT PARAPET CAP
SEAL BOOT AT PARAPET CAP
HRV REF.
MECH.
ACCESS
STAIR
OPENING
ROOF ASSEMBLY 2
ROOF FRAMING REF. STRUCT.
FLASHING
WRAP ROOF MEMBRANE
INTO OPENING
SPRAY FOAM INSULATION
PARAPET CAP TYP.
(E) WALL
ROOF ASSEMBLY 2
SUBSTRATE
CAP FLASHING
CONTINUOUS CLEAT
ROOF MEMBRANE; WRAP OVER
PARAPET AND DOWN WALL 2".
FASTEN AT CLEAT.
TAPERED FRTW BLOCKING
(E) PARAPET STRUCTURE
SUBSTRATE
4"
ESCUTCHEON
HVAC REF. MECH.
ROOF ASSEMBLY 2
HRV ENCLOSURE
WRAP MEMBRANE INTO OPENING
CURB
COLLAR
EXISTING CLADDING
NEW FRTW BLOCKING
HOOD; REF. MECH,
EXISTING WALL ASSEMBLY
EXISTING CLADDING
NEW FRTW BLOCKING
HOOD; REF. MECH,
EXISTING WALL ASSEMBLY
BACKROD AND
SEALANT
PARAPET CAP TYP.
(E) WALL
ROOF ASSEMBLY 2
(E) SCUPPER
CAP EXISTING SCUPPERS
1/8" WEEP HOLES @ 3" O.C.
A-510 E3
(E) WALL ASSEMBLY
(E) HVAC OPENING
INFILL FRTW FRAMING
1/2" FRTW SHEATHING
AIR BARRIER, SEAL TIGHT
TO ADJ (E) BARRIER
FLAT MTL PANEL; PT TO
MATCH ADJ SIDING
DRIP EDGE
METAL SHEET, MATCH ADJ
INTERIOR SURFACE
FILL WITH BATT INSUL
VR, SEAL TIGHT TO ADJ (E) VR
DAMPER
ROOF ASSEMBLY 2
CANT
FACTORY INSULATED
ROOF CURB
CONTINUOUS
NEOPRENE PAD
ROOFTOP HOOD
ATTACH EQUIPMENT TO
CURB PER MANUFACTURERS
RECOMENDATIONS
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
ION
2 D (K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-510
D
ET
AI
L S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
E X
TE
R I O
R D
ET
AI
L S
12" = 1'-0"E4 ROOF DRAIN DETAIL
1 1/2" = 1'-0"G1 HRV CURB
3" = 1'-0"E1 PARAPET TYP. @ LIGHT FIXTURE
1 1/2" = 1'-0"G3 HRV OPENING
1 1/2" = 1'-0"D1 PARAPET TYP.
3" = 1'-0"E3 PARAPET CAP
1 1/2" = 1'-0"B1 HRV PENETRATION TYP.
3" = 1'-0"A5 NEW MECH. HOOD HEAD
3" = 1'-0"C5 NEW MECH. HOOD JAMB / SILL
1 1/2" = 1'-0"D3 SCUPPER INFILL
1 1/2" = 1'-0"B3 HVAC WALL INFILL
1 1/2" = 1'-0"A1 ROOF HOOD CURB
AD
D
ED
D
ET
AI
L N
O
TE
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#2
/18
ATTACH HOT DIP GALVANIZED 4" X 4" X 1/4"
PLATE WASHER TO BOTTOM OF SECTION
WITH 1/2"-13 X 1" LG. FASTENER AND P1006
NUT. DRY-PACK GROUT BETWEEN BLOCK AND
WASHER
6" x 6" CONCRETE
CENTER SUPPORT,
HEIGHT AS REQUIRED
P1000, HG OR WITH POST
INSTALLED ANCHOR BOLTS,
KEEP 3" CLEAR OF FLOOR
PIPE ROLLER, TYP SEE
DETAIL E5/C-722
USE P1026. HG BRACKET
W/(2) 1/2"-3 X 1"LG.,
FASTENERS EG AND (2) P1006
EG NUTS, TYP.
(E) ELECTRICAL
CONDUIT TO
REMAIN, SEE
E-101
6" ST LOW END
POSITION
6" ST HIGH END
POSITION
4" S
2" DCW
3" COND
10" FW
NOTES:
1. STEAM PIPE SLOPES TO BUILDING, NOT IN DIRECTION OF UTILIDUCT AT 1"/40'-0".
2. PIPE GUIDES TO BE BOLTED TO STRUT SPACING OF GUIDES SHALL BE PER DWG. C-711
AND C-722 STEAM PIPE GUIDES MAY REPLACE A ROLLER SUPPORT. CONDENSATE PIPE
GUIDES WILL REQUIRE AN ADDITIONAL STRUT ACROSS THE UTILIDUCT. SEE DETAIL
F3/C-722.
3. PART NUMBERS ARE FOR UNISTRUT. EQUAL PRODUCTS MATCHING THE LOAD RATINGS
AND SPECIFICATIONS ARE ACCEPTABLE.
4. LOCATE PIPE SUPPORTS 10'-0" APART MAXIMUM.
GENERAL NOTES:
1. ANCHOR DETAILS ARE SUGGESTIONS ONLY. ACTUAL
CONFIGURATION AND DESIGN REQUIREMENTS SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR. SEE
DWG C-711 FOR DESIGN FORCES.
2. ALL PIPE SUPPORTS AND ANCHOR ELEMENTS SHALL
BE HOT-DIPPED GALVANIZED PER ASTM 123.
ADDITIONALLY, PIPE SUPPORTS AND ANCHORS WITHIN
6" OF THE FLOOR SHALL BE COATED WITH ASPHALT
FOR ADDITIONAL CORROSION PROTECTION. DO NOT
GALVANIZE UPPER PORTION AT FIELD WELDS.
3. WELDS ARE TO BE SHOP WELDS UNLESS NOTED
OTHERWISE.
4. THE DESIGN SHOWN IS TO RESIST FORCES, MOMENTS
AND TORSION DUE TO THE PIPE GEOMETRY AND
EXPANSION JOINT THRUST.
5. PLATE MATERIAL TO BE ASTM A36.
END VIEW
11 2"
4" TY
P
8" 20
8" 8"
11"
MAX
GALVANIZE LOWER
PORTION
3/16"
TYP
2" TY
P
DO NOT LOCATE
AT GIRTH WELD
1/4"
TYP
3/8
1/2" PLATE,
TYP
1" PLATE
1/4"
TYP
1/4"
TYP
PLAN VIEW
3/4" BASE PLATE
3/16 3/16
41 2"
2" TY
P
" S
Q.
11 2"1/4
1/4
TYP
3/4" PLATE
1/2" PLATE TYP
4"
MAX
3/16
END VIEWPLAN VIEW
6" ST
3" COND
USE P1001 HG
1/2"Ø BACKER ROD
SCALE:
LID PANEL JOINT SECTION
NTSA3
1/2" X 4" CONTINUOUS NEOPRENE BEARING
PAD, 50 DUROMETERS
SCALE:
LID PANEL / WALL JOINT SECTION
NTSC3
1/2" X 4" CONTINUOUS NEOPRENE BEARING
PAD, 50 DUROMETERS
JOINT SEALANT - CONSEAL CS-1500
OR APPROVED EQUAL
1/2"Ø BACKER ROD
JOINT SEALANT - CONSEAL CS-1500
OR APPROVED EQUAL
SEE C3/C-721 FOR
LID/WALL JOINT DETAIL
1/4
1/ 2"
1/2" 1/4
1/
2"
1/2"
US ARMY CORPS
OF ENGINEERS
Reference number:
U.
S.
A
RM
Y
EN
GI
NE
ER
D
IS
TR
IC
T
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
D R
A W
N
B
Y
D E
S I G
N E
D
S U
B M
I T
T E
D
R E
V I E
W E
D
B
Y
F I L
E
D A
T E
C O
N T
R A
C T
N
O
D W
G
D W
G
S
C A
L E
C O
N T
R A
C T
O R
C I T
Y
S T
A T
E
R e c o m m e n d e d
A p p r o v e d
D a t e
P R
I M
E
C
O N
T R
A C
T O
R
R E
S I D
E N
T
E
N G
I N
E E
R
E I E
NOT FOR CONSTRUCTION
P L
S
A
L E x x
ALASKA DISTRICT
F
A
R
E N
O V
A T
E
B
Y
W
A
T H
H E
L T
B
W
K B
R
W
K B
R
DESIGN
COMPLETE
E I E
L S
F B
A
L A
S K
A
S y m A c t i o n D e s c r i p t i o n D a t e
A p p v d
E I E
C
A
B C D E F G H
0 L
S
TR
EE
T, SU
ITE
0, AN
CH
OR
AG
E, A
K
1 P h:
7.2
.74
AK
C
OR
PO
RA
TIO
N
2 D (K
PB
A
EC
C2
(C
OF
FM
AN
REGISTERED PROFESSIONA L ENGINEER
JEFFREY D. BRACE
No. CE12292 Dec 08, 2017
T Y
P I C
L
U
I L
I D
U C
T
D
E T
A I L
S
C-721
J D
B
R M
G
M A
F
T
E D
C I V
I L
U T
I L
I T
Y
SCALE:
TYPICAL UTILIDUCT DETAIL
NTSA4
SCALE:
STEAM PIPE WALL ANCHOR DETAIL
NTSF3
SCALE:
CONDENSATE PIPE WALL ANCHOR DETAIL
NTSF1SCALE:
NOT USED
NTSA1
SHEET NOTES:
ANCHOR BOLTS FOR ALL PIPE ANCHORS ARE 3/4"
HEAVY HEX HEAD ASTM 316 (FY=42 KSI) STAINLESS
STEEL.
BACKING PLATE TO MATCH BASE SIZE, GALVANIZED
AND ASPHALT COATED
/18
AM
#2
AM
#2
P
IP
E
GU
ID
E
AN
D
AN
CH
OR
R
EV
IS
IO
N
JD
B
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text
(E) 14" DCW
(E) 2" CW
(E) 12" ST
(E) 6" COND
" F
W
A4 C-721
(E) 6" DCW
(E) 2" CW
(E) 6" S
6" S
T
(E) 2" DCW
(E) 4" S
3" COND
2" DCW
(E) 6" COND
(E) 12" ST
(E) 12" FW
(E) 2" CW
(E) 14" DCW
(E)
3" COND
4" S
(N)
(N) 10 FW
NOTE:
1. EXISTING ITEMS AS CONSTRUCTED IN EIE376 PROJECT.
(E) EJ-17
(E) EJ-18
(E)
(N)6" ST, 4" S, 2" DCW
(E)
TO BLDG. EIE394
(E) LIFT STATION
6" S
T
4" S
" F
W
BLDG. EIE 394
STEAM ANCHOR, SEE
DETAIL F3/C-721 & A5/C-722
SEAL PIPES AT WALL.
SEE DETAIL A1/S-505
CONDENSATE
ANCHOR SEE DETAIL
F1/C-721 & A5/C-722
FROM MANHOLE LP-34
3" COND
2" DCW
SEE MECHANICAL AND
FIRE PROTECTION FOR
CONTINUATION
PROVIDE DRIP LEG,
SEE F4/C-740
DRIP LEG TO BE LINE SIZE
DIRT LEG
MAIN STEAM LINE
6" M
IN
IM
UM
T
O
BO
TT
OM
O F
MA
IN
6" M
IN
NC
STRAINER
CHECK
VALVE
THREAD-O-LET
CONNECT AT
TOP OF MAIN
1"
48" MIN.
THERMODYNAMIC TRAP,
TLV J3X SERIES FREE
FLOAT OR APPROVED EQUAL
3/4"Ø, WELD TO
THREAD-O-LET
CONDENSATE MAIN
FLOW DIRECTION
LOCATE VALVE
AT FIRST NIPPLE
OFF MAIN.
2" SCH. 80 TO SUMP
OR SAFE LOCATION
AT FLOOR.
1"
NC2"
GATE VALVE AT
FIRST NIPPLE OFF
DRIP LEG.
UNION
TYP
3/4" TEST VALVE,
WITH PLUG
SCALE:
UTILIDUCT DRIP LEG AND TRAP DETAIL
NTSF4
3" M
IN
. THREAD-O-LET, TYP.
US ARMY CORPS
OF ENGINEERS
Reference number:
U.
S.
A
RM
Y
EN
GI
NE
ER
D
IS
TR
IC
T
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
D R
A W
N
B
Y
D E
S I G
N E
D
S U
B M
I T
T E
D
R E
V I E
W E
D
B
Y
F I L
E
D A
T E
C O
N T
R A
D W
G
D W
G
S
C A
L E
C O
N T
R A
C T
O R
C I T
Y
S T
A T
E
R e c o m m e n d e d
A p p r o v e d
D a t e
P R
I M
E
C
O N
T R
A C
T O
R
R E
S I D
E N
T
E
N G
I N
E E
R
E I E
NOT FOR CONSTRUCTION
P L
A
L E x x
ALASKA DISTRICT
F
N
O V
A T
E
B
Y
W
A
T H
E
L T
B
W
K B
R
W
K B
R
DESIGN
COMPLETE
E I E
L S
F B
A
L A
S K
A
S y m A c t i o n D e s c r i p t i o n D a t e
A p p v d
E I E
C
A
B C D E F G H
0 L
S
TR
EE
T, SU
ITE
0, AN
CH
OR
AG
E, A
K
1 P h:
7.2
.74
AK
C
OR
PO
RA
TIO
N
2 D (K
PB
A
EC
C2
(C
OF
FM
AN
REGISTERED PROFESSIONA L ENGINEER
JEFFREY D. BRACE
No. CE12292 Dec 08, 2017
U T
I L I D
U C
T
M
A N
H O
P
D
E T
A I L S
C-740
J D
B
R M
G
M A
F
T
E D
C I V
I L
U T
I L I T
Y
SCALE:
MANHOLE LP-34
1/2"=1'-0"B1 SCALE:
MANHOLE
1/2"=1'-0"F1 0 1 2 4 6
1/2"=1'-0"
0 1 2 4 6
1/2"=1'-0"
SHEET NOTES:
USE FLEXIBLE JOINTS IN THE DUCTILE IRON FIRE AND
SEWER UTILITIES TO ALLOW FOR EXPANSION AND
CONTRACTION IN THE LINE.
/18
AM
#2
AM
#2
C
LO
SU
RE
W
AL
L
JD
B
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text
CONTAINMENT PAD SEALED OVER DRAIN
AND SECURED IN POSITION. (C.I. AGENT POLYVINYL,
SORBWEB PLUS OR EQUAL.)
1" SCREENED STONE
GEOTEXTILE CONTAINMENT BLANKET
(C.I. AGENT POLYVINYL, SORBWEB
PLUS OR EQUAL)
SEAL CONTAINMENT BLANKET
CONDUIT PENETRATIONS.
(2) 4" SAND LAYERS
SLOPE FOR SAFETY
30" MIN
24" MIN
G E
N E
R A
L N
O T
E
12" MIN
PRE-MANUFACTURED OR
POURED IN PLACE PADVAULT
PER TRANSFORMER
DIMENSIONS
#4/0 BARE GROUND
CONDUCTOR
EXOTHERMIC WELD,
TYP.
TRANSFORMER
#4/0 BARE COPPER
COUNTERPOISE
PROVIDE 1" SCH 80 PVC SLEEVES
(TYPICAL) FOR GROUND CONDUCTOR
INSTALLATION. EXTEND SLEEVES 1"
MINIMUM BEYOND PADVAULT WALL ON
BOTH ENDS.
3/4"x10'-0" COPPER CLAD GROUND
ROD INSTALLED 20'-0" MINIMUM AWAY
FROM TRANSFORMER GROUND RING.
3/4"x10'-0" COPPER
CLAD GROUND ROD.
#4/0, 600V RATED INSULATED
SECONDARY NEUTRAL GROUND.
#4/0 BARE GROUND
CONDUCTOR
3/4"x10'-0" COPPER
CLAD GROUND ROD.
SECONDARYPRIMARY
REMOVE GROUND STRAP BETWEEN
SECONDARY NEUTRAL AND TRANSFORMER
CASE GROUND IF PRESENT.
CONDUCTORS FOR FEED
THROUGH TRANSFORMER NOT
SHOWN FOR CLARITY.
#4/0 MV
CONCENTRIC
NEUTRAL GROUND
S E
E N
O T
E
TRANSFORMER
SEE NOTE 5
TRANSFORMER
CASE GROUND
TRANSFORMER, SEE SITE PLAN
CONCRETE VAULT SIZED
AS REQUIRED
#4/0 BARE COPPER COUNTERPOISE
RING BURIED 30" BELOW GRADE, MIN.
PLACE 42" FROM PAD.
3/4"x10' LONG COPPER CLAD GROUND ROD
EXOTHERMIC WELDED TO #4/0 COPPER
COUNTERPOISE AT FOUR LOCATIONS.
SECONDARY NEUTRAL. REMOVE
GROUND BOND STRAP BETWEEN
NEUTRAL AND TRANSFORMER CASE
GROUND IF PRESENT.
GENERAL NOTES:
1. PADVAULT ASSEMBLIES INCLUDE SITE PREPARATION BEDDING AND DRAINAGE.
2. PADVAULTS MAY BE PRECAST OR POURED IN PLACE. STEEL REINFORCING SHALL
BE #5 BARS AT 12" O.C. EACH WAY MINIMUM TO STOP 1" FROM SIDES AND CABLE
OPENINGS.
3. EQUIPMENT SHALL BE SECURED TO PADVAULT IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS.
4. LOCATION & SIZE OF CABLE OPENING SHALL BE AS REQUIRED FOR CABLE RUN &
EQUIPMENT LAYOUT.
5. PADVAULT DIMENSIONS SHALL BE AT LEAST 12" LARGER THAN EQUIPMENT
OUTSIDE DIMENSIONS. COORDINATE DIMENSIONS WITH TRANSFORMER
MANUFACTURER, SITE CONDITIONS, ADJACENT UTILITIES AND ALL TRADES.
REFER TO CIVIL SITE PLANS.
6. BOND SYSTEM GROUND CONDUCTOR ROUTED WITH PRIMARY CONDUCTORS TO
GROUNDING ELECTRODE SYSTEM (NOT SHOWN).
7. BOND PRIMARY CONCENTRIC NEUTRALS (FOR FUTURE 12.47kV CONVERSION) TO
GROUNDING ELECTRODES.
8. PRIMARY DISTRIBUTION IS CLASSIFIED AS A SINGLE GROUND SYSTEM
OPERATING AT 7.2kV DELTA. INSTALLATION SHALL COMPLY WITH NESC AND BE SUITABLE FOR FUTURE 12.47GY/7.2kV CONVERSION WITH MINIMAL FIELD
MODIFICATIONS.
VAULT
CABLE
ENTRY
#4/0 EQUIPMENT
GROUND BOND
#4/0 MV
CONCENTRIC
NEUTRAL GROUND
#4/0 BARE GROUND
PROVIDE GROUND ROD FOR
SECONDARY NEUTRAL. GROUND
ROD SHALL BE SEPARATED FROM
PRIMARY GROUNDING ELECTRODE
SYSTEM BY 20'-0" MINIMUM PER
NESC 097D.
#4/0 INSULATED SECONDARY NEUTRAL
GROUNDING ELECTRODE CONDUCTOR.
GEOTEXTILE
CONTAINMENT
BLANKET
12"
30"
PADVAULT CONTAINMENT NOTES:
1. PROVIDE PADVAULT GEOTEXTILE CONTAINMENT BLANKET AROUND
BOTTOM OF PAD VAULT UP TO 12" BELOW GRADE. SEAL ALL AREAS
WHERE CONDUIT PENETRATE, OVERLAP LINER AROUND CONDUIT
AND SEAL WATER TIGHT.
2. FILL AREA BETWEEN PADVAULT AND LINER WITH 1" INCH
UNIFORMLY GRADED SCREEN ROCK.
3. COVER PADVAULT SUMP DRAIN WITH A GEOTEXTILE OIL
CONTAINMENT PAD TO IMPEDE PASSAGE OF OIL FROM VAULT.
4. SEAL ALL PADVAULT CONDUIT PENETRATIONS WATER TIGHT, WITH
CONCRETE GROUT OR EXPANDING FOAM.
5. SEAL ALL CONDUIT WATER TIGHT, WITH CONDUIT SEALANT OR
EXPANDING FOAM.
6. ALL EXPOSED METAL PARTS SHALL BE HOT DIPPED GALVANIZED.
PROVIDE WATER STOP AT ANY CONSTRUCTION JOINTS.
7. PROVIDE PADVAULT AND CONTAINMENT BLANKET SUBMITTAL FOR
ENGINEER REVIEW.
CONTAINMENT PAD SEALED OVER DRAIN
AND SECURED IN POSITION. (C.I. AGENT POLYVINYL,
SORBWEB PLUS OR EQUAL.)
1" SCREENED STONE
GEOTEXTILE CONTAINMENT BLANKET
(C.I. AGENT POLYVINYL, SORBWEB
PLUS OR EQUAL)
SEAL CONTAINMENT BLANKET
CONDUIT PENETRATIONS.
(2) 4" SAND LAYERS
SLOPE FOR SAFETY
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
E-502
D E
T A
IL
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
L R
J
A L M L
R H
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
E L E
C T
R
IC
A L
E L E
C T
R
IC
A L D
E T
A
IL
S
N.T.S.A1
PADVAULT MOUNT TRANSFORMER ELEVATION VIEW
N.T.S.E1
PADVAULT MOUNT TRANSFORMER DETAIL
N.T.S.A4
PADVAULT CONTAINMENT DETAIL
T S
T A
E
A K
AF ALO
49 TH
S
REG IST ER ED P R O F ES S I O NA L ENG IN
EER
No. EE12169
LON R. JOHANNES
DEC 08, 2017
2 2 2 22
N
O T
E A
N D
C A
LL
O
U T
C
LA
R
IF
IC
A
T
IO
N
LR
J
S ym
A ct io n
D es cr ip tio n
D at e A pp vd
A
M #2
/1
54321
UH-17
FIRE
RESTROOM
CORR.
JANITOR
SHOWER
RESTROOM
ELEC
UH-18
/MATCHLINE - SEE A1 M-123
/MATCHLINE - SEE A1 M-121
FT-1FT-1
CRP-1CRP-1
CUH-1
CUH-2CUH-2
T T
T
T
3" C
6" HPS
PRV's RACKED
ON THE WALL
8" LPS
1-1/4" HGS/HGR
UP TO
MECHANICAL
PLATFORM
3/4" HGR
3/4" HGS
1" HGR
1" HGS
CM-1
MS-1
6" HPS, 3" COND FOR
CONT. IN UTILIDUCT,
SEE CIVIL
4" COND
ENTRY
VEST.
1" HGR
1" HGS
FOR UNIT
HEATER PIPING
DETAIL, SEE
A5/M-502 (TYP.)
3/4" HGS/HGR
FOR CABINET UNIT
HEATER PIPING DETAIL,
SEE E3/M-502 (TYP.)
FIRE EQUIPMENT SHOWN
FOR COORDINATION.
PLUMBING
FIXTURES (TYP.)
D
C
54321
UH-19
UH-20
/MATCHLINE - SEE A1 M-123
/MATCHLINE - SEE A1 M-121
P-1AP-1A
P-1BP-1B
P-2BP-2BP-2AP-2A
AS-1AS-1
HX-2HX-1
HX-1HX-2
GMT-1GMT-1
ET-1ET-1
AS-2
MECHANICAL
PLATFORM
4" HGS2" SMS
4" HGS2" SMS
4" HGR2" SMR
4" HGR2" SMR
HEAT EXCHANGER
COIL PULL SPACE,
(TYP 2)
1-1/4" HGS/R
DN TO FIRST
FLOOR
3/4 HGR
3/4 HGS
4" SMS
6" HGS
4" HGS/HGR UP TO
PHC-1 FOR PIPING
DETAIL SEE
C1/M502
4" SMR
T
T
HC-6
3/4" HGS/HGR
8" LPS DN
4" COND DN
HOUSEKEEPING
PAD (TYP.)
6" HGS ET-2
6" HGR
M M
2-1/2" HGS/HGR UP
TO HC-1 FOR
PIPING DETAIL SEE
C1/M502
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
M-122
P L A
N
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M J M
S E
W B L L
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
M E
C H
A N
IC
A
L
L E
V E
L
M
E C
H A
N
IC
A L P
L A
T F
O R
M H
E A
T
IN
G
P L A
N S
A
R E
A B
1/4" = 1'-0"A1
LEVEL 1 HEATING PLAN - AREA B
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
1/4" = 1'-0"A4
MECHANICAL PLATFORM HEATING PLAN - AREA B
KEY PLAN
CBA
GENERAL NOTES:
1. ROUTE ALL PIPING ABOVE THE BOTTOM CHORD OF THE ROOF
TRUSSES EXCEPT WHERE SERVING EQUIPMENT.
2. SLEEVE AND SEAL ALL WALL PENETRATIONS. PROVIDE FIRE
CAULK AS REQUIRED TO MAINTAIN ASSEMBLY RATINGS. SEE
DETAIL C3/M-502.
3. PATCH ALL OPENINGS IN WALLS RESULTING FROM DEMOLITION
WORK.
4. SEE A3/M-701 FOR STEAM AND CONDENSATE PIPING DIAGRAM.
5. SEE A/1/M-701 FOR HEATING GLYCOL AND SNOWMELT PIPING
DIAGRAM.
6. RESTROOM 108 AND ADJACENT HALLWAY ARE CLASS1/ DIV 2
RATED. ALL EQUIPMENT LOCATED IN THESE AREAS SHALL BE
LISTED FOR CLASS1/ DIV 2 USE. SEE ELECTRICAL CLASSIFICATION
PLAN.
P
IP
E
S
IZ
E C
H A
N G
E
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER E D P R O F ES S IO NA L ENG IN
EER
Brent L. Little
ME 12298
JAN 08, 2017
B
LL
S ym
A ct io n
D es cr ip tio n
D at e A pp vd
A
M #2
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
M-601
S C
H E
D U
L E
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M J M
S E
W B L L
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
M E
C H
A N
IC
A
L
S C
H E
D U
L E
S
H E
A T
IN
G
SNOWMELT ZONE SCHEDULE
ZONE AREA (SF)
FLUID
TYPE
OUTPUT
BTU/ SQ.
FT.
TEMPERATURE
# OF
CIRCUITS
SPACING
O.C. (IN.)
TUBE
DIAMETER
(IN.)
FLOW
(GPM)
PRESSURE
DROP MAX.
(FT W.C.)
BASIS OF DESIGN
NOTESSUPPLY
(DEGREE F)
DELTA T
(DEGREE F)
MANUFACTURER MODEL
SM-1 1428 SF 60 / EG 185 130 20 10 6 3/4" 34 15 REHAU - -
SM-2 1431 SF 60 / EG 185 130 20 10 6 3/4" 34 15 REHAU - -
SM-3 1433 SF 60 / EG 185 130 20 10 6 3/4" 34 15 REHAU - -
SM-4 1428 SF 60 / EG 185 130 20 10 6 3/4" 34 15 REHAU - -
UNIT HEATER SCHEDULE
TYPE LOCATION
RATED CAPACITY
(MBH)
FLUID%/
TYPE
EGT
(F)
LGT
(F)
FLOW
(GPM)
EAT
(F)
FAN BASIS OF DESIGN
NOTES
VOLTAGE PHASE HP OR W CFM SCCR MANUFACTURER MODEL
CUH-1 WALL (EXPOSED) ENTRY 114 45 60 / EG 180 150 3 60 120 V 1 1/20 370 CFM 18K MODINE C-006 1,3
CUH-2 WALL (EXPOSED) CORR. 110 45 60 / EG 180 150 3 60 120 V 1 1/20 370 CFM 18K MODINE C-006 1,3
UH-1 VERTICAL BAY 9 102 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-2 VERTICAL BAY 9 102 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-3 VERTICAL BAY 9 102 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-4 VERTICAL BAY 9 102 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-5 VERTICAL BAY 10 103 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-6 VERTICAL BAY 10 103 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-7 VERTICAL BAY 10 103 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-8 VERTICAL BAY 10 103 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2
UH-9 VERTICAL BAY 11 104 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-10 VERTICAL BAY 11 104 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-11 VERTICAL BAY 11 104 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-12 VERTICAL BAY 11 104 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-13 VERTICAL BAY 12 105 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-14 VERTICAL BAY 12 105 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-15 VERTICAL BAY 12 105 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-16 VERTICAL BAY 12 105 188 60 / EG 180 150 15 55 480 V 3 3/4 4820 CFM 30K MODINE V-333 1,2,4
UH-17 HORIZONTAL FIRE 106 31 60 / EG 180 150 2 60 120 V 1 1/12 730 CFM 18K MODINE HSB-47 1
UH-18 HORIZONTAL ELEC 107 31 60 / EG 180 150 2 60 120 V 1 1/12 730 CFM 18K MODINE HSB-47 1
UH-19 HORIZONTAL MECHANICAL PLATFORM 200 31 60 / EG 180 150 2 60 120 V 1 1/12 730 CFM 18K MODINE HSB-47 1
UH-20 HORIZONTAL MECHANICAL PLATFORM 200 31 60 / EG 180 150 2 60 120 V 1 1/12 730 CFM 18K MODINE HSB-47 1
NOTES:
1. FLOW RATE BASED ON 30°F DELTA, 180 DEG F EGT AND 60% ETHYLENE GLYCOL SOLUTION.
2. SPACE TEMPERATURE RECOVERY UNIT HEATER. PROVIDE WITH MANUFACTURER'S LOUVER CONE DIFFUSER.
3. TWO ROW COIL, INVERTED FLOW. RATED FOR CLASS1, DIV 2 LOCATION.
4. UNIT RATED FOR CLASS 1 DIV 2 LOCATION.
SHELL AND TUBE HEAT EXCHANGER SCHEDULE
TAG TYPE LOCATION SERVES
RATED
CAPACITY
(MBH)
TUBE SIDE SHELL SIDE BASIS OF DESIGN
NOTESFLUID
(%TYPE)
FLOW
(GPM)
Ti (F) To (F)
MIN. FOULING
FACTOR
MAX. PD
(PSI)
FLUID LB/HR
PRESS
INLET (PSIG)
PRESS OUT
(PSIG)
MIN. SCALING/
FOULING
FACTOR
MFR MODEL
HX-1 SHELL AND TUBE MECHANICAL PLATFORM 200 HIGH TEMP SYSTEM 6600 60%/EG 553 180 150 0.002 1.5 STEAM 6809 2.0 0.00 0.002 B&G QSU-247-4 1
HX-2 SHELL AND TUBE MECHANICAL PLATFORM 200 SNOW MELT SYSTEM 1500 60%/EG 136 110 130 0.002 1.5 STEAM 1513 2.0 0.00 0.002 B&G SU-145-4 1
NOTES:
1. HEAT EXCHANGER TO BE U-TYPE DESIGN.
STEAM TRAP AND PRV SCHEDULE
TAG TYPE
DESIGN
LOAD (#/HR)
UPSTREAM
PRESSURE
(PSIG)
DOWNSTREAM
PRESSURE (PSIG)
Cv SIZE
BASIS OF DESIGN
NOTES
MANUFACTURER MODEL
PRV-1 - 2774 75 17 35 2" SPIRAX 25P -
PRV-2 - 5548 75 13 56 2-1/2" SPIRAX 25P -
PRV-3 - 73 75 35 3.48 1/2" SPIRAX 25P -
ST-1 THERMODYNAMIC 4 75 0 - 1" SPIRAX TDC -
ST-2 F&T 10 15 0 - 3/4" SPIRAX FT-15 -
ST-3 F&T 6 15 0 - 3/4" SPIRAX FT-15 -
ST-4 F&T 13618 2 0 - 2" SPIRAX FTB-30 -
ST-5 F&T 3 15 0 - 3/4" SPIRAX FT-15 -
ST-6 F&T 3026 2 0 - 2" SPIRAX FT-15 -
ST-7 F&T 7 75 0 - 3/4" SPIRAX FT-75 -
ST-8 F&T 2.5 2 0 - 3/4" SPIRAX FT-15 -
ST-9 F&T 1 2 0 - 3/4" SPIRAX FT-15 -
ST-10 F&T 2 35 0 - 3/4" SPIRAX FT-15 -
STEAM CONTROL VALVE SCHEDULE
TAG SERVES
LOAD
(#/HR)
UPSTREAM
PRESSURE
(PSIG)
DOWNSTREAM
PRESSURE (PSIG)
Cv
BASIS OF DESIGN
NOTES
MANUFACTURER MODEL
CV-1 STEAM HX-1 2270 15 2 56 SPIRAX SPIRATROL SERIES ELECTRIC ACTUATION - EQUAL PERCENTAGE
CV-2 STEAM HX-1 4539 15 2 115 SPIRAX SPIRATROL SERIES ELECTRIC ACTUATION - EQUAL PERCENTAGE
CV-3 STEAM HX-2 504 15 2 14 SPIRAX SPIRATROL SERIES ELECTRIC ACTUATION - EQUAL PERCENTAGE
CV-4 STEAM HX-2 1009 15 2 35 SPIRAX SPIRATROL SERIES ELECTRIC ACTUATION - EQUAL PERCENTAGE
CONDENSATE RECEIVER PUMP SCHEDULE
TAG APPLICATION LOCATION CONDENSATE
RATE (LB/HR)
CONDENSATE
PUMP RATE
(GPM)
OPERATING
PRESSURE
(PSI)
BACK
PRESSURE
(PSI)
BASIS OF DESIGN
NOTES
MFR MODEL
CRP-1 CONDENSATE RECEIVER MECHANICAL PLATFORM 24,750 50 GPM 35 10 SPIRAX PTF4 -
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER E D P R O F ES S IO NA L ENG IN
EER
Brent L. Little
ME 12298
JAN 08, 2017
S N
O W
M E
LT
S
P A
C
IN
G
T E
M P
B
LL
S ym
A ct io n
D es cr ip tio n
D at e A pp vd
A
M #2
VACUUM
BREAKER
HX-2
L P
S
ST-6
ST-5
TS
CV-3
CV-4
CV-1
CV-2
ST-3
VACUUM
BREAKER
ST-4
HX-1
L P
S
CRP-1
PRV-1
PRV-2
ST-2
ST-7
FT-1
S V
2 1
H P
S
TS
TS
TS
PIPE TO GLYCOL
MAKE-UP TANK
SMS/SMR TO SNOWMELT
SYSTEM
HGS/HGR TO HIGH
TEMPERATURE
SYSTEM
PIPE TO GLYCOL
MAKE-UP TANK
LPC LPC
LPC
SERVICE DRAIN
BYPASS GLOBE
VALVE Cv=75
BYPASS GLOBE
VALVE Cv=150
BYPASS GLOBE
VALVE Cv=35 30 PSIG
30 PSIG
STEAM PRV LINE, SIZE EQUAL TO PRV OUTLET. ROUTE THROUGH PLATFORM FLOOR, ABOVE. PROVIDE 2" MIN.
INSULATION. INSTALL MINIMUM 12 FT. FROM FINISHED GRADE.
EXTEND STEAM VENT THROUGH PLATFORM FLOOR, ABOVE. PROVIDE 2" MIN. INSULATION THROUGH WALL AND
WEATHER PROOF FLASHING. INSTALL MINIMUM 12 FT. FROM FINISHED GRADE.
SHEET NOTES:
MS-1
ST-10
H P
S
LP
C
LP
C
M
HPC
CONDENSATE
RECEIVER, 20"ø
PIPE, MIN. 48"
LENGTH
CM-1
N.C.
1-
/2
1-1/2"
3"
2"
1 1/2"
1 1/2" 1 1/2"
2"
1"3/4"
30 PSIG
2" 4"
1"
4"
3"
1 1/2"
1"
4" 4"
4" LPS
1-1/2"
3/4"
PRV-3
M
IN
6"
3"
ST-8
1"
ST-9
3/ 4"
DIRT LEG UTILITY
ENTRANCE PIT.
SEE CIVIL
4 HPS
5,548 LB/HR
5,141 FT/MIN
3 HPS
2,774 LB/HR
4,426 FT/MIN
6 LPS
5,548 LB/HR
6,398 FT/MIN
4 LPS
2,774 LB/HR
7,260 FT/MIN
6 HPS
8,322 LB/HR
3,395 FT/MIN
8 LPS
8,322 LB/HR
5,541 FT/MIN
8 LPS
8,322 LB/HR
5,541 FT/MIN
8 LPS
6,809 LB/HR
4,534 FT/MIN
10 LPS
6,809 LB/HR
4,931 FT/MIN
6 LPS
4,539 LB/HR
5,232 FT/MIN
4 LPS
2,270 LB/HR
5,940 FT/MIN
6 LPS
2,270 LB/HR
4,487 FT/MIN
8 LPS
4,539 LB/HR
5,181 FT/MIN
4 LPS
1,513 LB/HR
3,960 FT/MIN
3 LPS
1,009 LB/HR
4,548 FT/MIN
2 LPS
504 LB/HR
5,008 FT/MIN
4 LPS
1,513 LB/HR
6,787 FT/MIN
2.5 LPS
504 LB/HR
6,015 FT/MIN
4 LPS
1,009 LB/HR
4,525 FT/MIN
2"
N.C.
3" 6"
6 HPS
8,322 LB/HR
3,395 FT/MIN
8" LPS
1-1/2"
6" HPS
2"
4"
1"
1 1/2"
1" LPC
AS-1
ET-1
SECURELY ANCHOR BOLT ALL
EQUIPMENT THROUGH
HOUSEKEEPING PAD TO
FLOOR STRUCTURE
ANCHOR BOLT (TYP) FOR
ANCHORAGE INFORMATION SEE
STRUCTURAL
APIPE TO
GMT-1
P-1B
1-1/2 HIGH VOLUME GLYCOL
DRAIN WITH FILL CONNECTION
AND THREADED CAP
HGS
HGRHGR
HGS
HGS/R
TO/FROM
HX-1
AS-2
ET-2
GMT-1
SECURELY ANCHOR BOLT ALL
EQUIPMENT THROUGH
HOUSEKEEPING PAD TO
FLOOR STRUCTURE
ANCHOR BOLT (TYP) FOR
ANCHORAGE INFORMATION SEE
STRUCTURAL
3-1/2" CONC.
HOUSEKEEPING
PAD (TYP)
APIPE TO
GMT-1
P-2A
P-2B
SMS
SMRSMR
SMS
SMS/R
TO/FROM
HX-2
SMS/R TO/FROM
BUILDING SYSTEM
HX-2
1 GMT-1 SERVES BOTH HIGH TEMP AND SNOWMELT SYSTEMS.
NOTE:
HIGH VOLUME GLYCOL DRAIN
WITH FILL CONNECTION AND
THREADED CAP
FLEX CONNECTION
(TYP).
TO GLYCOL
MAKEUP TANK
GMT-1
HIGH TEMP
SNOWMELT
P-1A
FLEX
CONNECTION, TYP
TO HIGH
TEMP
SYSTEM
HGS/R TO/FROM
BUILDING SYSTEM
6" HGS 6" HGS
4" SMS4" SMS
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
M-701
D
IA
G R
A M
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M J M
S E
W B L L
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
M E
C H
A N
IC
A
L
D
IA
G R
A M
S
H E
A T
IN
G
N.T.S.A3
STEAM SYSTEM PIPING DIAGRAM
N.T.S.A1
HEATING PIPING DIAGRAM
2 2 2 2 2
P
IP
E S
IZ
E
C H
A N
G E
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER E D P R O F ES S IO NA L ENG IN
EER
Brent L. Little
ME 12298
JAN 08, 2017
B
LL
S ym
A ct io n
D es cr ip tio n
D at e A pp vd
A
M #2
(E) CONC STEM WALL TO REMAIN
(E) STRIP FOOTING TO REMAIN
2"
(E) 8" HANGAR
SLAB W/ #4 @
16" O.C.
1' - 8 5/8" 2' - 0"
7' - 0" 3' - 0"
DEMO EXTENTS
FIN.FLR. EL.-0'1/2"
FIN FLR. EL. 0'-0"
INTERIOR FACE OF
HANGAR DOOR
DEMO EXTENTS
1/4" R
(E) 3" ACC PAVEMENT
OVER 6" BASE COURSE
OVER CLASSIFIED FILL
1'
(E) FILL
(E) 8" HANGAR SLAB
(E) CONC STEM WALL TO REMAIN
(E) STRIP FOOTING TO REMAIN
(E) 8" HANGAR
SLAB
2' - 0"
NEW HEATED SLAB
PER F2/S-500
FIN FLR. EL. 0'-0"
INTERIOR FACE OF
HANGAR DOOR(E) 3" ACC PAVEMENT
OVER 6" BASE COURSE
OVER CLASSIFIED FILL
7' - 0" 3' - 0"
PROVIDE #5 EPOXY DOWEL @ 12" O.C.
WITH 4" EMBED AND STD HOOK
THICKENED
SLAB EDGE
D2
S-500
A1
S-500
NOTE 4
NOTES:
1. REINFORCEMENT & HEAT TUBES NOT SHOWN FOR CLARITY.
2. SEE DETAIL F1/S-500 FOR TYPICAL DOWEL PLACEMENT DETAILS.
3. DISCONTINUE REINFORCEMENT AT JOINT.
4. PROVIDE 1"x1'-6" SMOOTH EPOXY COATED DOWEL AT 12" O.C. AT SLAB MID-
DEPTH. OIL HALF OF DOWEL TO PREVENT BOND TO NEW SLAB SECTION
C1
S-500
NOTES:
1. HEAT TUBES NOT SHOWN FOR CLARITY.
2. DISCONTINUE REINFORCEMENT AT JOINT.
2" 2"
REINFORCEMENT
PER F2
S-500
NOTES:
1. SEALANT SHALL BE POURABLE SEALANT MEETING ASTM D 5893.
2. JOINT SEAL SHALL BE APPLIED SUBSEQUENT TO FLOOR COATING.
3. SEE SLAB PLANS FOR HANGAR BAY JOINT LOCATIONS.
+/-1/16"
1/2"
1/ 8"
1/4" CHAMFER
JOINT SEAL W/ BACKER ROD, NOTE 1
CONSTRUCTION BUTT JOINT
HANGAR BAY JOINT
DEPTH PER MANUFACTURER
RECOMMENDATIONS, 1.5" MIN
1/4" CHAMFER
INITIAL
SAWCUT
/2
1/8"
JOINT SEAL W/ BACKER ROD, NOTE 1
DEPTH PER MANUFACTURER
RECOMMENDATIONS, 1.5" MIN
NOTES:
1. SEALANT SHALL BE POURABLE SEALANT MEETING ASTM D 5893.
2. JOINT SEAL SHALL BE APPLIED SUBSEQUENT TO FLOOR COATING.
3. SEE SLAB PLANS FOR HANGAR BAY JOINT LOCATIONS.
HANGAR BAY JOINT
1/ 8"
+/-1/16"
1/2"
+/-1/16"
1/2"
1/4" CHAMFER
PREFORMED NON-
EXTRUDING EXPANSION
JOINT MATERIAL
JOINT SEAL W/ BACKER ROD, NOTE 1
DEPTH PER MANUFACTURER
RECOMMENDATIONS, 1.5" MIN
NOTES:
1. SEALANT SHALL BE POURABLE SEALANT MEETING ASTM D 5893.
2. JOINT SEAL SHALL BE APPLIED SUBSEQUENT TO FLOOR COATING.
3. SEE SLAB PLANS FOR HANGAR BAY JOINT LOCATIONS.
HANGAR BAY JOINT
/8
12"
TYP
12"
TYP 8'-0" SLAB
12"
PLANNED
CONTRACTION JOINT
D1
S-500
ADJACENT SLAB
PREFORMED NON-EXTRUDING
EXPANSION JOINT FILLER MATERIAL
NOTE 2
NOTES:
1. REINFORCEMENT AND HEAT
TUBES NOT SHOWN FOR CLARITY.
2. PROVIDE 1"x1'-6" SMOOTH EPOXY
COATED DOWEL AT 12" O.C. AT
SLAB MID-DEPTH. DRILL AND
EPOXY TO (E) SLAB PER GENERAL
NOTES W/6" EMBED. OIL HALF
DOWEL TO PREVENT BOND TO
NEW SLAB.
3. DISCONTINUE REINFORCEMENT
AT JOINT.
#5 @ 12" O.C. E.W.
CENTER REINFORCEMENT
3" FROM SURFACE
PCC PAVEMENT
HEAT TUBING, CENTERED 6" FROM SURFACE
SEE MECHANICAL
INSULATION, NOTE 1
4" AGGREGATE BASE COURSE
12" CLASSIFIED MATERIAL
NOTES:
1. PROVIDE 2" 60 PSI MIN RIGID
INSULATION UNDER HEATED
SLABS.
EXISTING CLASSIFIED FILL
6x6 W1.4xW1.4 WELDED WIRE FABRIC
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
S-500
D E
T A
IL
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M C
S
H U
B D R
B
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
S T
R U
C T
U R
A L
F O
U N
D A
T
IO
N D
E T
A
IL
S
3/4" = 1'-0" A4
SLAB SECTION - DEMO
SCALE: 3/4"=1'-0"
3/4" = 1'-0"
D4
HEATED SLAB SECTION
SCALE: 3/4"=1'-0"
N.T.S.
A2
CONSTRUCTION JOINT DETAIL
N.T.S.
C2
CONTRACTION JOINT DETAIL
N.T.S.
A1
CONSTRUCTION JT SEALANT DETAIL
N.T.S.
C1
CONTRACTION JT SEALANT DETAIL
N.T.S.
D1
EXPANSION JOINT SEALANT DETAIL
N.T.S.
F1
DOWEL BAR LAYOUT DETAIL
N.T.S.
D2
DOWELED EXPANSION JOINT DETAIL
N.T.S.
F2
HEATED PCC APRON/HANGAR SLAB DETAIL
S ym
A ct io n
D es cr ip ti o n D at e
A p p vd
A
M #2
/1
M
C S
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER ED P R O F ES S I O NA L ENG IN
EER
MATTHEW C. STIELSTRA
No. SE13651
DEC 08, 2017
R
E V
IS
E
D H
E A
T E
D P
C C
S
LA
B D
E T
IL
IC
K
E N
E D
S
LA
B E
D G
E
T Y
P
THICKENED
SLAB EDGE,
TYP
CONC SLAB W/ LIGHT BROOM FINISH
APPROX. ANCHOR BOLT LOCATION
ANCHORS SHALL BE 3/4"ø x 6" EMBED (MIN)
ADHESIVE ANCHORS TYP OF (6)
OUTLINE OF
GENERATOR
ENCLOSURE
5'
F
IE
LD
V
E R
IF
Y
G E
N E
R A
T O
R
3'
1'
1'
1'
1' - 6"
1' - 0" 1' - 0"
14' - 1"
FIELD VERIFY GENERATOR SKID DIMENSION
12' - 1"
S K
ID
D
IM
E
N S
IO
N
A1
S-501
C
LR
TYP
C
LR
#4 @ 12" O.C. MAX E.W.
24" (MIN) CLASSIFIED FILL (2) #4 CONT @
THICKENED EDGES, TYP
(E) GENERATOR ENCLOSURE
3/4" CHAMFER, TYP
APRON
PROVIDE 90° HOOK AT
EACH END OF EACH BAR,
TYP
2"
1' - 6"3"
1'
3"
6"
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
S-501
D E
T A
IL
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M C
S
H U
B D R
B
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
S T
R U
C T
U R
A L
F O
U N
D A
T
IO
N D
E T
A
IL
S
3/4" = 1'-0" A5
GENERATOR SLAB PLAN
3/4" = 1'-0" A1
GENERATOR SLAB SECTION
SCALE: 3/4"=1'-0"
SCALE: 3/4"=1'-0"
S ym
A ct io n
D es cr ip ti o n D at e
A p p vd
A
M #2
/1
M
C S
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER ED P R O F ES S I O NA L ENG IN
EER
MATTHEW C. STIELSTRA
No. SE13651
DEC 08, 2017
R
E M
O
VE
P
IP
E S
LE
E
V E
U
TI
LI
TY
T
R E
N C
H D
E
TA
IL
DEMO (E) CAST-IN-PLACE
PORTION OF UTILIDOR LID.
UTILIDOR WALLS TO REMAIN.
REPLACE LID PORTION PER
SECTION DETAIL
AFTER INSTALLATION OF
UTILIDOR PIPING.
1'
/8
6'
4' - 5" 10" 5' - 6" 10"
13' - 2"
10"
5/ 8"
F2
S-505
D2
S-505
NEW DEMO
DEMO (E) 8-INCH CMU WALL
CLOSURE (BELOW). REPLACE
CLOSURE WALL WITH 8-INCH
CAST-IN-PLACE CONCRETE WALL
PER SECTION DETAIL.
3'
1/
2"
10" VARIES 10"
DEMO (E) CAST-IN-PLACE
CONCRETE LID. WALLS TO REMAIN
DEMO (E) 8-INCH CMU
WALL CLOSURE. PIPE PENETRATIONS
NOT SHOWN FOR CLARITY
10" VARIES 10"
REPLACED UTILIDOR LID
#4 @ 18" O.C. E.W. TOP
#5 @ 4" O.C. BOT
#5 @ 12" O.C.
BOT CONT
#5 DRILLED-IN EPOXY DOWEL
@ 12" O.C. W/ STD HOOK2"
C
LR
1/
2" C
LR6"
1/ 2"
5" 5"
ROUGHEN SURFACE TO 1/4"
AMPLITUDE, CLEAN & APPLY
BONDING AGENT PRIOR TO
CASTING FRESH CONC.
BENTONITE WATER STOP
(E) CONC UTILIDOR
WALL
(E) CONC UTILIDOR
SLAB FOOTING
TYP
PIPING PER CIVIL.
PROVIDE LINK-SEAL
WITH CENTURY LINE
SLEEVE OR EQUAL
MODULAR SEAL AND
SLEEVE AT EACH PIPE
PENETRATION. BARS
CONFLICTING WITH PIPE
PENETRATIONS SHALL
BE BENT AND
CONTINUOUS AROUND
PIPE PENETRATIONS
PROVIDE NEW 8-INCH CONC.
CLOSURE WALL WITH #5 @
18" O.C. EACH WAY. DRILL &
EPOXY BARS TO (E)
UTILIDOR WITH 6" EMBED.
TOP OF VERT BARS SHALL
BE CAST-IN NEW LID WITH
STANDARD HOOK
(E) CONC. SLAB
ON GRADE
PROVIDE CLASS B
LAP SPLICE
#4 AT 18" O.C. E.W. DRILL &
EPOXY W/ 4" EMBED
E Q
E Q
AND REPLACEMENT
EXTENT OF DEMO CLEAN AND APPLY
BONDING AGENT
PRIOR TO CASTING
NEW CONC
(E) FLOOR DECKING
EDGE OF EQUIPMENT
3/4" CHAMFER
24"
(E) CONC FILL
SLAB
#4 DIAA X
AT 12" O.C. EACH EDGE,
2 1/4" MIN. EMBEDMENT
#4 AT 12" O.C.
EACH WAY, TOP
ROUGHEN SURFACE TO
1/4" AMPLITUDE. CLEAN AND
APPLY BONDING AGENT
SEE ELEC/MECH. DWGS
FOR SIZE AND LOCATION
4"
HOUSEKEEPING PAD ON
SLAB ON GRADE
EDGE OF EQUIPMENT
3/4" CHAMFER
(E) CONC SLAB
ON GRADE
#4 DIAA X
AT 12" O.C. EACH EDGE,
2 1/4" MIN. EMBEDMENT
#4 AT 12" O.C.
EACH WAY, TOP
ROUGHEN SURFACE TO
1/4" AMPLITUDE. CLEAN
AND APPLY BONDING
AGENT
SEE ELEC/MECH. DWGS
FOR SIZE AND LOCATION
4"
24"
HOUSEKEEPING PAD ON
MEZZANINE
(E) CONC. SLAB
ON GRADE
PROVIDE CLASS B
LAP SPLICE
#4 AT 18" O.C. E.W.
DRILL & EPOXY W/
4" EMBED
CLEAN AND APPLY
BONDING AGENT
PRIOR TO CASTING
NEW CONC
WALK OFF GRILLE
PER ARCH
E Q
E Q
US ARMY CORPS
OF ENGINEERS
Reference number:
U .S
. A R
M Y
E N
G
IN
E
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S A
N C
H O
R A
G E
A
LA
S
K A
D R
A W
N B
Y
D E
S
IG
N E
D
S U
B M
IT
T
E D
R E
V
IE
W E
D B
Y
F
IL
E
D A
T E
C
O N
T R
A C
T N
O
D W
G
A
D W
G S
C A
LE
C O
N T
R A
C T
O R
C
IT
Y
S T
A T
E
R ec om m en de d:
A pp ro ve d:
D at e:
P R
IM
E
C O
N T
R A
C T
O R
R E
S
ID
E N
T E
N G
IN
E
E R
E
IE
B C D E F G H
P
LO
T S
C A
LE
x
:1 x
:2
ALASKA DISTRICT
L
ST
R
EE
T, S
U
IT
E
0, A
N C
H O
R A
G E, A K
P h:
.2
.7
A K
C O
R
PO
R A
TI
O
N
: 3
D
(K
PB
A
EC
C
(C O
FF
M
A N
A S
N O
T E
D
NOT FOR CONSTRUCTION
S-505
D E
T A
IL
S
F -3
A
R E
N O
V A
T E
-B
A Y
W E
A T
H E
R S
H E
L T
E R
B
M C
S
H U
B D R
B
.1
.0
W
K B
-1 -R
-0
DESIGN
COMPLETE
E
IE
L S
O N
A F
B A
L A
S K
A
S T
R U
C T
U R
A L
U T
IL
ID
O R
A N
D C
O N
C D
E T
A
IL
S
1/4" = 1'-0" A1
UTILIDOR PLAN - DEMO
PLAN NORTH
02 4 8134
SCALE: 1/4"=1'-0"
KEY PLAN
CBA
3/4" = 1'-0" D2
UTILIDOR LID SECTION - DEMO
3/4" = 1'-0"
F2
UTILIDOR LID SECTION
SCALE: 3/4"=1'-0"
012 2
SCALE: 3/4"=1'-0"
N.T.S.
F5
SLAB ON GRADE (NOT AIRFIELD) REPAIR
N.T.S.
A4
TYPICAL HOUSEKEEPING PADS
N.T.S.
D5
SLAB ON GRADE REPAIR @ WALK OFF GRILLE
S ym
A ct io n
D es cr ip ti o n D at e
A p p vd
A
M #2
/1
M
C S
T S
TA
E
A K
AF ALO
49 TH
S
REG IST ER ED P R O F ES S I O NA L ENG IN
EER
MATTHEW C. STIELSTRA
No. SE13651
DEC 08, 2017
U
T
IL
ID
O
R C
LO
S
U R
E W
LL
FA5004-15-R-C003
EIELSON AFB, ALASKA
ATTACHMENT JA-5
DRAWINGS
dmckenzie Snapshot
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
dmckenzie Snapshot dmckenzie Callout Removed the existing standoff flashings and center the doors in the openings. New, custom made standoff flashings will be required to ensure a weather tight seal TYP.
dmckenzie Arrow dmckenzie Cloud dmckenzie Callout Modify Drain Pipe by removing combo fitting and installing regular 90 degree fitting to gain clearance above the counterweight dmckenzie Callout Modify Drain Pipe by removing combo fitting and installing regular 90 degree fitting to gain clearance above the counterweight dmckenzie Arrow dmckenzie Arrow dmckenzie Cloud
Cloud
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
dmckenzie Snapshot dmckenzie Line dmckenzie Callout Cut holes thru the existing sheetrock walls between Bay’s 9/10 and Bay’s 11/12 and weld TS 5” extending the horizontal run of the TS Truss to weld them together creating the diaphragm. We would need to procure more TS, cut, patch and fire caulk the sheetrock walls.
Cloud
ATTACHMENT JA-5
DRAWINGS
ATTACHMENT JA-5
DRAWINGS
AM#2 F-35 RENOVATE 4-BAY WEATHER SHELTER (B1335) EIE394
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 82 14.00 10
AM#2... HAZARDOUS MATERIALS ABATEMENT ...AM#2
PART 1 AM#2...GENERAL
1.1 REFERENCES
1.1.1 Planning and Execution of Work
1.2 SUBMITTALS
1.3 SUMMARY
1.3.1 Scope of Work
1.4 QUALIFICATIONS
1.4.1 Supervisors and Workers
1.4.2 Designated Industrial Hygienist
1.4.3 Independent Testing Laboratory
1.4.4 Citations on Previous Projects
1.5 HAZARDOUS MATERIALS WORK PLAN
1.6 MEDICAL REQUIREMENTS
1.7 TRAINING
1.8 RESPIRATORY PROTECTION PROGRAM
1.8.1 Respiratory Fit Testing
1.8.2 Respirator Selection and Use Requirements
1.9 HAZARD COMMUNICATION PROGRAM
1.10 LICENSES, PERMITS, AND NOTIFICATIONS
1.11 PERSONAL PROTECTIVE EQUIPMENT
1.12 HYGIENE FACILITIES AND PRACTICES
1.13 REGULATED AREAS
1.14 SIGNS AND LABELS
1.15 LOCAL EXHAUST VENTILATION
1.16 TOOLS
1.17 AIR MONITORING EQUIPMENT
1.18 EXPENDABLE SUPPLIES
1.19 CONFINED SPACE COMPLIANCE PROGRAM
PART 2 PRODUCTS
2.1 ENCAPSULANTS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 ASBESTOS ABATEMENT
3.3 LEAD BASED PAINT REMOVAL
3.4 CRITICAL BARRIERS
3.5 METHODS OF COMPLIANCE
3.6 FINAL CLEANING AND INSPECTION
3.7 LOCKDOWN
3.8 EXPOSURE ASSESSMENT AND AIR MONITORING
3.8.1 General Requirements
3.8.2 Environmental Air Monitoring During Abatement
Section 02 82 14.00 10 Page 1
3.8.3 Final Clearance Air Monitoring
3.8.3.1 Final Clearance Requirements, NIOSH PCM Method
3.8.3.2 Air Clearance Failure
3.8.4 Air-Monitoring Results and Documentation
3.9 CLEARANCE CERTIFICATION
3.10 CLEANUP AND DISPOSAL
-- End of Section Table of Contents --
Section 02 82 14.00 10 Page 2
SECTION 02 82 14.00 10
AM#2... HAZARDOUS MATERIALS ABATEMENT ...AM#2
PART 1 AM#2...GENERAL
1.1 REFERENCES
The planning and execution of work by the Contractor shall comply with the current edition of the following guides, standards, and codes. In the case of discrepancies between the following guides, standards, and codes, and the RFP Design Requirements, the more stringent shall apply. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
1.1.1 Planning and Execution of Work
The planning and execution of work by the Contractor shall comply with the current, or as noted, editions of the following guides, standards, and codes. In the case of discrepancies between the following guides, standards, and codes, and the RFP Design Requirements, the more stringent shall apply.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z9.2 Fundamentals Governing the Design and Operation of Local Exhaust Systems
ANSI Z87.1 Occupational and Educational Eye and Face Protection
ANSI Z88.2 Respiratory Protection
ASTM INTERNATIONAL (ASTM)
ASTM E 119 Fire Tests of Building Construction and Materials
ASTM D 1331 Surface and Interfacial Tension of Solutions of Surface-Active Agents
ASTM E 1368 Visual Inspection of Asbestos Abatement Projects
ASTM E 1553 Practice for Collection of Airborne Particulate Lead During Abatement and Construction Activities
ASTM E 1613 Standard Method for Determination of Lead by Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES), Flame Atomic Absorption Spectrometry (FAAS), or Graphite Furnace Atomic Absorption Spectrometry (GFAAS) Techniques
Section 02 82 14.00 10 Page 3
ASTM E 1644 Practice for Hot Plate Digestion of Dust Wipe Samples for the Determination of Lead
ASTM E 1726 Sample Digestion of Soils for the Determination of Lead by Atomic Spectrometry
ASTM E 1727 Field Collection of Soil Samples for Lead Determination by Atomic Spectrometry Techniques
ASTM E 1728 Field Collection of Settled Dust Samples Using Wipe Sampling Methods for Lead Determination by Atomic Spectrometry Techniques
ASTM E 1729 Field Collection of Dried Paint Samples for Lead Determination by Atomic Spectrometry Techniques
ASTM E 1741 Preparation of Airborne Particulate Lead Samples Collected during Abatement and Construction Activities for Subsequent Analysis by Atomic Spectrometry
ASTM E 1792 Wipe Sampling Materials for Lead in Surface Dust
ASTM D 4397 Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
COMPRESSED GAS ASSOCIATION (CGA)
CGA G-7 Compressed Air for Human Respiration
CGA G-7.1 Commodity Specification for Air
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 Methods of Fire Tests for Flame-Resistant Textiles and Films
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH Pub No. 84-100 NIOSH Manual of Analytical Methods
STATE OF ALASKA ADMINISTRATIVE CODE (AAC)
8 AAC 61 Occupational, Health and Environmental Control, Toxic and Hazardous Substances
18 AAC 60 Environmental Conservation - Solid Waste Management
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 340/1-90-018 Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance
Section 02 82 14.00 10 Page 4
EPA 340/1-90-019 Asbestos/NESHAP Adequately Wet Guidance
EPA 560/5-85-024 Guidance for Controlling Asbestos-Containing Materials in Buildings
Ref Id Ref Title
UNDERWRITERS LABORATORIES (UL)
UL 586 High-Efficiency, Particulate, Air Filter Units
UNIFIED FACILITIES GUIDE SPECIFICATION (UFGS)
Section 02 82 14.00 10 Asbestos Hazard Control Activities
Section 02 83 13.00 20 Lead in Construction
U S AIR FORCE, EIELSON AIR FORCE BASE
HMWMP Hazardous Waste/Hazardous Material
Management Plan
FW 32-7005 Hazardous Materials Management
WDBPWS EIELSON AFB PLAN Waste Disposal/Borrow Pit Worksheet
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
EP 1110-1-11 (1997; Change 1) Asbestos Abatement Guideline Detail Sheets
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.141 Sanitation
29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1926.1101 Asbestos
29 CFR 1926.32 Safety and Health Regulations for Construction - Definition
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 763 Asbestos
42 CFR 84 Approval of Respiratory Protective Devices
49 CFR 107 Hazardous Materials Program Procedures
Section 02 82 14.00 10 Page 5
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Hazardous Materials Abatement Plan; G
SD-02 Shop Drawings
Design Drawings; G
SD-03 Product Data
Asbestos Waste Shipment Records Weight Bills and Delivery Tickets
SD-05 Design Data
Design Analysis; G
Specifications; G
1.3 SUMMARY
1.3.1 Scope of Work
The Contractor shall assume that are known hazardous materials at this project site. For hazardous materials that are encountered during the construction of this project, the Contractor shall immediately contact the Contracing Officer and the requirements stated in this specification shall apply. Although asbestos was not identified during the survey, other hazardous building materials were identified including mercury, refrigerants, glycols, AFFF, and potentially PCBs and lead paint (see Technical Memorandum of Asbestos Hazard Materials Survey included as an attachment to 01 57 20.01 29)
1.4 QUALIFICATIONS
1.4.1 Supervisors and Workers
The Contractor shall use only properly qualified and trained supervisors
Section 02 82 14.00…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.