AM_4_package.pdf

PDF 1 MB Posted

Attached to
EIE382-F-35A Aircraft Weather Shelter (Squadron 2)
Solicitation number
W911KB-18-R-0014
Issued by

About this file

EIE382-Amendment 0004

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
AM_3_package.pdf PDF
JA-06,_08-14_approved_Redacted.pdf PDF
JA-07_Redacted_JA_Redacted.pdf PDF
JA-18-08-Det-tronics_EIE382_Redacted.pdf PDF
A.07.24_EIE382_AM2_W911KB18R0014_DWGS.pdf PDF
A.07.24_EIE382_AM2_W911KB18R0014_SPECS.pdf PDF
EIE382_AM_01.pdf PDF
Final_RFP-EIE382_30_Jan_2018.pdf PDF
Final_Drawings_EIE382.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE382 F-35 Aircraft Weather Shelters (Sqd 2), EIELSON AFB, ALASKA

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document

b. PROPOSAL DUE DATE HAS NOT BEEN EXTENDED and may be submitted electronically via email to michelle.r.mandel@usace.army.mil and theresa.m.afrank@usace.army.mil.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THIS STANDARD FOR 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0014

X 9B. DATED (SEE ITEM 11)

29-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Apr-2018

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

Drawing C-006 (revised size of pesticide contaminated area)

b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#4” appears before and after new and/or revised materials, except as noted below.

SECTION 00 11 01 – PROPOSAL SCHEDULE

– Revised CLIN 0006 to reflect new estimate of pesticide contaminated soil (Reissuing proposal schedule)

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

c. The following sections are deleted:

NONE

d. The following documents are added:

e. The following revisions are incorporated:

f. Other:

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

AM#4 F-35 A AIRCRAFT WEATHER SHELTER (SQD 2) W911KB-18-R-0014

EIELSON AFB, ALASKA EIE382

PS- 1

PROPOSAL SCHEDULE

F-35A AIRCRAFT WEATHER SHELTER (SQD 2)

EIELSON AFB, ALASKA

BASE ITEMS

Item No.

Description Quantity Unit Unit Price Amount

0001 Construct F-35A Aircraft Weather Shelter within the building 5-foot line, complete.

1 Job $_________ $_________

0002A Construct site work and utilities beyond the building 5 foot lines, minus CLINs 0002B, 0002C, and 0002D, complete.

1 Job $_________ $_________

0002B Construct utilidor from EIE376 manhole MH-LP34 to and including EIE382 manhole MH-LP41, complete.

1 Job $_________ $_________

0002C Construct primary electric circuit from EIE376 SW-1335 to and including EIE382 SW382, complete

1 Job $_________ $_________

0002D Construct main communications line from EIE376 handhole HH-2-24-2- 5 to and including EIE382 manhole MH-2-24-2-9, complete

1 Job $_________ $_________

0003 Provide Temporary Heating independent of existing central steam heating system, Complete.

1 Job $_________ $_________

0004 Stockpile and Sample 10,000 Cubic Yards of Potentially Contaminated Soil, From Field Screening, Including Construction of Holding Cells, Complete. Estimated Quantity *

10,000 CY $_________ $_________

0005 Dispose of 9,000 Cubic Yards of POL Contaminated Soil, Complete. Estimated Quantity **

9,000 CY $_________ $_________

PS-2

BASE ITEMS CONTINUED

No.

Description Quantity Unit Unit Price Amount

0006 Dispose of 5,000 Cubic Yards of Pesticide Contaminated Soil, Complete. Estimated Quantity ***

5,000 CY $_________ $_________

0007 Dispose of 35,000 Cubic Yards of Non-contaminated Soil, Complete. Estimated Quantity ****

35,000 CY $_________ $_________

Total of Base Items 0001 thru 0007 $_________

OPTION ITEMS

No.

Description Quantity Unit Unit Price Amount

0008 Purchase ACA-1 and ACA-2 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0009 Purchase ACA-3 and ACA-4 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0010 Purchase ACA-5 and ACA-6 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0011 Purchase ACA-7 and ACA-8 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

Install ACA-1 and ACA-2 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0008 is not awarded, ACA-1 and ACA-2 will be Government Furnished, Contractor Installed. *****

PS- 3

OPTION ITEMS CONTINUED

Item No.

Description Quantity Unit Unit Price Amount

0013 Install ACA-3 and ACA-4 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0009 is not awarded, ACA-3 and ACA-4 will be Government Furnished, Contractor Installed. *****

1 Job $_________ $_________

0014 Install ACA-5 and ACA-6 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0010 is not awarded, ACA-5 and ACA-6 will be Government Furnished, Contractor Installed. AM#1… *****

…AM#1

1 Job $_________ $_________

0015 Install ACA-7 and ACA-8 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0011 is not awarded, ACA-7 and ACA-8 will be Government Furnished, Contractor Installed. *****

1 Job $_________ $_________

0016 Unsatisfactory Material Excavation and Backfill.

****** 250 CY $_________ $_________

0017 Furnish and Install IDS End Devices, Complete *******

1 Job $_________ $_________

0018 Provide Concrete airfield apron in lieu of Asphalt airfield apron in base CLIN 0002, does not include additional pavement in CLIN 0019. ********

1 Job $_________ $_________

0019 Widen asphalt apron and Construct concrete GPS Synchronization Pads, Complete. ********

PS-4

OPTION ITEMS CONTINUED

No.

Description Quantity Unit Unit Price Amount

0020 Provide Concrete airfield apron in lieu of the Asphalt airfield apron in CLIN 0019, Complete. ********

1 Job $_________ $_________

0021 Provide Type I, Gradation A reflective media, per Section 32 17 23, Complete. Do not include cost in CLIN 0002.

1 Job $_________ $_________

0022 Provide Type III, Gradation A reflective media, per Section 32 17 23, Complete. Do not include cost in CLIN 0002.

Total of Optional Items 0008 thru 0022 $_________

TOTALS

Total of Base and Optional Items 0001 thru 0022 $_________

Proposed Contract Duration: ____________________

CLINs 0004, 0005, 0006, and 0007 are estimated quantities. Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY.

* Work on CLIN 0004 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. It does not include costs for disposal of any soils determined to be contaminated, which shall be included in CLINs 0005 and 0006. For CLIN 0004, the Contractor shall keep a record of the amount of soil being stockpiled and sampled, as required by results of the field screening. CLIN 0004 does not include stockpiling or sampling of soil within those areas identified on Sheet C- 006 as requiring 100% stockpiling and sampling. Those costs are to be included in CLINs 0001 and 0002 as applicable.

** For CLIN 0005, the Contractor shall keep a record of the amount of POL contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil from those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling and from the testing of soil required by CLIN 0004 to be stockpiled and sampled.

PS- 5

*** For CLIN 0006, the Contractor shall keep a record of the amount of Pesticide contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil from those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling.

**** For CLIN 0007, the Contractor shall keep a record of the amount of non-contaminated soil being disposed of. This is soil from those areas identified on Sheets C-102 and C-103 as requiring 100% stockpiling and sampling which has been tested and determined to be clean.

Soil shall be disposed on base at a clean soil disposal area within 7 miles of the stockpile area, as directed by the Contracting Officer. CLIN 0007 does not include clean soils excavated at the project site outside of those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling. Those costs are to be included in CLINs 0001 and 0002 as applicable.

***** For CLINs 0008 - 0015, these options may be exercised at any time prior to the contract completion date and completion time shall be 180 days from the date of option exercise or by the contract completion date, whichever is later.

****** Work on CLIN 0016 shall be the cost for work identified in Specs 31 00 00 paragraph 3.2.

The Contractor shall survey the extent of excavation and keep a record of the unsatisfactory material removed beyond the elevations noted in the drawings or specifications. This option may be exercised up to 10 times and may be exercised at any time prior to the contract completion date. No additional time will be added to the contract completion date if this option is exercised.

******* Work on CLIN 0017 shall be the cost of the Intrusion Detection System end devices noted in Section 28 10 05/2.3.1. This option may be exercised at any time prior to the contract completion date and completion time shall be 120 days from the date of option exercise or by the contract completion date, whichever is later. The IDS infrastructure, including all conduit, boxes, wiring, power, etc., is included in CLIN 0001.

******** For CLINs 0018 - 0022, these options may be exercised at any time within 60 days of contract award. CLIN 0020 will only be exercised if CLIN 0019 is exercised. Either CLIN 0021 or 0022 will be exercised, not both. No additional time will be added to the contract completion date if these options are exercised.

EVALUATION OF OFFERS.

1. AWARD: Award will be made in accordance with Section 00 22 11 – PROPOSAL, SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD ONE

STEP – BEST VALUE.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

PS-6

4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.

-- END OF PROPOSAL SCHEDULE –

D r a w i n g

F i l e

N a m e

D w g

S c a l e

P l o t

S c a l e

D a t e

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R P

R I M

E

C

O N

T R

A C

T O

R

S u b m i t t e d

D e s i g n e d

R e v i e w e d

C h i e f

B a n c h

C h i e

S c t i o n

U S

A

R M

Y

E

N G

I N

E E

R

D

I S

T R

I C

T

A N

C H

O R

A G

E

A

L A

S K

A

C O

R P

S

O

F

E

N G

I N

E E

R S

D a t e

S T

A T

E C

I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

C T

O

R e c o m m e n d e d

A p p r o v e d

Reference number:

C E

P O

A E

N D

B M

C E

P O

A E

N D

B

A

T

E D

P L O

T T

E

US Army Corps of Engineers ®

Alaska District

F T

Q W

E I E

A F

W K

B R

D

S R

B

S R

B

W E

E I E

L S

F B

A

L A

S K

A

E I E

F

I R

C R

A F

T

W

E A

T H

R

H E

L T

Q

DESIGN COMPLETE

H D

R

A

L A

S K

A

I N

C

A N

C H

O R

A G

E

A

K

R

E E

T

S

D r a w i n g

F i l a m e

D w g

S c a l e

P l o t

S c a l e

D a t e

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R P

R I M

E

C

O N

T R

A C

T O

R

S u b m i t t e d

D e s i g n e d

R e v i e w e d

C h i e

B a n c h

C h i e c t i o n

U S

A

R M

Y

E

N G

I N

E E

R

D

I S

T R

I C

T

A N

C H

O R

A G

E

A

L A

S K

A

C O

R P

S

O

F

E

N G

I N

E E

R S

D a t e

S T

A T

E C

I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R e c o m m e n d e d

A p p r o v e d

Reference number:

C E

P O

A E

N D

B M

C E

P O

A E

N D

B

T

E D

P L O

T T

US Army Corps of Engineers ®

Alaska District

F T

Q W

E I E

A F

W K

B R

D

S R

B

S R

B

W E

E I E

L S

F B

A

L A

S K

A

E I E

F

I R

C R

A F

T

W

E A

T H

H E

L T

Q

DESIGN COMPLETE

H D

R

A

L A

S K

A

I N

C

A N

C H

O R

A G

E

A

K

R

E E

T

S

POINT TABLE

POINT # NORTHING EASTING

POINT TABLE

POINT # NORTHING EASTING

POINT TABLE

POINT # NORTHING EASTING

POINT TABLE

POINT # NORTHING EASTING

POINT TABLE

POINT # NORTHING EASTING

TAXIW

AY "L

U

E

AP 5812

AP 5811

AP 5810

AP 5809

AP 5808

AP 5807

AP 5806

AP 5805

AP 5804

AP 5803

AP 5802

AP 5801

AP 5800

AP 5799

AP 5798

AP 5797

AP 5796

AP 5795

AP 5794

AP 5793

AP 5792

AP 5791

AP 5790

AP 5789

AP 5788

AP 5787

AP 5786

AP 5785

AP 5784

AP 5783

AP 5782

AP 5781

AP 5780

AP 5779

AP 5778

AP 5777

AP 5776

AP 5775

AP 5774

AP 5773

AP 5772

AP 5771

P704

P

P

P

P

P

P

P

P

P1008

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P1023

P1024

P

P

P

P

P1029

P1030

P

P

P

P

E R

C E

I L

S

T O

C K

P I L

E

A S

C-006

1" = 60'-0"

EIE382 - WEATHER SHELTER (SQD 2)

PLAN NORTH

100% SOIL STOCKPILE AREAS

0' 120'60'30'

A2

P

M

NOTES:

1. SOIL CONTAMINATION AREAS AND LIMITS SHOWN PROVIDED BY USACE.

2. WHERE THERE IS EXCAVATION REQUIRED FOR THE DESIGN AND CONSTRUCTION OF THIS PROJECT, SOIL SHALL BE EITHER FIELD SCREENED OR 100% STOCKPILE PER THIS

DRAWING. SAMPLING SHALL BE PERFORMED AS REQUIRED PER SPECIFICATION SECTION 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL.

3. FOR ADDITIONAL REQUIREMENTS, REFERENCE SPECIFICATION SECTIONS 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL AND 31 09 20.00 29 FIELD SCREEN

TESTING OF SOILS FOR CHEMICAL CONTAMINATION.

4. AREAS IDENTIFIED AS BEING WITHIN THE 100% STOCKPILE SHALL BE MAINTAINED IN SEPARATE STOCKPILE(S) IN ORDER TO MINIMIZE THE POTENTIAL DISPOSAL REQUIREMENTS

OF PERFLUOROOCTANE SULFONATE (PFOS)/PERFLUOROOCTANOIC ACID (PFOA). AREAS IDENTIFIED ON THIS DRAWING MAY BE FURTHER STOCKPILED AS REQUIRED.

5. SOME OF THE LIMITS SHOWN MAY BE OUTSIDE THE EXCAVATION AREAS REQUIRED FOR THE PROJECT, SUCH AS THE DESIGN BUILD AREA, IF NOT AWARDED.

100% SOIL STOCKPILE LEGEND:

X U

N I F

I E

D E

N T

E J o b s E

I E

D w g s C

A D

E

I E

C

M

A R d w g

EDGE OF

EXCAVATION;

MATCH TO OG

PESTICIDE STOCKPILE & SAMPLE

SOILS WITHIN THIS AREA SHALL BE PLACED IN THE LONG-TERM STOCKPILE(S) AND SHALL BE SAMPLED FOR CONTAMINANTS; REFERENCE PROPOSAL SCHEDULE AND SPECIFICATION SECTION 02 61 13 FOR DISPOSAL OF

CONTAMINATED SOILS (NON-PFOS/PFOA) AND DISPOSAL OF CLEAN SOILS.

POL - STOCKPILE & SAMPLE

SOILS WITHIN THIS AREA SHALL BE PLACED IN THE LONG-TERM STOCKPILE(S) AND SHALL BE SAMPLED FOR CONTAMINANTS; REFERENCE PROPOSAL SCHEDULE AND SPECIFICATION SECTION 02 61 13 FOR DISPOSAL OF

CONTAMINATED SOILS (NON-PFOS/PFOA) AND DISPOSAL OF CLEAN SOILS.

R50'

PFOS - STOCKPILE

SOILS WITHIN THIS AREA ARE POTENTIALLY CONTAMINATED WITH PERFLUOROOCTANE SULFONATE

(PFOS)/PERFLUOROOCTANOIC ACID (PFOA) AND SHALL BE PLACED IN LONG-TERM STOCKPILE(S);

SAMPLING AND DISPOSAL OF THIS SOIL IS NOT INCLUDED IN THIS PROJECT.

2 2

2 Sy m

.A ct io n

De sc rip tio n Da te Ap pv d

AM

#2

RE

VI

SE

S

TO

CK

PI

LE

L

EG

EN

D

/0 9/

W

E

RE

VI

SE

S

TO

CK

PI

LE

A

RE

A

P

O

IN

TS

/0 2/

M

A

R50'

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EIE382_AM4_C-006.pdf
Sheets and Views
C-006

File details come from the government source that posted it.