CP2_RTA_SPECS_V4_CLR039_18-0410.pdf

PDF 10 MB Posted

Attached to
CLR039b Long Range Discrimination Radar Construction Package #2 ECF, Clear AFS, AK Federal contract opportunity
Solicitation number
W911KB18R0006
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Specs V4

View the file

Other files for this federal contract opportunity

Other files attached to CLR039b Long Range Discrimination Radar Construction Package #2 ECF, Clear AFS, AK, newest first.
File Type Posted
01_19_30_02_29_Attachment_g.pdf PDF
01_19_30_02_29_Attachment_f.pdf PDF
01_50_00_02_00_Attachment_a.pdf PDF
01_19_30_02_29_Attachment_a.pdf PDF
23_05_93.02_00.pdf PDF
01_45_35.02_00.pdf PDF
W911KB18R0006_AM_3.pdf PDF
Schedule_of_Drawings_AM__3_Sheet_1.pdf PDF
05_40_00.02_00.pdf PDF
08_44_23.02_00.pdf PDF
G-100003E_Location_and_Vicinity_Map.pdf PDF
01_19_30.02_29.pdf PDF
01_11_00.02_00.pdf PDF
28_23_23.02_10.pdf PDF
09_29_00.02_00.pdf PDF
Revised_M_Drawings.pdf PDF
Revised_TY_Drawings.pdf PDF
EG100101E_SITE_PLAN_-_GROUNDING.pdf PDF
Schedule_of_Drawings_AM__3_Sheet_2.pdf PDF
01_50_00.02_00.pdf PDF
Final_Presentation--Pre-Proposal_Site_Visit--20180515_Slide_5_Date_Corrections.pdf PDF
01_33_29.02_00.pdf PDF
Revised_E-1_Drawings.pdf PDF
28_20_01.02_10.pdf PDF
Revised_Site_Plan_Drawings.pdf PDF
26_21_00.02_00.pdf PDF
Revised_T_Drawings.pdf PDF
Revised_Security_Drawings.pdf PDF
08_88_36.02_00.pdf PDF
G-100005E_Contractor_Laydown_Areas.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
W911KB18R0006_AM_2.pdf PDF
33_71_02.02_00.pdf PDF
EG100101E_-_SITE_PLAN_-_GROUNDING.pdf PDF
01_91_10.02_29.pdf PDF
28_23_23.02_10.pdf PDF
Final_Presentation--Pre-Proposal_Site_Visit--20180515.pdf PDF
C_Drawing_revisions.pdf PDF
Revised_E_Drawings.pdf PDF
A_Drawing_Revisions.pdf PDF
28_20_00.02_00.pdf PDF
Revised_E-9_Drawings.pdf PDF
W911KB18R0006_AM_1.pdf PDF
JA_for_Vindictor_LRDR_ECF_Redacted.pdf PDF
JA_Edwards_EST3_fire_Panel_CP_2_ECF_Redacted.pdf PDF
CP2_RTA_SPECS_V2_CLR039_18-0410.pdf PDF
SPECS_V2-4_CLR039_18-0410.pdf PDF
CLR_LRDR_CP2_Rev2_RTA_Drawings_22x34.pdf PDF
CP2_RTA_SPECS_V3_CLR039_18-0410.pdf PDF
W911KB18R0006.pdf PDF
Show all 50

CLR039b Long Range Discrimination Radar Construction Package #2 ECF, Clear AFS, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTA SUBMITTAL

SPECIFICATIONS

Volume 1 - Division 00 Volume 2 - Division 01-08 Volume 3 - Division 08-27

Volume 4 - Division 28-34

Prepared for: Prepared by:

US Army Corps of Engineers Alaska District

CLR039b

LONG RANGE DISCRIMINATION

RADAR (LRDR)

Construction Package #2 LRDR Complex Security

CLEAR AFS, ALASKA

W911KB-18-R-0006 UNCLASSIFIED

14 FEB 2018 FOR OFFICIAL USE ONLY

(INTENTIONALLY LEFT BLANK)

WARNING

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Section 751 et. Seq.) or the Export Administrative Act of 1979, as amended, Title 50, U.S.C. Violation of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD 5230.25.

DISTRIBUTION STATEMENT D

Distribution authorized to DoD and DoD Contractors only.

FOR OFFICIAL USE ONLY STATEMENT

This document contains information

EXEMPT FROM MANDATORY

DISCLOSURE

under the FOIA. 5 USC 552 Exemption (3) applies.

DISCLAIMER STATEMENT AND

DISTRIBUTION RESTRICTION

The views, options, and/or findings contained in this report are those of the author(s) and should not be construed as an official Department of Defense position, policy, or decision, unless so designated by other official documentation.

DESTRUCTION NOTICE

For unclassified, limited distribution information, destroy by any method that will prevent disclosure of contents or reconstruction of this document. For classified information, destroy in accordance with provisions of DoD 5220.22-M or OPNAVINST 5510.1H.

CP#2 Long Range Discrimination Radar (LRDR) CLR039b LRDR Complex Security - Clear AFS, Alaska

PROJECT TABLE OF CONTENTS

PROJECT TABLE OF CONTENTS Page 1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.02 00 SUMMARY OF WORK

01 19 30.02 29 SPECIAL ITEMS

01 22 00.02 10 PRICE AND PAYMENT PROCEDURES

01 32 01.02 10 PROJECT SCHEDULE

01 33 00.02 00 SUBMITTAL PROCEDURES

01 33 29.02 00 SUSTAINABILITY REPORTING

01 35 26.02 00 GOVERNMENTAL SAFETY REQUIREMENTS

01 36 00.02 29 RADIOACTIVE MATERIALS PROCEDURES

01 42 00.02 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 04.02 29 CONTRACTOR QUALITY CONTROL

01 45 35.02 00 SPECIAL INSPECTIONS

01 50 00.02 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.02 29 ENVIRONMENTAL PROTECTION

01 57 34.02 29 STORM WATER POLLUTION PREVENTION MEASURES

01 58 00.02 00 PROJECT IDENTIFICATION

01 74 19.02 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 75 00.02 40 STARTING AND ADJUSTING

01 78 00.02 00 CLOSEOUT SUBMITTALS

01 78 23.02 00 OPERATION AND MAINTENANCE DATA

01 78 24.02 10 OPERATIONS AND MAINTENANCE FACILITY DATA REQUIREMENTS

01 91 00.02 15 COMMISSIONING

01 91 10.02 29 CYBERSECURITY/RISK MANAGEMENT FRAMEWORK REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

02 61 13.02 00 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

DIVISION 03 - CONCRETE

03 11 13.02 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.02 10 CONCRETE ACCESSORIES

03 20 00.02 10 CONCRETE REINFORCING

03 30 00.02 10 CAST-IN-PLACE CONCRETE

03 35 00.02 10 CONCRETE FINISHING

03 39 00.02 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 25 13.02 00 METAL-SUPPORTED UNIT MASONRY PANELS

DIVISION 05 - METALS

05 05 23.02 13 ULTRASONIC INSPECTION OF WELDMENTS

05 05 23.02 16 STRUCTURAL WELDING

05 12 00.02 00 STRUCTURAL STEEL

05 40 00.02 00 COLD-FORMED METAL FRAMING

05 50 13.02 00 MISCELLANEOUS METAL FABRICATIONS

05 51 33.02 00 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00.02 00 ROUGH CARPENTRY

06 61 16.02 00 SOLID SURFACING FABRICATIONS

06 82 00.02 00 FIBERGLASS REINFORCED PLASTIC (FRP) PRODUCTS AND

VOLUME 2

FABRICATION

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23.02 00 PRESSURE TESTING A BUILDING ENVELOPE SYSTEM FOR AIR

TIGHTNESS

07 11 13.02 00 BITUMINOUS DAMPPROOFING

07 21 16.02 00 MINERAL FIBER BLANKET INSULATION

07 22 00.02 00 ROOF AND DECK INSULATION

07 42 14.02 00 CORRUGATED METAL WALL PANELS

07 42 63.02 00 FABRICATED WALL PANEL ASSEMBLIES

07 53 23.02 00 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00.02 00 FLASHING AND SHEET METAL

07 92 00.02 00 JOINT SEALANTS

G

T

PROJECT TABLE OF CONTENTS Page 2

VOLUME 3

DIVISION 08 - OPENINGS

08 11 13.02 00 STEEL DOORS AND FRAMES

08 11 16.02 00 ALUMINUM DOORS AND FRAMES

08 34 02.02 00 BULLET-RESISTANT COMPONENTS

08 34 53.02 00 SECURITY DOORS AND FRAMES

08 44 23.02 00 STRUCTURAL SEALANT GLAZED CURTAIN WALLS

08 71 00.02 00 DOOR HARDWARE

08 88 36.02 00 DYNAMIC GLAZING

08 91 00.02 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90.02 00 SCHEDULES FOR PAINTING AND COATING

09 22 00.02 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00.02 00 GYPSUM BOARD

09 30 10.02 00 CEMENT TILING, QUARRY TILING, AND PAVER TILING

09 51 00.02 00 ACOUSTICAL CEILINGS

09 62 38.02 00 STATIC-CONTROL FLOORING

09 90 00.02 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00.02 00 VISUAL DISPLAY UNITS

10 14 00.02 10 EXTERIOR SIGNAGE

10 14 00.02 20 INTERIOR SIGNAGE

10 14 53.02 00 TRAFFIC SIGNAGE

10 26 00.02 00 WALL AND DOOR PROTECTION

10 28 13.02 00 TOILET ACCESSORIES

10 44 16.02 00 FIRE EXTINGUISHER CABINETS

DIVISION 12 - FURNISHINGS

12 48 13.02 00 ENTRANCE FLOOR MATS AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.02 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.02 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.02 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00.02 00 PLUMBING, GENERAL PURPOSE

22 05 48.02 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00.02 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.02 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.02 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.02 00 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00.02 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.02 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.02 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC

23 23 00.02 00 REFRIGERANT PIPING

23 73 13.02 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 81 23.02 20 COMPUTER ROOM AIR CONDITIONING UNITS

23 83 00.02 20 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.02 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00.02 00 APPARATUS INSPECTION AND TESTING

26 08 01.02 00 COMMISSIONING OF ELECTRICAL SYSTEMS

26 20 00.02 00 INTERIOR DISTRIBUTION SYSTEM

26 21 00.02 00 EXTERIOR DISTRIBUTION SYSTEM

26 28 01.02 10 COORDINATED POWER SYSTEM PROTECTION STUDY

26 51 00.02 00 INTERIOR LIGHTING

26 56 00.02 00 EXTERIOR LIGHTING

PROJECT TABLE OF CONTENTS Page 3

28 20 01.02 10 ELECTRONIC SECURITY SYSTEM

28 23 23.02 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 76.02 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

28 51 23.02 10 SECURITY INTERCOMMUNICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.02 00 EARTHWORK

31 05 19.02 00 GEOTEXTILE

31 09 20.02 29 FIELD SCREEN TESTING OF SOILS FOR POL CONTAMINATION

31 23 00.02 20 EXCAVATION AND FILL

31 62 16.02 16 STEEL PIPE PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13.02 00 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 31 13.02 00 CHAIN LINK FENCES AND GATES

32 31 13.02 53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 20 00.02 00 CERTIFICATION OF ELECTRONIC SECURITY SYSTEMS

28 20 01.02 10 ELECTRONIC SECURITY SYSTEM

28 23 23.02 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 76.02 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

28 51 23.02 10 SECURITY INTERCOMMUNICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.02 00 EARTHWORK

31 05 19.02 00 GEOTEXTILE

31 09 20.02 29 FIELD SCREEN TESTING OF SOILS FOR POL CONTAMINATION

31 23 00.02 20 EXCAVATION AND FILL

31 62 16.02 16 STEEL PIPE PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13.02 00 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 31 13.02 00 CHAIN LINK FENCES AND GATES

32 31 13.02 53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

28 20 01.02 10 ELECTRONIC SECURITY SYSTEM

VOLUME 4

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 20 00.02 00 CERTIFICATION OF ELECTRONIC SECURITY SYSTEM

DIVISION 27 - COMMUNICATIONS

27 10 00.02 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 4

DIVISION 33 - UTILITIES

33 11 00.02 00 WATER DISTRIBUTION

33 30 00.02 00 SANITARY SEWERS

33 71 02.02 00 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00.02 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 71 13.02 16 VEHICLE CRASH BARRIERS

34 71 13.02 19 ACTIVE VEHICLE BARRIERS

-- End of Project Table of Contents --

SECTION 28 20 00.02 00

CERTIFICATION OF ELECTRONIC SECURITY SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

Integrated Electronic Security System (IESS) test and evaluation, Government Acceptance Test (GAT), completes the installation and integration effort by thoroughly testing installed equipment in accordance with Electronic Security Equipment (ESE) Master Installation Acceptance Test and Turnover Plan, ESE-TP-0023 (Attachment 1) and verifying that all documentation is in place for the acceptance of the installed equipment by the Government.

Work associated in Sections 28 20 01.02 10 ELECTRONIC SECURITY SYSTEM and 28 23 23.02 10 CLOSED CIRCUIT TELEVISION SYSTEMS are expansions to the existing Integrated Electronic Security Systems (IESS) located at Building 804 Entry Control Facility (ECF) and Building 900, provided under Construction Package 1 . The additions and modifications to the integrated system must be certified by the Government prior to acceptance. This section along with attachment outlines the Contractors and Governments responsabilties for completion of the security systems acceptance. Acceptance shall include work on aspects of the subsystems:

1.1.1 Existing Central Stations

Configuration of the existing central station equipment provides operator interface, interaction, dynamic and real time monitoring, display, and control of the expanded IESS and CCTV systems . The central station shall control using networks to interconnect all system components including peer and field equipment. The existing system is the most current system component of the Vindicator V5 IDE/ACS and VICADS CCTV system meeting Department of The Air Force Non-Nuclear Intrusion Detection System (IDS) Equipment Approval List at time of installation. Verification of existing system firmware version as basis for upgrading as required shall be included in the 28 20 01.02 10 ELECTRONIC SECURITY SYSTEM, Group II Technical Package report on existing conditions.

1.1.2 Systems Networks

System networks shall interconnect all components of the system. These networks shall include communications between a central stations and any peer or subordinate workstations, enrollment stations, local annunciation stations, portal control stations and ViCADs CCTV system. The systems network provides totally automatic communication of status changes, commands, field initiated interrupts and any other communications required for proper system operation.

1.1.2.1 Field Device Network

The field device network shall provide communication between all local control equipment and field devices of the system. The field device network shall be configured as shown in the drawings. Field devices shall consist of alarm annunciation local processors and entry control local

SECTION 28 20 00.02 00 Page 1 processors for intrusion detection and alarm and fixed/PTZ cameras for CCTV System.

1.1.2.2 Ethernet Network

The ethernet network shall provide communication between peer central and local processors. This ethernet networks shall have equipment which has been approved for Risk Management Framework (RMF) requirements as provided in accordance with Section 01 91 10.02 29 CYBERSECURITY/RISK MANAGEMENT FRAMEWORK REQUIREMENTS and Division 28 security sections.

1.1.3 Field Equipment

Field equipment shall include local processors, sensors and controls.

Local processors shall serve as an interface between the central station and sensors and controls.

1.1.4 Integrated Electronic Security System Interfaces (IESS)

The IESS includes interactive connections to other systems including:

1.1.4.1 Security Lighting Interface

Security lighting shall be controlled by the IESS system command workstations as specified in Section 26 56 00.02 00 EXTERIOR LIGHTING and as shown.

1.1.4.2 CCTV interface

CCTV system as specified in accepts input from intrusion and access control system to change primary focus Section 28 23 23.02 10 CLOSED CIRCUIT TELEVISION display(s) to show primary and secondary views of fixed and PTZ cameras to show sector with alarm or vehicle gate access area.

1.1.4.3 Vehicle barrier interface

Active vehicle barriers and gates as specified in Section 34 71 13.02 19 ACTIVE VEHICLE BARRIERS shall respond to access control system to open, close and alarm upon failure to close.

1.1.4.4 Security Intercommunication System

Monitoring of intercom call requests from gate and entry lobby via contacts within the ACS system components or manual call requests at intercom stations shall be as specified in Section 28 51 23.02 10 SECURITY INTERCOMMUNICATIONS SYSTEM from Bldg 800 Entry Control Facility, shall be tested for manual communications with remote LRDR entry control point for remote manual operation entry portals at LRDR.

1.1.5 Electrical Requirements

Electrically powered IESS and CCTV equipment shall operate on a 120 volt 60 Hz ac sources as shown. Intrusion detection equipment shall be operational on standby power source for 4 hours.

SECTION 28 20 00.02 00 Page 2

1.1.6 System Reaction

1.1.6.1 System Response

The field device network shall provide a system end-to-end response time in accordance with ESE-TP-0023 requirements. Alarms shall be annunciated at the central station for all alarms occurring at a local processor or device controlled by a local processor, or at the central station. Alarm and status changes shall be displayed after receipt of data by the central station. All graphics shall be displayed, including graphics generated map displays, on the console monitor within 5 seconds of alarm receipt at the security console. This response time shall be maintained during system heavy load.

1.1.6.2 System Heavy Load Condition

For the purpose of system heavy load condition, the system shall consist of central station equipment, communication controllers and all local processors as shown. System heavy load condition is the occurrence of alarms at the rate of 10 alarms per second distributed evenly among all local processors in the system. The alarm printer shall continue to print out all occurrences, including time of occurrence, to the nearest second.

1.1.7 Probability of Detection

Each zone shall have a continuous probability of detection greater than 90 percent and shall be demonstrated with a confidence level of 90 percent.

The intrustion detection capability shall be evaluated separately for each level of alarm during Government Acceptance Testing.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. AIR FORCE (USAF)

Also see applicable technical orders, drawings, and commercial installation manuals for specific ESE systems and equipment as contained in the individual sections of this project.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013; INT 8-10 2014; INT 11 2015) National Electrical Safety Code

U.S. AIR FORCE (USAF)

ESE-TP-0023 (28 NOV 2008) Electronic Security Equipment (ESE) Master Installation Acceptance Test And Turnover Plan

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" designation following the “G” are for

SECTION 28 20 00.02 00 Page 3 inclusion in the Sustainability Notebook, in conformance to Section 01 33 29.02 00 SUSTAINABILITY REPORTING. Other designations following the "G" designation identify the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.02 00

SUBMITTAL PROCEDURES:

SD-07 Certificates

Contractor's Field Testing Completion Certificates; G

SD-08 Manufacturer's Instructions

Existing System Integration Plan; G

SD-06 Testing Reports

ESE-TP-0023 Phase I Report; G Test Readiness Letter(s); G ESE-TP-0023 Phase II Corrective Action Report; G

Test Readiness letter(s) will be provided after any failure of Phase I or Phase II testing.

1.4 DEFINITIONS

For Definitions used in Security System, see Section 28 20 01.02 10 ELECTRONIC SECURITY SYSTEM and Attachment 1, Electronic Security Equipment (ESE) Master Installation Acceptance Test and Turnover Plan.

1.5 RISK MANAGEMENT FRAMEWORK

The Contractor shall follow direction and provide materials, labor,etc.

necessary to expand the existing LRDR Risk Management Framework for Construction Package 1's Security Authorization process in accordance with Section 01 91 10.02 29 CYBERSECURITY/RISK MANAGEMENT FRAMEWORK EXPANSION REQUIREMENTS. The testing as required by this section shall be integrated into the certification process's testing.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

3.1 EXAMINATION

Verify that site conditions are in agreement with the design package and report any changes in the site, or conditions that will affect performance of the system to the Government in the Existing Site Report as defined in paragraph Group II Technical Data Package. Do not take any corrective action without written permission from the Government.

3.2 GENERAL REQUIREMENTS

Provide test equipment and include all system components, including Government furnished equipment, and appurtenances in accordance with the manufacturer's instructions, IEEE C2 and as shown. Furnish necessary interconnections, services, and adjustments required for a complete and operable system as specified and shown. Control signal, communications, SECTION 28 20 00.02 00 Page 4 and data transmission line grounding shall be installed as necessary to preclude ground loops, noise, and surges from adversely affecting system operation.

3.3 INTEGRATION WITH EXISTING SYSTEM

Unless coordination with Authorizing Official with prior approval for integration with the existing system, Complete stand alone system equipment and operational demonstration and Phase I testing of stand alone components prior to Authorization to operate or test per RMF requirements of Section 01 91 10.02 29. Once approval to operate, test or early approval is obtained, connect to existing system and complete of Phase I testing.

Written notification of planned integration dates including duration for integration shall be given to the Government at least 60 days prior to the access to Building 800 server equipment is required; notice shall not be given until after the Contractor has received written approval of the Existing System Integration Plan.

3.4 SUPPLEMENTAL CONTRACTOR QUALITY CONTROL

Provide the services of technical representatives who are familiar with all components and installation procedures of the installed system; and are approved by the Contracting Officer. These representatives shall be present on the job site during the preparatory and initial phases of quality control to provide technical assistance. These representatives shall also be available on an as needed basis to provide assistance with follow-up phases of quality control. These technical representatives shall participate in the testing and validation of the system and shall provide certification that their respective system portions meet the contractual requirements.

3.5 TESTING

3.5.1 Contractor Support of Government Information Assurance Verification and Government Acceptance Tests

Provide personnel, equipment, instrumentation, and supplies necessary to perform site testing. Original copies of all data produced during performance verification and endurance testing, shall be turned over to the Government at the conclusion of each phase of testing, prior to Government approval of the test.

3.5.2 Contractor's Field Testing

Contractor's field testing shall be conducted as part of Sections 28 20 01.02 10 and 28 23 23.02 10. Submit successful completion results as Contractor's Field Testing Completion Certificates prior to GAT.

Field testing should be conducted with representatives of the maintenance section to establish that all installed systems(s) are ready for formal Government Testing.

3.5.3 Risk Management Verification

See Section 01 91 10.02 29 CYBERSECURITY/RISK MANAGEMENT FRAMEWORK REQUIREMENTS for RMF specific requirements. After receipt of the Contractor's Step 3 scan data and assessment results and letter notification that the system is ready for Government RMF verification, the

SECTION 28 20 00.02 00 Page 5

Government will review this information to determine if the system is ready for Government RMF verification testing. The mobilization of the Government RMF verification team to the site will take approximately 14 calendar days after receipt of the Contractor notification letter or as otherwise indicated in Setion 01 91 10.02 29. If the RMF verification readiness review determines the system is ready for RMF testing, the Government will conduct RMF verification testing prior to the start of GAT.

3.5.4 Government Acceptance Testing (GAT)

After Government verification of RMF control compliance; Government approval of the Contractor's CVT report including updates/revisions as may be required; and Government receipt of the Contractor's As-Built Commercial Drawings/Models and Associated Lists, the As-Built Configuration List, and the Contractor's Test Readiness Letter(s), the Government will conduct a Test Readiness Review (TRR) to determine if the system is ready for GAT. The mobilization of the Government test team to the site will take approximately 14 calendar days if the TRR finds the system is ready for Government test. The Government will conduct testing for ESE-TP-0023 Phase I report and ESE-TP-0023 Phase II Corrective Action report in accordance with its test plan ESE-TP-0023 and SI 538-02 which will be scheduled for approximately 10 calendar days. The Contractor shall support the GAT by providing on-site technical assistance and on-site maintenance support during the test period. To prevent delays to GAT, in the event of any equipment, infrastructure and/or GFE failure after completion of CVT either prior to start of GAT or during GAT, the Contractor shall ensure that the system including GFE, is restored to operation within twenty-four (24) hours of the failure. Contractor shall provide ESE-TP-0023 Phase II Corrective Action Report showing completion of all failures have been corrected and verified.

3.5.4.1 GAT Phase I - Functional Test

Demonstrate that the completed system complies with the contract functionalrequirements and is suitable for government acceptance in accordance with ESE-TP-0023. Using the approved test procedures, all physical and functional requirements of the project shall be demonstrated and shown. Upon termination of testing by the Government or by the Contractor, commence an assessment period as described for Certification Testing Phase II. Upon successful completion of the performance verification test, deliver test reports and other documentation as specified to the Government prior to commencing the endurance test.

3.5.4.2 Correction Verification & Reporting of GAT-identified Deficiencies.

The Contractor shall correct and verify (through additional CVT and/or regression testing as appropriate) all deficiencies identified during GAT. The Contractor shall update the test report to identify the results of requisite additional verification testing. After all GAT deficiencies have been corrected, tested and an updated test report has been submitted and approved by Government, the Contractor shall submit a ESE-TP-02023 Test Readiness Letter certifying to the Government that the system is ready for additional GAT.

3.5.5 GAT Phase II - Endurance Test

Demonstrate system reliability and operability for each portal, and for the completed system. The test shall be conducted in accordance with ESE-TP-0023 requirements. Make no repairs during this phase of testing

SECTION 28 20 00.02 00 Page 6 unless authorized by the Government in writing. If the system experiences no failures during Phase II testing, the Contractor may proceed directly to System Physical Audit after receipt of written permission from the Government. The Government may terminate testing at any time the system fails to perform as specified. Upon termination of testing by the Government or by the Contractor, commence an assessment period as described for Phase II. Verify the operation of each terminal device during the last day of the test. Upon successful completion of the endurance test, deliver test reports and other documentation as specified to the Government prior to acceptance of the system.

3.5.5.1 Certification Testing Phase II Assessment

After the conclusion of Phase II Testing, identify all failures, determine causes of all failures, repair all failures, and deliver a written Test Readiness report to the Government. The report shall explain in detail the nature of each failure, corrective action taken, results of tests performed, and shall recommend the point at which testing should be resumed. After delivering the written report, convene a test review meeting at the jobsite to present the results and recommendations to the Government. The meeting shall not be scheduled earlier than 5 business days after receipt of the report by the Government. As a part of this test review meeting, demonstrate that all failures have been corrected by performing appropriate portions of the certification verification test.

Based on the Contractor's report and the test review meeting, the Government will determine the restart date, or may require that Phase I be repeated. If the retest is completed without any failures, the Contractor and Government may proceed directly System Physical Configuration Audit .

3.5.6 Government Acceptance - System Physical Configuration Audit

As part of Government Acceptance prior to System Turnover, the Contractor shall support a Government conducted Physical Configuration Audit (PCA) after successful completion of GAT. The PCA is expected to take approximately four days. The Contractor shall ensure that all paperwork, drawings, and Contractor personnel necessary to support the audit are available. The Contractor shall prepare and provide a standardized system inventory list which will identify all items of hardware, firmware and software that combine to constitute the system. Successful completion of GAT, approved final as-built drawings, and completion of the Government Acceptance, Physical Configuration Audit will normally be sufficient to allow the Government to formally accept the system through execution of an AFTO Form 747 (Cyberspace Infrastructure System Acceptance).

Discrepancies noted during each facility PCA shall be corrected, and applicable as-built drawings and configuration status accounting information shall be updated to incorporate required changes/corrections resulting from the audit process.

3.5.7 Licenses

The Contractor shall provide all equipment software licenses required to test, operate and maintain the installed system. These operating licenses shall be formally transferred to the Government at systems turnover.

3.5.8 Warranties

The Contractor shall provide customary commercial warranties.

Notwithstanding anything to the contrary, the full duration of such warranties shall commence at the time of system turnover. The Contractor

SECTION 28 20 00.02 00 Page 7 shall track by item and serial number, manage and enforce open warranties on all failed items. The Contractor shall provide copies of all warranties for Contractor furnished equipment and materials delivered.

After contract completion, at system turnover, the Contractor shall pass through/transfer all OEM warranty coverage to the Government.

3.5.9 Exclusions

The Contractor will not be held responsible for failures in system certification resulting from the following:

a. An outage of the main power in excess of the capability of any backup power source, provided that the automatic initiation of all backup sources was accomplished and that automatic shutdown and restart of the IESS performed as specified.

b. Failure of a Government furnished communications circuit, provided that the failure was not due to Contractor furnished equipment, installation, or software.

c. Failure of existing Government owned equipment, provided that the failure was not due to Contractor furnished equipment, installation, or software.

d. The occurrence of specified nuisance alarms.

e. The occurrence of specified environmental alarms.

-- End of Section --

SECTION 28 20 00.02 00 Page 8

ESE-TP-0023

ELECTRONIC SYSTEMS CENTER

AIR FORCE MATERIEL COMMAND

HANSCOM AIR FORCE BASE, MASSACHUSETTS

ELECTRONIC SECURITY EQUIPMENT (ESE)

MASTER INSTALLATION ACCEPTANCE TEST

AND TURNOVER PLAN

28 NOVEMBER 2008

642d ELECTRONIC SYSTEMS SQUADRON (642 ELSS)

ELECTRONIC SYSTEMS CENTER

HANSCOM AIR FORCE BASE, MA 01731-2100

THIS DOCUMENT SUPERCEDES ESE-TP-0023, DATED 1 MAY 2000

TABLE OF CONTENTS

Section Page

LIST OF FIGURES ................................................................................................................................... vi

LIST OF TABLES ..................................................................................................................................... vi

SECTION I. INTRODUCTION ............................................................................................................ 1-1

1.1 PURPOSE ..................................................................................................................................... 1-1

1.2 APPLICABILITY ......................................................................................................................... 1-1

1.3 REFERENCED DOCUMENTS ................................................................................................... 1-1

1.4 SECURITY CLASSIFICATION .................................................................................................. 1-2

1.5 REPORTS AND CORRESPONDENCE ..................................................................................... 1-2

1.6 HOTLINE ..................................................................................................................................... 1-2

SECTION 2. GENERAL TEST REQUIREMENTS ........................................................................... 2-1

2.1 INTRODUCTION ........................................................................................................................ 2-1

2.2 METHOD OF TESTING .............................................................................................................. 2-1

2.3 RESPONSIBLE TEST ORGANIZATION .................................................................................. 2-2

2.4 TEST PERSONNEL ..................................................................................................................... 2-2

2.5 TEST REQUIREMENTS ............................................................................................................. 2-3

2.5.1 Phase I Testing ................................................................................................................. 2-3

2.5.2 Phase II Testing ............................................................................................................... 2-4

2.5.3 Phase III Testing .............................................................................................................. 2-5

2.6 SYSTEM ACCEPTANCE............................................................................................................ 2-5

2.6.1 Pass/Fail Test Criteria ...................................................................................................... 2-5

2.7 CORRECTION OF DEFICIENCIES ........................................................................................... 2-7

2.8 TEST DOCUMENTATION ......................................................................................................... 2-7

2.9 SECURITY CLASSIFICATION .................................................................................................. 2-7

SECTION 3. COMMAND CONTROL DISPLAY EQUIPMENT (CCDE) ..................................... 3-1

3.1 INTRODUCTION ........................................................................................................................ 3-1

3.2 APPLICABLE DOCUMENTS .................................................................................................... 3-1

3.3 TEST OBJECTIVE ....................................................................................................................... 3-1

3.4 SYSTEM ACCEPTANCE STANDARD ..................................................................................... 3-1

3.5 CCDE TEST SEQUENCE ........................................................................................................... 3-1

3.6 PHASED FUNCTIONAL TESTING ........................................................................................... 3-2

3.6.1 Phase I Functional Testing ............................................................................................... 3-2

3.6.2 Phase II 72 Hour Monitoring and Operational Tests ....................................................... 3-2

3.6.3 Phase III 30 Day Operational Tests ................................................................................. 3-2

3.7 CCDE TEST OBJECTIVES ......................................................................................................... 3-2

TABLE OF CONTENTS (Cont.)

SECTION 4. PERIMETER SURVEILLANCE SYSTEM, CLOSED CIRCUIT

TELEVISION (PSS-CCTV) ......................................................................................... 4-1

4.1 INTRODUCTION ........................................................................................................................ 4-1

4.2 APPLICABLE DOCUMENTS .................................................................................................... 4-1

4.3 TEST OBJECTIVES .................................................................................................................... 4-1

4.4 ACCEPTANCE STANDARD ...................................................................................................... 4-1

4.5 PHASE I TESTING ...................................................................................................................... 4-1

4.5.1 Test Equipment ................................................................................................................ 4-1

4.5.2 Test Sequence .................................................................................................................. 4-2

4.5.3 CCTV Terminal Box Tamper Test .................................................................................. 4-2

4.5.4 CCTV Line Fault Test ..................................................................................................... 4-2

4.5.5 CCTV AC Power Loss Test ............................................................................................. 4-2

4.5.6 CCTV Intrusion Detection Tests ..................................................................................... 4-3

SECTION 5. VIDEO STORAGE SYSTEM (VSS) .............................................................................. 5-1

5.1 INTRODUCTION ........................................................................................................................ 5-1

5.2 APPLICABLE DOCUMENTS .................................................................................................... 5-1

5.3 TEST OBJECTIVE ....................................................................................................................... 5-1

5.4 ACCEPTANCE STANDARD ...................................................................................................... 5-1

5.5 PHASE I TESTING ...................................................................................................................... 5-1

5.5.1 Test Equipment ................................................................................................................ 5-1

5.5.2 VSS Test Sequence .......................................................................................................... 5-2

5.5.3 VSS Tamper Test ............................................................................................................. 5-2

5.5.4 VSS Line Fault Test ......................................................................................................... 5-2

5.5.5 VSS AC Power Loss Test ................................................................................................ 5-2

5.5.6 VSS Intrusion Detection Test .......................................................................................... 5-3

5.5.7 Battery Backup 4 Hour Operational Test ......................................................................... 5-3

SECTION 6. FENCE SENSOR ............................................................................................................. 6-1

6.1 INTRODUCTION ........................................................................................................................ 6-1

6.2 APPLICABLE DOCUMENTS .................................................................................................... 6-1

6.3 TEST OBJECTIVE ....................................................................................................................... 6-1

6.4 ACCEPTANCE STANDARD ...................................................................................................... 6-1

6.5 PHASE I TESTING ...................................................................................................................... 6-1

6.5.1 Test Equipment ................................................................................................................ 6-1

6.5.2 Test Sequence .................................................................................................................. 6-2

6.5.3 Fence Sensor Line Supervision Test ................................................................................ 6-2

6.5.4 Fence Sensor Tap Intrusion Detection Tests ................................................................... 6-2

6.5.5 Backup Battery 4 Hour Operational Test ......................................................................... 6-3

SECTION 7. VERTICAL TAUT WIRE SENSOR (VTWS) SYSTEM ............................................. 7-1

7.1 INTRODUCTION ........................................................................................................................ 7-1

7.2 APPLICABLE DOCUMENTS .................................................................................................... 7-1

7.3 TEST OBJECTIVE ....................................................................................................................... 7-1

7.4 ACCEPTANCE STANDARD ...................................................................................................... 7-1

7.5 PHASE I TESTING ...................................................................................................................... 7-2

7.5.1 Test Equipment ................................................................................................................ 7-2

7.5.2 Test Sequence .................................................................................................................. 7-2

7.5.3 VTWS Line Supervision Test .......................................................................................... 7-2

7.5.4 Tamper Switch Tests ....................................................................................................... 7-3

7.5.4.1 Sensor Arm Cover Tamper Test ...................................................................... 7-3

7.5.4.2 Sensor Post Junction Box Tamper Test (if used)............................................. 7-3

7.5.5 Intrusion Detection Tests ................................................................................................. 7-3

7.5.5.1 Tension Tests ................................................................................................... 7-4

7.5.5.2 Deflection Tests ............................................................................................... 7-4

7.5.6 Backup Battery 4 Hour Operational Test ......................................................................... 7-5

SECTION 8. BURIED LINE SENSOR ................................................................................................ 8-1

8.1 INTRODUCTION ........................................................................................................................ 8-1

8.2 APPLICABLE DOCUMENTS .................................................................................................... 8-1

8.3 TEST OBJECTIVE ....................................................................................................................... 8-1

8.4 ACCEPTANCE STANDARD ...................................................................................................... 8-1

8.5 PHASE I TESTING ...................................................................................................................... 8-2

8.5.1 Test Equipment ................................................................................................................ 8-2

8.5.2 Test Sequence .................................................................................................................. 8-2

8.5.3 Line Supervision Test ...................................................................................................... 8-2

8.5.4 Tamper Switch Tests ....................................................................................................... 8-2

8.5.5 Intrusion Detection Walk Test ......................................................................................... 8-3

8.5.6 Intrusion Detection Run and Jump Test ........................................................................... 8-3

8.5.7 Backup Battery 4 Hour Operational Test ......................................................................... 8-4

SECTION 9. ABOVE GROUND PERIMETER INTRUSION DETECTION SYSTEM (IDS) .... 9-1

9.1 INTRODUCTION ........................................................................................................................ 9-1

9.2 APPLICABLE DOCUMENTS .................................................................................................... 9-1

9.3 TEST OBJECTIVE ....................................................................................................................... 9-1

9.4 ACCEPTANCE STANDARD ...................................................................................................... 9-1

9.5 PHASE I TESTING ...................................................................................................................... 9-2

9.5.1 Test Equipment ................................................................................................................ 9-2

9.5.2 Test Sequence .................................................................................................................. 9-2

9.5.3 Tamper Switch Test ......................................................................................................... 9-2

9.5.4 Line Supervision Test ...................................................................................................... 9-2

9.5.5 Intrusion Detection Tests ................................................................................................. 9-3

9.5.5.1 Walk Test ........................................................................................................ 9-3

9.5.5.2 Run and Jump Test .......................................................................................... 9-3

9.5.5.3 Human Crawl Test ........................................................................................... 9-4

9.5.5.4 Post-Climb/Jump Test (applies only to sensors installed on posts) ................. 9-4

9.5.5.5 Beam Intrusion Detection Test (applies only to active IR sensors)................. 9-4

9.5.6 Battery Backup 4 Hour Operational Test ......................................................................... 9-4

SECTION 10. BALANCED MAGNETIC SWITCH (BMS) ............................................................ 10-1

10.1 INTRODUCTION ...................................................................................................................... 10-1

10.2 APPLICABLE DOCUMENTS .................................................................................................. 10-1

10.3 TEST OBJECTIVE ..................................................................................................................... 10-1

10.4 ACCEPTANCE STANDARD .................................................................................................... 10-1

10.5 PHASE I TESTING .................................................................................................................... 10-2

10.5.1 Test Equipment .............................................................................................................. 10-2

10.5.2 Test Sequence ................................................................................................................ 10-2

10.5.3 BMS Tamper Test .......................................................................................................... 10-2

10.5.4 BMS Intrusion Test ........................................................................................................ 10-2

SECTION 11. INTERIOR INTRUSION DETECTION SYSTEM (IIDS) ...................................... 11-1

11.1 INTRODUCTION ...................................................................................................................... 11-1

11.2 APPLICABLE DOCUMENTS .................................................................................................. 11-1

11.3 TEST OBJECTIVE ..................................................................................................................... 11-1

11.4 ACCEPTANCE STANDARD .................................................................................................... 11-1

11.5 PHASE I TESTING .................................................................................................................... 11-2

11.5.1 Test Equipment .............................................................................................................. 11-2

11.5.2 Test Sequence ................................................................................................................ 11-2

11.5.3 Sensor Tamper Tests ...................................................................................................... 11-2

11.5.4 Line Fault Test ............................................................................................................... 11-2

11.5.5 Interior Sensor Intrusion Detection Test ........................................................................ 11-3

11.5.5.1 Intrusion Lanes .............................................................................................. 11-3

11.5.5.2 Ground Level Intrusion Detection Tests ....................................................... 11-3

11.5.5.3 Overhead Intrusion Detection Tests .............................................................. 11-3

11.5.6 Backup Battery 4 Hour Operational Test ....................................................................... 11-4

SECTION 12. ACCESS CONTROL SYSTEM (ACS) ...................................................................... 12-1

12.1 INTRODUCTION ...................................................................................................................... 12-1

12.1.1 Access Control Devices ................................................................................................. 12-1

12.1.2 Portals ............................................................................................................................ 12-2

12.2 APPLICABLE DOCUMENTS .................................................................................................. 12-2

12.3 TEST OBJECTIVE ..................................................................................................................... 12-2

12.4 ACCEPTANCE STANDARD .................................................................................................... 12-2

12.5 PHASED FUNCTIONAL TESTING ......................................................................................... 12-2

12.5.1 Phase I Functional Testing ............................................................................................. 12-2

12.5.2 Phase II 72 Hour Monitoring and Operational Tests ..................................................... 12-3

12.5.3 Phase III 30 Day Operational Tests ............................................................................... 12-3

12.6 PHASE I TESTING .................................................................................................................... 12-3

12.6.1 Test Equipment .............................................................................................................. 12-3

12.6.2 Phase I Tests .................................................................................................................. 12-3

12.6.3 Objectives ...................................................................................................................... 12-3

SECTION 13. WIDE AREA DETECTION (APPROACH SENSORS) .......................................... 13-1

13.1 INTRODUCTION ...................................................................................................................... 13-1

13.2 APPLICABLE DOCUMENTS .................................................................................................. 13-1

13.3 TEST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.