W911KB-17-R-0003, Amendment 0003 for Phase 2 (applicable to the 3 Phase 2 offerors and their design-build teams)
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE378
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE / LOCATION: F-35A AIRCRAFT WEATHER SHELTER, SQUAD #1, EIELSON AIR FORCE BASE (AFB), ALASKA (EIE378)
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. PHASE 2 PROPOSAL DUE DATE IS 24 OCTOBER 2017 AT 1400 ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.10, Proposal Format.
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0003
X 9B. DATED (SEE ITEM 11)
23-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-17-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
NONE
b. The following revised documents/sections are substituted for the superseded documents/sections.
SECTION 00 11 00 – STANDARD FORM 1442, BLOCK 13
The required response date/time has changed from 06-Jul-2017 02:00 PM to 24-Oct-2017
02:00 PM
SECTION 00 11 01 – PROPOSAL SCHEDULE
- Modified quantity of CLIN 0005
- Added Base CLINs 0006 and 0007
- Revised ALL Optional CLINs to include numbering and description; added two (2) new Optional CLINs
SECTION 00 73 46 – WAGE DETERMINATIONS
- Replaced with AK1, dated 28 July 2017
TABLE OF CONTENTS
- Division 01 Revised
- Added Divisions 02, 31, 32 and Appendices
c. The following sections are deleted:
d. The following documents are added:
- DIVISION 01 – GENERAL REQUIREMENTS
- DIVISION 02 – EXISTING CONDITIONS
- DIVISION 31 – EARTHWORK
- DIVISION 32 – EXTERIOR IMPROVEMENTS
- APPENDICES A – S (Issued as a separate .pdf)
e. The following revisions are incorporated:
f. Other:
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
F-35 A AIRCRAFT WEATHER SHELTER (SQD 1) W911KB-17-R-0003
EIE378 AM#3
PS- 1
PROPOSAL SCHEDULE
F-35A AIRCRAFT WEATHER SHELTER (SQD 1)
EIELSON AFB, ALASKA
BASE ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0001 Design F-35A Aircraft Weather Shelter, complete 1 Job $_________ $_________
0002 Construct F-35A Aircraft Weather Shelter within the building 5-foot line, complete.
1 Job $_________ $_________
0003 Construct site work and utilities beyond the building 5 foot lines, complete. 1 Job $_________ $_________
0004 Provide Temporary Heating independent of existing central steam heating system, Complete
1 Job $_________ $_________
0005 Stockpile and Sample 4,000 Cubic Yards of Potentially Contaminated Soil, From Field Screening, Including Construction of Holding Cells, Complete*.
4,000 CY $_________ $_________
0006 Dispose of 1,500 Cubic Yards of POL Contaminated Soil, Complete**. 1,500 CY $_________ $_________
0007 Dispose of 20 Cubic Yards of PFOS/PFOA Contaminated Soil, Complete**. 20 CY $_________ $_________
Total of Base Items 0001 thru 0007 $_________
PS-2
OPTION ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0008 Purchase ACA-1 and ACA-2 avionics cooling units and deliver to site, Complete *** 1 Job $_________ $_________
0009 Purchase ACA-3 and ACA-4 avionics cooling units and deliver to site, Complete *** 1 Job $_________ $_________
00010 Purchase ACA-5 and ACA-6 avionics cooling units and deliver to site, Complete *** 1 Job $_________ $_________
0011 Purchase ACA-7 and ACA-8 avionics cooling units and deliver to site, Complete *** 1 Job $_________ $_________
0012 Install ACA-1 and ACA-2 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0008 is not awarded, ACA-1 and ACA-2 will be Government Furnished, Contractor Installed. ***
1 Job $_________ $_________
0013 Install ACA-3 and ACA-4 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0009 is not awarded, ACA-3 and ACA-4 will be Government Furnished, Contractor Installed. ***
1 Job $_________ $_________
0014 Install ACA-5 and ACA-6 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0010 is not awarded, ACA-5 and ACA-6 will be Government Furnished, Contractor Installed. ***
1 Job $_________ $_________
PS- 3
0015 Install ACA-7 and ACA-8 avionics Cooling Units, at locations shown on drawings, Complete. If CLIN 0011 is not awarded, ACA-7 and ACA-8 will be Government Furnished, Contractor Installed. ***
1 Job $_________ $_________
0016 Provide Concrete airfield apron in lieu of Asphalt airfield apron around Weather Shelter, Complete.
1 Job $_________ $_________
0017 Unsatisfactory Material Excavation and Backfill. *****
280 CY $_________ $_________
Total of Optional Items 0008 thru 0017 $_________
TOTALS
Total of Base and Optional Items 0001 thru 0017 $_________
Proposed Contract Duration: ____________________
* Work on CLIN 0005 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. It does not include costs for disposal of soils determined to be contaminated, which shall be included in CLINs 0006 and 0007. For CLIN 0005, the Contractor shall keep a record of the amount of soil being stockpiled and sampled, as required by results of the field screening. Upon completion, if the amount of soil stockpiled and sampled is less than 4,000 cubic yards, the Government will receive a credit based upon the unit price noted in CLIN 0005. If the amount of contaminated soil stockpiled & sampled is above 115% or below 85% of the estimated quantity, the equitable adjustment will be in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY. CLIN 0005 does not include stockpiling or sampling of soil within those areas identified in Appendix A/sheet C-102 as requiring 100% stockpiling and sampling. Those costs are to be included in CLINs 0002 and 0003 as applicable.
** For CLINs 0006 and 0007, the Contractor shall keep a record of the amount of contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil from those areas identified in Appendix A/sheet C-102 as requiring 100% stockpiling and sampling and the testing of soil required by CLIN 0005 to be stockpiled and sampled. Soil determined to be clean shall be disposed of as shown on the drawings. Upon completion, if the amount of contaminated soil disposed of is less than the estimated quantities shown for each CLIN respectively, the Government will receive a credit based upon the unit price noted in CLINs 0006 and 0007. If the amount of contaminated soil disposed of is above 115% or below 85% of the estimated quantity, the equitable adjustment will be in accordance with FAR CLAUSE
52.211-18, VARIATION IN ESTIMATED QUANTITY.
PS-4
*** For CLINs 0008 - 0015, these options may be exercised at any time during the Construction Contract period and completion time shall be 180 days from the date of option award.
**** For CLIN 0016, this option may be exercised at any time within 60 days of contract award.
***** Work on CLIN 0017 shall be the cost for work identified in Specs 01 10 00. The Contractor shall survey the extent of excavation and keep a record of the unsatisfactory material removed and disposed of. This CLIN can be awarded up to 10 times. For CLIN 0017, this option can be awarded at any time during the Construction Contract Period.
EVALUATION OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 20 – PHASE 2 DESIGN-
BUILD SELECTION PROCEDURES AND BASIS FOR AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
-- END OF PROPOSAL SCHEDULE --
Section 00 73 46 W911KB-17-R-0003
General Decision Number: AK170001 07/28/2017 AK1
Superseded General Decision Number: AK20160001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 01/27/2017 3 02/17/2017 4 03/17/2017 5 03/31/2017 6 04/07/2017 7 04/21/2017 8 05/12/2017 9 05/19/2017 10 05/26/2017 11 07/21/2017 12 07/28/2017
ASBE0097-001 01/01/2017
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 20.07
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
BOIL0502-002 08/01/2016
Rates Fringes
BOILERMAKER......................$ 44.26 28.41
BRAK0001-002 07/01/2016
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.15 Tile & Terrazzo Finisher.........$ 34.79 19.15
CARP1501-001 09/01/2016
Rates Fringes
MILLWRIGHT.......................$ 36.74 22.99
CARP2520-003 09/01/2016
Rates Fringes
Diver Stand-by....................$ 42.65 25.04 Tender......................$ 41.65 25.04 Working.....................$ 82.45 25.04 Piledriver Carpenter...................$ 38.34 25.04 Piledriver; Skiff Operator and Rigger..................$ 38.34 25.04 Sheet Stabber...............$ 38.34 25.04 Welder......................$ 43.90 25.04
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2016
Rates Fringes
CARPENTER
Carpenter...................$ 38.34 25.04 Lather/Drywall Applicator...$ 36.59 22.59
ELEC1547-004 04/01/2017
Rates Fringes
CABLE SPLICER....................$ 39.82 3%+25.44
ELECTRICIAN......................$ 39.49 3%+25.69
* ELEC1547-005 04/01/2017
Line Construction
Rates Fringes
CABLE SPLICER....................$ 52.57 3%+30.81
Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81 Powderman........................$ 48.52 3%+30.81
TREE TRIMMER.....................$ 35.84 3%+23.56
ELEV0019-002 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 53.76 31.585+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.28 22.65
GROUP 1A....................$ 42.04 22.65
GROUP 2.....................$ 39.51 22.65
GROUP 3.....................$ 38.79 22.65
GROUP 4.....................$ 32.58 22.65
TUNNEL WORK
GROUP 1....................$ 44.31 22.65
GROUP 1A...................$ 46.24 22.65
GROUP 2....................$ 43.46 22.65
GROUP 3....................$ 42.67 22.65
GROUP 4....................$ 35.84 22.65
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 07/01/2015
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 36.25 28.05
FENCE, BARRIER INSTALLER....$ 32.75 28.05
GUARDRAIL INSTALLERS........$ 33.75 28.05
GUARDRAIL LAYOUT MAN........$ 33.49 28.05
HELICOPTER, TOWER...........$ 37.25 28.05
LABO0341-005 04/01/2017
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.72
GROUP 2....................$ 34.71 26.72
GROUP 3....................$ 35.70 26.72
GROUP 3A...................$ 39.30 26.72
GROUP 3B...................$ 43.20 24.01
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2017
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.52
GROUP 2....................$ 34.71 26.52
GROUP 3....................$ 35.70 26.52
GROUP 3A...................$ 39.30 26.52
GROUP 3B...................$ 43.20 23.81
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2017
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 31.99 20.29
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.51 20.29
PAIN1959-002 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.23 20.04 Machine Taper/Drywall.......$ 31.48 20.04 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.58 20.04
PAIN1959-003 07/01/2017
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 38.63 22.39
* PAIN1959-004 07/01/2017
Rates Fringes
FLOOR LAYER: Carpet.............$ 29.23 13.96
PAIN1959-006 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 38.63 21.67
PLAS0867-001 02/01/2016
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLAS0867-004 02/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLUM0262-002 01/01/2017
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 38.02 26.72
PLUM0367-002 07/01/2017
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.00 23.80
PLUM0375-002 07/01/2017
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 40.91 25.40
PLUM0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 46.00 23.29
ROOF0189-006 04/01/2016
Rates Fringes
ROOFER...........................$ 42.62 15.50
SHEE0023-003 07/01/2015
South of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 40.79 22.38
SHEE0023-004 07/01/2015
North of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 45.93 21.44
TEAM0959-003 09/01/2016
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 39.59 21.17
GROUP 1A....................$ 40.86 21.17
GROUP 2.....................$ 38.33 21.17
GROUP 3.....................$ 37.51 21.17
GROUP 4.....................$ 36.93 21.17
GROUP 5.....................$ 36.17 21.17
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
REQUEST FOR PROPOSAL
US Army Corps of Engineers Alaska District
EIE378
F-35A AIRCRAFT WEATHER
SHELTER, SQUAD #1
EIELSON AIR FORCE BASE (AFB), ALASKA
AUG 2017
THIS PAGE INTENTIONALLY LEFT BLANK
F-35 AIRCRAFT WEATHER SHELTER (SQD 1) W911KB-17-D-0003
TOC Page 1
EIE378 F-35A AIRCRAFT WEATHER SHELTER, SQUAD #1
REQUEST FOR PROPOSAL
TABLE OF CONTENTS
GENERAL REQUIREMENTS AND TECHNICAL PROVISIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 STATEMENT OF WORK
01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS
ATTACH. 1 AF FORM 592 – USAF WELDING, CUTTING & BRAZING PERMIT
ATTACH. 2 AF FORM 103 – BASE CIVIL ENGINEERING WORK CLEARANCE
REQUEST
ATTACH. 3 SAMPLE LETTER – WARRANTY PROVISIONS
ATTACH. 4 EIELSON AFB UTILITY RATES 2017
ATTACH. 5 POD LIGHTNING PROTECTION SYSTEM GUIDANCE
ATTACH. 6 AIRFIELD GEOTECHNICAL, SURVEY, AND CONSTRUCTION FREE
ZONE OVERVIEW
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
ATTACH. 1 SUBMITTAL REGISTER
ATTACH. 2 ENG FORM 4025-R
01 33 16.00 29 DESIGN DATA (DESIGN AFTER AWARD)
ATTACH. A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS
ATTACH. B FF&E REQUIREMENTS
ATTACH. C TRACKING COMMENTS IN DRCHECKS
ATTACH. D SAMPLE FIRE PROTECTION AND LIFE SAFETY CODE REVIEW
ATTACH. E NOT USED
ATTACH. F BUILDING INFORMATION MODELING REQUIREMENTS
ATTACH. G DESIGN SUBMITTAL DIRECTORY AND SUBDIRECTORY FILE
ARRANGEMENT
ATTACH. H USACE BIM PROJECT EXECUTION PLAN (PxP) TEMPLATE
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
TOC Page 2
01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
ATTACH. 1 CONTRACTOR’S QUALITY CONTROL REPORT (QCR)
01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
EIELSON AFB PROJECTS
01 57 20.01 29 ENVIRONMENTAL PROTECTION
ATTACH. 1 2017 EIELSON AFB ENVIRONMENTAL SOP
ATTACH. 1A EIELSON AFB WASTE DISPOSAL / BORROW PIT WORKSHEET
(TO BE COMPLETED BY CONTRACTOR’S DOR)
ATTACH. 1B FUGITIVE DUST EMISSIONS PLAN FOR EIELSON AIR FORCE BASE
ATTACH. 1C AEROSOL CAN DISPOSAL MANAGEMENT PROCEDURE
ATTACH. 2 EIELSON DISPOSAL AREAS
ATTACH. 3 EXCAVATION DEWATERING AT EAFB MEMO 2017
01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES
ATTACH. 1 SWPPP DELEGATION OF AUTHORITY LETTER TEMPLATE
01 58 00 PROJECT IDENTIFICATION
ATTACH. 1 PROJECT SIGN DETAIL
01 74 19.01 29 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
ATTACH. 1 DD FORM 1354 CHECKLIST
ATTACH. 2 GIS DRAFTING SURVEYING STANDARDS
01 78 23 OPERATIONS AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
DIVISION 31 – EARTHWORK
31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 10 DRAINAGE LAYER
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
TOC Page 3
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENT
APPENDIXES
APPENDIX A SCHEMATIC DRAWINGS
APPENDIX B SECTION 09 67 23.16 FUEL RESISITIVE RESINOUS FLOORING, 5-COAT
SYSTEM
APPENDIX C SECTION 23 00 99 AIRCRAFT COOLING UNITS
APPENDIX D EAFB FUEL LINE & TANK STORAGE AS-BUILTS
APPENDIX E GEOTECHNICAL DATA REPORT
APPENDIX F CHEMICAL DATA REPORT
APPENDIX G UVOST REPORT (Placeholder)
APPENDIX H PROJECT INFORMATION FORM – GUIDING PRINCIPLES ASSESSMENT,
DEPARTMENT OF DEFENCE BY GBCI
APPENDIX I FT WAINWRIGHT "CLIFF SWALLOW NESTING BARRIER PROJECT
REPORT"
APPENDIX J AIR FORCE SUSTAINABILITY REQUIREMENTS SCORESHEET (Blank)
APPENDIX K OWNER’S PROJECT REQUIREMENTS (OPR)
APPENDIX L HANGAR ACCEPTANCE TEST PROCEDURES
APPENDIX M HI-EX FOAM CHECKLIST EXAMPLE
APPENDIX N 21 13 20.00 20 LOW-LEVEL HIGH EXPANSION FOAM FIRE
EXTINGUISHING FOR AIRCRAFT HANGARS (FOR REFERENCE)
APPENDIX O ADDITIONAL ROOF REQUIREMENTS (Placeholder)
APPENDIX P FIRE ALARM/FOAM SYSTEM MATRICES & SEQUENCE OF OPERATION
APPENDIX Q WEAPONS SYSTEMS CHARACTERISTICS – IPP EXHAUST PLUME
FIGURE 1-12
APPENDIX R EIE405 – EXTEND STEAM WATER TO UTILIDUCT TO SOUTH LOOP
CONSTRUCTION DOCUMENTS
APPENDIX S HVAC EXCEPTIONS – SYSTEM CAPACITY AND RELIABILITY
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 10 00
F35 AIRCRAFT WEATHER SHELTER, SQUAD #1
TABLE OF CONTENTS
TABLE OF CONTENTS
1.0 PROJECT OBJECTIVES
1.1 SECTION ORGANIZATION
1.1.1 This Section is organized under seven major Articles
2.0 SCOPE AND PURPOSE
2.1 F35 AIRCRAFT WEATHER SHELTER SQUAD #1 SCOPE
2.1.1 GENERAL
2.1.2 UTILITIES
2.1.3 SITE
2.1.4 SUSTAINABILITY
2.1.5 OFFEROR
2.1.6 EAFB BEDDOWN WORK INTERFACES
2.2 FUNCTIONAL SCOPE REQUIREMENTS
2.2.1 FACILITY DESCRIPTION
2.2.2 SITE
2.2.3 ACCESSIBILITY
2.2.4 BUILDING AREAS
2.2.5 SCHEMATIC FLOOR PLAN
2.2.6 GOVERNMENT FURNISHED / GOVERNMENT INSTALLED (GFGI)
EQUIPMENT
2.2.7 FURNITURE REQUIREMENTS
3.0 FUNCTIONAL CRITERIA/REQUIREMENTS
3.1 ENVIRONMENTAL REQUIREMENTS
3.1.1 GENERAL DESCRIPTION
3.2 UTILITY REQUIREMENTS
3.2.1 CRITERIA, CODES AND STANDARDS
3.2.2 GENERAL DESCRIPTION
3.2.3 DOMESTIC/FIRE WATER
3.2.4 SEWER IN UTILIDOR
F-35 AIRCRAFT WEATHER SHELTER (SQD 1)
EIE378
W911KB-17-R-0003
AM#3
3.2.5 STEAM SYSTEM
3.2.6 CONDENSATE RETURN SYSTEM
3.2.7 UTILIDOR SUMPS
3.2.8 PIPE SYSTEM APPURTENANCES
3.2.9 CORROSION PROTECTION
3.2.10 NEW UTILIDOR
3.3 CIVIL REQUIREMENTS
3.3.1 CRITERIA, CODES AND STANDARDS
3.3.2 GENERAL REQUIREMENTS
3.3.3 Geotechnical
3.3.4 LIMITS OF EXCAVATION FOR STRUCTURES
3.3.5 GEOTECHNICAL TESTING
3.3.6 Excess Clean Fill
3.3.7 Borrow Material
3.3.8 GROUND IMPROVEMENT FOR STRUCTURES AND FACILITIES
3.3.9 GROUND VIBRATION MONITORING
3.3.10 Excavation, Soils and Site Grading
3.3.11 Site Access, Haul Route, Security
3.3.12 Storm Water
3.3.13 Airfield Pavements
3.3.14 Aprons
3.3.15 Airfield Pavement Markings
3.3.16 Contractor Staging/Storage Yard
3.3.17 Parking
3.3.18 Snow Removal and Storage
3.3.19 Waste Disposal
3.4 STRUCTURAL REQUIREMENTS
3.4.1 CRITERIA, CODES AND STANDARDS
3.4.2 GENERAL REQUIREMENTS
3.4.3 DESIGN LOADS
3.4.4 STRUCTURAL MATERIALS
3.4.5 ANTITERRORISM FORCE PROTECTION (AT&FP) AND PROGRESSIVE
COLLAPSE
3.5 ARCHITECTURAL REQUIREMENTS
F-35 AIRCRAFT WEATHER SHELTER (SQD 1)
EIE378
W911KB-17-R-0003
3.5.1 CRITERIA, CODES AND STANDARDS
3.5.2 GENERAL REQUIREMENTS
3.5.3 FUNCTIONAL SPACES
3.5.4 SPACE PLANNING
3.5.5 BUILDING ENVELOPE
3.5.6 EXTERIOR MATERIALS
3.5.7 BIRD NESTING MITIGATION
3.5.8 ARCHITECTURAL INTERIOR FINISHES
3.5.9 SOUND TRANSMISSION CLASSIFICATION RATINGS
3.5.10 BUILDING SIGNAGE
3.5.11 OPERATIONS AND MAINTENANCE MANUALS (O&M)
3.6 MECHANICAL REQUIREMENTS
3.6.1 CRITERIA, CODES AND STANDARDS
3.6.2 GENERAL REQUIREMENTS
3.6.3 EXTERIOR DESIGN CONDITIONS
3.6.4 INTERIOR DESIGN CONDITIONS
3.6.5 LOAD CALCULATIONS
3.6.6 GENERAL MATERIALS AND METHODS
3.6.7 GENERAL MECHANICAL REQUIREMENTS
3.6.8 GENERAL PIPING REQUIREMENTS
3.6.9 VIBRATION ISOLATION
3.6.10 SEISMIC PROTECTION
3.6.11 TESTING AND BALANCING
3.6.12 GENERAL INSULATION REQUIREMENTS
3.6.13 PLUMBING SYSTEM
3.6.14 STEAM AND CONDENSATE SYSTEM
3.6.15 VENTILATION SYSTEM
3.6.16 HYDRONIC SYSTEM
3.6.17 COMPRESSED AIR SYSTEM
3.6.18 FUEL CAPTURE SYSTEM
3.6.19 BUILDING AUTOMATION SYSTEM
3.7 FIRE PROTECTION REQUIREMENTS
3.7.1 GENERAL OVERVIEW
F-35 AIRCRAFT WEATHER SHELTER (SQD 1)
EIE378
W911KB-17-R-0003
3.7.2 CRITERIA, CODES AND STANDARDS
3.7.3 REFERENCES
3.7.4 GENERAL REQUIREMENTS
3.7.5 QUALIFIED FIRE PROTECTION ENGINEER (QFPE)
3.7.6 QUALIFIED SYSTEM INSTALLERS
3.7.7 QUALIFIED SYSTEM DESIGNER(S)
3.7.8 QFPE AREA OF RESPONSIBILITY DURING THE CONSTRUCTION PHASE . 116
3.7.9 LIFE SAFETY REQUIREMENTS
3.7.10 UTILITIES
3.7.11 FIRE SPRINKLER AND FOAM SYSTEMS
3.7.12 FIRE ALARM, MASS NOTIFICATION AND FOAM SYSTEMS
3.7.13 TESTING
3.7.14 TRAINING
3.7.15 WARRANTY
3.8 ELECTRICAL REQUIREMENTS
3.8.1 CRITERIA, CODES AND STANDARDS
3.8.2 GENERAL REQUIREMENTS
3.8.3 DESIGN CRITERIA
3.8.4 SITE ELECTRICAL DISTRIBUTION SYSTEM
3.8.5 INTERIOR ELECTRICAL DISTRIBUTION SYSTEM
3.8.6 LIGHTING
3.8.7 LIGHTNING PROTECTION
3.8.8 GROUNDING:
3.9 COMMUNICATIONS REQUIREMENTS
3.9.1 CRITERIA, CODES AND STANDARDS
3.9.2 GENERAL TELECOMMUNICATIONS
3.9.3 ACCESS CONTROL SYSTEM
3.9.4 INTRUSION DETECTION SYSTEM
3.9.5 CCTV
3.9.6 CATV
3.10 SUSTAINABILITY REQUIREMENTS
3.10.1 CRITERIA, CODES AND STANDARDS
3.10.2 LEED CERTIFICATION – NOT REQUIRED
F-35 AIRCRAFT WEATHER SHELTER (SQD 1)
EIE378
W911KB-17-R-0003
3.10.3 THIRD PARTY CERTIFICATION – GUIDING PRINCIPLES
3.10.4 FULL TIME EQUIVALENT ANALYSIS (FTE)
3.10.5 COMMISSIONING
4.0 TECHNICAL GUIDE SPECIFICATIONS
5.0 ROOM CRITERIA SHEETS
5.1 STANDARD WEATHER SHELTER BAY (14)
5.2 WEATHER SHELTER WASH BAY (2)
5.3 ARCTIC ENTRY
5.4 BREAK AREA(S)
5.5 RESTROOMS (3)
5.6 JANITOR CLOSET
5.7 MECHANICAL ROOMS (2)
5.8 ELECTRICAL ROOMS (2)
5.9 COMMUNICATION ROOM
5.10 FIRE PROTECTION ROOM(S)
6.0 APPLICABLE CRITERIA
6.1 INDUSTRY CRITERIA
6.2 MILITARY CRITERIA
6.3 EAFB DESIGN GUIDES
7.0 GLOSSARY
F-35 AIRCRAFT WEATHER SHELTER (SQD 1)
W911KB-17-R-0003
SECTION 01 10 00
STATEMENT OF WORK
1.0 PROJECT OBJECTIVES
The project objective is to design and construct facilities for the military that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to military projects.
For example, a Company Operations Facility has the similar function as an office/warehouse in the civilian sector; therefore the design and construction practices should be consistent with the design and construction of an office/warehouse building.
Comparison of Military Facilities to Civilian Facilities
Military Facility Civilian Facility F35 Aircraft Weather Shelter Low Maintenance Aircraft Hangar
It is the Air Force's objective that these buildings will have a 50 year useful life. The design and construction should provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project OWNER. The facility design should consider that the Air Force may repurpose the use of the facility over the 50 year life.