AM2, Sol. No. W911KB-18-R-0014, EIE382 Aircraft Weather Shelter - Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D r a w i n g
F i l e
N a m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e f
B a n c h
C h i e
S e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
C T
N
O
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
A
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W
K B
R
E
S
R B
S R
B
W E
E I E
L S
F B
A
L A
S K
A
E I E
F
I R
C R
A F
T
W
E A
T H
R
H E
L T
Q
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
MULLINS BORROW PIT
2310 CENTRAL AVE.
CIVIL ENGINEERING
WATER
TREATMENT
POND (WTP)
CHPP (POWER
PLANT)
FLIGHTLINE AVE
CENTRAL AVE
ARCTIC AVE
FIRE/RESCUE STATION
F-35 TEMPORARY SOUTH GATE
ACCESS FOR CONSTRUCTION
INDUSTRIAL
DRIVE
TO CATHER'S LAKE
L O
C A
T I O
N
A
V
C
I N
I T
Y
M
A P
1. THIS DRAWING IS OF GENERAL NATURE, DO NOT
USE THIS DRAWING FOR CONSTRUCTION.
2. THE GOVERNMENT SANITARY LANDFILL IS NOT
AVAILABLE FOR NON-HAZARDOUS WASTES.
NON-HAZARDOUS WASTES SHALL BE DISPOSED
OFF GOVERNMENT PROPERTY. THERE ARE
DISPOSAL AREAS FOR CLEAN CONCRETE,
CONCRETE WASTES AND CONCRETE WASTES
THAT CONTAIN ASBESTOS. REFERENCE THE
SCOPE OF WORK FOR ADDITIONAL DISPOSAL
REQUIREMENTS.
3. REFERENCE SHEET C-101 FOR THE CONTRACTOR'S
STAGING/LAYDOWN AREA. THE CONTRACTOR
SHALL COORDINATE WITH THE CONTRACTING
OFFICER FOR ADDITIONAL STAGING/LAYDOWN
AREA(S).
4. CLEAN EXCESS SOIL DISPOSAL AREAS ARE SHOWN
ON DRAWING G-103. COORDINATE WITH THE
CONTRACTING OFFICER FOR DISPOSAL LOCATION.
5. SOIL EXCAVATED FROM THOSE AREAS
DESIGNATED ON SHEETS C-006 AS REQUIRING
100% STOCKPILING AND SAMPLING SHALL BE
STOCKPILED AS FOLLOWS: PFOS AT LANDFILL #3;
PESTICIDE AND POL ON OR ADJACENT TO
PROJECT SITE.
6. GOVERNMENT GRAVEL MATERIAL IS AVAILABLE AT
MULLINS BORROW PIT AND/OR CATHER'S LAKE.
COORDINATE WITH THE BASE FOR ACCESS AND
REQUIREMENTS TO OBTAIN MATERIAL.
7. NUMBERS ON EACH BUILDING SHOWN ON THE
FOLLOWING SHEETS ARE THE FACILITY NUMBERS
UNLESS PRECEEDED BY EIE, WHICH INDICATES
PROJECT NUMBER.
8. MULLINS PIT MAY BE UTILIZED BY SEVERAL
CONTRACTORS AND COORDINATION WILL BE
NECESSARY, AND MAY REQUIRE 24 HOUR
OPERATIONS.
LEGEND:
HAUL ROUTE
PROJECT LOCATION/
STOCKPILE(S)/LAYDOWN-STAGING
AREAS
NOTES:
MAIN GATE
G-101
CLEAN FILL
DISPOSAL
AREA
EIE382 -
PROJECT
LOCATION
NTS
LOCATION AND VICINITY MAP
A1
BASE MAP
VICINITY MAP
FAIRBANKS
ANCHORAGE
ALASKA MAP
A
M
A
M
R
E V
I S
E
N
O T
B J
X
X
X
X
X
X
X
X
X
X
D r a w i n g
F i l e
N a m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W
K B
R
S
R B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
EIE379
FY18
HANGAR &
SQUADRON
OPS & AMU
EIE376
FY17
HANGAR &
PROPULSION
DISPATCH
EIE399
FY18
APRON UPGRADE
(PHASE 1)
EIE384
FY18
AGE
FACILITY
EIE394 - FY18
RENOVATE 4-BAY
WEATHER SHELTER
EIE420 - FY19
APRON UPGRADE
(PHASE 2)
EIE399 - FY18
APRON UPGRADE (PHASE 1)
EIE389 - FY18
SATELLITE DINING
FACILITY
EIE393 - FY18
RENOVATE AMU 8-BAY
WEATHER SHELTER
EIE378 - FY18
AIRCRAFT WEATHER
SHELTERS
SEE SHEET G-101 FOR HAUL
ROUTE FROM THE SOUTH LOOP
PROJECTS TO/FROM BORROW
AREAS, DISPOSAL AREAS AND
ENTRANCE/EXIT INTO EIELSON AFB.
EIE406 (PHASE B) FY18 - UPGRADE
EXISTING UTILIDOR AND UTILITIES
MH12 TO MH19
EIE407 (PHASE C) FY18 -
UPGRADE EXISTING UTILIDOR
AND UTILITIES MH19 TO MH22
EIE405; SEE SHEET G-102 FOR
CONTINUATION OF PROJECT
SOUTH LOOP PROJECT SCHEDULE*
PROJECT
SCHEDULED
AWARD DATE
SCHEDULE
COMPLETION DATE
EIE376 JUNE 2017 JULY 2019
EIE378 JANUARY 2018 OCTOBER 2019
EIE379 FEBRUARY 2018 NOVEMBER 2019
EIE382 MAY 2018 APRIL 2020
EIE384 FEBRUARY 2018 JANUARY 2020
EIE388 MARCH 2018 JANUARY 2020
EIE389 JULY 2018 AUGUST 2020
EIE392 SEPTEMBER 2017 JANUARY 2019
EIE393 MARCH 2018 AUGUST 2019
EIE394 MARCH 2018 OCTOBER 2019
EIE399 JANUARY 2018 OCTOBER 2018
EIE405 FEBRUARY 2018 SEPTEMBER 2019
EIE420 MARCH 2019 NOVEMBER 2019
EIE400 (PHASE A)** JULY 2017 SEPTEMBER 2018
EIE406 (PHASE B)** SEPTEMBER 2017 JUNE 2019
EIE407 (PHASE C)** SEPTEMBER 2018 SEPTEMBER 2019
EIE400 (PHASE A) FY18 -
UPGRADE EXISTING
UTILIDOR AND UTILITIES
MH792 TO MH12
NOTES:
* DATES SHOWN ON THIS TABLE ARE ONLY APPROXIMATE.
** THESE PROJECTS ARE NOT ASSOCIATED WITH THE F-35
PROGRAM. HOWEVER ARE LOCATED IN THE SOUTH
LOOP AND MAY AFFECT CONSTRUCTION.
F-35 PROJECTS
1. THIS DRAWING IS OF GENERAL NATURE, DO NOT USE THIS DRAWING FOR
CONSTRUCTION.
2. THIS DRAWING SHOWS F-35 PROJECTS LOCATED IN THE SOUTH LOOP AREA THAT
WILL BE ADMINISTRATED BY THE USACE - AK DISTRICT. THESE PROJECTS ARE
EITHER IN CONSTRUCTION, IN DESIGN, AND/OR IN THE PRELIMINARY DESIGN STAGE.
NOT ALL PROJECTS ARE SHOWN ON THIS SHEET THAT SUPPORT THE F-35 PROGRAM
AND SUPPORT OTHER EIELSON PROGRAMS (SOME ARE NOTED). FISCAL YEAR (FY)
SHOWN IS THE EXPECTED START OF CONSTRUCTION.
3. PROJECT LOCATIONS SHOWN ARE ONLY APPROXIMATE. THERE ARE SOME
PROJECTS THAT MAY OVERLAP OTHER PROJECT LOCATIONS.
4. THE PROPOSED LAYDOWN AREAS SHOWN ARE ONLY APPROXIMATE. COORDINATE
WITH THE CONTRACTING OFFICER REPRESENTATIVE FOR THE EXACT LAYDOWN
BOUNDARY AND LOCATION FOR THIS PROJECT. THE PROPOSED LAYDOWN AND SOIL
STOCKPILES AREAS SHALL MAINTAIN A 200 FT BUFFER FROM THE FIRE TRAINING
AREA.
PROPOSED STAGING AND
LAYDOWN AREAS AND SOIL
STOCK PILES AREAS
EIE388 - FY18
R-11 FUEL TRUCK
SHELTER
EIE392 FY17
RENOVATE FOR F-35
SQUAD OPS AMU
EIE405-FY18
EXTEND STEAM UTILIDUCT TO
SOUTH LOOP
LOOP CIRCLE
C
A
R
G
A
A
D
L
O
P
C
E
A
D
C
A
R
G
A
A
D
EIE378
SOIL STOCKPILE
STORAGE
EIE399/420
EIE379
EIE376
L
O
C
E
A
D
EIE378 - WILL BE CONSTRUCTING A NEW
FEEDER ALONG CARGAIN ROAD, QUARRY
ROAD AND INDUSTRIAL DRIVE
EIE382 - FY19 WILL
BE CONSTRUCTING
A UTILIDOR SYSTEM
EXISTING FIRE
TRAINING AREA;
SEE NOTE 4
A
C
T
I V
E
A
I R
F
I E
L
D
C O
N S
T R
U C
T I O
N
Z O
N E
AIRFIELD SECURITY
GATE, NOTE 7
C O
N S
T R
U C
T
IO
N
Z O
N E
A
C
T
I V
E
A
I R
F
I E
L
D
A
C
T
I V
E
A
I R
F
I E
L
D
C
O
N
S
T
R
U
C
T
I O
N
Z
O
N
E
AIRFIELD SECURITY
GATE, NOTE 7
AIRFIELD SECURITY
GATE, NOTE 7
O V
E R
A L L
F
P
R O
J E
C T
S
L O
C A
T I O
O
U T
H
L O
O P
PROPOSED LAYDOWN AREAS FOR
EIE388 AND SOIL STOCK PILE AREAS-
SEE NOTES 4 AND 5
G-103
NOTES:
NOTES:
EIE382 - FY18
AIRCRAFT WEATHER
SHELTER;
THIS PROJECT
CLEAN FILL
DISPOSAL AREA
NTS
GRADING PLAN - SOUTH
A1
LEGEND
A
M
E
I
E
S
O
L
O
C
K
P
I
L
E
S
T
O
R
A
G
E
E
I
E
S
O
I
L
S
T
O
C
K
P
I
L
E
S
T
O
R
A
G
E
POND A
POND B
POND C
5. SOIL STOCKPILE LOCATION SHOWN IS ONLY APPROXIMATE. COORDINATE EXACT LOCATION WITH THE
CONTRACTING OFFICER. STOCKPILE STORAGE SHOWN IS ONLY FOR SOILS REQUIRING SAMPLING AS
A RESULT OF FIELD SCREENING. SEE NOTE 5 ON SHEET G-101 FOR SOILS EXCAVATED FROM AREAS
DESIGNATED AS REQUIRING 100% STOCKPILING AND SAMPLING. STOCKPILED SOILS WILL REMAIN
UNTIL ANALYTICAL'S OF THE SOIL ARE COMPLETE. BASED ON TEST RESULTS, SOIL WHICH IS
CONTAMINATED ABOVE ACTION LEVELS SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS. SOILS WHICH ARE CONSIDERED CLEAN SHALL BE TAKEN TO A
CLEAN FILL DISPOSAL AREA IN ACCORDANCE WITH NOTE 4 ON SHEET G-101.
6. PONDS A, B, AND C SHALL BE FILLED WITH CLEAN EXCESS SOIL FROM PROJECT EXCAVATION. OTHER CONTRACTS MAY DEPOSIT CLEAN SOIL NEAR THE REMAINING PONDS BETWEEN PROJECT SITE AND CARGAIN ROAD TO ENSURE ALL PONDS CAN BE FILLED. CONTRACTOR SHALL PUSH ALL SOIL INTO PONDS AND ENSURE ALL PONDS BETWEEN PROJECT SITE AND CARGAIN ROAD ARE FILLED AND LEVEL WITH SURROUNDING LANDSCAPE AT COMPLETION OF PROJECT. CLEAN EXCESS SOIL ABOVE THAT REQUIRED TO FILL THE PONDS
SHALL BE DISPOSED IN ACCORDANCE WITH NOTE 4 ON SHEET G-101.
7. AIRFIELD SECURITY GATE SHALL REMAIN CLOSED AT ALL TIMES. AFTER ENTERING OR EXITING THE
CONTRACTOR SHALL CLOSE THE GATE. EIELSON AIRFIELD OPERATIONS WILL PROVIDE SECURITY
BARRIERS, CONTRACTOR SHALL REMAIN ON THE CONSTRUCTION ZONE SIDE AT ALL TIMES
8. ACCESS VIA THE AIRFIELD PAVEMENT (EIE399 AND EIE420) WILL NOT BE ALLOWED AFTER 1 APRIL 2018.
CONTRACTOR'S ARE REQUIRED TO GO AROUND THIS AIRFIELD PAVEMENT OR VIA CARGAIN ROAD.
A M
R
E V
I S
E
N
O T
E
B J T
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text a w i n g
F i l a m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L O
T T
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
POINT TABLE
POINT # NORTHING EASTING
POINT TABLE
POINT # NORTHING EASTING
POINT TABLE
POINT # NORTHING EASTING
POINT TABLE
POINT # NORTHING EASTING
POINT TABLE
POINT # NORTHING EASTING
TAXIW
AY "L
U
E
AP 6061
AP 6049
AP 6060
AP 6050
AP 6051
AP 6059
AP 6052
AP 6058
AP 6053
AP 6054
AP 6057
AP 6055
AP 6056
AP 6047
AP 6062
AP 6048
AP 5812
AP 5811
AP 5810
AP 5809
AP 5808
AP 5807
AP 5806
AP 5805
AP 5804
AP 5803
AP 5802
AP 5801
AP 5800
AP 5799
AP 5798
AP 5797
AP 5796
AP 5795
AP 5794
AP 5793
AP 5792
AP 5791
AP 5790
AP 5789
AP 5788
AP 5787
AP 5786
AP 5785
AP 5784
AP 5783
AP 5782
AP 5781
AP 5780
AP 5779
AP 5778
AP 5777
AP 5776
AP 5775
AP 5774
AP 5773
AP 5772
AP 5771
P
P
P
P
P
P
P
P
P1008
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P1023
P1024
P
P
P
P
PFOS - STOCKPILE
SOILS WITHIN THIS AREA ARE POTENTIALLY CONTAMINATED WITH PERFLUOROOCTANE SULFONATE
(PFOS)/PERFLUOROOCTANOIC ACID (PFOA) AND SHALL BE PLACED IN LONG-TERM STOCKPILE(S);
SAMPLING AND DISPOSAL OF THIS SOIL IS NOT INCLUDED IN THIS PROJECT.
PESTICIDE STOCKPILE & SAMPLE
SOILS WITHIN THIS AREA SHALL BE PLACED IN SHORT-TERM STOCKPILE(S) ON SITE AND SHALL BE SAMPLED FOR CONTAMINANTS; REFERENCE PROPOSAL SCHEDULE AND SPECIFICATION SECTION 02 61 13 FOR DISPOSAL OF
CONTAMINATED SOILS (NON-PFOS/PFOA) AND DISPOSAL OF CLEAN SOILS.
NOTES:
1. SOIL CONTAMINATION AREAS AND LIMITS SHOWN PROVIDED BY USACE.
2. WHERE THERE IS EXCAVATION REQUIRED FOR THE DESIGN AND CONSTRUCTION OF THIS PROJECT, SOIL SHALL BE EITHER FIELD SCREENED OR 100% STOCKPILE PER THIS
DRAWING. SAMPLING SHALL BE PERFORMED AS REQUIRED PER SPECIFICATION SECTION 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL.
3. FOR ADDITIONAL REQUIREMENTS, REFERENCE SPECIFICATION SECTIONS 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL AND 31 09 20.00 29 FIELD SCREEN
TESTING OF SOILS FOR CHEMICAL CONTAMINATION.
4. AREAS IDENTIFIED AS BEING WITHIN THE 100% STOCKPILE SHALL BE MAINTAINED IN SEPARATE STOCKPILE(S) IN ORDER TO MINIMIZE THE POTENTIAL DISPOSAL REQUIREMENTS
OF PERFLUOROOCTANE SULFONATE (PFOS)/PERFLUOROOCTANOIC ACID (PFOA). AREAS IDENTIFIED ON THIS DRAWING MAY BE FURTHER STOCKPILED AS REQUIRED.
5. SOME OF THE LIMITS SHOWN MAY BE OUTSIDE THE EXCAVATION AREAS REQUIRED FOR THE PROJECT, SUCH AS THE DESIGN BUILD AREA, IF NOT AWARDED.
100% SOIL STOCKPILE LEGEND:
POL - STOCKPILE & SAMPLE
SOILS WITHIN THIS AREA SHALL BE PLACED IN SHORT-TERM STOCKPILE(S) ON SITE AND SHALL BE SAMPLED FOR CONTAMINANTS; REFERENCE PROPOSAL SCHEDULE AND SPECIFICATION SECTION 02 61 13 FOR DISPOSAL OF
CONTAMINATED SOILS (NON-PFOS/PFOA) AND DISPOSAL OF CLEAN SOILS
P
E R
C E
I L
S
T O
C K
P I
E
A S
C-006
1" = 60'-0"
EIE382 - WEATHER SHELTER (SQD 2)
PLAN NORTH
100% SOIL STOCKPILE AREAS
0' 120'60'30'
A2
P
M C p w w o r k i n g w e s t d
E
I E
C d w g
EDGE OF
EXCAVATION;
MATCH TO OG
R50'
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p v d
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AM#2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 03/09/18
AutoCAD SHX Text
WE
AutoCAD SHX Text
REVISE STOCKPILE LEGEND
a w i n g
F i m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
N O
T E
S
L E
G E
N D
A
N D
A B
B R
E V
I A
T I O
N S
C-001
LEGEND:
EXISTING NEW
ABBREVIATIONS:
CIVIL DESIGN CRITERIA:
1) PAVEMENTS: USACE PAVEMENT TRANSPORTATION COMPUTER ASSISTED STRUCTURAL ENGINEERING
(PCASE) PROGRAM, AASHTO, AND ALASKA DOT & PF.
SITE WORK:
1) THE CONTRACTOR STAGING AREA SHALL BE WITHIN THE DESIGNATED PROJECT BOUNDARY SHOWN, SUPPLEMENTAL STORAGE AREA MAY BE REQUESTED IN ACCORDANCE WITH SPECIFICATION SECTION 01 19
30.02 29.
2) IT IS THE CONTRACTOR'S RESPONSIBILITY TO RESTORE THOSE EXISTING FACILITIES AND SURFACES
BEYOND THE LIMITS OF NEW WORK WHICH ARE DISTURBED IN THE COURSE OF CONSTRUCTION TO A
CONDITION EQUAL TO OR BETTER THAN EXISTING CONDITION AT THE CONTRACTOR'S EXPENSE.
3) EXISTING UTILITY LOCATIONS ARE APPROXIMATE. COMMUNICATION CABLE AND OTHER BURIED UTILITIES
DAMAGED BY CONTRACTOR CONSTRUCTION ACTIVITIES SHALL BE REPAIRED TO BASE REPAIR STANDARDS.
4) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEARLY FLAG ALL OVERHEAD CROSSINGS PRIOR TO
MOVING ANY EQUIPMENT INTO WORK AREAS OR ALONG HAUL ROUTES, AND TO PROVIDE FLAG MEN OR
OTHER APPROPRIATE POSITIVE WARNING SYSTEM WHEN ACTIVELY WORKING IN AN AREA.
5) WORK SHALL NOT INTERRUPT F-35 CONTRACTORS ACCESS AS SHOWN. PROVIDE TRAFFIC CONTROL AS
NECESSARY AND DIRECTED BY THE CONTRACTING OFFICER.
6) DIMENSIONS SHOWN ARE TO FACE OF FOUNDATION, EDGE OF PAVEMENT, GRADE BREAK, OR EDGE OF
CONCRETE UNLESS NOTED OTHERWISE.
7) WATER FOR COMPACTION, DUST CONTROL, OR OTHER CONTRACTOR USE SHALL BE OBTAINED FROM A
POND OR A PIT ON BASE. WHERE POTABLE WATER IS REQUIRED, THE CONTRACTOR SHALL COORDINATE
WITH THE CONTRACTING OFFICER TO OBTAIN WATER FROM A BASE HYDRANT WITH A CONTRACTOR
PROVIDED AND BASE TESTED AND APPROVED BACKFLOW PREVENTION DEVICE INSTALLED ON THE
HYDRANT.
GEOTECHNICAL:
1) EXCAVATIONS MUST BE KEPT DRY UNTIL PROPERLY BACKFILLED, EXCEPT FOR EXCAVATION, OVER
EXCAVATION, AND PLACEMENT OF FILL WITHIN THE PAVED SHOULDERS AND THE ADDITIONAL EXCAVATION
AREAS. GROUNDWATER AND STORM WATER RUNOFF MAY BE CONTAMINATED AND MAY REQUIRE
TREATMENT IF ENCOUNTERED. CONTRACTOR SHALL AVOID HANDLING SUCH WATER BY DIVERTING RUNOFF
AROUND SITE, WHILE COMPLYING WITH ALL APPLICABLE DEWATERING SPECIFICATIONS AND ADEC
APPROVED DEWATERING PLAN, AND AVOIDING EXCAVATION BELOW GROUNDWATER TABLE WHENEVER
POSSIBLE. WHERE EXCAVATION DEWATERING IS REQUIRED, IT SHALL BE PERFORMED IN ACCORDANCE
WITH THE EIELSON AFB EXCAVATION DEWATERING GUIDE.
2) IF SILTY SOILS AT THE BOTTOM OF EXCAVATIONS BECOME PUMPED, MUDDY OR RUTTED DURING
CONSTRUCTION, THEY MUST BE OVER EXCAVATED TO COMPETENT MATERIAL.
3) TEMPORARY CUT SLOPES OF EXCAVATION WALLS HAVE BEEN KNOWN TO STAND AT VERY STEEP ANGLES
FOR EXTENDED PERIODS OF TIME AND THEN FAIL SUDDENLY WITHOUT WARNING. WHERE EXCAVATION
LINES ARE NOT SHOWN, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE APPROPRIATE
TEMPORARY CUT SLOPES OR SHORING FOR EXCAVATIONS AND TRENCHES FOR SITE SOILS,
GROUNDWATER AND RUNOFF CONDITIONS, AND SURFACE LOADING CONDITIONS. CONTRACTOR MUST
COMPLY WITH FEDERAL AND STATE OSHA REGULATIONS, AS WELL AS EM385-1-1.
4) SOILS AT THE CONSTRUCTION SITE THAT QUALIFY AS CLASSIFIED MATERIAL MAY BE USED AS BACKFILL.
PROVIDE PASSING SOILS TEST CONFIRMING GRADATION PRIOR TO PLACING AS BACKFILL.
INTERRUPTION OF UTILITY SERVICES:
1) ALL UTILITY SHUTDOWNS AND START-UPS SHALL BE COORDINATED WITH THE BASE CIVIL ENGINEER
THROUGH THE CONTRACTING OFFICER PER SPECIFICATION SECTION 01 19 30.02 29.
CONTAMINATED SOIL, GROUNDWATER, AND SPILLS:
1) IMMEDIATELY NOTIFY THE CONTRACTING OFFICER FOLLOWED BY THE BASE ENVIRONMENTAL DEPARTMENT
IF CONTAMINATED SOIL IS ENCOUNTERED, CONTAMINATED GROUNDWATER DISCOVERED, OR HAZARDOUS
MATERIAL SPILLS.
& AND
@ AT
℄ CENTERLINE
Ø DIAMETER
# NUMBER
% PERCENT
ABC AGGREGATE BASE COURSE
AC ASPHALT CONCRETE
APPROX APPROXIMATELY
BLDG BUILDING
BOP BOTTOM OF PIPE
BOT BOTTOM
CB CATCH BASIN
CIP CAST IRON PIPE
CIRC CIRCULATION
CLEAN UNCONTAMINATED SOIL
CLR CLEAR
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
COMM UNDERGROUND COMMUNICATION
CONC CONCRETE
COND CONDENSATE
CONT CONTINUOUS
CR CIRCULATING RETURN
CU COPPER
CW CIRCULATING WATER
DCW DOMESTIC COLD WATER
DDC DEEP DYNAMIC COMPACTION
DEMO DEMOLITION
DIA DIAMETER
DIP DUCTILE IRON PIPE
DP DRAIN POINT
E EAST
(E) EXISTING
EG EXISTING GRADE
EIE EIELSON
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EOC EDGE OF CONCRETE
EP EDGE OF PAVEMENT
EW EACH WAY
(F) FUTURE
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FM FORCE MAIN
FP FIRE PROTECTION
FT FEET
FW FIRE WATER
GA GALVANIZED
GCABC GRADED CRUSHED AGGREGATE BASE COURSE
GB GRADE BREAK
G.V. GATE VALVE
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HMA HOT MIXED ASPHALT
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
IN INCH
INV INVERT
LONG LONGITUDINAL
LP LOW POINT
MAX MAXIMUM
ME MATCH EXISTING
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
N NORTH
NE NORTHEAST
NIC NOT IN CONTRACT
NW NORTHWEST
OHE OVERHEAD ELECTRIC
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
POC POINT OF CONNECTION
PCC PORTLAND CEMENT CONCRETE
POL PETROLEUM, OIL, LUBRICANTS
PSI POUNDS PER SQUARE INCH
R RADIUS
RC REINFORCED CONCRETE
REINF REINFORCING
REQ'D REQUIRED
RL RAIN LEADER
SD STORM DRAIN
SE SOUTHEAST
SEC SECTION
SF SQUARE FEET
ST HIGH PRESSURE STEAM
STA STATION
STL STEEL
SW SOUTHWEST
TB TEST BORING
TC TOP OF CONCRETE
TH TEST HOLE
TP TOP OF PAVEMENT
TYP TYPICAL
UGC UNDERGROUND COMMUNICATIONS
UGD UNDERGROUND DUCTBANK
USACE UNITED STATES ARMY CORPS OF ENGINEERS
V.B. VALVE BOX
VERT VERTICAL
W WATER, WEST
GENERAL NOTES:
CIVIL NOTES:
VEGETATION
POWER POLE
GUY ANCHOR
LIGHT POLE
JUNCTION BOX
VEHICLE HEATER OUTLET
COMMUNICATION PEDESTAL
FIRE HYDRANT
VALVE
ACCESS LID
MANHOLE
ROOF DRAIN
VENT PIPE
CLEAN OUT
SIGN
GUARD POST / BOLLARD
MONITORING WELL
AVIATION LIGHT
CULVERT
LIMITS OF TREES/CLEARING
OVERHEAD ELECTRIC
UNDERGROUND COMMUNICATIONS
STEAM LINE
EDGE OF PAVEMENT
EDGE OF SHOULDER
BUILDING OUTLINE
CONCRETE
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
J
V
C
V
C
MW
OH/E
COM
ST
X
X
X
X
UNDERGROUND ELECTRIC
UE
STORM DRAIN
PAINT LINE
DRAINAGE ROCK
TRANSFORMER
WETLANDS
WATERLINE
UTILIDOR VAULT
FENCE
E
GEOTECHNICAL BORING
SURVEY CONTROL POINT
EDB
ELECTRICAL DUCTBANK
MATCHLINE
ROOF DRAIN LINE
C
P
M
ELEVATION
C p w w o r k i n g w e s t d
E
I E
C d w g
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p v d a w i n g
F i m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
M A
T C
H
L
I N
E
S E
E
S
H E
D E
S I G
N
B
U I
T
I O
N
C L
A
C-104
1" = 40'-0"
0' 80'40'20'
PLAN NORTH
SITE PLAN - SOUTH END OPTION (DESIGN-BUILD) - PLAN SHOWN ON THIS SHEET IS SCHEMATIC ONLY
T
A
X
I
W
Y
EIE382 - WEATHER SHELTER (SQD 2)
FF ELEV: 553.85 FT
UNPAVED SHOULDER
PAVED SHOULDER
PAVED SHOULDER
UNPAVED SHOULDER
NON-HEATED CONCRETE PAVEMENT
GPS SYNCHRONIZATION PADS
OPTION REQUIREMENTS:
1. AIRFIELD PAVEMENTS SHALL BE PROVIDED IN ACCORDANCE WITH
THE REQUIREMENTS HEREIN AND WITH ALL APPLICABLE
REQUIREMENTS OF UFC 3-260-01, UFC 3-260-02 AND PCASE WITH A
TRAFFIC LOADING OF 400,000 PASSES OF A FULLY LOADED F-35A FOR
TYPE B TRAFFIC AREA. PAVING MATERIALS SHALL BE SPECIFIED
USING THE SEVERE WEATHER CLIMATE.
2. TRANSITIONS, FINISH GRADES, AND STRUCTURAL SECTIONS
BETWEEN THE WEATHER SHELTER PROJECT AND THE APRON
PAVING PROJECT AND THE PAVEMENT SECTIONS SHALL BE
COORDINATED WITH THE DESIGN FOR THIS PROJECT.
3. CONSTRUCTION JOINTS IN PCC PAVEMENT SHALL BE DESIGNED AND
CONSTRUCTED IN ACCORDANCE WITH UFC 3-260-02 UTILIZING
ROUND EPOXY COATED STEEL DOWELS. THE REINFORCEMENT
SHALL NOT EXTEND THROUGH CONTROL (CONTRACTION) OR
CONSTRUCTION JOINTS.
4. HMA PAVEMENT MIX DESIGNS SHALL BE IN ACCORDANCE WITH
SPECIFICATION SECTION 32 12 15.23. HMA MIX DESIGN FORMULATION
SHALL BE PERFORMED BY A CORPS OF ENGINEERS APPROVED
INDEPENDENT TESTING LABORATORY. THE JOB MIX FORMULA SHALL
BE DEVELOPED NOT MORE THAN TWELVE MONTHS PRIOR TO THE
PLACEMENT OF THE HMA PAVEMENT FOR THIS PROJECT.
5. AGGREGATES SHALL MEET THE ALKALI-SILICA REACTIVITY AND
DELETERIOUS MATERIAL REQUIREMENTS IDENTIFIED IN
SPECIFICATION SECTION 32 13 11, PCC PAVEMENT FOR AIRFIELDS
AND OTHER HEAVY-DUTY PAVEMENTS. TRIAL DESIGN BATCHES,
MIXTURE PROPORTIONING STUDIES, AND TESTING REQUIREMENTS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE
PERFORMED BY A CORPS OF ENGINEERS APPROVED INDEPENDENT
TESTING LABORATORY. TRIAL MIXTURES HAVING PROPORTIONS,
SLUMPS, AND AIR CONTENT SUITABLE FOR THE WORK SHALL BE
BASED ON METHODOLOGY DESCRIBED IN ACI 211.1, MODIFIED AS
NECESSARY TO ACCOMMODATE FLEXURAL STRENGTH. TESTING FOR
AGGREGATES, ALKALI-SILICA REACTIVITY AND FLEXURAL STRENGTH
CONCRETE MIX DESIGNS, USING MATERIALS PROPOSED FOR WORK
IN THIS PROJECT, SHALL HAVE BEEN PERFORMED NOT MORE THAN
12 MONTHS PRIOR TO PLACEMENT OF THE MIX IN THIS PROJECT.
6. THE DESIGN AND CONSTRUCTION OF THE PREFORMED
COMPRESSION SEALS SHALL INCORPORATE THE EDITED
SPECIFICATION SECTION 32 13 73, COMPRESSION JOINT SEALS FOR
CONCRETE PAVEMENTS.
7. EXTERIOR CONCRETE SLABS SHALL RECEIVE A BURLAP DRAG
SURFACE FINISH PER SPECIFICATION SECTION 32 13 11.
8. THE DESIGN AND CONSTRUCTION OF THE HANGAR ACCESS APRON
SHALL INCORPORATE THE EDITED SPECIFICATION SECTION 32 13 11,
CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS.
9. THE FOLLOWING SPECIFICATIONS ARE BEING PROVIDED IN THIS
PACKAGE PERTAINING TO AIRFIELD PAVEMENTS (THE PROVIDED
SPECIFICATIONS SHALL NOT BE CHANGED OR EDITED):
1) 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER
HEAVY DUTY PAVEMENTS (FOR CLIN 0018, 0019 AND 0020 ONLY)
10. THE OVERALL TAXI AND APRON AREA OPTION LAYOUT, SHALL
ACCOUNT FOR AND ACCOMMODATE F35 CLEARANCES FOR ACCESS
AND REQUIRED TURNING RADII TO THE TAXIWAYS IN ACCORDANCE
WITH THE F-35 LIGHTNING II FRD AND UFC 3-260-01.
11. NEW AIRFIELD PAVEMENT MARKINGS SHALL COMPLY WITH ETL 04-02
AND UFC 3-260-01 AIRFIELD AND HELIPORT PLANNING AND DESIGN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR NEW PAVEMENT
MARKINGS AND COORDINATING THE MARKINGS WITH THE EXISTING
TAXIWAY L AND THE EAFB AIR FIELD MANAGER.
12. REFER TO SPECIFICATION 01 33 16 FOR DESIGN AFTER AWARD
REQUIREMENTS.
13. PROVIDE REMOVAL AND REPLACEMENT OF AIRFIELD LIGHTING IN
EXPANDED APRON AREA SHOWN, SIMILAR TO WORK SHOWN ON
ES102, ES403, ES404, ES503 AND ES504.
14. MINIMUM THICKNESS SHALL BE AS FOLLOWS; PCC-12 INCHES, HMA-4
INCHES, GRADED CRUSHED AGGREGATE BASE COURSE-8 INCHES.
15. DESIGN SHALL INCLUDE A DRAINAGE LAYER.
1. CLIN 0019 - THIS CLIN PROVIDES ALL DESIGN MODIFICATIONS
AND WORK TO CONSTRUCT AN ALTERNATE SOUTH APRON
ACCESS TO THE TAXIWAY L AND GPS SYNCHRONIZATION PADS AS
SHOWN ON THIS SHEET.
BASE BID ITEMS, DRAINAGE, AND GRADES SHALL REMAIN THE
SAME EXCEPT AS MODIFICATIONS REQUIRED FOR THE SOUTH
END OPTION SHOWN ON THIS SHEET.
2. CLIN 0020 - THIS CLIN PROVIDES ALL DESIGN MODIFICATIONS
AND WORK TO CONSTRUCT A CONCRETE (PCC) APRON WITHIN
THE AREAS SHOWN AS HMA PAVED APRONS IN OPTIONAL CLIN
0019 SHOWN ON THIS SHEET.
DESIGN-BUILD OPTIONS DESCRIPTION:
A2
BASE BID UNPAVED SHOULDER
SHOWN FOR REFERENCE
A
M
25' TYP
25' TYP
126' TYP
93' TYP
25' TYP
25' TYP
POND A
LIMITS OF WORK FOR CLIN
0019 AND 0020
HMA PAVING
HMA PAVING
DESIGN-BUILD OPTION
CLIN 0019 AND CLIN 0020
C p w w o r k i n g w e s t d
E
I E
C d w g
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p
TAXIW
AY "L
U
E
D r a w i n g
F i m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
D E
S I G
N
B
U I
T
I O
N
C L
C-105
1" = 60'-0"
EIE382 - WEATHER SHELTER (SQD 2)
PLAN NORTH
SITE PLAN - PCC APRON - PLAN SHOWN ON THIS SHEET IS SCHEMATIC ONLY
0' 120'60'30'
79.25'
72.5'
25' TYP
25' TYP
126' TYP
93' TYP
25' TYP
25' TYP
UNPAVED SHOULDER
PAVED SHOULDER
UNPAVED SHOULDER
PAVED SHOULDER
A3
A
M
TAXIWAY
SHOULDER TO
REMAIN HMA
PER BASE BID
TAXIWAY TO
REMAIN HMA
PER BASE BID
NOTES:
1. CONTRACTOR TO PROVIDE ALL DESIGN MODIFICATIONS AND
CONSTRUCTION TO DEVELOP SOUTH APRON AS SHOWN.
OPTION REQUIREMENTS:
1. AIRFIELD PAVEMENTS SHALL BE PROVIDED IN ACCORDANCE WITH THE REQUIREMENTS HEREIN AND WITH ALL
APPLICABLE REQUIREMENTS OF UFC 3-260-01, UFC 3-260-02 AND PCASE WITH A TRAFFIC LOADING OF 400,000 PASSES
OF A FULLY LOADED F-35A FOR TYPE B TRAFFIC AREA. PAVING MATERIALS SHALL BE SPECIFIED USING THE SEVERE
WEATHER CLIMATE.
2. TRANSITIONS, FINISH GRADES, AND STRUCTURAL SECTIONS BETWEEN THE WEATHER SHELTER PROJECT AND THE
APRON PAVING PROJECT AND THE PAVEMENT SECTIONS SHALL BE COORDINATED WITH THE DESIGN FOR THIS
PROJECT.
3. CONSTRUCTION JOINTS IN PCC PAVEMENT SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH UFC
3-260-02 UTILIZING ROUND EPOXY COATED STEEL DOWELS. THE REINFORCEMENT SHALL NOT EXTEND THROUGH
CONTROL (CONTRACTION) OR CONSTRUCTION JOINTS.
4. HMA PAVEMENT MIX DESIGNS SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 32 12 15.23. HMA MIX DESIGN
FORMULATION SHALL BE PERFORMED BY A CORPS OF ENGINEERS APPROVED INDEPENDENT TESTING LABORATORY.
THE JOB MIX FORMULA SHALL BE DEVELOPED NOT MORE THAN TWELVE MONTHS PRIOR TO THE PLACEMENT OF THE
HMA PAVEMENT FOR THIS PROJECT.
5. AGGREGATES SHALL MEET THE ALKALI-SILICA REACTIVITY AND DELETERIOUS MATERIAL REQUIREMENTS IDENTIFIED
IN SPECIFICATION SECTION 32 13 11, PCC PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS. TRIAL
DESIGN BATCHES, MIXTURE PROPORTIONING STUDIES, AND TESTING REQUIREMENTS SHALL BE THE RESPONSIBILITY
OF THE CONTRACTOR, AND SHALL BE PERFORMED BY A CORPS OF ENGINEERS APPROVED INDEPENDENT TESTING
LABORATORY. TRIAL MIXTURES HAVING PROPORTIONS, SLUMPS, AND AIR CONTENT SUITABLE FOR THE WORK SHALL
BE BASED ON METHODOLOGY DESCRIBED IN ACI 211.1, MODIFIED AS NECESSARY TO ACCOMMODATE FLEXURAL
STRENGTH. TESTING FOR AGGREGATES, ALKALI-SILICA REACTIVITY AND FLEXURAL STRENGTH CONCRETE MIX
DESIGNS, USING MATERIALS PROPOSED FOR WORK IN THIS PROJECT, SHALL HAVE BEEN PERFORMED NOT MORE
THAN 12 MONTHS PRIOR TO PLACEMENT OF THE MIX IN THIS PROJECT.
6. THE DESIGN AND CONSTRUCTION OF THE PREFORMED COMPRESSION SEALS SHALL INCORPORATE THE EDITED
SPECIFICATION SECTION 32 13 73, COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS.
7. EXTERIOR CONCRETE SLABS SHALL RECEIVE A BURLAP DRAG SURFACE FINISH PER SPECIFICATION SECTION 32 13 11.
8. THE DESIGN AND CONSTRUCTION OF THE HANGAR ACCESS APRON SHALL INCORPORATE THE EDITED SPECIFICATION
SECTION 32 13 11, CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS.
9. THE FOLLOWING SPECIFICATIONS ARE BEING PROVIDED IN THIS PACKAGE PERTAINING TO AIRFIELD PAVEMENTS (THE
PROVIDED SPECIFICATIONS SHALL NOT BE CHANGED OR EDITED):
1) 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS (FOR CLIN 0018, 0019 AND
0020 ONLY)
10. THE OVERALL TAXI AND APRON AREA OPTION LAYOUT, SHALL ACCOUNT FOR AND ACCOMMODATE F35 CLEARANCES
FOR ACCESS AND REQUIRED TURNING RADII TO THE TAXIWAYS IN ACCORDANCE WITH THE F-35 LIGHTNING II FRD AND
UFC 3-260-01.
11. NEW AIRFIELD PAVEMENT MARKINGS SHALL COMPLY WITH ETL 04-02 AND UFC 3-260-01 AIRFIELD AND HELIPORT
PLANNING AND DESIGN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NEW PAVEMENT MARKINGS AND
COORDINATING THE MARKINGS WITH THE EXISTING TAXIWAY L AND THE EAFB AIR FIELD MANAGER.
12. REFER TO SPECIFICATION 01 33 16 FOR DESIGN AFTER AWARD REQUIREMENTS.
13. PCC MINIMUM THICKNESS SHALL BE 12 INCHES.
14. DESIGN SHALL INCLUDE A DRAINAGE LAYER.
1. CLIN 0018 - THIS CLIN PROVIDES ALL DESIGN MODIFICATIONS
AND ALL WORK TO CONSTRUCT A CONCRETE (PCC)
AIRFIELD APRON IN LIEU OF HMA PAVED APRONS AS SHOWN
ON THIS SHEET. THIS DOES NOT INCLUDE TAXIWAY L HMA
PAVING AS REQUIRED FOR THE UTILITY CROSSING OR
SHOULDERS.
DESIGN-BUILD OPTIONS DESCRIPTION:
LEGEND:
PCC AIRFIELD PAVEMENT AREA
10' WIDE HEATED PCC
APRON PER BASE BID
C p w w o r k i n g w e s t d
E
I E
C d w g
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p
U
U
E
116+04
109+00
E
D
B
E
D
B
E
D
B
E
D
B
E
D
B
E
D
B
E
D
B
E
E
E
D
B
E
D
B
E
D
B
E
D
B
E
D
B
E
S
D
B
E
S
D
B
P705
P706
P707
S T
A
M H
L
P
S T
A
M H
L
P
S T
A
V A
U L
T L
P
110+00
111+00 112+00 113+00 114+00 115+00 116+00109+00
S T
A
S T
A
UTILIDOR POINT TABLE
POINT #
P705
P706
P707
NORTHING
3892488.08
3892214.72
3892076.71
EASTING
1476076.58
1475758.85
1475877.58
DESCRIPTION
MH-LP39
MH-LP40
MH-LP41
D r a w i n g
F i m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
INSULATION TYPE AND LOCATION:
STATION RANGE TYPE
100+00 - 111+00 60 PSI
111+00 - 113+20 100 PSI
113+20 - 115+00 60 PSI
115+00 - 116+16 100 PSI
SEE STRUCTURAL AND CIVIL UTILIDOR
SHEETS FOR MORE DETAIL
U T
I L I D
A
N
A
O
F I L E
C-141
1" = 40'
PLAN NORTH
UTILIDOR PLAN
0' 80'40'20'
UTILIDOR PROFILE
U
T
I
L
I
D
U
C
T
W
A
L
K
A
B
U
I
L
I
D
O
R
EIE382 - WEATHER SHELTER
(SQD 2)
M
A
T
C
H
L
I
M A
T C
H L I N
E
S
S T
A
T
O
REDUCE
COVER TO 12"
ABOVE TOP
OF UTILIDOR
MODIFY DITCH BOTTOM
AS NECESSARY TO
MAINTAIN 12" COVER
OVER UTILIDOR
MH-LP39;
SEE C1/S-701
MH-LP41;
SEE F1/S-701
BUILDING VAULT
SEE STRUCTURAL
MH-LP40;
SEE A1/C-802
STA 112+10.14
H: 1" = 40' V:1"=4'
A3
A1
ROCK FILLED SUBDRAIN
SEE DETAIL C2/C-506
BUILDING VAULT
SEE STRUCTURAL
ROCK FILLED SUBDRAIN
CENTERED ON STA 109+50
SEE DETAIL C2/C-506
C
A
P
M
C
F
1. APRON DITCH GRADING NOT SHOWN FOR CLARITY.
NOTE:
C p w w o r k i n g w e s t d
E
I E
C d w g
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p a w i n g
F i m e
D w g
S c a l e
P l o t
S c a l e
D a t e
D r a w n
R E
S I D
E N
T
E
N G
I N
E E
R P
R I M
E
C
O N
T R
A C
T O
R
S u b m i t t e d
D e s i g n e d
R e v i e w e d
C h i e a n c h
C h i e c t i o n
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
D a t e
S T
A T
E C
I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R e c o m m e n d e d
A p p r o v e d
Reference number:
C E
P O
A E
N D
B M
C E
P O
A E
N D
B
T
E D
P L
O T
T E
D
O
N
US Army Corps of Engineers ®
Alaska District
F T
Q W
E I E
A F
W K
B R
D
S R
B
S R
B
W E
E I E
L S
B
A
L A
S K
A
E I E
F
R
C R
A F
T
W
E A
T H
E
L T
DESIGN COMPLETE
H D
R
A
L A
S K
A
I N
C
A N
C H
O R
A G
E
A
K
R
E E
T
S
P A
V E
M E
T
A I L S
C-501
1. 4" HMA SHALL BE PLACED IN 2 - 2" LIFTS. APPLY
BITUMINOUS TACK COAT BETWEEN LIFTS PER
SPECIFICATION 32 12 13.
SEE F2 AND
D2
4" HMA PAVEMENT
8" GCABC
NEW PCC PAVING 10' WIDE
HEATED SEE STRUCTURAL
NEW APRON PAVING -
SEE GRADING PLANS FOR SLOPE
NEW PCC
PAVEMENT
NEW HMA
PAVEMENT
1. DEPTH OF SAW CUT FOR JOINT SEALANT RESERVOIR AS
RECOMMENDED BY MANUFACTURER PER TYPE OF SEAL
AND BOND BREAKING TAPE USED.
2. SEALANT GEOMETRY PER SEALANT MANUFACTURER'S
RECOMMENDATION.
3. FIELD MOLDED JOINT SEALANTS PER SPECIFICATION
SECTION 32 01 19.
4. BOND BREAKING TAPE SHALL BE THE WIDTH OF THE JOINT.
1/4" R
NEW PCC PAVEMENT
JOINT SEALANT
CONSTRUCTION JOINT
HMA PAVEMENT
T
= 5.5"
T
= THICKNESS
OF PAVEMENT
TO BE
REMOVED
24" 1"
14"
SUBBASE
REMOVE PAVEMENT, BASE COURSE
AND SUBGRADE PER THE TABLES ON
THE EXISTING/DEMOLITION PLANS
SEE NOTE 2
EXISTING BASE/SUBBASE/
SUBGRADE TO REMAIN
LEAVE ASPHALT UNTIL SUBGRADE IS
EXCAVATED, SAW CUT AT THAT TIME;
SINGLE FULL DEPTH DIAMOND SAW CUT
EXISTING 5.5" ASPHALT
PAVEMENT TO REMAIN
HMA PAVEMENT
HMA PAVEMENT
SEE NOTE 2
CONSTRUCTION JOINT
BOND BREAKING TAPE
JOINT SEALANT
SEE
NOTE 1
NEW 4" HMA PAVEMENT -
SEE NOTES BELOW
1. 4" HMA SHALL BE PLACED IN 2 - 2" LIFTS. APPLY BITUMINOUS TACK COAT BETWEEN LIFTS
PER SPECIFICATION 32 12 13.
SEE F5
EXISTING 5.5" ASPHALT
PAVEMENT TO REMAIN
14"
SUBBASE
8" GRADED CRUSHED
AGGREGATE BASE COURSE
1. DEPTH OF SAW CUT FOR JOINT SEALANT RESERVOIR AS RECOMMENDED
BY MANUFACTURER PER TYPE OF SEAL AND BOND BREAKING TAPE USED.
2. SEALANT GEOMETRY PER SEALANT MANUFACTURER'S RECOMMENDATION.
3. FIELD MOLDED JOINT SEALANTS PER SPECIFICATION SECTION 32 01 19.
4. BOND BREAKING TAPE SHALL BE THE WIDTH OF THE JOINT.
NTS
REMOVAL OF ASPHALT ADJACENT TO EXISTING ASPHALT
NTS
HMA PAVING ADJACENT TO EXISTING ASPHALT
NTS
HMA TO HMA FIELD MOLDED JOINT SEALANT DETAIL
NTS
HMA AND PCC PAVEMENT INTERFACE
NTS
BUTT JOINT - PCC ADJACENT TO HMA
CLASSFIED FILL
NTS
THICKEN GCABC
AND THIN SUBBASE
AS SHOWN
SEE S-500
1. THE AREA ADJACENT TO THE EXISTING PAVEMENT TO REMAIN MUST BE
EXCAVATED SUCH THAT THE MATERIAL UNDERNEATH THE EXISTING
PAVEMENT DOES NOT GET REMOVED OR ERODE, UNDERMINING THE
PAVEMENT STRUCTURE. CONTRACTOR MAY NEED TO PLACE TEMPORARY
BASE COURSE MATERIAL ALONG THIS EXPOSED EDGE AS DIRECTED BY
THE CONTRACTING OFFICER. THE CONTRACTING OFFICER SHALL INSPECT
THE EXISTING PAVEMENT EDGE AND PROVIDE APPROVAL TO THE
CONTRACTOR FOR PLACING NEW MATERIAL.
2. REMOVE THESE SECTIONS WITHIN 24 HOURS OF PLACEMENT OF NEW
HMA.
DEMOLITION NOTES:
PCC TO HMA FIELD MOLDED JOINT SEALANT DETAIL
HMA PAVEMENT NOTE: FIELD MOLDED JOINT SEALANT NOTES:
HMA AND PCC PAVEMENT INTERFACE NOTE: FIELD MOLDED JOINT SEALANT NOTES:
A5 D5 F5
A2 D2 F2
P
M
T
1/4" BELOW
TOP OF PCC
PAVEMENT
SEE
NOTE 2
3/8" TO 1/2"
SEE
NOTE 1
1/4" BELOW
TOP OF HMA
PAVEMENT
1/2" TO 3/8"
10'
SEE PCC-HMA FIELD
MOLDED JOINT SEALANT
DETAIL F2
APPLY BITUMINOUS TACK COAT
APPLY BITUMINOUS TACK COAT
GEOTEXTILE
4" DRAINAGE
LAYER
2" INSULATION
4" GCABC
4" DRAINAGE LAYER
54" BELOW EDGE OF
EXISTING ASPHALT GRADE
24" 1"
INITIAL FULL DEPTH SAW CUT
CORRESPONDS WITH THE
DEMOLITION LIMITS ON C-004
SUPPLEMENT WITH GCABC AS
REQUIRED TO MAKE UP FOR
THICKER EXISTING ASPHALT
PAVEMENT
24" MIN CLASSIFIED FILL/
PREPARED SUBGRADE
C p w w o r k i n g w e s t d
E
I E
C d w g
A c t i o n S y m
D a t e
D e s c r i p t i o n A p p
6" ST
3" FM
8" CW
8" CW
8" CW
P-10
8" CW
12" CW
2" CW
A2
C-811
E2
C-811
12" CHECK VALVE
8" CHECK VALVE
2" CW
1" CW
1" CW
TO HYDRANT
LOOP
TO HYDRANT LOOP
12" CW
12" FPW
TO MECHANICAL
ROOM UTILIDOR PIT
E2
C-824
3" CR
TO FIRE PUMP
ROOM UTILIDOR PIT
12" CW
TO MH-LP41
D ra w in g
F ile
N a m e
D w g S c a le
P lo t S c a le
D a te
D ra w n
R E
S
ID
E N
T E
N G
IN
E
E R
P R
IM
E
C O
N T
R A
C T
O R
S u b m it te d
D e s ig n e d
R e v ie w e d
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
A N
C H
O R
A G
E A
L A
S K
A
C O
R P
S O
F E
N G
IN
E
E R
S
D a te
S T
A T
E C
IT
Y
C O
N T
R A
C T
O R
C O
N T
R A
C T
N O
R e c o m m e n d e d
A p p ro v e d
Reference number:
HGFEDCBA
C E
P O
A -E
N -D
B -M
C E
P O
A -E
N -D
B
A S
N O
T E
D
P L O
T T
E D
O N
US Army Corps of Engineers ® Alaska District
F T
Q W
E
IE
A F
-1
-1
-0
W K
B -1
-R
-0
G
A M
B E
L L S
T
S U
IT
A N
C H
O R
A G
E
A K
-7
-3
A
E C
C
/8
/2
:2
:5
A
M C
U s e rs \m ic h a e lb a rt e ll\
D o c u m e n ts
\E
IE
M e c h -U ti lid o r_
M ic h a e lB a rt e ll.
rv t
C-804
B U
IL
D
IN
G
V A
U L T
F -3
W
E A
T H
E R
S H
E L T
E R
S
Q D
E
IE
L S
O N
A F
B A
L A
S K
A D e s ig n e r
D
E C
A u th o r
AM#2
1/2" = 1'-0"C-804
B2 BUILDING SERVICE VAULT
GENERAL NOTES
1. ALL UTILITIES TO EIE378 (INCLUDING STEAM,
CONDENSATE, WATER, SEWER, AND FIRE PROTECTION)
SHALL BE COMPLETED (INSTALLED, TESTED, AND
COMMISSIONED) AND READY FOR USE BY EIE378 PRIOR
TO 15 AUGUST, 2019.
2. MAINTAIN ACCESS CLEARANCE AROUND MANHOLE
LADDERS, VALVES, EXPANSION JOINTS, TRAPS, AND
OTHER ACCESSORIES AT ALL TIMES.
3. SLOPE PIPING TO MATCH UTILIDOR. PROVIDE DRIP LEGS
AND TRAPS ON STEAM LINE AT ALL LOW POINTS.
4. SEE STRUCTURAL FOR UTILDOR, UTILIDOR MANHOLE
AND BUILDING VAULT CONSTRUCTION.
S y m
A c ti o n
D e s c ri p ti o n D a te
A p p v d
A
M
F
IR
E P
IP
IN
G F
L O
W D
IR
E
C T
IO
N
/0 /2
14" CW
2" CW
TO MH-LP38
TO MH-LP40
4' - 8 1/4"
2' - 0 1/4"
2' - 10 1/2"
12" ST
12" ST
12" ST
6" CR
4" FM
4" FM4" FM CO
6" CR
DRIP LEG DRIP LEG
A4
C-824
A4
C-824
SP-39
1 1/2" FM
TO MH-LP40 TO MH-LP38
5' - 0 1/2"
1' - 0 3/4"
1' - 10 1/4"
6" ST
3" CR
3" FM
3" FM
6" ST
2" CW
3" CR
DRIP LEG
A4
C-824
8" CW
TO MECHANICAL
ROOM
A
0' - 11 3/4"
1' - 11 3/4"
1' - 0 3/4"
1' - 6 1/2"
2" CW
12" CW
12" FPW
8" CW
8" CW
2" CW
12" CW
12" FPW
1" CW
P-10 E2
C-824
TO FIRE
PUMP ROOM
TO MH-LP41
A
1' - 1 1/2"
2' - 4 3/4"
2' - 0 1/2"
2 2
D ra w in g
F ile
N a m e
D w g S c a le
P lo t S c a le
D a te
D ra w n
R E
S
ID
E N
T E
N G
IN
E
E R
P R
IM
E
C O
N T
R A
C T
O R
S u b m it te d
D e s ig n e d
R e v ie w e d
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
A N
C H
O R
A G
E A
L A
S K
A
C O
R P
S O
F E
N G
IN
E
E R
S
D a te
S T
A T
E C
IT
Y
C O
N T
R A
C T
O R
C O
N T
R A
C T
N O
R e c o m m e n d e d
A p p ro v e d
Reference number:
HGFEDCBA
C E
P O
A -E
N -D
B -M
C E
P O
A -E
N -D
B
A S
N O
T E
D
P L O
T T
E D
O N
US Army Corps of Engineers ® Alaska District
F T
Q W
E
IE
A F
-1
-1
-0
W K
B -1
-R
-0
G
A M
B E
L L S
T
S U
IT
A N
C H
O R
A G
E
A K
-7
-3
A
E C
C
-0 -0
:4
:1
C
U s e rs
\d a v id a p p e rs o n \D o c u m e n ts
\E
IE
M e c h -U ti lid o r_ d a v id a p p e rs o n p d c e n g .c o m
.r v t
C-811
M A
N H
O L E
E L E
V A
T
IO
N S
F -3
W
E A
T H
E R
S H
E L T
E R
S
Q D
E
IE
L S
O N
A F
B A
L A
S K
A J C
D
E C
S A
AM#2
1/4" = 1'-0"C-811
E4 MH-LP39 SOUTH
1/4" = 1'-0"C-811
A4 MH-LP39 NORTH
1/2" = 1'-0"C-811
A2 Building Vault North 1/2" = 1'-0"C-811
E2 Building Vault South
GENERAL NOTES
1. ALL UTILITIES TO EIE378 (INCLUDING STEAM, CONDENSATE, WATER, SEWER, AND
FIRE PROTECTION) SHALL BE COMPLETED (INSTALLED, TESTED, AND COMMISSIONED)
AND READY FOR USE BY EIE378 PRIOR TO 15 AUGUST, 2019.
S y m
A c ti o n
D e s c ri p ti o n D a te
A p p v d
A
M
F
IR
E P
IP
IN
G F
L O
W D
IR
E
C T
IO
N
/0 /2
STRUCTURAL STEEL
MATERIALS:
WIDE-FLANGE SHAPES: ASTM A992
STRUCTURAL STEEL TUBES (HSS): ASTM A500, GRADE B
STRUCTURAL STEEL PIPES: ASTM A53, GRADE B
ALL OTHER SHAPES & PLATE: ASTM A36
BOLTS, WASHERS & NUTS: ASTM A325, F436 & A563
WELDED STEEL STUDS: ASTM A108
ANCHOR RODS: ASTM F1554, GRADE 55
CONTINUITY AND DOUBLE PLATES: ASTM A572 GR. 50
ALL DETAILING, FABRICATION AND ERECTIONS SHALL CONFORM TO AISC SPECIFICATIONS AND
CODES, LATEST EDITION. FABRICATOR MUST PARTICIPATE IN THE AISC QUALITY
CERTIFICATION PROGRAM, BE CERTIFIED BY THE AHJ OR SPECIAL INSPECTIONS, AT THE
CONTRACTOR’S EXPENSE, MUST BE PROVIDED IN THE FABRICATION SHOP.
ALL WELDING SHALL BE DONE BY QUALIFIED WELDERS AND SHALL CONFORM TO THE AWS D1.1
AND D1.8, LATEST EDITIONS. ALL WELDING ELECTRODES SHALL BE PROPERLY CONDITIONED
70 KSI MINIMUM TENSILE STRENGTH, WITH DIFFUSED HYDROGEN LEVELS OF 16ml/g (H16) OR
LESS IN ACCORDANCE WITH AWS A4.3.
WELDS NOT SPECIFIED SHALL BE SHOP-PERFORMED CONTINUOUS OR ALL-AROUND 3/16"
FILLET WELDS.
WELD FILLER METAL FOR COMPLETE-JOINT-PENETRATION GROOVE WELDS AND DEMAND
CRITICAL WELDS SHALL MEET THE FOLLOWING ADDITIONAL REQUIREMENTS:
MINIMUM YIELD STRENGTH: 58 KSI
CVN TOUGHNESS: 20 FT LBS AT 0°F, 40 FT LBS AT 70°F
ELONGATION: 22% MINIMUM
WHERE BUTT WELDS OCCUR AT STEEL WITH DIFFERENT THICKNESSES OR WIDTHS, THE
LARGER PIECE OF STEEL MUST BE TAPERED AT A SLOPE NOT EXCEEDING 1 ON 2.5 PER AWS
D1.1.
STEEL DECK AND COLD-FORMED STEEL MAY BE WELDED WITH E60 ELECTRODES. WELDING
SHALL BE IN ACCORDANCE WITH AWS D1.3, "SPECIFICATION FOR THE WELDING OF SHEET
STEEL IN STRUCTURES".
THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK OF
OTHER TRADES WITHOUT THE PRIOR APPROVAL OF THE DOR.
ALL CONNECTIONS SHALL BE SIMPLE, SINGLE PLATE SHEAR CONNECTIONS USING HIGH-
STRENGTH BEARING TYPE BOLTS WITH THREADS INCLUDED IN THE SHEAR PLANE, A325-N,
UON. NUTS SHALL BE SNUG-TIGHT, UON. ONE PLY OF THE CONNECTION SHALL USE SHORT-
SLOTTED HOLES ORIENTED HORIZONTALLY.
BOLTS AND NUTS USED IN THE PRIMARY LATERAL FORCE RESISTING SYSTEM SUCH AS DRAG
STRUTS, MOMENT FRAMES, BRACED FRAMES SHALL BE PRETENSIONED AND ALL PILES OF THE
JOINT SHALL BE PREPARED AS CLASS 'A' FAYING SURFACES PER AISC 360 SECTION J3.8.
ALL BEAMS, JOISTS AND TRUSSES SHALL BE FABRICATED WITH THE NATURAL CAMBER UP.
PROVIDE CAMBERS AS INDICATED ON THE DRAWINGS.
COMPOSITE BEAMS SHALL BE CONSTRUCTED PER ONE OF THE FOLLOWING, AT THE
CONTRACTOR’S OPTION, TO PRODUCE A LEVEL AND FLAT FLOOR:
-CAMBER THE STEEL BEAMS FOR AT LEAST 75% OF THE CONCRETE WEIGHT.
-SHORE THE BEAMS UNTIL CONCRETE REACHES SUFFICIENT STRENGTH, WHILE
ACCOUNTING FOR DEAD LOAD COMPOSITE BEAM DEFLECTION.
-PLACE SCREED PINS OF VARYING LENGTH BASED ON A LOAD-DEFLECTION MAP
(PROVIDED UPON REQUEST) AND POUR EXTRA CONCRETE TO ADDRESS EXTRA
CONCRETE THICKNESS AT CENTER OF BEAMS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF ALL ERECTION
PROCEDURES AND SEQUENCES. CONSIDERATION SHOULD BE GIVEN TO TEMPERATURE
DIFFERENTIALS, ESPECIALLY WITH RESPECT TO STRUCTURAL STEEL FRAMING INTO
CONCRETE WALLS, BEAMS, OR COLUMNS.
ALL STEEL STUD ANCHORS SHALL BE WELDED AND INSPECTED PER AWS D1.1, SECTION 7.8.
AFTER WELDING, THE CERAMIC FERRULE SHALL BE REMOVED FROM EACH STUD AND THE
WELD FILLET VISUALLY INSPECTED.
ALL STEEL SHALL BE CLEANED BY METHODS COMPLYING WITH THE STEEL STRUCTURES
PAINTING COUNCIL METHOD SSPC-SP3, POWER TOOL CLEANING. REMOVE OIL, GREASE, AND
SIMILAR CONTAMINANTS. STEEL TO BE GALVANIZED SHALL BE CLEANED PER: SSPC-SP6.
EXCEPT FOR MEMBERS TO BE WELDED, AND GALVANIZED, APPLY STRUCTURAL STEEL PRIMER
PAINT IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS TO A UNIFORM DRY FILM
THICKNESS OF 2.0 MILS. AFTER FINAL STEEL INSTALLATION, WIRE BRUSH EXPOSED STEEL
SURFACES AND CLEAN WITH SOLVENTS BEFORE TOUCH-UP PAINTING. TOUCH-UP PAINT SHALL
BE THE SAME AS SHOP PAINT. STRUCTURAL STEEL TO RECEIVE SPRAY-APPLIED FIRE-
PROOFING MAY BE SUPPLIED AS BARE STEEL.
STEEL EXPOSED TO WEATHER OR INDICATED AS GALV SHALL BE HOT-DIP GALVANIZED PER
ASTM A123. TOUCH-UP AND REPAIR GALVANIZATION SHALL CONFORM TO ASTM A780.
FASTENERS SHALL COMPLY WITH ASTM A153.
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE DOR FOR REVIEW. THESE
DRAWINGS SHALL BE CHECKED BY THE CONTRACTOR BEFORE SUBMITTAL AND SHALL SHOW
SHOP FABRICATION DETAILS, FIELD ASSEMBLY DETAILS, AND ERECTION DIAGRAMS FOR ALL
STRUCTURAL STEEL. ALSO SUBMIT WELDERS QUALIFICATIONS.
STRUCTURAL STEEL DECK
ALL STEEL DECKING SHALL MEET ASTM A 653-SS, GRADE 33, WITH A MINIMUM YIELD STRENGTH OF 38 KSI. ALL DECKING SHALL BE GALVANIZED PER ASTM A653-G60. ALL ROOF METAL DECK
SHALL BE LAPPED A MINIMUM OF 2-INCHES.
MINIMUM DECK GAGES ARE SHOWN ON PLANS AND ARE BASED ON 3-SPAN, UNSHORED
CONDITIONS. HEAVIER DECK MAY BE REQUIRED FOR OTHER CONDITIONS, DEPENDING ON THE
MANUFACTURER’S AND CONTRACTOR'S LAYOUT. ALL DECK SHALL SATISFY AISI,
"SPECIFICATION FOR THE DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS".
FASTEN STEEL DECKING PER SCHEDULE:
FLOOR DECK
SUPPORTING STEEL: 36/4 PATTERN, 7/8-INCH DIAMETER VISUAL (1/2-INCH EFFECTIVE)
PUDDLE WELDS (OR SHEAR STUDS) AT 12-INCHES ON CENTER.
SIDE LAPS: BUTTON PUNCHED AT 12-INCHES MAXIMUM ON CENTER.
Q-ALLOW-MINIMUM (BEFORE CONC FILL) = 300 LB/FT
ROOF DECK
SUPPORTING STEEL: 24/4 PATTERN, 7/8-INCH DIAMETER VISUAL (1/2-INCH EFFECTIVE)
PUDDLE WELDS AT 6-INCHES ON CENTER.
SIDE LAPS: TOP SEAM WELDED AT 12-INCHES MAXIMUM ON CENTER. CRIMP SIDE LAPS
BEFORE WELDING.
Q-ALLOW-MINIMUM = 1000 LB/FT
"PUNCHLOK" OR "DELTA-GRIP" OR OTHER ENHANCED PUNCHING CONNECTION SYSTEM MAY BE
SUBSTITUTED FOR ROOF SIDE LAPS, AND MECHANICAL 'PAF' FASTENERS MAY BE SUBSTITUTED
FOR SUPPORTING STEEL CONNECTIONS. CONTRACTOR SHALL SUBMIT CALCULATIONS TO
SHOW UNIT SHEAR CAPACITIES OF ALTERNATE FASTENER LAYOUT EXCEEDS THE BASIS OF
DESIGN INDICATED ABOVE.
ALL COMPOSITE STEEL DECK SHALL HAVE WIDE RIBS SUITABLE FOR SHEAR STUD PLACEMENT
WHERE STUDS ARE REQUIRED. THE CONFIGURATION OF THE STEEL DECK SHALL ALLOW THE
DEVELOPMENT OF FULL SHEAR VALUES OF THE STUD. SHEAR STUDS SHALL BE WELDED
THROUGH THE DECK BY PRE-QUALIFIED METHODS. IF THROUGH-DECK WELDING IS
UNFEASIBLE, THE STUDS SHALL BE INSTALLED IN PRE-PUNCHED HOLES IN THE DECK. THE
CONTRACTOR SHALL PROVIDE CHECKED SHOP DRAWINGS INDICATING EXACT LAYOUT OF
STUDS FOR EACH BEAM TYPE, SPAN AND DECK LAYOUT.
PROVIDE CONTINUOUS METAL CLOSURES AT ALL SLAB OPENINGS AND SLAB EDGES AND
CONTINUOUS DECK CLOSURE AT ALL DECK ENDS. PROVIDE, AS REQUIRED, ALL RIDGE AND
VALLEY PLATES, COLUMN CLOSURES, CANT STRIPS, SUMP PLATES AT PIPING PENETRATIONS
AND RECESSED SUMP PANS AT ALL ROOF DRAINS. PROVIDE SUPPLEMENTAL FRAMING AT
OPENINGS AS REQUIRED FOR SUPPORT OF THE METAL DECK. ALL OPENING SIZES AND
LOCATIONS SHALL BE COORDINATED WITH ARCHITECTURAL AND MECHANICAL DRAWINGS.
THE DECK SUPPLIER SHALL CONFIRM THE DECK SIZE FOR THE ACTUAL LAYOUT AND PROVIDE
THE DOR WITH ENGINEERING CALCULATIONS OR PUBLISHED MANUFACTURER'S DATA
VERIFYING THE SPECIFIED DECK REQUIREMENTS.
PROVIDE ENGINEERED AND CHECKED SHOP DRAWINGS INDICATING LOCATION, GAGE, AND
SIZE OF EACH PIECE OF DECKING. THE DRAWINGS SHALL CLEARLY SHOW WELDING DETAILS
TO STRUCTURAL FRAMING AND SIDE LAP CONNECTIONS DETAILS.
COLD FORMED STEEL
COLD FORMED STEEL SHALL MEET ASTM A1003 STRUCTURAL GRADE 50 TYPE H (Fy=50 KSI) FOR 14 GAUGE (68 MIL) OR 16 GAUGE (54 MIL) MEMBERS AND ASTM A1003 STRUCTURAL GRADE 33 TYPE H (Fy=33 KSI) FOR 18 GAUGE (43 MIL) AND LIGHTER MEMBERS.
ALL STRUCTURAL MEMBERS SHALL BE DESIGNED PER THE AMERICAN IRON AND STEEL
INSTITUTE (AISI) "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL
MEMBERS", LATEST EDITION.
USE ONLY ONE MANUFACTURER OF COLD FORMED JOIST THROUGHOUT THE WORK, UNLESS
OTHERWISE SHOWN ON THE DRAWINGS OR SPECIFICALLY APPROVED IN ADVANCE BY THE
DOR. ACCEPTABLE JOIST MANUFACTURERS INCLUDE ANY MEMBER OF THE STEEL STUD
MANUFACTURER'S ASSOCIATION.
PROVIDED ALL ACCESSORIES INCLUDING TRACKS, CLIPS, WEB STIFFENERS, ANCHORS,
FASTENING DEVICES, RESILIENT CLIPS, AND OTHER ITEMS REQUIRED FOR A COMPLETE AND
PROPER INSTALLATION. INSTALL ALL ITEMS RECOMMENDED BY THE MANUFACTURER.
FASTENING OF COMPONENTS SHALL BE WITH SELF-DRILLING SCREWS (ASTM C1513) OR WELDS
OF SUFFICIENT SIZE TO INSURE THE STRENGTH OF THE CONNECTION. WIRE TYING OF
COMPONENTS SHALL NOT BE PERMITTED. ALL WELDS SHALL BE TOUCHED UP WITH A ZINC-
RICH PAINT.
UNLESS OTHERWISE INDICATED:
1. TRACKS SHALL BE CONNECTED WITH TWO #8 SCREWS OR PAF TO SUPPORTING
SUBSTRATE AT EACH STUD, OR AN EQUIVALENT EQUAL SPACING;
2. OVERLAPPING STUDS OR BRACES SHALL BE CONNECTED WITH THREE #8 SCREWS;
3. STUDS SHALL BE CONNECTED TO TOP AND BOTTOM TRACKS WITH TWO #8 SCREWS, ONE
AT EACH FLANGE;
4. BUILT-UP MEMBERS SHALL BE STITCHED TOGETHER WITH WELDS OR #8 SCREWS AT EACH
CORNER AT 6-INCHES ON-CENTER.
PROVIDE COMMERCIAL GROUT FOR LEVELING THE FLOOR RUNNER OF STEEL STUD
PARTITIONS AS REQUIRED.
STEEL JOISTS AND JOIST GIRDERS
DEPTH OF STYLE OF STEEL JOISTS AND GIRDERS SHALL BE MAINTAINED, SERIES MAY BE
ADJUSTED AS REQUIRED TO SATISFY DESIGN CONSTRAINTS. STEEL JOISTS SHALL MEET THE
SPECIFICATIONS OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) AND STEEL
JOIST INSTITUTE (SJI). THE JOIST MANUFACTURER SHALL PROVIDE ALL BRIDGING AND BRACING
(BOTH PERMANENT AND FOR ERECTION) AND CONNECTION HARDWARE NECESSARY FOR
PROPER INSTALLATION. CALCULATIONS FOR STEEL JOISTS SHALL BE STAMPED BY AN ALASKA
LICENSED CIVIL OR STRUCTURAL ENGINEER.
THE DESIGN OF THE ROOF JOISTS AND JOIST GIRDERS SHALL ACCOMMODATE THE LOADS
NOTED AND MEET OR EXCEED THE FOLLOWING DEFLECTION CRITERIA:
SNOW LOAD DEFLECTION: L/360
TOTAL DEFLECTION: L/240
THE JOIST MANUFACTURER SHALL CONFIRM THE WEIGHT AND LOCATION OF ALL MECHANICAL
EQUIPMENT, SUPPORTS FOR CATWALKS, AND SUPPORTS FOR FOAM GENERATORS. ADD
ADDITIONAL WEB MEMBERS OR INCREASE BOTTOM CHORD SIZES AS REQUIRED FOR THESE
CONCENTRATED LOADS. JOISTS SHALL BE PROVIDED WITH BOTTOM CHORD EXTENSIONS AS
REQUIRED TO ATTACH SUPPORTS.
FOR SPANS 40 FEET OR MORE (EXCEPT FOR STEEL JOISTS OR GIRDERS THAT HAVE BEEN PRE-
ASSEMBLED INTO PANELS), CONNECTIONS OF INDIVUDUAL STEEL JOISTS OR GIRDERS SHALL
BE FABRICATED TO ALLOW FOR FIELD BOLTING DURING ERECTION.
JOIST MANUFACTURER SHALL CALCULATE NET UPLIFT AND DESIGN JOISTS, GIRDERS, AND
BRIDGING PER THE "WIND UPLIFT MAP" AND NOTES ON SHEET S-141.
STEEL GRATING
GRATING SHALL BE GALVANIZED TYPE W-19-4, 1 3/4" X 3/16 OR EQUAL. STEEL SHALL MEET
ASTM A1011 AND HAVE A MINIMUM YIELD STRESS OF 30 KSI.
ALL GRATING PANEL EDGES MUST BE SUPPORTED BY STEEL FRAMING ELEMENTS TO ENSURE
NO DIFFERENTIAL MOVEMENT AT PANEL JOINTS AND EDGES.
GRATING TO BE SECURED TO SUPPORTING STRUCTURE WITH WELDS, WELD LUGS OR SIMILAR
ATTACHMENT PER MNFR.
FIBERGLASS PLANKING
BASIS OF DESIGN IS 2" SAFPLANK SOLID SURFACE FIBERGLASS PLANK SYSTEM OR APPROVED
EQUAL.
STRUT FRAMING
ALL STRUT FRAMING CONSTRUCTION AND DESIGN SHALL CONFORM TO THE AMERICAN IRON
AND STEEL INSTITUTE (AISI) "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL
STRUCTURAL MEMBERS", LATEST EDITION.
FRAMING, PRODUCT NUMBERS AND FITTINGS NOTED HERE-IN ARE PER THE UNISTRUT
GENERAL ENGINEERING MANUAL. PROVIDE ALL CHANNELS, FITTINGS AND FASTENERS FROM A
SINGLE MANUFACTURER. OTHER KNOWN MANUFACTURERS EQUAL TO UNISTRUT ARE B-LINE,
SEASAFE, AND STRUT-TECH.
CHANNEL MEMBERS SHALL BE 1 5/8"X1 5/8", AND FABRICATED FROM 12 GAGE ASTM A1011 SS
GR 33 OR A653 GR 33. FINISH SHALL BE ELECTRO-GALVANIZED UNLESS A MORE DURABLE
FINISH IS SPECIFICALLY INDICATED. THE HOLE PATTERN ON THE BACK OF THE CHANNEL SHALL
BE EITHER UNPIERCED, "HS" OR "T".
ALL FITTINGS SHALL BE FABRICATED FROM EITHER ASTM A575, A576, A36 OR A635 STEEL. USE
1/2" DIAMETER FASTENERS TYPICALLY, UNLESS ANOTHER FASTENER IS SPECIFICALLY
INDICATED. TORQUE ALL FASTENERS TO THE MANUFACTURERS RECOMMENDED TORQUE
VALUES.
STRUCTURAL GENERAL NOTES CONTINUED
A K
AF AL
T S
TA
E O
49 TH
S
ROBERT J. KORUNA
No. SE 13916
REG IST ER ED PR O F E S S IO N A L ENG IN
EER
Co rp or at e Li ce ns e #A
EC
C5
B S t., S ui te
A nc ho ra ge , A
K
0 3
Ph on e:
-3
- w ww
.re id m id dl et on . c om
Co py rig ht R ei d
M id dl et on , I nc . 2
D ra w in g
F ile
N a m e
D w g S c a le
P lo t S c a le
D a te
D ra w n
R E
S
ID
E N
T E
N G
IN
E
E R
P R
IM
E
C O
N T
R A
C T
O R
S u b m it te d
D e s ig n e d
R e v ie w e d
C h ie f, ra n c h
C h c ti o n
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
A N
C H
O R
A G
E A
L A
S K
A
C O
R P
S O
F E
N G
IN
E
E R
S
D a te
S T
A T
E C
IT
Y
C O
N T
R A
C T
O R
C O
N T
R A
C T
N O
R e c o m m e n d e d
A p p ro v e d
Reference number:
HGFEDCBA
C E
P O
A -E
N -D
B -M
C E
P O
A -E
N -D
B
A S
N O
T E
D
P L O
T T
E D
O N
US Army Corps of Engineers ® Alaska District
F T
Q W
E
IE
A F
-1
-1
-0
W K
B -1
-R
-0
2017/12/20
/8
/2
:2
:4
A
M C
U s e rs
\j k e n t\ D o c u m e n ts
\E
IE
S T
R U
C T
U R
A L
-R e v it
C
E N
T R
A L
J K e n t.
rv t
DESIGN COMPLETE S-003
S T
R U
C T
U R
A L G
E N
E R
A L
N
O T
E S
E
IE
F
- 3 A
A
IR
C R
A F
T W
E A
T H
E R
S H
E L T
E R
S
Q D
E
IE
L S
O N
A F
B A
L A
S K
A
R J K
R J K
D
E C
D C
P
S ym
A c ti o n
D e s cr ip ti o n
D a te
A p p v d
A
M
A D
M E
N D
M E
N T
-0
-2
PX
CX.X
(-X'-XX")
PIER TYPE
FOOTING TYPE
TOP OF FOOTING
ELEVATION
FOUNDATION CALLOUT LEGEND
NOT TO SCALE
SEE S-101 FOR FOOTING…