AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE394, F-35 Renovate 4-Bay Weather Shelter, Eielson AFB, Alaska
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. PROPOSAL DUE DATE IS UNCHANGED AND REMAINS: 19 January 2018 at 1400 hours ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.10, Proposal Submittals.
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Dec-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0019
X 9B. DATED (SEE ITEM 11)
19-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Dec-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
NONE
b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM 01” appears before and after new and/or revised materials, except as noted below.
SECTION 00 21 00 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
-Paragraph 1.11 SITE VISIT/PRE-PROPOSAL CONFERENCE -52.236-27 Alt 1 – Site Visit
NOTE: Revisions within the following documents do not contain the above referenced identifiers:
c. The following sections are deleted:
d. The following documents are added:
EAL Contractor Sponsor Form
e. The following revisions are incorporated:
f. Other:
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
EIE394
A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov/ via Quick Search (Solicitation No.
W911KB-18-R-0019).
1.8. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to these documents should be submitted via the Bidder Inquiry system as indicated below. All questions and/or comments should be submitted no later than seven (7) calendar days prior to the proposal due date. Bidder Inquiry Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click on continue. From this page you may view all bidder inquiries or add inquiry.
A complete listing of all inquiries and responses will be issued by amendment after the inquiry period closes.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W911KB-18-R-0019
The Bidder Inquiry Key is: 6TS55C-CWGCQV
The Bidder Inquiry System will be unavailable for new inquires 7 calendar days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.9. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Standard Form 1442, block 10 for the small business size standard/NAICS code.
1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.11. SITE VISIT/PRE-PROPOSAL CONFERENCE
…AM 01 Refer to 52.236-27 for site visit instructions…AM 01 A pre-proposal conference/site visit is yet to be determined. Offerors interested in a pre-proposal conference or site visit should submit a request in writing. Send requests to:
U.S. Army Corps of Engineers, Alaska District ATTN: CEPOA-CT (Michael Suprenant) P.O. Box 6898 Joint Base Elmendorf-Richardson, Alaska 99506-0898 Fax: 907-753-2553 Email: .michael.d.suprenant@usace.army.mil
1.12. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.13. PROPOSAL SUBMITTALS
http://www.fbo.gov/ http://www.projnet.org/projnet mailto:.michael.d.suprenant@usace.army.mil j4ct9tma Cross-Out
EIE394
on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. ARMY ENGINEER DISTRICT, ALASKA
ATTN: CEPOA-CT
P.O.BOX 6898
JOINT BASE ELMENDORF-RICHARDSON (JBER), ALASKA 99506-0898
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
(c) Participants will meet at--
(End of provision)
52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.
(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--
(1) Lump sum price;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.
(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.
AM 01
3 January 2018 at 0830 hours
2310 Central Ave/Bldg 2258 1st floor- Ops Conference Room Eielson AFB, AK POC: John Raso at john.m.raso@usace.army.mil (907) 753-5714
(d) All firms attending the site visit must submit the completed EAL Contractor Sponsor Form to John Raso at john.m.raso@usace.army.mil by noon 2 January 2018.
AM 01
| 52.236-27 .pdf |
| EIE394 F-35A Design Complete Spec Cover |
| Table of Contents |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| SF 1442 |
| 00 11 01 - PROPOSAL SCHEDULE |
| 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS |
| 00 22 11 - SELECTION PROCEDURES |
| 00 22 11 - ATTACHMENT 1 PROPOSAL DATA SHEET |
| 00 22 11 - ATTACHMENT 2 COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR |
| 00 22 11 - ATTACHMENT 3 COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR (OR PRIME IF WORK NOT TO BE SUBCONTRACTED) |
| 00 22 11 - ATTACHMENT 4 PAST PERFORMANCE QUESTIONNAIRE |
| 00 22 11 - ATTACHMENT 5 LETTER OF COMMITMENT OF KEY SUBCONTRACTOR |
| 00 45 00 - REPRESENTATIONS & CERTIFICATIONS |
| 00 72 00 - CONTRACT CLAUSES |
| 00 73 00 - SPECIAL CONTRACT REQUIREMENTS |
| 00 73 46 - WAGE DETERMINATIONS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 19 30.02 29 |
| 01 19 30.02 29 - SPECIAL ITEMS FOR EIELSON AFB PROJECTS |
| 01 19 30.02 29 - SPECIAL ITEMS FOR EIELSON AFB PROJECTS |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FIRE SAFETY |
| 1.4.1 Fire Protection |
| 1.4.2 Hot Work Permit |
| 1.5 IDENTIFICATION OF EMPLOYEES |
| 1.6 TRAFFIC CONTROL PLAN |
| 1.7 COORDINATION OF WORK |
| 1.8 WORK CLEARANCE AND UTILITY OUTAGES |
| 1.8.1 Clearance Request |
| 1.8.2 Utility Outages |
| 1.9 DISPOSITION OF MATERIALS |
| 1.9.1 Salvageable Material |
| 1.9.2 TESTS |
| 1.10 WARRANTY OF CONSTRUCTION |
| 1.10.1 Failures |
| 1.10.2 Warranty Tag |
| 1.11 SITE/FACILITY RESPONSIBILITY |
| 1.11.1 General |
| 1.11.1.1 Site Security |
| 1.12 DUST CONTROL |
| 1.13 DUST AND FORIEGN OBJECT DAMAGE FOD |
| 1.14 CAMP FACILITIES |
| 1.15 CONTRACTOR'S TEMPORARY FACILITIES |
| 1.15.1 Administrative Field Offices |
| 1.15.2 Storage Area |
| 1.15.3 Supplemental Storage Area |
| 1.15.4 Appearance of Trailers |
| 1.15.5 Maintenance of Storage Area |
| 1.15.6 Security Provisions |
| 1.16 CLEANUP |
| 1.17 RESTORATION OF STORAGE AREA |
| 1.18 TEMPORARY HEATING |
| 1.19 NON-GOVERNMENT BORROW SOURCES |
| 1.20 WEEKLY COORDINATION MEETINGS |
| 1.21 RED ZONE MEETING |
| 1.22 COORDINATION WITH OTHER PROJECTS IN THE SOUTH LOOP AREA |
| 1.23 ACCESS REQUIREMENTS |
| 1.24 AVAILABILITY AND USE OF UTILITY SERVICES |
| 1.24.1 Temporary Utilities |
| 1.24.2 Payment for Utility Services |
| 1.24.3 Meters and Temporary Connections |
| 1.24.4 Final Meter Reading |
| 1.24.5 Permanent Steam Supply |
| 1.24.6 Permanent Power Upgrade |
| 1.25 COMPLIANCE WITH ALASKA LABOR LAWS ON OCCUPATIONAL LICENSING |
| 1.26 PROTECTION OF EXCAVATED COMMUNICATIONS AND ELECTRICAL DUCTS |
| 1.27 EXISTING FIBER OPTICS |
| 1.28 EXISTING COMMUNICATIONS LINES OTHER THAN FIBER |
| 1.29 COMMUNICATIONS UTILITIES DAMAGE |
| 1.30 LOCKSET CORE INSTALLATION |
| 1.31 Stipulations for Contractors Operating in Free Zone |
| 1.32 PARTNERING |
| 1.33 JOINT SCHEDULE BASELINE REVIEW |
| 1.34 ATTACHMENTS |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION - NOT USED |
| 01 19 30.02 29 - Attachment 1 - AF Form 592 |
| 01 19 30.02 29 - Attachment 2 - Eielson AF IMT 103 Work Clearance Request 170811 |
| 01 19 30.02 29 - Attachment 3 - Sample Letter |
| 01 19 30.02 29 - Attachment 4 - CY2017 Utility Rates - Eielson AFB |
| DOD Rates 2017.pdf |
| DoD |
| 01 19 30.02 29 - Attachment 5 - POD LPS Memorandum |
| 01 19 30.02 29 - Attachment 6 - Airfield Geotechnical and Survey Construction Free Zone Map |
| 01 22 00.00 10 |
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 LUMP SUM PAYMENT ITEMS |
| 1.3 UNIT PRICE PAYMENT ITEMS |
| 1.4 CONTAMINATED SOIL REMOVAL |
| 1.4.1 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 CONTRACT COST BREAKDOWN |
| 01 32 01.00 10 |
| 01 32 01.00 10 - PROJECT SCHEDULE |
| 01 32 01.00 10 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 PROJECT SCHEDULER QUALIFICATIONS |
| PART 2 PRODUCTS |
| 2.1 SOFTWARE |
| 2.1.1 Government Default Software |
| 2.1.2 Contractor Software |
| 2.1.2.1 Primavera |
| 2.1.2.2 Other Than Primavera |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 BASIS FOR PAYMENT AND COST LOADING |
| 3.2.1 Activity Cost Loading |
| 3.2.2 Withholdings / Payment Rejection |
| 3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.3.1 Level of Detail Required |
| 3.3.2 Activity Durations |
| 3.3.3 Procurement Activities |
| 3.3.4 Mandatory Tasks |
| 3.3.5 Government Activities |
| 3.3.6 Standard Activity Coding Dictionary |
| 3.3.6.1 Workers Per Day WRKP |
| 3.3.6.2 Responsible Party Coding RESP |
| 3.3.6.3 Area of Work Coding AREA |
| 3.3.6.4 Modification Number MODF |
| 3.3.6.5 Bid Item Coding BIDI |
| 3.3.6.6 Phase of Work Coding PHAS |
| 3.3.6.7 Category of Work Coding CATW |
| 3.3.6.8 Feature of Work Coding FOW |
| 3.3.7 Contract Milestones and Constraints |
| 3.3.7.1 Project Start Date Milestone and Constraint |
| 3.3.7.2 End Project Finish Milestone and Constraint |
| 3.3.7.3 Interim Completion Dates and Constraints |
| 3.3.7.3.1 Start Phase |
| 3.3.7.3.2 End Phase |
| 3.3.8 Calendars |
| 3.3.9 Open Ended Logic |
| 3.3.10 Default Progress Data Disallowed |
| 3.3.11 Out-of-Sequence Progress |
| 3.3.12 Added and Deleted Activities |
| 3.3.13 Original Durations |
| 3.3.14 Leads, Lags, and Start to Finish Relationships |
| 3.3.15 Retained Logic |
| 3.3.16 Percent Complete |
| 3.3.17 Remaining Duration |
| 3.3.18 Cost Loading of Closeout Activities |
| 3.3.18.1 As-Built Drawings |
| 3.3.18.2 O & M Manuals |
| 3.3.19 Anticipated Adverse Weather |
| 3.3.20 Early Completion Schedule and the Right to Finish Early |
| 3.4 PROJECT SCHEDULE SUBMISSIONS |
| 3.4.1 Preliminary Project Schedule Submission |
| 3.4.2 Initial Project Schedule Submission |
| 3.4.3 Periodic Schedule Updates |
| 3.5 SUBMISSION REQUIREMENTS |
| 3.5.1 Data CD/DVDs |
| 3.5.2 Narrative Report |
| 3.5.3 Schedule Reports |
| 3.5.3.1 Activity Report |
| 3.5.3.2 Logic Report |
| 3.5.3.3 Total Float Report |
| 3.5.3.4 Earnings Report by CLIN |
| 3.5.3.5 Schedule Log |
| 3.5.4 Network Diagram |
| 3.5.4.1 Continuous Flow |
| 3.5.4.2 Project Milestone Dates |
| 3.5.4.3 Critical Path |
| 3.5.4.4 Banding |
| 3.5.4.5 Cash Flow Schedule Variance Control SVC Diagram |
| 3.6 PERIODIC SCHEDULE UPDATE |
| 3.6.1 Periodic Schedule Update Meetings |
| 3.6.2 Update Submission Following Progress Meeting |
| 3.7 WEEKLY PROGRESS MEETINGS |
| 3.8 REQUESTS FOR TIME EXTENSIONS |
| 3.8.1 Justification of Delay |
| 3.8.2 Time Impact Analysis Prospective Analysis |
| 3.8.3 Forensic Schedule Analysis Retrospective Analysis |
| 3.8.4 Fragmentary Network Fragnet |
| 3.8.5 Time Extension |
| 3.8.6 Impact to Early Completion Schedule |
| 3.9 FAILURE TO ACHIEVE PROGRESS |
| 3.9.1 Artificially Improving Progress |
| 3.9.2 Failure to Perform |
| 3.9.3 Recovery Schedule |
| 3.10 OWNERSHIP OF FLOAT |
| 3.11 TRANSFER OF SCHEDULE DATA INTO RMS/QCS |
| 3.12 PRIMAVERA P6 MANDATORY REQUIREMENTS |
| 01 33 00 |
| 01 33 00 - SUBMITTAL PROCEDURES |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 DEFINITIONS |
| 1.2.1 Submittal Descriptions SD |
| 1.2.2 Approving Authority |
| 1.2.3 Work |
| 1.3 SUBMITTALS |
| 1.4 SUBMITTAL CLASSIFICATION |
| 1.4.1 Designer of Record Approved DA |
| 1.4.2 Government Approved G |
| 1.4.3 For Information Only |
| 1.4.4 Sustainability Reporting Submittals S |
| 1.5 PREPARATION |
| 1.5.1 Transmittal Form |
| 1.5.2 Source Drawings for Shop Drawings |
| 1.5.2.1 Terms and Conditions |
1.5.3 Electronic File Format
| 1.6 QUANTITY OF SUBMITTALS |
| 1.6.1 Number of Copies of SD-02 Shop Drawings |
| 1.6.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's |
| 1.6.3 Number of Samples SD-04 Samples |
| 1.6.4 Number of Copies SD-05 Design Data and SD-07 Certificates |
| 1.6.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field |
| 1.6.6 Number of Copies of SD-10 Operation and Maintenance Data |
| 1.6.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11 |
| 1.7 INFORMATION ONLY SUBMITTALS |
| 1.8 SUBMITTAL REGISTER |
| 1.8.1 Use of Submittal Register |
| 1.8.2 Contractor Use of Submittal Register |
| 1.8.3 Approving Authority Use of Submittal Register |
| 1.8.4 Copies Delivered to the Government |
| 1.9 VARIATIONS |
| 1.9.1 Considering Variations |
| 1.9.2 Proposing Variations |
| 1.9.3 Warranting that Variations are Compatible |
| 1.9.4 Review Schedule Extension |
| 1.10 SCHEDULING |
| 1.11 GOVERNMENT APPROVING AUTHORITY |
| 1.12 DISAPPROVED OR REJECTED SUBMITTALS |
| 1.13 APPROVED/ACCEPTED SUBMITTALS |
| 1.14 APPROVED SAMPLES |
| 1.15 WITHHOLDING OF PAYMENT |
| 1.16 STAMPS |
| 1.17 1.19 ATTACHMENTS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 33 00 - Attachment 1 - Submittal Register |
| 01 33 00 - Attachment 2 - Eng Form 4025 |
| 01 33 29 |
| 01 33 29 - SUSTAINABILITY REPORTING |
| 01 33 29 - SUSTAINABILITY REPORTING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUMMARY |
| 1.3 SUBMITTALS |
| 1.4 GUIDING PRINCIPLES VALIDATION GPV |
| 1.4.1 Sustainability Action Plan |
| 1.4.2 Costs |
| 1.4.3 Calculations |
| 1.4.4 Third Party Certification TPC Documentation |
| 1.4.5 Third Party Certification TPC |
| 1.4.5.1 TPC Already Registered |
| 1.4.5.2 TPC Management and Certification |
| 1.5 SUSTAINABILITY SUBMITTALS |
| 1.5.1 AF MILCON Score Sheet |
| 1.5.1.1 AF MILCON Score Sheet Submittals |
| 1.5.1.2 AF MILCON Score Sheet Public Access |
| 1.5.2 "S" Submittals for Sustainability Documentation |
| 1.5.3 Sustainability eNotebook |
| 1.5.3.1 Sustainability eNotebook Submittal Schedule |
| 1.6 DOCUMENTATION REQUIREMENTS |
| 1.6.1 Commissioning |
| 1.6.2 Energy Efficient Products |
| 1.6.3 Indoor Water Use |
| 1.6.4 Reduce Volatile Organic Compounds VOC Low Emitting Materials |
| 1.6.5 Indoor Air Quality During Construction |
| 1.6.6 Recycled Content |
| 1.6.7 Bio-Based Products |
| 1.6.8 Ozone Depleting Substances |
| 1.6.9 Waste Material Management Recycling Œ Construction |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 SUSTAINABILITY COORDINATION |
| 3.1.1 Coordinating Sustainability Documentation Progress |
| 3.2 THIRD PARTY CERTIFICATION CERTIFICATES OR VALIDATION |
| 3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS VOC LOW EMITTING MATERIALS |
| 01 33 29 - Attachment 1 - AF Sustainability Scoresheet |
| 01 33 29 - Attachment 2 - NC2009 LEED Checklist |
| 01 33 29 - Attachment 3 - Narrative Letter and Survey |
| 01 35 26 |
| 01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS |
| 01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Competent Person CP |
| 1.2.2 Competent Person, Confined Space |
| 1.2.3 Competent Person, Cranes and Rigging |
| 1.2.4 Competent Person, Excavation/Trenching |
| 1.2.5 Competent Person, Fall Protection |
| 1.2.6 Competent Person, Scaffolding |
| 1.2.7 Competent Person CP Trainer |
| 1.2.8 High Risk Activities |
| 1.2.9 High Visibility Accident |
| 1.2.10 Load Handling Equipment LHE |
| 1.2.11 Medical Treatment |
| 1.2.12 Near Miss |
| 1.2.13 Operating Envelope |
| 1.2.14 Qualified Person QP |
| 1.2.15 Qualified Person, Fall Protection QP for FP |
| 1.2.16 USACE Property and Equipment |
| 1.2.17 Load Handling Equipment LHE Accident or Load Handling Equipment |
| 1.3 SUBMITTALS |
| 1.4 MONTHLY EXPOSURE REPORTS |
| 1.5 REGULATORY REQUIREMENTS |
| 1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS |
| 1.6.1 Personnel Qualifications |
| 1.6.1.1 Site Safety and Health Officer SSHO |
| 1.6.1.1.1 Additional Site Safety and Health Officer SSHO Requirements and |
| 1.6.1.2 Competent Person Qualifications |
| 1.6.1.2.1 Competent Person for Confined Space Entry |
| 1.6.1.2.2 Competent Person for Scaffolding |
| 1.6.1.2.3 Competent Person for Fall Protection |
| 1.6.1.3 Qualified Trainer Requirements |
| 1.6.1.4 Crane Operators/Riggers |
| 1.6.2 Personnel Duties |
| 1.6.2.1 Duties of the Site Safety and Health Officer SSHO |
| 1.6.3 Meetings |
| 1.6.3.1 Preconstruction Conference |
| 1.6.3.2 Safety Meetings |
| 1.7 ACCIDENT PREVENTION PLAN APP |
| 1.7.1 Names and Qualifications |
| 1.7.2 Plans |
| 1.7.2.1 Confined Space Entry Plan |
| 1.7.2.2 Standard Lift Plan SLP |
| 1.7.2.3 Critical Lift Plan - Crane or Load Handling Equipment |
| 1.7.2.3.1 Critical Lift Plan Planning and Schedule |
| 1.7.2.3.2 Lifts of Personnel |
| 1.7.2.4 Multi-Purpose Machines, Material Handling Equipment, and |
| 1.7.2.5 Fall Protection and Prevention FP&P Plan |
| 1.7.2.6 Rescue and Evacuation Plan |
| 1.7.2.7 Hazardous Energy Control Program HECP |
| 1.7.2.8 Excavation Plan |
| 1.8 ACTIVITY HAZARD ANALYSIS AHA |
| 1.8.1 AHA Management |
| 1.8.2 AHA Signature Log |
| 1.9 DISPLAY OF SAFETY INFORMATION |
| 1.9.1 Safety Bulletin Board |
| 1.9.2 Safety and Occupational Health SOH Deficiency Tracking System |
| 1.10 SITE SAFETY REFERENCE MATERIALS |
| 1.11 EMERGENCY MEDICAL TREATMENT |
| 1.12 NOTIFICATIONS and REPORTS |
| 1.12.1 Mishap Notification |
| 1.12.2 Accident Reports |
| 1.12.3 LHE Inspection Reports |
| 1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and |
| 1.13 HOT WORK |
| 1.13.1 Permit and Personnel Requirements |
| 1.13.2 Work Around Flammable Materials |
| 1.14 RADIATION SAFETY REQUIREMENTS |
| 1.14.1 Radiography Operation Planning Work Sheet |
| 1.14.2 Site Access and Security |
| 1.14.3 Loss or Release and Unplanned Personnel Exposure |
| 1.14.4 Site Demarcation and Barricade |
| 1.14.5 Security of Material and Equipment |
| 1.14.6 Transportation of Material |
| 1.14.7 Schedule for Exposure or Unshielding |
| 1.14.8 Transmitter Requirements |
| 1.15 CONFINED SPACE ENTRY REQUIREMENTS |
| 1.15.1 Entry Procedures |
| 1.15.2 Forced Air Ventilation |
| 1.15.3 Sewer Wet Wells |
| 1.15.4 Rescue Procedures and Coordination with Local Emergency Responders |
| 1.16 DIVE SAFETY REQUIREMENTS |
| 1.17 SEVERE STORM PLAN |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 CONSTRUCTION AND OTHER WORK |
| 3.1.1 Worksite Communication |
| 3.1.2 Hazardous Material Exclusions |
| 3.1.3 Unforeseen Hazardous Material |
| 3.2 PRE-OUTAGE COORDINATION MEETING |
| 3.3 CONTROL OF HAZARDOUS ENERGY LOCKOUTTAGOUT |
| 3.4 FALL PROTECTION PROGRAM |
| 3.4.1 Training |
| 3.4.2 Fall Protection Equipment and Systems |
| 3.4.2.1 Additional Personal Fall Protection |
| 3.4.2.2 Personal Fall Protection Harnesses |
| 3.4.3 Fall Protection for Roofing Work |
| 3.4.4 Horizontal Lifelines HLL |
| 3.4.5 Guardrails and Safety Nets |
| 3.4.6 Rescue and Evacuation Plan and Procedures |
| 3.5 WORK PLATFORMS |
| 3.5.1 Scaffolding |
| 3.5.2 Elevated Aerial Work Platforms AWPs |
| 3.6 EQUIPMENT |
| 3.6.1 Material Handling Equipment MHE |
| 3.6.2 Load Handling Equipment LHE |
| 3.6.3 Machinery and Mechanized Equipment |
| 3.6.4 Base Mounted Drum Hoists |
| 3.6.5 Use of Explosives |
| 3.7 EXCAVATIONS |
| 3.7.1 Utility Locations |
| 3.7.2 Utility Location Verification |
| 3.7.3 Utilities Within and Under Concrete, Bituminous Asphalt, and Other |
| 3.8 ELECTRICAL |
| 3.8.1 Conduct of Electrical Work |
| 3.8.2 Qualifications |
| 3.8.3 Arc Flash |
| 3.8.4 Grounding |
| 3.8.5 Testing |
| 01 36 00.00 29 |
| 01 36 00.00 29 - RADIOACTIVE MATERIALS PROCEDURES |
| 01 36 00.00 29 - RADIOACTIVE MATERIALS PROCEDURES |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 Standards |
| 1.4 Usage Request |
| 1.5 INITIAL NOTIFICATION |
| 1.6 COMPLETE NOTIFICATION |
| 1.7 VIOLATIONS |
| 1.8 ACCIDENTS |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION - NOT USED |
| 01 42 00 |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 00.15 10 |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM |
| 01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODERMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 Contract Administration |
| 1.2.1 Correspondence and Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 RMS SOFTWARE |
| 1.3.1 RMS CONTRACTOR'S MODE CM |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 RMS User Guide |
| 1.6 CONTRACT DATABASE |
| 1.7 DATABASE MAINTENANCE |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports. |
| 1.7.3.2 Deficiency Tracking. |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.3.8 Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 MONTHLY COORDINATION MEETING |
| 1.10 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 04.00 29 |
| 01 45 04.00 29 - CONTRACTOR QUALITY CONTROL |
| 01 45 04.00 29 - CONTRACTOR QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PAYMENT |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 QUALITY CONTROL PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 CQC Personnel |
| 3.4.4 Additional Requirement |
| 3.4.5 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.2.1 Capability Check |
| 3.7.2.2 Capability Recheck |
| 3.7.3 Onsite Laboratory |
| 3.7.4 Furnishing or Transportation of Samples for Testing |
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 NOTIFICATION OF NONCOMPLIANCE |
| 3.11 ATTACHMENT |
01 45 04.00 29 - Attachment 1 - CQC Report
| 01 45 35 |
| 01 45 35 - SPECIAL INSPECTIONS |
| 01 45 35 - SPECIAL INSPECTIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 DEFINITIONS |
| 1.3.1 Continuous Special Inspections |
| 1.3.2 Periodic Special Inspections |
| 1.3.3 Perform |
| 1.3.4 Observe |
| 1.3.5 Special Inspector SI |
| 1.3.6 Associate Special Inspector ASI |
| 1.3.7 Third Party |
| 1.3.8 Contracting Officer |
| 1.3.9 Contractor's Quality Control QC Manager |
| 1.3.10 Designer of Record DOR |
| 1.3.11 Statement of Special Inspections SSI |
| 1.3.12 Schedule of Special Inspections |
| 1.3.13 Designated Seismic System |
| 1.4 SUBMITTALS |
| 1.5 SPECIAL INSPECTOR QUALIFICATIONS |
| 1.5.1 Steel Construction and High Strength Bolting |
| 1.5.1.1 Special Inspector |
| 1.5.1.2 Associate Special Inspector |
| 1.5.2 Welding Structural Steel |
| 1.5.2.1 Special Inspector |
| 1.5.2.2 Associate Special Inspector |
| 1.5.3 Nondestructive Testing of Welds |
| 1.5.3.1 Special Inspector |
| 1.5.3.2 Associate Special Inspector |
| 1.5.4 Cold Formed Steel Framing |
| 1.5.4.1 Special Inspector |
| 1.5.4.2 Associate Special Inspector |
| 1.5.5 Concrete Construction |
| 1.5.5.1 Special Inspector |
| 1.5.5.2 Associate Special Inspector |
| 1.5.6 Verification of Site Soil Condition, Fill Placement and Load-Bearing |
| 1.5.6.1 Special Inspector |
| 1.5.6.2 Associate Special Inspector |
| 1.5.7 Fire-Resistant Penetrations and Joints |
| 1.5.7.1 Special Inspector |
| 1.5.7.2 Associate Special Inspector |
| 1.5.8 Smoke Control |
| 1.5.8.1 Special Inspector |
| 1.5.8.2 Associate Special Inspector |
| PART 2 PRODUCTS |
| 2.1 FABRICATOR SPECIAL INSPECTIONS |
| PART 3 EXECUTION |
| 3.1 RESPONSIBILITIES |
| 3.1.1 Quality Control Manager |
| 3.1.2 Special Inspectors |
3.2 DEFECTIVE WORK
| 01 45 35 - Attachment 1 - Schedule of Special Inspections |
| Schedule of Special Inspections |
| 01 45 35 - Attachment 2 - Statement of Special Inspections |
| Statement of Special Inspections |
| Design Professional Seal |
| 01 50 00.04 29 |
| 01 50 00.04 29 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR EIELSON AFB PROJECTS |
| 01 50 00.04 29 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR EIELSON AFB PROJECTS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 CONSTRUCTION SITE PLAN |
| PART 2 PRODUCTS |
| 2.1 TEMPORARY SIGNAGE |
| 2.1.1 Bulletin Board |
| 2.1.2 Project and Safety Signs |
| 2.2 TEMPORARY TRAFFIC CONTROL |
| 2.2.1 Haul Roads |
| 2.2.2 Barricades |
| PART 3 EXECUTION |
| 3.1 EMPLOYEE PARKING |
| 3.2 AVAILABILITY AND USE OF UTILITY SERVICES |
| 3.2.1 Sanitation |
| 3.2.2 Telephone |
| 3.3 TRAFFIC PROVISIONS |
| 3.3.1 Maintenance of Traffic |
| 3.3.2 Protection of Traffic |
| 3.3.3 Dust Control |
| 3.4 GOVERNMENT FIELD OFFICE |
| 3.4.1 Resident Engineer's Office |
| 3.4.2 Furnishings For Government Field Office |
| 01 57 20.01 29 |
| 01 57 20.01 29 - ENVIRONMENTAL PROTECTION |
| 01 57 20.01 29 - ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Environmental Pollution and Damage |
| 1.2.2 Environmental Protection |
| 1.2.3 Contractor Generated Hazardous Waste |
| 1.2.4 Installation Pest Management Coordinator |
| 1.2.5 Project Pesticide Coordinator |
| 1.2.6 Land Application for Discharge Water |
| 1.2.7 Pesticide |
| 1.2.8 Pests |
| 1.2.9 Surface Discharge |
| 1.2.10 Waters of the United States |
| 1.2.11 Wetlands |
| 1.3 GENERAL REQUIREMENTS |
| 1.4 SUBCONTRACTORS |
| 1.5 PAYMENT |
| 1.6 SUBMITTALS |
| 1.7 ENVIRONMENTAL PROTECTION PLAN |
| 1.7.1 Compliance |
| 1.7.2 Contents |
| 1.7.3 Appendix |
| 1.8 PROTECTION FEATURES |
| 1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS |
| 1.10 NOTIFICATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 LAND RESOURCES |
| 3.1.1 Work Area Limits |
| 3.1.2 Landscape |
| 3.1.3 Erosion and Sediment Controls |
| 3.1.4 Contractor Facilities and Work Areas |
| 3.2 WATER RESOURCES |
| 3.3 AIR RESOURCES |
| 3.3.1 Particulates |
| 3.3.2 Odors |
| 3.3.3 Sound Intrusions |
| 3.3.4 Burning |
| 3.3.4.1 Title V Air Permit Compliance |
| 3.4 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL |
| 3.4.1 Solid Wastes |
| 3.4.2 Chemicals and Chemical Wastes |
| 3.4.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.4.4 Fuel and Lubricants |
| 3.4.5 Waste Water |
| 3.5 RECYCLING AND WASTE MINIMIZATION |
| 3.6 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT |
| 3.7 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.8 BIOLOGICAL RESOURCES |
| 3.8.1 Migratory Birds |
| 3.9 INTEGRATED PEST MANAGEMENT |
| 3.9.1 Pesticide Delivery and Storage |
| 3.9.2 Qualifications |
| 3.9.3 Pesticide Handling Requirements |
| 3.9.4 Application |
| 3.10 PREVIOUSLY USED EQUIPMENT |
| 3.11 MAINTENANCE OF POLLUTION FACILITIES |
| 3.12 MILITARY MUNITIONS |
| 3.13 TRAINING OF CONTRACTOR PERSONNEL |
| 3.14 CONTAMINATED MEDIA MANAGEMENT |
| 3.15 POST CONSTRUCTION CLEANUP |
| 3.16 HAZARDOUS MATERIALS SURVEY |
| 3.17 ATTACHMENTS |
| 01 57 20.01 29 - Attachment 1 - Eielson AFB Environmental SOP 12 December 2017 |
| 01 57 20.01 29 - Attachment 2 - Eielson Disposal Areas |
| 01 57 20.01 29 - Attachment 3 - Stockpile Detail |
| 01 57 20.01 29 - Attachment 4 - Asbestos Hazard Materials Survey for Building 1335 |
| 01 57 20.01 29 - Attachment 5 - Drum Marking Example |
| 01 57 20.01 29 - Attachment 6 - EAFB Asbestos MOP |
| 01 57 34.00 29 |
| 01 57 34.00 29 - STORM WATER POLLUTION PREVENTION MEASURES |
| 01 57 34.00 29 - STORM WATER POLLUTION PREVENTION MEASURES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 SUBMITTALS |
| 1.4 ALASKA POLLUTANT DISCHARGE ELIMINATION SYSTEM APDES |
| 1.4.1 Storm Water Pollution Prevention Plan SWPPP |
| 1.4.2 Notice of Intent NOI |
| 1.4.3 NOI Filing |
| 1.4.4 Notice of Termination NOT |
| 1.4.5 Notice of Government's Delegation of Signature Authority and |
| 1.4.6 QUALIFICATIONS AND CERTIFICATES |
| 1.4.6.1 Storm Water Lead Qualifications and Certificates |
| 1.4.6.2 SWPPP Preparer Qualifications and Certificates |
| 1.4.6.3 Storm Water Inspector Qualifications and Certificates |
| 1.4.6.4 Monitoring Person Qualifications and Certificates |
| 1.4.6.5 Active Treatment System Operator Qualifications and Certificates |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 CONTRACTOR RESPONSIBILITY |
| 3.1.1 Fines, Penalties, Citations or Fees |
| 3.1.2 Records |
| 3.2 INSPECTIONS |
| 3.2.1 General |
| 3.2.2 Inspection Reports |
3.3 ATTACHMENT
01 57 34.00 29 - Attachment 1 - SWPPP Delegation of Authority Letter Template 2017
| 01 58 00 |
| 01 58 00 - PROJECT IDENTIFICATION |
| 01 58 00 - PROJECT IDENTIFICATION |
| PART 1 GENERAL |
| 1.1 PROJECT SIGN |
| 1.1.1 Project Signboard Air Force |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
01 58 00 - Attachment 1 - AF Project Sign Plate 6 and 7
| 01 74 19.01 29 |
| 01 74 19.01 29 - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT |
| 01 74 19.01 29 - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GOVERNMENT POLICY |
| 1.3 MANAGEMENT |
| 1.4 SUBMITTALS |
| 1.5 MEETINGS |
| 1.6 WASTE MANAGEMENT PLAN |
| 1.7 RECORDS |
| 1.8 REPORTS |
| 1.9 COLLECTION |
| 1.9.1 Source Separated Method. |
| 1.9.2 Co-Mingled Method. |
| 1.9.3 Other Methods. |
| 1.10 DISPOSAL |
| 1.10.1 Reuse. |
| 1.10.2 Recycle. |
| 1.10.3 Compost |
| 1.10.4 Waste. |
| 1.10.5 Return |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 78 00 |
| 01 78 00 - CLOSEOUT SUBMITTALS |
| 01 78 00 - CLOSEOUT SUBMITTALS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 As-Built Drawings |
| 1.2.2 Record Drawings |
| 1.3 SOURCE DRAWING FILES |
| 1.3.1 Terms and Conditions |
| 1.4 SUBMITTALS |
| 1.5 SPARE PARTS DATA |
| 1.6 QUALITY CONTROL |
| 1.7 WARRANTY MANAGEMENT |
| 1.7.1 Warranty Management Plan |
| 1.7.2 Performance Bond |
| 1.7.3 Pre-Warranty Conference |
| 1.7.4 Contractor's Response to Construction Warranty Service Requirements |
| 1.7.5 Warranty Tags |
| PART 2 PRODUCTS |
| 2.1 GOVERNMENT FURNISHED MATERIALS |
| 2.2 SYSTEM DESCRIPTION |
| 2.2.1 Additional Drawings |
| 2.2.1.1 Sheet Numbers and File Names |
2.3 CERTIFICATION OF EPA DESIGNATED ITEMS
| PART 3 EXECUTION |
| 3.1 AS-BUILT DRAWINGS |
| 3.1.1 Markup Guidelines |
| 3.1.2 As-Built Drawings Content |
| 3.2 RECORD DRAWING FILES |
| 3.2.1 SURVEY |
| 3.3 RECORD DRAWINGS |
| 3.3.1 Final Record Drawing Package |
| 3.4 FINAL APPROVED SHOP DRAWINGS |
| 3.5 CONSTRUCTION CONTRACT SPECIFICATIONS |
| 3.6 AS-BUILT RECORD OF EQUIPMENT AND MATERIALS |
| 3.7 OPERATION AND MAINTENANCE MANUALS |
| 3.8 CLEANUP |
| 3.9 REAL PROPERTY RECORD |
| 3.10 ATTACHMENTS |
| 01 78 00 - Attachment 1 - EIE394 DD1354 |
| 01 78 00 - Attachment 2 - GIS Drafting Surveying Stds (22 September 16) |
| PART 1 GENERAL |
| 1.1 Purpose |
| A. This document is provided for informational purposes and to assure data compatibility and compliance for as-built drawings or vector data formats specifically for the 354th Civil Engineer Squadron (CES) and its assets. Specific questions may be ad... |
| 1.2 Map Projection and Datum: |
| A. Universal Transverse Mercator (UTM), World Geodetic System 1984 (WGS84) datum, Zone-6N, Units – Meters. |
| B. Vertical Datum: NAVD 88. |
| C. The coordinate system and vertical datum shall be noted in the drawing in the metadata. |
| D. Eielson local grid coordinates shall not be used. |
| 1.3 Coordinate System Standards |
| A. All drawings shall be geo-referenced to the above coordinate system |
| B. The existing network of survey monuments at Eielson AFB shall be used to establish control for all drawings. Drawings shall be based upon the established projection and coordinate system at Eielson AFB. Survey control monument coordinates are pub... |
| 1.4 OWNERSHIP |
| A. The Government, for itself and such others as it deems appropriate, will have unlimited rights under this contract to all information and materials developed under this contract and furnished to the Government and documentation thereof, reports, an... |
| 1.5 DELIVERY MEDIA AND FORMAT |
| A. FORMAT. A copy of all data and files developed under this contract shall be delivered to the Government in digital format (insert the appropriate submittal time: e.g., at project completion, with each submittal as required in the Schedule of Work, ... |
| B. LABEL. The external label for each digital media shall contain, as a minimum, the following information: |
| 1. If projects reference an existing facility or infrastructure with Real Property ID, the project name should be in the following format: B99999 FTQW XX-XXXX Project Description where B99999 is the Real Property ID, FTQW XX-XXXX is the ACES Project i... |
| 2. Contract Number (and Delivery Order Number if applicable) and date. |
| 3. Format and version of operating system software. |
| 4. Name and version of utility software used for preparation (e.g., compression/decompression) (if applicable) and copying files to the media. |
| 5. Sequence number of digital media. |
| 6. List of file names on the digital media (as space on the label permits). |
PART 2 STANDARDS FOR GEOGRAPHICAL INFORMATION SYSTEMS (GIS) DELIVERABLES
| 1.6 Target Technologies |
| A. Geospatial Information System Software: Environmental Systems Research Institute (ESRI) ArcGIS 10.X |
| B. Geospatial Information System Data Format: Spatial Data Standard for Facilities, Infrastructure and Environment (SDSFIE), Version 3.0, ESRI File Geodatabase. |
| 1.7 Content Standards for Digital Geospatial Metadata |
| A. The ability to use existing geospatial data is important to individuals in various organizations who are trying to share data. Metadata or “data about data” is the key to developing this ability. Metadata describes the content, quality, condition, ... |
| B. GEODETIC CONTROL SURVEYS. Services include horizontal and vertical control surveys for the precise location of primary survey points for planning, engineering, construction, real estate projects, GIS applications, or facility management. These surv... |
| C. TOPOGRAPHIC AND ENGINEERING SURVEYS. Services include but are not limited to field acquisition and office data reduction of detailed topographic and planimetric feature data for Eielson Air Force Base to support airfield pavement evaluation, engine... |
| 1.8 GRAPHIC FORMAT |
| A. All surveying, mapping, and/or GIS graphical digital data generated by the contractor and supplied to the Government shall be fully compatible with, ESRI ArcGIS, Version 10.X native digital format, with a Windows 7 operating system. The contractor ... |
| B. The contractor shall utilize topology and data reviewer checks as needed. To assure that there are no overshoots or undershoots in the line work. |
| 1.9 MAPPING AND GIS STANDARDS. |
| A. All mapping and GIS work performed as part of this contract shall conform to the following standards for accuracy, content, and structure: All large-scale mapping projects (scales equal to or larger than 1: 24,000), shall follow the Government Stan... |
| B. SDSFIE 3.0 schema; All GIS deliverables will include the following filled out in the attribute tables: |
| 1. All data: |
| a. Feature description fields (usually the SDSFEATUREDESCRIPTION field) |
| b. Installation Date (DDMMYYYY) |
| 2. Utilities: |
| a. Quantitative information fields (diameter, volume, voltage, or equivalent fields) |
| b. Unit of measurement fields (Inches, gallons, volts, or equivalent fields) |
| c. Material type fields (steel, aluminum, stone, water, JP-8, or equivalent fields) |
| 3. Transportation: |
| a. Material type field (asphalt, concrete, steel, equivalent fields) |
| b. Unit of measurement fields (Inches, gallons, volts, or equivalent fields) |
| c. Clearances (horizontal, (vertical for bridges)) |
| 1.10 METADATA GENERATION. |
| A. Contractor shall provide metadata files for all geospatial and GIS data and products produced under this contract. Geospatial data are defined as information that identifies the geographic location and characteristics of natural or constructed feat... |
| B. The digital metadata files shall be provided to the Government along with each final product deliverable, unless otherwise approved in writing by the Contracting Officer. The following sections within the Metadata (Description) tab for Features Cla... |
| 1. Title: Name of the Feature Class |
| 2. Tags: Key words that describe the data set: type, spatial location, and usage) |
| 3. Summary: List the purpose, along with date collected. |
| 4. Description: Describe standards used such as coordinate system, datum and survey accuracy. Include information if any tables are joined or associated ancillary data such as photos. |
| 5. Credits: List what entity collected the data, including the contact information for follow up (address and phone number). |
| 1.11 Computer Aided Design (CAD) Drawing Formats and Standards |
| A. PACAF installations use the A/E/C CADD Standard published by the CADD/GIS Technology Center for Facilities, Infrastructure and Environment for all computer-aided drafting and design-generated “as-built” drawings. The standard is published at https:... |
| B. Drawings shall be in AutoCAD 2010 or more current release Drawing File (.DWG) format. Educational versions and or student formatting are not permitted. |
| C. Drawing sheets shall be 22 x 34 (ANSI D size) |
| D. Drawing sets for individual projects shall include a cover sheet, or sheets, with the following information: 1) Eielson project number and name, and “PACIFIC AIR FORCES, 354th Civil Engineer Squadron, Eielson AFB, Alaska” in large lettering; 2) Ba... |
| E. A title block on each drawing sheet shall include the following information: 1) Real Property Facility ID; 2) Project Title; 3) Eielson ACES Project Number; 4) Drawing Title; 5) Sheet Reference Number; 6) Sheet [#] of [total number of sheets in the... |
| F. No non-standard fonts or shape files shall be used. |
| G. PACAF installations use the United States National CAD Standard for guidelines on formats and standards for features inside buildings, vaults, or other structures. The standard is published at http://www.nationalcadstandard.org. |
| 1.12 QUALITY ASSURANCE/QUALITY CONTROL |
| A. The contractor shall insure that any and all products provided to the Government have received careful and complete QA/QC. |
| B. The Government will immediately return for remedial action (at the Contractor’s expense) any products that do not meet these specifications. |
| C. Before a file is placed on the delivery digital media, the following procedures shall be performed: |
| 1. Remove all extraneous graphics outside the border area and set the active parameters to a standard setting or those in the Government-furnished seed file. |
| 2. X-refs shall be bound, without device or directory specifications, to the drawings that reference them. |
| 3. All digital files shall be delivered to the Government uncompressed. |
| 4. Include all files, both graphic and nongraphic, required for the project (i.e., color tables, pen tables, font libraries, symbol libraries, user command files, plot configuration files, AML plot routines, etc.). Applicable plotstyle (.ctb) files s... |
| 5. Each finished CADD drawing or map shall have its own separate plot file. |
| 6. Make sure that all support files such as those listed above are in the same directory and that refers to those files do not include device or directory specifications. |
| 7. Include any standard sheets (i.e., abbreviation sheets, standard symbol sheets, etc.) necessary for a complete project. |
| 8. Document any fonts, tables, symbols, cells/blocks, line styles/types, details, reference drawings, etc., developed by the contractor. The contractor shall obtain Government approval before using anything other than the Government's standards. |
| PART 4 STANDARDS FOR (GPS) SURVEY DELIVERABLES |
| 1.13 DELIVERABLES |
| A. The format will be GIS product (reference Part 2) |
| B. Survey Accuracy: Third Order 5.0 cm or better. |
| C. Survey Field Notes shall be included. A surveyor's narrative report shall be prepared and submitted by the surveyor or in responsible charge as documentation of the survey project. The surveyor's narrative report shall include: |
| 1. Make and Model of the GPS receiver, Antenna, and related equipment. |
| 2. A processing generated report or summary of all RTK field operations, including calibrations, duplicate point measurements. |
| 3. A processing generated report regarding the baseline processing results and the software and version number used. |
| 4. A processing generated report regarding the Network adjustment results including a summary of covariance's, standard deviation or RMS values and the software and version number used. |
| 5. A network diagram, true line diagram or map showing the network configuration as designed. |
| 6. A list of the HARN, CORS or reference stations used in the survey. |
| 7. A list of coordinates by station, including the datum, geoid model, epoch, and measurement units used. |
| 8. Local and Network Accuracies. |
| 9. Document any variations from these guidelines. |
| 01 78 23 |
| 01 78 23 - OPERATION AND MAINTENANCE DATA |
| 01 78 23 - OPERATION AND MAINTENANCE DATA |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 OPERATION AND MAINTENANCE DATA |
| 1.2.1 Package Quality |
| 1.2.2 Package Content |
| 1.2.3 Changes to Submittals |
| 1.2.4 Commissioning Authority Review and Approval |
| 1.3 O&M DATABASE |
| 1.4 OPERATION AND MAINTENANCE MANUAL FILE FORMAT |
| 1.4.1 Organization |
| 1.4.2 CD or DVD Label and Disk Holder or Case |
| 1.5 TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES |
| 1.5.1 Operating Instructions |
| 1.5.1.1 Safety Precautions and Hazards |
| 1.5.1.2 Operator Prestart |
| 1.5.1.3 Startup, Shutdown, and Post-Shutdown Procedures |
| 1.5.1.4 Normal Operations |
| 1.5.1.5 Emergency Operations |
| 1.5.1.6 Operator Service Requirements |
| 1.5.1.7 Environmental Conditions |
| 1.5.1.8 Operating Log |
| 1.5.1.9 Additional Requirements for HVAC Control Systems |
| 1.5.2 Preventive Maintenance |
| 1.5.2.1 Lubrication Data |
| 1.5.2.2 Preventive Maintenance Plan, Schedule, and Procedures |
| 1.5.3 Repair |
| 1.5.3.1 Troubleshooting Guides and Diagnostic Techniques |
| 1.5.3.2 Wiring Diagrams and Control Diagrams |
| 1.5.3.3 Repair Procedures |
| 1.5.3.4 Removal and Replacement Instructions |
| 1.5.3.5 Spare Parts and Supply Lists |
| 1.5.3.6 Repair Work-Hours |
| 1.5.4 Real Property Equipment |
| 1.5.5 Appendices |
| 1.5.5.1 Product Submittal Data |
| 1.5.5.2 Manufacturer's Instructions |
| 1.5.5.3 O&M Submittal Data |
| 1.5.5.4 Parts Identification |
| 1.5.5.5 Warranty Information |
| 1.5.5.6 Extended Warranty Information |
| 1.5.5.7 Personnel Training Requirements |
| 1.5.5.8 Testing Equipment and Special Tool Information |
| 1.5.5.9 Testing and Performance Data |
| 1.5.5.10 Field Test Reports |
| 1.5.5.11 Contractor Information |
| 1.6 SCHEDULE OF OPERATION AND MAINTENANCE DATA PACKAGES |
| 1.6.1 Data Package 1 |
| 1.6.2 Data Package 2 |
| 1.6.3 Data Package 3 |
| 1.6.4 Data Package 4 |
| 1.6.5 Data Package 5 |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 TRAINING |
| 3.1.1 Training Plan |
| 3.1.2 Training Content |
| 3.1.3 Training Outline |
| 3.1.4 Training Video Recording |
| 3.1.5 Unresolved Questions from Attendees |
| 3.1.6 Validation of Training Completion |
| 01 91 00 |
| 01 91 00 - COMMISSIONING |
| 01 91 00 - COMMISSIONING |
| PART 1 GENERAL |
| 1.1 GENERAL |
| 1.1.1 Building Commissioning of the Following Systems: |
| 1.2 RELATED SECTIONS |
| 1.3 COMMISSIONING DESCRIPTION |
| 1.4 COMMISSIONING SUBMITTALS |
| 1.4.1 Submittals |
| 1.4.2 Forms |
| 1.4.3 Forms |
| 1.4.4 Test Reports |
| 1.4.5 Field Reports |
| 1.5 QUALITY CONTROL |
| 1.6 CONTRACTOR AND EQUIPMENT OR SYSTEM INSTALLER COMMISSIONING |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 COORDINATION |
| 3.2 EXAMINATION |
| 3.3 TRAINING |
| 01 91 00 - Attachment 1 - Cx Plan |
| Executive Summary. |
| Owner’s Project Requirements. |
| Basis of Design. |
| Contractor listing and contact information. |
| Construction record documents. |
| Equipment Information by specification section. |
| Systems operating procedures and schedules. |
| Maintenance procedures and schedules. |
| Operational record keeping. |
| Benchmarking and optimization. |
| Operation and maintenance manuals. |
| Training information and records. |
| 01 91 00 - Attachment 2 - Cx Equip List |
| 01 91 00 - Attachment 3 - PFTC Example Form |
| 01 91 00 - Attachment 4 - FPT Example Form |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 00 |
| 02 41 00 - DEMOLITION |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PROJECT DESCRIPTION |
| 1.2.1 Demolition/Deconstruction Plan |
| 1.2.2 General Requirements |
| 1.3 ITEMS TO REMAIN IN PLACE |
| 1.3.1 Existing Construction Limits and Protection |
| 1.3.2 Weather Protection |
| 1.3.3 Trees |
| 1.3.4 Utility Service |
| 1.3.5 Facilities |
| 1.4 BURNING |
| 1.5 AVAILABILITY OF WORK AREAS |
| 1.6 SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Dust and Debris Control |
| 1.8 PROTECTION |
| 1.8.1 Traffic Control Signs |
| 1.8.2 Protection of Personnel |
| 1.9 FOREIGN OBJECT DAMAGE FOD |
| 1.10 RELOCATIONS |
| 1.11 EXISTING CONDITIONS |
| PART 2 PRODUCTS |
| 2.1 FILL MATERIAL |
| PART 3 EXECUTION |
| 3.1 EXISTING FACILITIES TO BE REMOVED |
| 3.1.1 Utilities and Related Equipment |
| 3.1.1.1 General Requirements |
| 3.1.1.2 Disconnecting Existing Utilities |
| 3.1.2 Paving and Slabs |
| 3.1.3 Roofing |
| 3.1.3.1 Temporary Roofing |
| 3.1.3.2 Reroofing |
| 3.1.4 Masonry |
| 3.1.5 Concrete |
| 3.1.6 Structural Steel |
| 3.1.7 Miscellaneous Metal |
| 3.1.8 Patching |
| 3.1.9 Cylinders and Canisters |
| 3.1.10 Locksets on Swinging Doors |
| 3.1.11 Mechanical Equipment and Fixtures |
| 3.1.11.1 Preparation for Storage |
| 3.1.11.2 Piping |
| 3.1.11.3 Ducts |
| 3.1.11.4 Fixtures, Motors and Machines |
| 3.1.12 Electrical Equipment and Fixtures |
| 3.1.12.1 Fixtures |
| 3.1.12.2 Electrical Devices |
| 3.1.12.3 Wiring Ducts or Troughs |
| 3.1.12.4 Conduit and Miscellaneous Items |
3.1.13 Items With Unique/Regulated Disposal Requirements
| 3.2 CONCURRENT EARTH-MOVING OPERATIONS |
| 3.3 DISPOSITION OF MATERIAL |
| 3.3.1 Title to Materials |
| 3.3.2 Reuse of Materials and Equipment |
| 3.3.3 Salvaged Materials and Equipment |
| 3.3.4 Disposal of Ozone Depleting Substance ODS |
| 3.3.4.1 Special Instructions |
| 3.3.4.2 Fire Suppression Containers |
3.3.5 Transportation Guidance
| 3.4 CLEANUP |
| 3.5 Demolition of Existing AFFF Fire Suppression System |
| 3.6 DISPOSAL OF REMOVED MATERIALS |
| 3.6.1 Regulation of Removed Materials |
| 3.6.2 Burning on Government Property |
| 3.6.3 Removal to Spoil Areas on Government Property |
| 3.6.4 Removal from Government Property |
3.7 REUSE OF SALVAGED ITEMS
| 02 61 13 |
| 02 61 13 - EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL |
| 02 61 13 - EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL |
| PART 1 GENERAL |
| 1.1 MEASUREMENT AND PAYMENT |
| 1.1.1 Measurement |
| 1.1.2 Payment |
| 1.1.2.1 Excavation and Transportation |
| 1.1.2.2 Backfilling |
| 1.1.2.3 Stockpiling |
| 1.2 REFERENCES |
| 1.3 DESCRIPTION OF WORK |
| 1.3.1 Scheduling |
| 1.3.2 Work Plan |
| 1.3.3 Other Submittal Requirements |
| 1.4 SUBMITTALS |
| 1.5 REGULATORY REQUIREMENTS |
| 1.5.1 Permits and Licenses |
| 1.5.2 Air Emissions |
| 1.5.3 Chemical Testing |
| PART 2 PRODUCTS |
| 2.1 SPILL RESPONSE MATERIALS |
| 2.2 BACKFILL |
| PART 3 EXECUTION |
| 3.1 SURVEYS |
| 3.2 EXISTING STRUCTURES AND UTILITIES |
| 3.3 CONTAMINATED MATERIAL REMOVAL |
| 3.3.1 Excavation |
| 3.3.2 Shoring |
| 3.3.3 Dewatering |
| 3.4 CONFIRMATION SAMPLING AND ANALYSIS |
| 3.5 CONTAMINATED AND POTENTIALLY MATERIAL STORAGE |
| 3.5.1 Long Term and Short Term Stockpiles |
| 3.5.2 Liquid Storage |
| 3.6 SAMPLING |
| 3.6.1 Sampling of Stored Material |
| 3.6.2 Sampling Liquid |
| 3.6.3 Sampling Beneath Storage Units |
| 3.7 SPILLS |
| 3.8 BACKFILLING |
| 3.8.1 Confirmation Test Results |
| 3.9 CLOSURE REPORT |
| 3.10 ATTACHMENT |
| 02 61 13 - Attachment 1 - Draft F-35 UFP - QAPP Work Plan |
| TABLE OF CONTENTS |
| LIST OF FIGURES |
| LIST OF TABLES |
| LIST OF ATTACHMENTS |
| LIST OF ACRONYMS AND ABBREVIATIONS |
| 1. OVERVIEW |
| FIGURE 1 |
| 2. REFERENCES |
| PROGRAMMATIC UFP-QAPP WORKSHEETS |
| QAPP Worksheets #1 and #2 Title and Approval Page |
| QAPP Worksheets #3 and #5 – Project Organization and Quality Assurance Project Plan Distribution |
| QAPP Worksheets #4, #7, and #8 – Personnel Responsibilities, Qualifications, and Sign-Off Sheet |
| QAPP Worksheet #6 –Communication Pathways |
| QAPP Worksheet #9 – Project Scoping Session Summary |
| QAPP Worksheet #10 – Problem Definition |
| FIGURE 10-1 |
| FIGURE 10-2 |
| QAPP Worksheet #11 – Programmatic Data Quality Objectives/Systematic Planning Process |
| FIGURE 11-1 |
| QAPP Worksheet #12 – Measurement Performance Criteria |
| QAPP Worksheet #13 – Secondary Data Uses and Limitations |
| QAPP Worksheets #14 – Summary of Program Tasks |
| FIGURE 14-1 |
| QAPP Worksheet #15 – Project Action Limits and Detection/Quantitation Limits |
| QAPP Worksheet #16 – Project Schedule |