AM03.pdf
PDF 6 MB Posted
- Solicitation number
- W911KB-18-R-0019
About this file
AM #3, Sol. No. W911KB-18-R-0019, EIE394
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA-18-07-Det-tronics_EIE394_Redacted.pdf | ||
| EIE394_AM02.pdf | ||
| Attch-EAL_Contractor_Sponsor_Form_201712.xlsx | XLSX spreadsheet | |
| Amendment_1_package-EIE394.pdf | ||
| 02_EIE394_Drawings_EN_RTA.pdf | ||
| A.07.23__18R0019-Final_EIE394_Solicitation.pdf | ||
| JA-07_Redacted_JA_Redacted.pdf | ||
| JA-06,_08-14_approved_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE394, F-35 Renovate 4-Bay Weather Shelter, Eielson AFB, Alaska.
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 40
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0019
X 9B. DATED (SEE ITEM 11)
19-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2018
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
EIE394 – AM#3
SUMMARY OF CHANGES
A. The following drawings were included in the original solicitation and are substituted for the superseded documents:
1. EIE394-Cover Sheet_AM#3
2. EIE394-Schedule of Drawings_AM#3
3. EIE394-A-201_AM#3
4. EIE394-A-202_AM#3
5. EIE394-A-603_AM#3
B. The following original specifications are revised as indicated:
1. New Specification Table of Content
2. 00 73 46
a. Wage Determinations have been updated
3 09 90 00
a. Revised paragraph 1.3.2 to DELETED TEXT.
4. 21 13 20.00 20
a. Revised paragraph 1.3.1 Design Requirements to delete or equal.
b. Revised paragraph 1.7.1 System Activation to delete or equal.
c. Revised paragraph 1.7.1.a System Activation to delete or equal.
d. Revised paragraph 2.2.1 Releasing Service Fire alarm Control Unit (RSFACU) to delete or equal.
e. Revised paragraph 2.3.1 Optical Flame Detectors to delete or equal.
C. The following documents are added:
1. Dr. Checks Questions and Answers
(End of Summary of Changes)
General Decision Number: AK180001 01/12/2018 AK1
Superseded General Decision Number: AK20170001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018
ASBE0097-001 01/01/2017
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 20.07
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
BOIL0502-002 08/01/2016
Rates Fringes
BOILERMAKER......................$ 44.26 28.41
BRAK0001-002 07/01/2017
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.19 Tile & Terrazzo Finisher.........$ 34.79 19.19
CARP1501-001 09/01/2016
Rates Fringes
MILLWRIGHT.......................$ 36.74 22.99
CARP2520-003 09/01/2016
Rates Fringes
Diver Stand-by....................$ 42.65 25.04 Tender......................$ 41.65 25.04 Working.....................$ 82.45 25.04 Piledriver Carpenter...................$ 38.34 25.04 Piledriver; Skiff Operator and Rigger..................$ 38.34 25.04 Sheet Stabber...............$ 38.34 25.04 Welder......................$ 43.90 25.04
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2016
Rates Fringes
CARPENTER
Carpenter...................$ 38.34 25.04 Lather/Drywall Applicator...$ 36.59 22.59
ELEC1547-004 04/01/2017
Rates Fringes
CABLE SPLICER....................$ 39.82 3%+25.44
ELECTRICIAN......................$ 39.49 3%+25.69
ELEC1547-005 04/01/2017
Line Construction
Rates Fringes
CABLE SPLICER....................$ 52.57 3%+30.81
Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81 Powderman........................$ 48.52 3%+30.81
TREE TRIMMER.....................$ 35.84 3%+23.56
* ELEV0019-002 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 55.45 32.645+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.28 22.65
GROUP 1A....................$ 42.04 22.65
GROUP 2.....................$ 39.51 22.65
GROUP 3.....................$ 38.79 22.65
GROUP 4.....................$ 32.58 22.65
TUNNEL WORK
GROUP 1....................$ 44.31 22.65
GROUP 1A...................$ 46.24 22.65
GROUP 2....................$ 43.46 22.65
GROUP 3....................$ 42.67 22.65
GROUP 4....................$ 35.84 22.65
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump
Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 07/01/2017
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 37.25 30.43
FENCE, BARRIER INSTALLER....$ 33.75 30.08
GUARDRAIL INSTALLERS........$ 34.75 30.08
GUARDRAIL LAYOUT MAN........$ 34.49 30.08
HELICOPTER, TOWER...........$ 38.25 30.43
LABO0341-005 04/01/2017
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.72
GROUP 2....................$ 34.71 26.72
GROUP 3....................$ 35.70 26.72
GROUP 3A...................$ 39.30 26.72
GROUP 3B...................$ 43.20 24.01
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2017
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.52
GROUP 2....................$ 34.71 26.52
GROUP 3....................$ 35.70 26.52
GROUP 3A...................$ 39.30 26.52
GROUP 3B...................$ 43.20 23.81
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2017
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 31.99 20.29
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.51 20.29
PAIN1959-002 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.23 20.04 Machine Taper/Drywall.......$ 31.48 20.04 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.58 20.04
PAIN1959-003 07/01/2017
NORTH OF THE 63RD PARALLEL
GLAZIER..........................$ 38.63 22.39
PAIN1959-004 07/01/2017
Rates Fringes
FLOOR LAYER: Carpet.............$ 29.23 13.96
PAIN1959-006 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 38.63 21.67
PLAS0867-001 02/01/2016
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLAS0867-004 02/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLUM0262-002 01/01/2017
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 38.02 26.72
PLUM0367-002 07/01/2017
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.00 23.80
PLUM0375-002 07/01/2017
North of the 63rd Parallel
Plumber; Steamfitter.............$ 40.91 25.40
PLUM0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 46.00 23.29
ROOF0189-006 04/01/2016
Rates Fringes
ROOFER...........................$ 42.62 15.50
SHEE0023-003 07/01/2017
South of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 42.00 24.82
SHEE0023-004 07/01/2017
North of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 47.74 23.48
TEAM0959-003 09/01/2017
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 39.59 21.97
GROUP 1A....................$ 40.86 21.97
GROUP 2.....................$ 38.33 21.97
GROUP 3.....................$ 37.51 21.97
GROUP 4.....................$ 36.93 21.97
GROUP 5.....................$ 36.17 21.97
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over
20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
F-35A RENOVATE 4-BAY WEATHER
SHELTER (B1335)
W911KB-17-R-0001
EIE394
EIELSON AFB, ALASKA
DESIGN COMPLETE, 08 DECEMBER 2017
of Engineers
Alaska District
US Army Corps
SHEET OFDWG #:
12 SHEETS (MARKED WITH * ON SCHEDULE OF DRAWINGS) CHANGED WITH THIS AMENDMENT2
3 SHEETS (MARKED WITH * ON SCHEDULE OF DRAWINGS) CHANGED WITH THIS AMENDMENT3
REF.
NUM.
SHEET TITLESHT
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
W911KB-17-R-0001
DESIGN COMPLETE - EIE394, 08 DECEMBER 2017
F-35A RENOVATE 4-BAY WEATHER SHELTER
EIELSON AFB, ALASKA
SCHEDULE OF DRAWINGS
SHEET OF
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
E-606 PANEL SCHEDULE
E-701 ELECTRICAL ONE-LINE DIAGRAM
E-702 ELECTRICAL GROUNDING DIAGRAM
E-703 ELECTRICAL CONTROL DIAGRAMS
T-001 SYMBOL LEGEND
T-111 TELECOMMUNICATION PLAN - OVERALL
T-121 TELECOMMUNICATION - DIAMOND STUDY
T-501 TELECOMMUNICATION DETAILS
FP-001 LEGENDS & NOTES
FPD-110 LEVEL 1 DEMOLITION PLAN - OVERALL
FPD-111 LEVEL 1 FIRE PROTECTION PLAN - AREA A
FPD-112 LEVEL 1 & MECHANICAL PLATFORM FIRE PROTECTION PLAN - AREA B
FPD-113 LEVEL 1 FIRE PROTECTION PLAN - AREA C
FP-101 FIRE PROTECTION SITE PLAN
FP-110 LEVEL 1 FIRE PROTECTION PLAN - OVERALL
FP-111 LEVEL 1 FIRE PROTECTION PLAN - AREA A
FP-112 LEVEL 1 & MECHANICAL PLATFORM FIRE PROTECTION PLANS - AREA B
FP-113 LEVEL 1 FIRE PROTECTION PLAN - AREA C
FP-300 ENLARGED FIRE PROTECTION FIRE ROOM PLAN
FP-400 SECTIONS - FIRE ROOM
FP-500 FIRE PROTECTION DETAILS
FA-001 FAMNS GENERAL NOTES AND LEGENDS
FAD-110 LEVEL 1 FIRE ALARM DEMOLITION PLAN - OVERALL
FAD-111 LEVEL 1 FIRE ALARM DEMOLITION PLAN - AREA A
FAD-112 LEVEL 1 & MECHANICAL PLATFORM FIRE PROTECTION DEMOLITION PLANS - AREA B
FAD-113 LEVEL 1 FIRE PROTECTION PLAN - AREA C
FA-110 LEVEL 1 FIRE PROTECTION PLAN - OVERALL
FA-111 LEVEL 1 FIRE ALARM PLAN - AREA A
FA-112 LEVEL 1 & MECHANICAL PLATFORM FIRE ALARM PLANS - AREA B
FA-113 LEVEL 1 FIRE ALARM PLAN - AREA C
FA-300 ENLARGED FIRE ALARM FIRE ROOM PLAN
FA-500 FAMNS DETAILS
FA-503 FAMNS ANTENNA DETAILS
FA-601 FAMNS AND RSFACU RISER DIAGRAM
FA-701 FAMNS OPERATIONAL MATRIX
X-001 SYMBOL LEGEND
X-111 SECURITY PLAN - OVERALL
X-501 SECURITY DETAILS
RD-1 EXISTING UTILIDUCT REFERENCE DRAWINGS
RD-2 EXISTING UTILIDUCT REFERENCE DRAWINGS
RD-3 EXISTING UTILIDUCT REFERENCE DRAWINGS
RD-4 EXISTING UTILIDUCT REFERENCE DRAWINGS
RD-5 EXISTING UTILIDUCT REFERENCE DRAWINGS
M-132 LEVEL 1 & MECHANICAL PLATFORM VENTILATION PLANS - AREA B
M-133 LEVEL 1 VENTILATION PLAN - AREA C
M-140 ROOF PLAN
M-300 SECTION
M-301 SECTION
M-500 PLUMBING DETAILS
M-501 PLUMBING DETAILS
M-502 HEATING DETAILS
M-503 VENTILATION DETAILS
M-600 SCHEDULES - PLUMBING
M-601 * SCHEDULES - HEATING
M-602 SCHEDULES - HEATING
M-603 SCHEDULES - VENTILATION
M-701 * DIAGRAMS - HEATING
M-800 CONTROL SEQUENCES
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
E-001 LEGEND AND ABBREVIATIONS
E-002 GENERAL NOTES
ED-101 ELECTRICAL DEMOLITION PLAN
ED-111 LIGHTING DEMOLITION PLAN - OVERALL
ED-112 LIGHTING DEMOLITION PLAN - AREA A
ED-113 LIGHTING DEMOLITION PLAN - AREA B
ED-114 LIGHTING DEMOLITION PLAN - AREA C
ED-121 POWER DEMOLITION PLAN - OVERALL
ED-122 POWER DEMOLITION PLAN - AREA A
ED-123 POWER DEMOLITION PLAN - AREA B
ED-124 POWER DEMOLITION PLAN - AREA C
ED-131 ROOF DEMOLITION PLAN
E-101 ELECTRICAL SITE PLAN
E-102 GROUNDING PLAN
E-103 AREA CLASSIFICATION PLAN
E-111 LIGHTING PLAN - OVERALL
E-112 LIGHTING PLAN - AREA A
E-113 LIGHTING PLAN - AREA B
E-114 LIGHTING PLAN - AREA C
E-121 POWER PLAN - OVERALL
E-122 POWER PLAN - AREA A
E-123 POWER PLAN - AREA B
E-124 POWER PLAN - AREA C
E-131 ROOF PLAN
E-501 ELECTRICAL DETAILS
E-502 * ELECTRICAL DETAILS
E-601 EQUIPMENT CONNECTION SCHEDULES
E-602 EQUIPMENT CONNECTION SCHEDULES
E-603 FIXTURE SCHEDULE
E-604 PANEL SCHEDULE
E-605 PANEL SCHEDULE
S-100 FOUNDATION & SLAB PLAN - OVERALL
S-101 FOUNDATION & SLAB PLAN - AREA A
S-102 FOUNDATION & SLAB PLAN AND MECH PLATFORM FRAMING PLAN - AREA B
S-103 FOUNDATION & SLAB PLAN - AREA C
S-140 ROOF FRAMING PLAN - OVERALL
S-141 ROOF FRAMING PLAN - AREA A
S-142 ROOF FRAMING PLAN - AREA B
S-143 ROOF FRAMING PLAN - AREA C
S-200 FRAMING ELEVATIONS
S-201 FRAMING ELEVATIONS
S-202 FRAMING ELEVATIONS
S-203 FRAMING ELEVATIONS
S-204 FRAMING ELEVATIONS
S-205 FRAMING ELEVATIONS
S-206 FRAMING ELEVATIONS
S-207 FRAMING ELEVATIONS
S-208 FRAMING ELEVATIONS
S-500 * FOUNDATION DETAILS
S-501 * FOUNDATION DETAILS
S-505 * UTILIDOR AND CONC. DETAILS
S-510 ROOF FRAMING DETAILS
S-511 ROOF FRAMING DETAILS
S-512 FRAMING ELEVATION DETAILS
S-513 FRAMING ELEVATION DETAILS
S-600 FOUNDATION & REBAR SCHEDULES
S-700 WALL DETAILS
S-701 CMU DETAILS
S-800 M&E SUPPORT DETAILS
S-801 M&E SUPPORT DETAILS
S-802 M&E SUPPORT DETAILS
S-803 M&E SUPPORT DETAILS
M-001 MECHANICAL LEGEND
MD-101 LEVEL 1 DEMOLITION PLUMBING PLAN - OVERALL
MD-102 LEVEL 1 DEMOLITION PLUMBING PLAN - AREA A
MD-103 LEVEL 1 & MECHANICAL PLATFORM DEMOLITION PLUMBING PLANS - AREA B
MD-104 LEVEL 1 DEMOLITION PLUMBING PLAN - AREA C
MD-105 LEVEL 1 DEMOLITION RAIN LEADER PLUMBING PLAN - AREA A & AREA B
MD-106 LEVEL 1 DEMOLITION RAIN LEADER PLUMBING PLAN - AREA C
MD-120 LEVEL 1 DEMOLITION HVAC PLAN - OVERALL
MD-121 LEVEL 1 DEMOLITION HVAC PLAN - AREA A
MD-122 LEVEL 1 & MECHANICAL PLATFORM DEMOLITION HVAC PLANS - AREA B
MD-123 LEVEL 1 DEMOLITION HVAC PLAN - AREA C
M-100 LEVEL 1 PLUMBING PLAN - OVERALL
M-101 LEVEL 1 PLUMBING PLAN - AREA A
M-102 LEVEL 1 & MECHANICAL PLATFORM PLUMBING PLANS - AREA B
M-103 LEVEL 1 PLUMBING PLAN - AREA C
M-120 LEVEL 1 HEATING PLAN - OVERALL
M-121 LEVEL 1 HEATING PLAN - AREA A
M-122 * LEVEL 1 & MECHANICAL PLATFORM HEATING PLANS - AREA B
M-123 LEVEL 1 HEATING PLAN - AREA C
M-130 LEVEL 1 VENTILATION PLAN - OVERALL
M-131 LEVEL 1 VENTILATION PLAN - AREA A
G-001 COVER SHEET
G-002 SCHEDULE OF DRAWINGS
G-003 ABBREVIATIONS
G-004 GENERAL NOTES, ABBREVIATIONS, CODE STUDY
G-005 LIFE SAFETY PLAN
G-020 ASSEMBLY TYPES
G-101 OVERALL F-35 PROJECT LOCATIONS
G-102 OVERALL SOUTH LOOP PLAN
G-103 LOCATION AND VICINITY MAP
V-001 TOPOGRAPHIC SURVEY
C-001 NOTES, LEGEND, AND ABBREVIATIONS
C-101 SITE PLAN
C-501 DETAILS
C-711 STEAM AND CONDENSATE SCHEMATIC
C-721 * TYPICAL UTILIDUCT DETAILS
C-722 UTILIDUCT PIPE SUPPORT DETAILS
C-740 * UTILIDUCT MANHOLE LP-34 DETAILS
AD-100 FIRST FLOOR PLAN DEMO OVERALL
AD-101 FIRST FLOOR PLAN DEMO A
AD-102 FIRST FLOOR PLAN DEMO B
AD-103 FIRST FLOOR PLAN DEMO C
AD-104 MECHANICAL PLATFORM FLOOR PLAN DEMO B
AD-105 ROOF PLAN DEMO A/B
AD-106 ROOF PLAN DEMO C
A-100 FIRST FLOOR PLAN OVERALL
A-101 FIRST FLOOR PLAN - AREA A
A-102 * FIRST FLOOR PLAN - AREA B
A-103 FIRST FLOOR PLAN - AREA C
A-104 * MECHANICAL PLATFORM FLOOR PLAN
A-105 ROOF PLAN - AREA A/B
A-106 ROOF PLAN - AREA C
A-107 REFLECTED CEILING PLAN_LEVEL 1
A-201 * NORTH AND SOUTH ELEVATIONS
A-202 * EAST AND WEST ELEVATIONS
A-301 BUILDING CROSS SECTION
A-302 BUILDING LONGITUDINAL SECTION
A-310 WALL SECTIONS
A-320 STAIR SECTIONS/DETAILS
A-501 INTERIOR DETAILS
A-510 * EXTERIOR DETAILS
A-603 * DOOR AND FINISH SCHEDULE
A-604 * DOOR DETAILS
A-605 SIGN SCHEDULE
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 GENERAL NOTES, LEGEND, & ABBREVIATIONS
S-004 SPECIAL INSPECTIONS
S-005 SPECIAL INSPECTIONS
S-010 AREA LOAD PLAN
S-011 ROOF WIND UPLIFT PLAN
LEVEL 1
0"
MECHANICAL
PLATFORM
12' - 0"
ROOF
35' - 6"
ABCDE
F
T.O. STEEL
31' - 10"
CORE LEVEL
6"
E4 A-301
E1 A-301
PATCH EXISTING HVAC
PENETRATIONS; REF.
MECH.
COLORMATCH
KINGSPAN ROCK TAN
PREP AND PAINT ALL
(E) METAL SIDING AND
WALL FLASHING.
COLORMATCH
KINGSPAN ROCK TAN
NEW FACILITY NUMBER SIGN
PREP AND PAINT (E) PAINTED CANOPY
SURFACES, INCLUDING UNDERSIDE OF
ROOF DECKING.
COLORMATCH KINGSPAN DARK BRONZE.
(E) HANGAR DOOR
FINISH TO REMAIN, TYP.
5'
- 0
RELOCATED KNOX BOX
FROM SOUTH WALL
NEW ADDRESS SIGNEXTERIOR CONCRETE WAINSCOT
NOT TO RECEIVE PAINT, TYP. 3
3 3
LEVEL 1
0"
MECHANICAL
PLATFORM
12' - 0"
ROOF
35' - 6"
A B C D E F
T.O. STEEL
31' - 10"
CORE LEVEL
6"
E4 A-301
E1 A-301
PATCH EXISTING HVAC
PENETRATIONS; REF
MECH.
COLORMATCH
KINGSPAN ROCK TAN
B3 A-510
PREP AND PAINT ALL
(E) METAL SIDING AND
WALL FLASHING.
COLORMATCH
KINGSPAN ROCK TAN
PREP AND PAINT (E) PAINTED CANOPY
SURFACES, INCLUDING UNDERSIDE OF
ROOF DECKING.
COLORMATCH KINGSPAN DARK BRONZE
(E) HANGAR DOOR FINISH TO REMAIN, TYP.PAINT EXTERIOR DOOR FACES
AND FRAMES TO COLORMATCH
KINGSPAN DARK BRONZE, TYP.
EXTERIOR CONCRETE
WAINSCOT NOT TO RECEIVE
PAINT, TYP.
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
NE
ER
DI
ST
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
IO
N #
: 3
D
(K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-201
EL
EV
AT
IO
N S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
N O
R
TH
A N
D S
O U
TH
E
LE
V A
TI
O
N S
1/16" = 1'-0"A4 NORTH ELEVATION
1/16" = 1'-0"A2 SOUTH ELEVATION
1. REMOVE AND RETAIN ALL EXTERIOR SIGNAGE FOR
REINSTALATION POST EXTERIOR PAINTING.
2. REPLACE VERTICAL METAL SIDING AS NEEDED AT INFILLED AND
NEW HVAC/PLUMBING PENETRATIONS.
3. PROTECT ALL EXISTING ITEMS TO REMAIN IN PLACE FROM
PAINTING PROCESS, INCLUDING HANGAR BAY DOORS.
SHEET NOTES:
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#3
/18
U
PD
AT
ED
E
LE
VA
TI
O
N N
O
TE
S
LEVEL 1
0"
MECHANICAL
PLATFORM
12' - 0"
ROOF
35' - 6"
12345
T.O. STEEL
31' - 10"
CORE LEVEL
6"
A4 A-302
PREP AND PAINT ALL
(E) METAL SIDING AND WALL
FLASHING. COLORMATCH
KINGSPAN ROCK TAN
EXTERIOR CONCRETE WAINSCOT
NOT TO RECEIVE PAINT, TYP.
PAINT EXTERIOR DOOR FACES
AND FRAMES TO COLORMATCH
KINGSPAN DARK BRONZE, TYP.
LEVEL 1
0"
MECHANICAL
PLATFORM
12' - 0"
ROOF
35' - 6"
1 2 3 4 5
T.O. STEEL
31' - 10"
CORE LEVEL
6"
A1 A-302
INFILL WALL, MATCH ADJACENT
WALL ASSEMBLY AND FINISH
PREP AND PAINT ALL
(E) METAL SIDING AND WALL
FLASHING. COLORMATCH
KINGSPAN ROCK TAN
EXTERIOR CONCRETE WAINSCOT
NOT TO RECEIVE PAINT, TYP.
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
IO
N #
: 3
D
(K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-202
EL
EV
AT
IO
N S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
E A
ST
A N
D W
ES
T
E L
EV
A T
IO
N S
1/8" = 1'-0"B4 EAST ELEVATION
1/8" = 1'-0"B1 WEST ELEVATION
1. REMOVE AND RETAIN ALL EXTERIOR SIGNAGE FOR
REINSTALATION POST EXTERIOR PAINTING.
2. REPLACE VERTICAL METAL SIDING AS NEEDED AT INFILLED AND
NEW HVAC/PLUMBING PENETRATIONS.
3. PROTECT ALL EXISTING ITEMS TO REMAIN IN PLACE FROM
PAINTING PROCESS.
SHEET NOTES:
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#3
/18
U
PD
AT
ED
E
LE
VA
TI
O
N N
O
TE
S
TYPE A TYPE B
TYPE A TYPE B
DOOR TYPES
FRAME TYPES
TYPE C TYPE D
PE
R
SC
HE
D
PER SCHED PER SCHED
PE
R
SC
HE
D
PE
R
SC
HE
D
PER SCHED
PER SCHED
PER SCHED
PER SCHED
PE
R
SC
HE
D
PE
R
SC
HE
D
PE
R
SC
HE
D
REMOVABLE
MULLION
3'
- 0
6"
3'
- 0
6"
6"6"6"6"
US ARMY CORPS
OF ENGINEERS
SHEET OF
Reference number:
U.
S.
A
RM
Y
EN
GI
RI
CT
CO
RP
S
OF
E
NG
IN
EE
RS
AN
CH
OR
AG
E, A
LA
SK
A
DR
AW
N
BY
DE
SI
GN
ED
SU
BM
IT
TE
D:
RE
VI
EW
ED
B Y:
FI
LE
DA
TE
CO
NT
RA
CT
N
O.
DW
G
A
DW
G
SC
AL
E:
CO
NT
RA
CT
OR
CI
TY
ST
AT
E:
Re co mm en de d:
Ap pr ov ed
Da te:
PR
IM
E
CO
NT
RA
CT
O
R
RE
SI
DE
NT
E
NG
IN
EE
R
EI
E3
B C D E F G H
PL
OT
S
CA
LE
x3
-1
:1 x1
-1 :2
ALASKA DISTRICT
0 L
ST
RE
ET
, S
UIT
E 4
, A
NC
HO
RA
GE
, A K 9
Ph : 9
.27
4.7
AK
CO
RP
OR
AT
ION
2 D (K
PB
AE
CC
9 (
CO
FF
MA
N)
AS
N
O
TE
D
NOT FOR CONSTRUCTION
A-603
SC
H
ED
U
L E S
RE
NO
VA
TI
O N
4-
BA
Y W
EA
TH
ER
S
HE
LT
ER
(B
R
ES
R
ES
JP
K
.1 2.
W
1K
B-
-R -0
DESIGN
COMPLETE
EI
E L
SO
N
AF
B, A
LA
S K A
AR
C
H
IT
EC
TU
R E
D O
O R
A N
D F
IN
IS
H S
C H
ED
U
LE
DOOR SCHEDULE
DOOR NO. TYPE
DOOR
FIRE RATING
FRAME
HARDWARE COMMENTS:
SIZE
MATERIAL
FINIS
H
UNDER
CUT TYPE MATERIAL FINISH
DETAILS
WIDTH HEIGHT THICKNESS HEAD JAMB SILL
102 D 4' - 0" 7' - 0" 1 3/4" IHM PT3 A IHM PT2 0" 01 EXTRA HEAVY DUTY
103 A 6' - 0" 7' - 0" 1 3/4" HM PT3 90 A HM PT2 0" 02 EXTRA HEAVY DUTY
104 A 6' - 0" 7' - 0" 1 3/4" HM PT3 90 A HM PT2 0" 02 EXTRA HEAVY DUTY
105 D 3' - 0" 7' - 0" 1 3/4" HM PT3 A HM PT2 0" 01 EXTRA HEAVY DUTY
106A D 4' - 0" 7' - 0" 1 3/4" IHM PT3 A IHM PT2 6" 03
106B B 6' - 0" 7' - 0" 1 3/4" HM PT3 45 A HM PT2 6" 04 180 DEGREE SWING
107 B 6' - 0" 7' - 0" 1 3/4" IHM PT3 B IHM PT2 6" 05
108 D 2' - 8" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 06
109 D 2' - 8" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 06
110A C 3' - 0" 7' - 0" 1 3/4" IHM PT3 A IHM PT2 6" 07
110B C 3' - 0" 7' - 0" 1 3/4" HM PT3 90 A HM PT2 6" 08 180 DEGREE SWING, EXTRA HEAVY DUTY
110C B 6' - 0" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 04
111 D 3' - 0" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 06
112 D 3' - 0" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 09
113A C 3' - 6" 7' - 0" 1 3/4" HM PT3 A HM PT2 6" 10 EXTRA HEAVY DUTY
113B C 3' - 6" 7' - 0" 1 3/4" HM PT3 90 A HM PT2 6" 08 EXTRA HEAVY DUTY
114A C 3' - 0" 7' - 0" 1 3/4" IHM PT3 A IHM PT2 6" 13
114B C 3' - 0" 7' - 0" 1 3/4" IHM PT3 A IHM PT2 6" 11
200A D 2' - 8" 7' - 0" 1 3/4" HM PT3 45 A HM PT2 0" 12
200B B 6' - 0" 7' - 0" 1 3/4" HM PT3 45 A HM PT2 0" 04 LATCH FROM PUSH SIDE
FINISH SCHEDULE
ROOM NO ROOM NAME
WALL FINISH BASE FINISH FLOOR CEILING
NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST MAT. FIN. MAT. FIN. HEIGHT
102 BAY 9 PT-1 PT-1 PT-1 PT-1 - - - - CONCRETE FRRF STEEL - 10'x10' SODIUM SILICATE COATING 103 BAY 10 PT-1 PT-1 PT-1 PT-1 - - - - CONCRETE FRRF STEEL - 10'x10' SODIUM SILICATE COATING 104 BAY 11 PT-1 PT-1 PT-1 PT-1 - - - - CONCRETE FRRF STEEL - 10'x10' SODIUM SILICATE COATING 105 BAY 12 PT-1 PT-1 PT-1 PT-1 - - - - CONCRETE FRRF STEEL - 10'x10' SODIUM SILICATE COATING
106 FIRE PT-1 PT-1 PT-1 PT-1 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE CONC-1 STEEL -
107 ELEC PT-1 PT-1 PT-1 PT-1 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE CONC-1 STEEL -
108 RESTROOM PT-2 PT-2 PT-2 PT-4 PTB-1 PTB-1 PTB-1 PTB-1 CONCRETE PFT-1 (E) GYP
BOARD
PT-1 RE-INSTALL METAL WAINSCOT, ALL
WALLS
109 RESTROOM PT-2 PT-4 PT-2 PT-2 PTB-1 PTB-1 PTB-1 PTB-1 CONCRETE PFT-1 (E) GYP
BOARD
PT-1 RE-INSTALL METAL WAINSCOT, ALL
WALLS
110 CORR. PT-2 PT-2 PT-2 PT-4 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE CONC-1 STEEL -
111 SHOWER PWT REF. ELEV. PT-2 PWT-1/ PT-2 PTB-1 PTB-1 PTB-1 PTB-1 CONCRETE PFT-1 MR GYP
BOARD
PT-1 MR GYP BOARD @ CEILING AND
EXPOSED STUD WALLS
112 JANITOR PT-1 PT-1 PT-1 PT-1 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE CONC-1 STEEL -
113 VEST. PT-2 PT-2 PT-2 PT-2 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE CONC-1 STEEL -
114 ENTRY PT-2 PT-2 PT-2 PT-4 RCB-1 RCB-1 RCB-1 RCB-1 CONCRETE WO-1 STEEL -
200 MECHANICAL PLATFORM PT-1 PT-1 PT-1 PT-1 - - - - CONCRETE CONC-1 - -
300 HRV ENCLOSURE FF FF FF FF FF FF FF FF -FF FF FF FF
EXTERIOR FINISH MATERIAL LEGEND
MARK MATERIAL MANUFACTURER STYLE / PRODUCT COLOR SIZE FINISH NOTES
CONC-1 CONCRETE SEALER H&C LOW VOC CONCRETE SEALANT, SOLVENT BASED PEARL GRAY
FRRF FUEL RESISTIVE RESINOUS FLOORING,
5 COAT SYSTEM
TENNANT COMPANY WHITE
G-1 GROUT LATICRETE SPECTRALOCK 2000 IG EPOXY GROUT 42 PLATINUM
PFT-1 PORCELEIN FLOOR TILE STONEPEAK CERAMICS SKY COLLECTION/USG1212106 CLOUDSKY 12" x 12" INSTALLED ON DIAGONAL
PT-1 PAINT SHERWIN WILLIAMS SUPERPAINT SW 7071 GRAY SCREEN -
PT-2 PAINT SHERWIN WILLIAMS PROCLASSIC SW 7073 NETWORK GRAY DOOR TRIM
PT-3 PAINT SHERWIN WILLIAMS PROCLASSIC SW 7074 SOFTWARE DOORS
PT-4 PAINT SHERWIN WILLIAMS SUPERPAINT SW 6242 BRACING BLUE ACCENT COLOR
PT-5 PAINT SHERWIN WILLIAMS SUPERPAINT SW 6385 DOVER WHITE
PTB-1 PORCELEIN TILE BASE STONEPEAK CERAMICS SKY COLLECTION/USG612C106 COVE BASE CLOUDSKY 6" x 12" PWT-1 PORCELAIN WALL TILE STONEPEAK CERAMICS SKY COLLECTION/USG124D4106 MOSAIC CLOUDSKY 12" x 24"
RCB-1 RUBBER COVE BASE ARMSTRONG WALL BASE R4861 GRAPHITE GRAY 4" COVE ROLL
SDT STATIC DISSIPATIVE TILE ARMSTRONG EXCELON SDT 51955 MOSS GREEN 12" x 12"
WO-1 WALK OFF GRILLE AMARCO PRODUCTS AL-TRACK AT F2 NATURAL -
SCHEDULE NOTE:
1. ALL EXISTING PERSONNEL DOORS IN BUILDING ARE REPLACED UNDER THIS SCOPE. ALL DOORS INCLUDED IN THE SCHEUDLE ARE THE REPLACEMENTS.
Sy m
Ac tio n De sc rip tio n
Da te
Ap pv d
AM
#3
/18
U
PD
AT
ED
C
EI
LI
N G
F
IN
IS
H
ES
AM#3 EIE394 F-35A Renovate 4-Bay Design Complete
Documentation Notebook.
LEED documentation relative to low emitting materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
1.3 APPLICATOR'S QUALIFICATIONS
1.3.1 Contractor Qualification
Submit the name, address, telephone number, FAX number, and e-mail address of the contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on a minimum of three similar projects within the past three years. List information by individual and include the following:
a. Name of individual and proposed position for this work.
b. Information about each previous assignment including:
Position or responsibility
Employer (if other than the Contractor)
Name of facility owner
Mailing address, telephone number, and telex number (if non-US) of facility owner
Name of individual in facility owner's organization who can be contacted as a reference
Location, size and description of structure
Dates work was carried out
Description of work carried out on structure
1.3.2 AM#3... DELETED TEXT...AM#3
SECTION 09 90 00 Page 8 January 16, 2018
NFPA 409 (2016) Standard on Aircraft Hangars
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2)
National Electrical Code
NFPA 72 (2016) National Fire Alarm and Signaling Code
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-520-01 Interior Electrical Systems
UFC 3-600-01 (2016; with Change 1) Fire Protection Engineering for Facilities
UNIFIED FACILITIES CRITERIA (UFC)
UFC 4-211-01 (2017) Aircraft Maintenance Hangars
1.3 SYSTEM DESCRIPTION
1.3.1 Design Requirements
Design and provide a new automatic low-level high expansion foam (HEF) fire suppression system including electronic detection, control, release systems, and alarm reporting systems. The low-level fire suppression system must provide uniform distribution of aerated high expansion solution to provide complete coverage throughout the areas indicated. The electronic detection, control, and release system must include wiring, raceways and other accessories and miscellaneous items required for a complete operating system even though each item is not specifically mentioned or described. The design, equipment, materials, installation, and workmanship shall be in strict accordance with the required and advisory provisions of UFC 4-211-01 , NFPA 11 , NFPA 13 , NFPA 70 , NFPA 72 , NFPA 409 , and UFC 3-600-01 , except as modified herein.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.