AM_3_package.pdf

PDF 20 MB Posted

Attached to
EIE382-F-35A Aircraft Weather Shelter (Squadron 2)
Solicitation number
W911KB-18-R-0014
Issued by

About this file

EIE382-Amendment 0003

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
AM_4_package.pdf PDF
JA-06,_08-14_approved_Redacted.pdf PDF
JA-07_Redacted_JA_Redacted.pdf PDF
JA-18-08-Det-tronics_EIE382_Redacted.pdf PDF
A.07.24_EIE382_AM2_W911KB18R0014_DWGS.pdf PDF
A.07.24_EIE382_AM2_W911KB18R0014_SPECS.pdf PDF
EIE382_AM_01.pdf PDF
Final_RFP-EIE382_30_Jan_2018.pdf PDF
Final_Drawings_EIE382.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE382 F-35 Aircraft Weather Shelters (Sqd 2), EIELSON AFB, ALASKA

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document

b. DUE DATE FOR PROPOSAL REVISIONS IS HEREBY EXTENDED TO 6 APRIL 2018 BY 2:00 PM ALASKA TIME. Proposals may be submitted electronically via email to michelle.r.mandel@usace.army.mil and theresa.m.afrank@usace.army.mil.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THIS STANDARD FOR 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 428

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB-18-R-0014

X 9B. DATED (SEE ITEM 11)

29-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2018

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

Drawing C-105 (clarify shoulder paving) Drawing C-301 (revise detail A5) Drawing S-511 (revise details C1 & E5) Drawing A-002 (revise 5/8” roof cover to 1/2” cover)

b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#3” appears before and after new and/or revised materials, except as noted below.

PROJECT TABLE OF CONTENTS

– Revised Section 02 61 13 (Reissuing page 2)

SECTION 00 11 01 – PROPOSAL SCHEDULE

– Revised CLIN 0002 to break down in CLIN 0002AA-0002AD (Reissuing proposal schedule)

SECTION 01 50 00.04 29 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR

EIELSON AFB PROJECTS (Reissuing entire section) --Paragraph 3.4.1 --Paragraph 3.4.2 --Paragraph 3.4.3.b

SECTION 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

-Attachment 1 - Final F-35 UFP-QAPP Work Plan (Reissuing entire Attachment)

SECTION 07 22 00 – ROOF AND DECK INSULATION

--Paragraph 2.3.1 (Reissuing entire section)

SECTION 32 11 23 – GRADED-CRUSHED AGGREGATE BASE COURSE

--Consolidated changes made in AM#1 and AM#2 (Reissuing entire section)

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

SECTION 00 11 00 – STANDARD FORM 1442, BLOCK 13

– The required response date/time has changed to 6 April 2018

SECTION 00 73 46 – WAGE DETERMINATIONS

– Replaced with AK1, dated 03/30/2018

c. The following sections are deleted:

NONE

d. The following documents are added:

NONE

e. The following revisions are incorporated:

NONE

f. Other:

NONE

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

Section PROJECT W911KB-18-R-0014

EIE382

PROJECT TABLE OF CONTENTS Page 2 RTA Design Submittal December 20, 2017

- Attachment 2 - Eielson Disposal Areas

- Attachment 3 - Excavation Dewatering Memo

- Attachment 4 - Drum Marking Sample

- Attachment 5 - Stockpile Detail

- Attachment 6 – Wetlands Permit

01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES

- Attachment 1 - SWPPP Delegation of Authority Letter Template 2017

01 58 00 PROJECT IDENTIFICATION

- Attachment 1 - AF Project Sign Plate 6 & 7

01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

- Attachment 1 - EIE Fillable 1354 – Check List

- Attachment 2 - GIS Drafting Surveying Stds (22 September 16)

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

- Attachment A – Owner’s Project Requirements

- Attachment B – Basis of Design

- Attachment C – Design Phase Commissioning Plan

DIVISION 02 - EXISTING CONDITIONS

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

- Attachment 1 – Final F-35 UFP-QAPP Work Plan

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 30 00 CAST-IN-PLACE CONCRETE

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

03 62 16 NON-METALLIC NON-SHRINK GROUTING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

04 22 53 METAL-SUPPORTED UNIT MASONRY PANELS

DIVISION 05 - METALS

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

AM#3

AM#3 F-35 A AIRCRAFT WEATHER SHELTER (SQD 2) W911KB-18-R-0014

EIELSON AFB, ALASKA EIE382

PS- 1

PROPOSAL SCHEDULE

F-35A AIRCRAFT WEATHER SHELTER (SQD 2)

EIELSON AFB, ALASKA

BASE ITEMS

Item No.

Description Quantity Unit Unit Price Amount

0001 Construct F-35A Aircraft Weather Shelter within the building 5-foot line, complete.

1 Job $_________ $_________

0002A Construct site work and utilities beyond the building 5 foot lines, minus CLINs 0002B, 0002C, and 0002D, complete.

1 Job $_________ $_________

0002B Construct utilidor from EIE376 manhole MH-LP34 to and including EIE382 manhole MH-LP41, complete.

1 Job $_________ $_________

0002C Construct primary electric circuit from EIE376 SW-1335 to and including EIE382 SW382, complete

1 Job $_________ $_________

0002D Construct main communications line from EIE376 handhole HH-2-24-2- 5 to and including EIE382 manhole MH-2-24-2-9, complete

1 Job $_________ $_________

0003 Provide Temporary Heating independent of existing central steam heating system, Complete.

1 Job $_________ $_________

0004 Stockpile and Sample 10,000 Cubic Yards of Potentially Contaminated Soil, From Field Screening, Including Construction of Holding Cells, Complete. Estimated Quantity *

10,000 CY $_________ $_________

0005 Dispose of 9,000 Cubic Yards of POL Contaminated Soil, Complete. Estimated Quantity **

9,000 CY $_________ $_________

PS-2

BASE ITEMS CONTINUED

Item No.

Description Quantity Unit Unit Price Amount

0006 Dispose of 11,000 Cubic Yards of Pesticide Contaminated Soil, Complete. Estimated Quantity ***

11,000 CY $_________ $_________

0007 Dispose of 35,000 Cubic Yards of Non-contaminated Soil, Complete. Estimated Quantity ****

35,000 CY $_________ $_________

Total of Base Items 0001 thru 0007 $_________

OPTION ITEMS

No.

Description Quantity Unit Unit Price Amount

0008 Purchase ACA-1 and ACA-2 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0009 Purchase ACA-3 and ACA-4 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0010 Purchase ACA-5 and ACA-6 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

0011 Purchase ACA-7 and ACA-8 avionics cooling units and deliver to site, Complete.

1 Job $_________ $_________

Install ACA-1 and ACA-2 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0008 is not awarded, ACA-1 and ACA-2 will be Government Furnished, Contractor Installed. *****

PS- 3

OPTION ITEMS CONTINUED

Item No.

Description Quantity Unit Unit Price Amount

0013 Install ACA-3 and ACA-4 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0009 is not awarded, ACA-3 and ACA-4 will be Government Furnished, Contractor Installed. *****

1 Job $_________ $_________

0014 Install ACA-5 and ACA-6 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0010 is not awarded, ACA-5 and ACA-6 will be Government Furnished, Contractor Installed. AM#1… *****

…AM#1

1 Job $_________ $_________

0015 Install ACA-7 and ACA-8 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0011 is not awarded, ACA-7 and ACA-8 will be Government Furnished, Contractor Installed. *****

1 Job $_________ $_________

0016 Unsatisfactory Material Excavation and Backfill.

****** 250 CY $_________ $_________

0017 Furnish and Install IDS End Devices, Complete *******

1 Job $_________ $_________

0018 Provide Concrete airfield apron in lieu of Asphalt airfield apron in base CLIN 0002, does not include additional pavement in CLIN 0019. ********

1 Job $_________ $_________

0019 Widen asphalt apron and Construct concrete GPS Synchronization Pads, Complete. ********

PS-4

OPTION ITEMS CONTINUED

No.

Description Quantity Unit Unit Price Amount

0020 Provide Concrete airfield apron in lieu of the Asphalt airfield apron in CLIN 0019, Complete. ********

1 Job $_________ $_________

0021 Provide Type I, Gradation A reflective media, per Section 32 17 23, Complete. Do not include cost in CLIN 0002.

1 Job $_________ $_________

0022 Provide Type III, Gradation A reflective media, per Section 32 17 23, Complete. Do not include cost in CLIN 0002.

Total of Optional Items 0008 thru 0022 $_________

TOTALS

Total of Base and Optional Items 0001 thru 0022 $_________

Proposed Contract Duration: ____________________

CLINs 0004, 0005, 0006, and 0007 are estimated quantities. Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY.

* Work on CLIN 0004 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. It does not include costs for disposal of any soils determined to be contaminated, which shall be included in CLINs 0005 and 0006. For CLIN 0004, the Contractor shall keep a record of the amount of soil being stockpiled and sampled, as required by results of the field screening. CLIN 0004 does not include stockpiling or sampling of soil within those areas identified on Sheet C- 006 as requiring 100% stockpiling and sampling. Those costs are to be included in CLINs 0001 and 0002 as applicable.

** For CLIN 0005, the Contractor shall keep a record of the amount of POL contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil from those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling and from the testing of soil required by CLIN 0004 to be stockpiled and sampled.

PS- 5

*** For CLIN 0006, the Contractor shall keep a record of the amount of Pesticide contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil from those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling.

**** For CLIN 0007, the Contractor shall keep a record of the amount of non-contaminated soil being disposed of. This is soil from those areas identified on Sheets C-102 and C-103 as requiring 100% stockpiling and sampling which has been tested and determined to be clean.

Soil shall be disposed on base at a clean soil disposal area within 7 miles of the stockpile area, as directed by the Contracting Officer. CLIN 0007 does not include clean soils excavated at the project site outside of those areas identified on Sheet C-006 as requiring 100% stockpiling and sampling. Those costs are to be included in CLINs 0001 and 0002 as applicable.

***** For CLINs 0008 - 0015, these options may be exercised at any time prior to the contract completion date and completion time shall be 180 days from the date of option exercise or by the contract completion date, whichever is later.

****** Work on CLIN 0016 shall be the cost for work identified in Specs 31 00 00 paragraph 3.2.

The Contractor shall survey the extent of excavation and keep a record of the unsatisfactory material removed beyond the elevations noted in the drawings or specifications. This option may be exercised up to 10 times and may be exercised at any time prior to the contract completion date. No additional time will be added to the contract completion date if this option is exercised.

******* Work on CLIN 0017 shall be the cost of the Intrusion Detection System end devices noted in Section 28 10 05/2.3.1. This option may be exercised at any time prior to the contract completion date and completion time shall be 120 days from the date of option exercise or by the contract completion date, whichever is later. The IDS infrastructure, including all conduit, boxes, wiring, power, etc., is included in CLIN 0001.

******** For CLINs 0018 - 0022, these options may be exercised at any time within 60 days of contract award. CLIN 0020 will only be exercised if CLIN 0019 is exercised. Either CLIN 0021 or 0022 will be exercised, not both. No additional time will be added to the contract completion date if these options are exercised.

EVALUATION OF OFFERS.

1. AWARD: Award will be made in accordance with Section 00 22 11 – PROPOSAL, SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD ONE

STEP – BEST VALUE.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

PS-6

4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.

-- END OF PROPOSAL SCHEDULE –

Section 00 73 46 W911KB-18-R-0014

General Decision Number: AK180001 03/30/2018 AK1

Superseded General Decision Number: AK20170001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 03/30/2018

* ASBE0097-001 01/01/2018

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 21.57

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

BOIL0502-002 08/01/2016

Rates Fringes

BOILERMAKER......................$ 44.26 28.41

BRAK0001-002 07/01/2017

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.19 Tile & Terrazzo Finisher.........$ 34.79 19.19

CARP1501-001 09/01/2016

Rates Fringes

MILLWRIGHT.......................$ 36.74 22.99

* CARP2520-003 09/01/2017

Rates Fringes

Diver Stand-by....................$ 42.65 25.16 Tender......................$ 41.65 25.16 Working.....................$ 82.45 25.16 Piledriver Piledriver; Skiff Operator and Rigger..................$ 38.34 25.16 Sheet Stabber...............$ 38.34 25.16 Welder......................$ 43.90 25.16

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

* CARP4059-001 09/01/2016

Rates Fringes

CARPENTER

Including Lather and Drywall Hanging.............$ 38.34 25.04

ELEC1547-004 04/01/2017

Rates Fringes

CABLE SPLICER....................$ 39.82 3%+25.44

ELECTRICIAN......................$ 39.49 3%+25.69

ELEC1547-005 04/01/2017

Line Construction

Rates Fringes

CABLE SPLICER....................$ 52.57 3%+30.81

Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81 Powderman........................$ 48.52 3%+30.81

TREE TRIMMER.....................$ 35.84 3%+23.56

ELEV0019-002 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 55.45 32.645+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day

ENGI0302-002 01/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.28 22.65

GROUP 1A....................$ 42.04 22.65

GROUP 2.....................$ 39.51 22.65

GROUP 3.....................$ 38.79 22.65

GROUP 4.....................$ 32.58 22.65

TUNNEL WORK

GROUP 1....................$ 44.31 22.65

GROUP 1A...................$ 46.24 22.65

GROUP 2....................$ 43.46 22.65

GROUP 3....................$ 42.67 22.65

GROUP 4....................$ 35.84 22.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 07/01/2017

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 37.25 30.43

FENCE, BARRIER INSTALLER....$ 33.75 30.08

GUARDRAIL INSTALLERS........$ 34.75 30.08

GUARDRAIL LAYOUT MAN........$ 34.49 30.08

HELICOPTER, TOWER...........$ 38.25 30.43

LABO0341-005 04/01/2017

Rates Fringes

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.72

GROUP 2....................$ 34.71 26.72

GROUP 3....................$ 35.70 26.72

GROUP 3A...................$ 39.30 26.72

GROUP 3B...................$ 43.20 24.01

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad

Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 04/01/2017

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.72

GROUP 2....................$ 34.71 26.72

GROUP 3....................$ 35.70 26.72

GROUP 3A...................$ 39.30 26.72

GROUP 3B...................$ 43.20 24.01

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 07/01/2017

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 31.99 20.29

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 32.51 20.29

PAIN1959-002 07/01/2017

SOUTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.23 20.04 Machine Taper/Drywall.......$ 31.48 20.04 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.58 20.04

PAIN1959-003 07/01/2017

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 38.63 22.39

PAIN1959-004 07/01/2017

Rates Fringes

FLOOR LAYER: Carpet.............$ 29.23 13.96

PAIN1959-006 07/01/2017

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 38.63 21.67

PLAS0867-001 02/01/2016

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLAS0867-004 02/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLUM0262-002 01/01/2017

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 38.02 26.72

PLUM0367-002 07/01/2017

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 39.00 23.80

PLUM0375-002 07/01/2017

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 40.91 25.40

PLUM0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER.................$ 46.00 23.29

ROOF0189-006 04/01/2016

Rates Fringes

ROOFER...........................$ 42.62 15.50

SHEE0023-003 07/01/2017

South of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 42.00 24.82

SHEE0023-004 07/01/2017

North of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 47.74 23.48

TEAM0959-003 09/01/2017

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 39.59 21.97

GROUP 1A....................$ 40.86 21.97

GROUP 2.....................$ 38.33 21.97

GROUP 3.....................$ 37.51 21.97

GROUP 4.....................$ 36.93 21.97

GROUP 5.....................$ 36.17 21.97

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

AM#3 F-35A AIRCRAFT WEATHER SHELTER (SQD 2) W911KB-18-R-0014

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 50 00.04 29

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR EIELSON AFB PROJECTS

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 CONSTRUCTION SITE PLAN

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

2.1.2 Project and Safety Signs

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

2.2.2 Barricades

PART 3 EXECUTION

3.1 EMPLOYEE PARKING

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

3.2.1 Sanitation

3.2.2 Telephone

3.3 TRAFFIC PROVISIONS

3.3.1 Maintenance of Traffic

3.3.2 Protection of Traffic

3.3.3 Dust Control

3.4 GOVERNMENT FIELD OFFICE

3.4.1 Government Field Office

3.4.2 IT Requirements:

3.4.3 South Loop Communications Infrastructure

3.4.4 AM#1...Environmental...AM#1

3.5 ATTACHMENT

ATTACHMENTS:

Field Office Locations

-- End of Section Table of Contents --

Section 01 50 00.04 29 Page 1

SECTION 01 50 00.04 29

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR EIELSON AFB PROJECTS

PART 1 GENERAL

1.1 SUMMARY

Requirements of this Section apply to, and are a component of, each section of the specifications.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual on Uniform Traffic Control Devices

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

CONSTRUCTION SITE PLAN;G

Traffic Control Plan;G

1.4 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

Reference SECTION 01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS for additional requirements.

Section 01 50 00.04 29 Page 2

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

2.1.2 Project and Safety Signs

The requirements for the signs, their content, and location are as shown on the drawings. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

At contractors expense construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

Reference SECTION 01 19 30.02 29 SPECIAL ITEMS EIELSON AFB Projects for

Section 01 50 00.04 29 Page 3 additional requirements.

3.2.1 Sanitation

Provide and maintain within the construction area minimum field-type sanitary facilities…