W911KB-17-R-0021_AM_09.pdf

PDF 826 KB Posted

Attached to
CLR043 Design and Construct Fire Station Federal contract opportunity
Solicitation number
W911KB-17-R-0021
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

CLR043 - AM 09

View the file

Other files for this federal contract opportunity

Other files attached to CLR043 Design and Construct Fire Station, newest first.
File Type Posted
AM_10.pdf PDF
A.3.9_Redacted_JA_CLR043_Fire_Station_Siemens_BCAS.pdf PDF
Amendment_08.pdf PDF
CLR043_SF30_Amendment_07.pdf PDF
W911KB-17-R-0021_AM_05.pdf PDF
W911KB-17-R-0021-0006.pdf PDF
SF30_AM04.pdf PDF
Amendment_3_to_post.pdf PDF
CLR043_SF30_AM_02-finala.pdf PDF
W911KB-17-R-0021_AM_01.pdf PDF
W911KB-17-R-0021_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLR043

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: CLR043, FIRE STATION, CLEAR AFS, ALASKA

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.

b. PROPOSAL DUE DATE IS UNCHANGED: 15 June 2017 at 1400 hours ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.10, Proposal Submittals.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0021

X 9B. DATED (SEE ITEM 11)

22-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jun-2017

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM09” appears before and after new and/or revised materials, except as noted below.

SECTION 00 22 20 – PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS

OF AWARD

- Para. 5.3.1

SECTION 00 73 46 - Wage Rates

- Replace with AK170001 05/26/2017 AK1

SECTION 01 10 00

- Para. 2.6.11 F

- Para. 2.7 B

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

c. The following sections are deleted:

NONE

d. The following documents are added:

NONE

e. The following revisions are incorporated:

Bidder Inquiry Report

f. Other:

NONE

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

Section 00 22 20 Page 7

• Are the proposed colors and material finishes conducive to the working environment of the facility?

• Has the proposal addressed/provided for natural and artificial light in working spaces and is the arrangement of fenestration and lighting fixtures in the spaces conducive to space usage?

• Has “support item” placement been considered and addressed in the proposal to enhance the environment? For example: placement of supply/exhaust devices, placement of electrical panels, and placement of exhaust fans, etc.

• Does the proposal provide for acoustic control of noise in the fire station?

5.2.2.3. Minimum Space and Facility Size: The proposal must include all the mandatory spaces in response to the requirements set forth in Section 01 10 00, Statement of Work. For this element, proposals will be evaluated on compliance with these requirements. Individual areas may slightly exceed the requirements, so long as building function is not compromised elsewhere and as long as the overall square footage is not greater than that as described in

Section 01 10 00, as authorized by Congress

5.3. VOLUME 1- TAB B – SUBFACTOR 2 - QUALITY OF BUILDING SYSTEMS AND MATERIALS

5.3.1. General. As part of this Subfactor, the Government has identified certain items as desirable features or preferable items. Desirable features are identified below in the evaluation criteria. Preferable items are listed in order of priority. These items, along with any Offeror-identified betterment, will be given additional consideration during the evaluation process, provided that they are included in the proposed base price and are within the contract cost limitation

(CCL) identified in the Solicitation.

Preferable Items:

1. Day lighting via insulated translucent wall systems located on apparatus bay. Translucent wall panels to be thermally broken, have a minimum light transmission of 17% and a minimum center panel U-factor of 0.05.

2. Sound absorption panels/baffles in ceiling and/or on walls to reduce noise in the apparatus bay. Baffle face area will ideally total at least half of the total combined wall and ceiling area of the apparatus (less doors). Sound baffle core should be inert, mildew resistance and meet fire rating ASTM E- 84 class I.

Baffles will ideally have noise reduction capability of 25 STC or 0.80 NRC, minimum.

3. Laminate solar panels mounted to vertical building surfaces.

5.3.2. Submission Requirements:

5.3.2.1. Presentation Drawings

There are no specific drawings requirements for this Subfactor. However, the Offeror has the option of providing concept level drawing information for specific materials and/or systems which the Offeror feels are necessary to describe the proposed systems or materials in the drawings provided under Tab A.

5.3.2.2. Technical Approach Narrative:

Provide technical approach narrative, both qualitative and quantitative, defining the elements of the proposal. It is the responsibility of the proposer to ensure that all aspects identified in the evaluation criteria below are addressed.

Maximum total length for the narrative shall be ten (10) typewritten pages.

(a) Architectural Finishes: Describe how the materials selected provide for a suitable environment for the

AM 08... AM 08...

AM 09...

AM 09...

J4RMMJCM

Cross-Out

General Decision Number: AK170001 05/26/2017 AK1

Superseded General Decision Number: AK20160001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 01/27/2017 3 02/17/2017 4 03/17/2017 5 03/31/2017 6 04/07/2017 7 04/21/2017 8 05/12/2017 9 05/19/2017 10 05/26/2017

ASBE0097-001 01/01/2017

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 20.07

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55

BOIL0502-002 08/01/2016

Rates Fringes

BOILERMAKER......................$ 44.26 28.41

BRAK0001-002 07/01/2016

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.15 Tile & Terrazzo Finisher.........$ 34.79 19.15

CARP1501-001 09/01/2014

Rates Fringes

MILLWRIGHT.......................$ 35.74 21.29

* CARP2520-003 09/01/2016

Rates Fringes

Diver Stand-by....................$ 42.65 25.04 Tender......................$ 41.65 25.04 Working.....................$ 82.45 25.04 Piledriver Carpenter...................$ 38.34 25.04 Piledriver; Skiff Operator and Rigger..................$ 38.34 25.04 Sheet Stabber...............$ 38.34 25.04 Welder......................$ 43.90 25.04

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP4059-001 09/01/2014

Rates Fringes

CARPENTER

Carpenter...................$ 37.34 23.34 Lather/Drywall Applicator...$ 36.59 22.59

ELEC1547-004 04/01/2017

Rates Fringes

CABLE SPLICER....................$ 39.82 3%+25.44

ELECTRICIAN......................$ 39.49 3%+25.69

ELEC1547-005 04/01/2017

Line Construction

Rates Fringes

CABLE SPLICER....................$ 52.57 3%+30.81

Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81 Powderman........................$ 48.52 3%+30.81

TREE TRIMMER.....................$ 35.84 3%+22.56

ELEV0019-002 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 53.76 31.585+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day

ENGI0302-002 01/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.28 22.65

GROUP 1A....................$ 42.04 22.65

GROUP 2.....................$ 39.51 22.65

GROUP 3.....................$ 38.79 22.65

GROUP 4.....................$ 32.58 22.65

TUNNEL WORK

GROUP 1....................$ 44.31 22.65

GROUP 1A...................$ 46.24 22.65

GROUP 2....................$ 43.46 22.65

GROUP 3....................$ 42.67 22.65

GROUP 4....................$ 35.84 22.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 07/01/2015

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 36.25 28.05

FENCE, BARRIER INSTALLER....$ 32.75 28.05

GUARDRAIL INSTALLERS........$ 33.75 28.05

GUARDRAIL LAYOUT MAN........$ 33.49 28.05

HELICOPTER, TOWER...........$ 37.25 28.05

LABO0341-005 04/01/2017

Rates Fringes

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.72

GROUP 2....................$ 34.71 26.72

GROUP 3....................$ 35.70 26.72

GROUP 3A...................$ 39.30 26.72

GROUP 3B...................$ 43.20 24.01

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 04/01/2017

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 30.55 26.72

GROUP 2.....................$ 31.55 26.72

GROUP 3.....................$ 32.45 26.72

GROUP 3A....................$ 35.73 26.72

GROUP 3B....................$ 39.27 24.01

GROUP 4.....................$ 20.12 26.72

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 33.61 26.52

GROUP 2....................$ 34.71 26.52

GROUP 3....................$ 35.70 26.52

GROUP 3A...................$ 39.30 26.52

GROUP 3B...................$ 43.20 23.81

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 09/01/2015

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 32.07 20.01

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 32.59 20.01

PAIN1959-002 02/01/2016

SOUTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.31 19.76 Machine Taper/Drywall.......$ 31.56 19.76 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.66 19.76

PAIN1959-003 01/01/2017

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 38.63 21.54

PAIN1959-004 07/01/2012

Rates Fringes

FLOOR LAYER: Carpet.............$ 30.09 13.02

PAIN1959-006 01/01/2017

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 38.63 20.82

PLAS0867-001 02/01/2016

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLAS0867-004 02/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41

PLUM0262-002 01/01/2017

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 38.02 26.72

PLUM0367-002 07/01/2016

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 39.85 22.85

PLUM0375-002 07/01/2016

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 40.81 24.25

PLUM0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER.................$ 46.00 23.29

ROOF0189-006 04/01/2016

Rates Fringes

ROOFER...........................$ 42.62 15.50

SHEE0023-003 07/01/2015

South of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 40.79 22.38

SHEE0023-004 07/01/2015

North of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 45.93 21.44

TEAM0959-003 09/01/2016

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 39.59 21.17

GROUP 1A....................$ 40.86 21.17

GROUP 2.....................$ 38.33 21.17

GROUP 3.....................$ 37.51 21.17

GROUP 4.....................$ 36.93 21.17

GROUP 5.....................$ 36.17 21.17

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section 01 10 00

3. Correct phase sequence.

4. Correct operation of tap changer.

Transformers shall be field tested and inspected in accordance with NETA ATS, except Section 4.

Perform field inspections and tests listed in NETA ATS, Section 7.2.

Site Telecommunications Distribution System

A. Existing Site Telecommunications Distribution System

1 The existing telecommunication distribution system is located along Frank Loop road. The existing telecommunication duct bank typically follows the route of the primary electrical underground distribution. The duct banks for the existing electrical and telecommunication system are typical joint trenched with manhole of both systems located side by side.

2 There is no existing telecommunication cabling available to serve the new fire station. The telecommunication duct bank in the vicinity of the project site are empty ducts.

B. New Site Telecommunications Distribution System

1 The existing telecommunications duct bank system shall be extended to the fire station site. To be consistent with the existing system layout, the exterior telecommunication distribution system shall run side by side with the exterior primary electrical distribution system. See attached concept telecommunications distribution plan for additional information.

2 To serve the new fire station new copper and new fiber optic cabling shall be installed from the main telecommunication room in Bldg 201. Multi-cell fabric innerducts shall be installed in one of the conduits in the existing and the new duct bank. A 400 pair copper and a 144 strand fiber optic main distribution cable shall be installed from Bldg 201 to the new fire station.

3 Investigate the consolidation point where the communications cables from the monitored buildings enter the existing fire station’s monitoring center (B251) to determine the quantity and the type of cabling required to establish connectivity to the new fire station. Also, investigate pathway routing for establishing connectivity to the new fire station. Extend connectivity of the monitored buildings from the existing fire station (B251) to the new fire station based on the cabling and the routing investigation.

Premises Telecommunications Distribution.

A. Telecommunications outside plant cabling shall terminate inside a dedicated communications entrance room. The room shall have a telecommunications main grounding bar and terminal protection equipment for copper cables and entrance enclosures for fiber cable.

B. The room shall also have provision for termination and protection of feeds from external communication antennas and Satellite TV system.

1 The emergency communications room shall be provided with a separate dedicated telecommunications room to house all emergency communications related equipment. See architectural concept floor plan in the appendix.

Section 01 10 00

2 The emergency communications room is expected to be served by sixteen (16) communications circuits minimum.

3 Locate a quadruplex electrical outlet within 6 inches (152 mm) of all work area outlets to serve telecommunications loads associated with that outlet in the emergency communications room.

C. The telecommunication room(s) shall be provided with floor mounted racks and ceiling mounted cable tray system. For mounting of present and future wall mounted telecommunications equipment, all unused wall space inside the telecommunications room shall be provided with fire rated plywood backboard.

D. Raceway and cabling shall be provided for voice, data, satellite TV, CCTV, public address, and radio communication systems.

E. Voice, data, and TV outlets shall be provided at locations indicated in UFC 4-730-10 and US Air Force Fire Station Design Guide.

F. The fire station shall be provided with an internal public address (PA) system. This system shall be separate and independent from the base wide PA system that is part of the base wide giant voice system. This PA system shall have a central control at the emergency communications rooms with speakers laid out all over the fire station building.

The system shall have zoning capability to individually page each sleeping room in the fire station. AM#09…

As mentioned above the fire station shall have another PA system that will be integrated with the giant voice system that will be able to make announcement to the base wide giant voice system. This system shall be also integrated with the voice phone system.

G. Contractor shall provide four (4) 1-inch conduits located in the dispatch room to an area specified by the Clear Fire Department on the roof. Contractor to assume 100 feet minimum for each conduit and each conduit provided with a pull wire. This area of the roof shall support 150 pounds minimum in addition to all other loading and shall be provided with a suitable surface to fasten to. The terminations at the roof shall be provided with a weather hood and each conduit shall be sealed with a temporary seal against weather intrusion. …AM#09

Premises Electronic Security System (ESS)

A. The only ESS related requirement for this project are the CCTV system required in UFC 4-730-10. The fire station will not have any intrusion detection and access control system.

1 The fire station shall have a CCTV system to monitor areas indicated in UFC 4- 730-10 and US Air Force Fire Station Design Guide. In addition to the requirement in the UFC, a CCTV camera shall be installed at the entrance lobby to monitor any personnel requesting access in the fire station.

2 The CCTV monitoring station shall be located in the emergency communications room and the head end equipment will be in the dedicated emergency communications telecommunication room.

The only access control related requirement in this project is the automatic vehicle barrier gates at the access roads leading to the fire station and the cipher locks on doors at areas in the fire station that are restricted from the public.

A. The vehicle barrier gates shall be controlled as indicated in Section 2.2 Civil Design and Construction Criteria, paragraph Access Gates.

21. Candela and speaker tap settings shall be noted at each speaker/strobe on the floor plans.

22. If HAZMAT and POL Storage rooms are provided, all devices located within these rooms shall be explosion proof and shall be separated from adjacent areas in accordance with IBC and NFPA 30.

23. Provide speaker strobe in AHUs that have enclosures with maintenance vestibules.

24. For CIS calculations, show a map of the entire building with the calculations plotted in the map. The map shall be legible at 1/8” to 1 foot scale. This calculation shall be provided as part of the drawing set.

25. All wiring shall be in red conduit. Wiring for 120-Volt power shall be No. 12 AWG minimum. Wiring for fire alarm dc circuits shall be No. 14 AWG minimum. Make all conductor connections under screw terminals. Provide insulated barrier type terminal strips at junction points. Use of wire nuts, crimped connectors or twisting of conductors is prohibited. Each conductor or terminal shall be marked for identification.

26. Technical Data and Software to include the following:

a. Identification of programmable portions of system equipment and capabilities.

b. Description of system revision and expansion capabilities and methods of implementation detailing both equipment and software requirements.

c. Provision of operational software data on all modes of programmable portions of the fire alarm, mass notification and foam systems.

d. Description of fire alarm and mass notification system equipment operations.

e. Description of auxiliary and remote equipment operations.

f. Library of application software.

g. Operation and Maintenance manuals.

27. Spare devices in the amount of two percent of the total number of each type of device, but not less than two each, shall be furnished.

28. The fire alarm, mass notification systems shall be Class A or X. Looped conduit shall be provided to each individual device. Provide 1 foot separation where the looped conduit is installed vertically and 4 foot separation where the looped conduit is installed horizontally.

The pathway survivability shall be a minimum of 1. Pathway survivability for the dispatch center shall be as required by NFPA 1221.

29. The fire alarm system matrix attached are to be modified by the Designer of Record and included in the fire alarm drawings.

B. Mass Notification System

1. Provide a Building Mass Notification System (BMNS) in accordance with all requirements of UFC 4-021-01, except as noted herein. AM#09….The contractor is to note that a Whelen IPS 400 does not currently meet UL standard 864 and therefore cannot be used to power speakers to broadcast a fire alarm evacuation signal. Therefore, the BMNS must be either stand-alone and have separate speakers from the fire alarm system or the IPS 400 must be electrically isolated from a combination fire alarm/mass notification system, in accordance with UFC 4-021-01.

2. Connection to the Wide Area Mass Notification System (MNS): The individual BMNS system shall be interfaced with the Clear-wide mass notification central control system.

The existing Clear AFS-wide central control system was provided by Whelen. In order for the Individual BMNS to be fully and completely integrated into the Clear-wide central control system, it must be added and programmed into the Whelen Central receiving station by a Whelen authorized representative. The installation of a new combination fire alarm/mass notification system will not be deemed complete until the new building has been added to the Clear-wide mass notification system as a new site. Mass notification system testing will include testing of the interface and control of the building mass notification system by the Clear AFS central mass notification system. Contractor must coordinate installation, testing and connection of the MNS system with the Contracting Officer’s Representative...AM#09

3. BMNS shall consist of Autonomous Control Unit with battery backup, local operator consoles (LOC) and a Notification Appliance Network within the building to provide intelligible instructions at all locations in and around the building in accordance with

UFC 4-021-01.

4. Voice notification appliances shall have adjustable or multi-tap settings with available setting both above and below the design settings (except that 15 watt devices, where permitted, can be the highest setting). Speakers shall be spaced such that the speaker does not need to be tapped higher than 0.5 watt to meet audibility and intelligibility requirements. Speakers are permitted to have a higher tap setting than 2 Watts in large, hard-surfaced areas. Provide directional speakers in large, hard-surfaced areas (Mechanical Room, Apparatus Bay, etc.)

5. Amplifier circuits shall be loaded to no more than 70 percent of rated continuous capacity when producing sound levels as required by NFPA 72 against normal ambient background noise levels for this occupancy for simultaneous operation of all speakers for all areas in the voice zone. Annotate data for each circuit on the drawing.

6. All Local Operator Consoles (LOC) are required to have an adjustable microphone gain.

7. Contractor shall provide operating instructions located inside the LOC cabinet and at the ACU describing the procedures for initiating either live voice messages or pre-recorded messages. These instructions shall be permanently attached to the cabinet.

8. Contractor shall provide an emergency shutdown switch for the HVAC units as described in UFC 4-021-01. The emergency shutdown switches are not required to be integral to the LOC but may be independent devices.

9. Handheld LOC microphones shall be located and adjusted so that the microphones can be used to provide a message meeting the intelligibility requirements of UFC 4-021-01.

10. Intelligibility test criteria for small rooms. Rooms or areas 200 square feet and less that are tested when empty and unfurnished are permitted a reduction of 0.1 in CIS criteria.

11. Building shall be provided with handheld microphones installed at the locations requested by the user that activates the speakers on the MNS system but does not activate the amber strobes. Contractor shall design for a minimum of 3 handheld microphones, one located in the dispatch.

12. LOC enclosures shall be protected from tampering by the use of a break-glass, thumb-lock, tamper wire, tamper alarm or approved equivalent protection. Enclosures that can be opened only by a key shall not be used.

13. Mass notification system sequence of operation: For a combined fire alarm and mass notification system, the ACU is the main fire alarm control panel. For separate systems, the ACU is the building mass notification panel. Once the ACU is activated, the LOC shall not be able to override the ACU. AM#09…The mass notification system shall take priority and override the PA system (if installed).Any mass notification or fire alarm event shall override the microphones used for PA as required elsewhere in this document The PA system described elsewhere in this document shall take priority over any fire alarm and mass notification audible signals ….AM#09

14. The mass notification transceiver power shall be supplied from its own breaker.

15. The following pre-recorded messages shall be programmed into and clearly labeled on the LOC’s:

a. Attention all personnel: Please take cover under a sturdy surface immediately. Be prepared for aftershocks. This is not a drill.

b. Attention all personnel: Lockdown, lockdown, lockdown. There is an active shooter on the premises. This is not a drill.

c. Attention all personnel: Please proceed to your designated shelter-in-place room immediately and wait for further instruction. This is not a drill.

d. Attention all personnel: Please evacuate the building immediately. This is not a drill.

e. Attention all…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .