A.07.24_W911KB-17-R-0003_AM_6.pdf
PDF 14 MB Posted
- Solicitation number
- W911KB-17-R-0003
About this file
W911KB-17-R-0003 Amendment 0006 Project EIE378 F-35A Aircraft Weather Shelter, Squad #1, Eielson AFB, Alaska For Phase 2 Offerors
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE378
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE / LOCATION: F-35A AIRCRAFT WEATHER SHELTER, SQUAD #1, EIELSON AFB, ALASKA (EIE378)
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. PHASE 2 PROPOSAL DUE DATE IS HEREBY EXTENDED UNTIL 27 OCTOBER 2017 AT 1400 ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.10, Proposal Format.
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0003
X 9B. DATED (SEE ITEM 11)
23-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Oct-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-17-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE
a. The following drawings are substituted for the superseded documents/sections:
- ES116
- G-101
- G-103
b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#6” appears before and after new and/or revised materials, except as noted below.
SECTION 01 10 00 – F35 AIRCRAFT WEATHER SHELTER, SQUAD #1
- Revised paragraphs 2.1.4.1; 3.2.3; 3.2.3.1; 3.3.4.3; 3.4.2.3.H; 3.4.3.4.C; 3.5.6.8.B; 3.5.6.8.E.;
3.5.8.3.A; 3.6.13.2.S.1; 3.6.13.2.T.3; 3.6.16.1.A; 3.6.16.1.K; 3.6.18.2.C.2; 3.7.12.2.HH;
3.7.12.2.II; 3.7.12.2.JJ; 3.7.12.5.B; 3.7.13.6.C.1.(n); and 3.9.2.3 (Reissuing entire specification).
NOTE: Revisions within the following documents do not contain the above referenced identifiers:
SECTION 00 11 00 – STANDARD FORM (SF) 1442
- The required response date/time has changed from 24-Oct-2017 02:00 PM to 27-Oct-2017 02:00
PM.
SECTION 00 72 00 – CONTRACT CLAUSES
- Revised Table of Contents (TOC) per the changes herein (Reissuing entire TOC).
- Alternate I (Apr 1984) added to clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
- Revised clause 52.211-12, LIQUIDATED DAMAGES—CONSTRUCTION.
- Deleted clause 52.231-5000, EQUIPMENT OWNDERSHIP AND OPERATING EXPENSE
SCHEDULE (text moved to SECTION 00 73 00.00 29, SCRs).
- Deleted USACE D-B Clauses 5152.232-9000, 5152.236-9000, 5152.236-9001, 5152.236-9002, 5152.236-9003, 5152.236-9004, 5152.236-9005, 5152.236-9006, 5152.236-9007, 5152.236- 9008 and 5152.236-9010 (text moved to SECTION 00 73 00.00 29, SCRs).
SECTION 00 73 00.00 29 – SPECIAL CONTRACT REQUIREMENTS
- Incorporated text previously contained in SECTION 00 72 00 – Clause 52.231-5000 and
USACE D-B Clauses 5152.232-9000, 5152.236-9000, 5152.236-9001, 5152.236-9002, 5152.236-9003, 5152.236-9004, 5152.236-9005, 5152.236-9006, 5152.236-9007, 5152.236- 9008 and 5152.236-9010.
SECTION 01 57 20.01 29 – ENVIRONMENTAL PROTECTION
- Attachment 1, Eielson AFB Environmental SOP replaced it its entirety. Offerors shall note new Eielson AFB Waste Disposal / Borrow Pit Worksheets.
c. The following sections are deleted:
NONE
d. The following documents are added:
- Sheet C-102 Site Plan (2) added to Appendix A.
e. The following revisions are incorporated:
NONE
f. Other:
- PROJNET BIDDER INQUIRY REPORT dated 19 October 2017 is incorporated.
- Additional information for Phase 2 Offerors: Reference Section 00 22 20, para 5.2.1.2, Color Board – include the insulated metal panel and masonry veneer colors; other exterior colors shall be required to match the colors for project EIE382, which will be provided at time of award.
Also reference Appendix A, sheets A-202 and A-203 for the color basis of design for the insulated metal panel and masonry veneer.
Electronic files for the following shall be provided electronically to Phase 2 offerors:
- EIE399 Updated Files (replaces EIE399 files provided in AM#5)
SECTION 00 72 00 - CONTRACT CLAUSES
The following has been added by full text:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 635 calendar days after the date the Contractor receives notice to proceed. In accordance with Section 01 10 00/3.8.4.3 A. and 3.8.4.4 A, the Feeders #1 and #15 upgrade shall be installed and on-line no later than 31 October 2018. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 25 February 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
The following has been modified:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,892.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Interim Completion Date Liquidated Damages Work
31 October 2018 $2,215.00 per day Contractor shall have Feeders #1 and #15 upgrade installed and on-line.
The following have been deleted:
52.211-10 52.231-5000
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
Equipment Ownership and Operating Expense Schedule (MAR 1995)
(a) This clause does not apply to terminations. See 52.249-9000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [insert Roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
PAYMENT FOR MATERIALS DELIVERED OFF-SITE
(a) Pursuant to Federal Acquisition Regulation (FAR) FAR 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site shall be limited to:
(1) Materials required by the technical provisions; or
(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or
(3) Items specifically listed below.
(b) Payment for materials delivered off-site shall be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor’s title to the items delivered off site. Payment for materials delivered off-site shall be limited to the following items:
Construction materials as approved by the Contracting Officer http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P31_3455 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P31_3455
DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE
(a) The contract includes the standard contract clauses and schedules current at the time of contract award. It entails (1) the solicitation in its entirety, including all drawings, cuts, and illustrations, and any amendments, and (2) the successful offeror’s accepted proposal. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.
(b) In the event of conflict or inconsistency between any of the provisions of this contract, precedence shall be given in the following order:
(1) Betterments: Any portions of the accepted proposal which both conform to and exceed the provisions of the solicitation.
(2) The provisions of the solicitation.
(3) All other provisions of the accepted proposal.
(4) Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, equipment installation drawings, etc. These are "deliverables" under the contract and are not part of the contract itself. Design products must conform to all provisions of the contract, in the order of precedence herein.
PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS
In connection with this contract, any in-house personnel, subcontractors, and outside associates or consultants will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.
GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND SPECIFICATIONS IN
THE REQUEST FOR PROPOSAL
This is to clarify Defense Federal Acquisition Regulation Supplement (DFARS) 252.236-7001, Contract Drawings and Specifications, refers to any Government-furnished design or design criteria included in the Request for Proposal (RFP).
GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
This is to clarify Federal Acquisition Regulation FAR 52.236-21, Specifications and Drawings for Construction, refers to any specifications and drawings furnished in the Request for Proposal (RFP). The term "specifications" refers to the design criteria or scope of work, in addition to any attached specifications.
RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN
(a) The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other non-construction services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiency in its http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_232.htm#P784_58963 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_232.htm#P784_58963 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P1416_250291 designs, drawings, specifications, and other non-construction services and perform any necessary rework or modifications, including any damage to real or personal property, resulting from the design error or omission.
(b) The standard of care for all design services performed under this agreement shall be the care and skill ordinarily used by members of the architectural or engineering professions practicing under similar conditions at the same time and locality. Notwithstanding the above, in the event that the contract specifies that portions of the Work be performed in accordance with a performance standard, the design services shall be performed so as to achieve such standards.
(c) Neither the Government’s review, approval or acceptance of, nor payment for, the services required under this contact, shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract. The Contractor shall be and remain liable to the Government in accordance with applicable law for all damages to the Government caused by the Contractor’s negligent performance of any of these services furnished under this contract.
(d) The rights and remedies of the Government provided for under this contract are in addition to any other rights and remedies provided by law.
(e) If the Contractor is comprised of more than one legal entity, each entity shall be jointly and severally liable hereunder.
WARRANTY OF DESIGN
(a) The Contractor warrants that the design shall be performed in accordance with the contract requirements. Design and design related construction not conforming to the Contract requirements shall be corrected at no additional cost to the Government. The standard of care for design is defined in paragraph (b) of special contract requirement UAI 5152.236-9004, Responsibility of the Contractor for Design.
(b) The period of this warranty shall commence upon final completion and the Government’s acceptance of the work, or in the case of the Government’s beneficial occupancy of all or part of the work for its convenience, prior to final completion and acceptance, at the time of such occupancy.
(c) This design warranty shall be effective from the above event through the Statute of Limitations and Statute of Repose, as applicable to the state that the project is located in.
(d) The rights and remedies of the Government provided for under this clause are in addition to any other rights and remedies provided in this contract or by law.
DEVIATING FROM THE ACCEPTED DESIGN
(a) The Contractor must obtain the approval of the Designer of Record and the Government’s concurrence, in the form of a supplemental agreement to the contract, for any Contractor proposed revision to the professionally stamped-and-sealed and Government-reviewed design before proceeding with the revision. The Government reserves the right to disapprove such a revision.
(b) The Government reserves the right to non-concur with any revision to the design, which may impact furniture, furnishings, equipment selections or operations decisions that were made, based on the reviewed design.
(c) Any revision to the design, which deviates from the contract requirements (i.e., the RFP and the accepted proposal), will require a modification, pursuant to the Changes clause, in addition to Government concurrence. The Government reserves the right to disapprove such a revision.
(d) Unless the Government initiates a change to the contract requirements, or the Government determines that the Government furnished design criteria are incorrect and must be revised, any Contractor initiated proposed change to the contract requirements, which results in additional cost, shall strictly be at the Contractor's expense.
(e) The Contractor shall track all approved revisions to the reviewed and accepted design and shall incorporate them into the as-built design documentation, in accordance with agreed procedures. The Designer of Record shall document its professional concurrence on the as-builts for any revisions in the stamped-and-sealed drawings and specifications.
CONTRACTOR'S ROLE DURING DESIGN PROCESS
The contractor's construction management key personnel shall be actively involved during the design process to effectively integrate the design and construction requirements of this contract. In addition to the typical required construction activities, the Contractor's involvement includes, but is not limited to actions such as: integrating the design schedule into the Master Schedule to maximize the effectiveness of fast-tracking design and construction (within the limits allowed in the contract), ensuring constructability and economy of the design, integrating the shop drawing and installation drawing process into the design, executing the material and equipment acquisition programs to meet critical schedules, effectively interfacing the construction QC program with the design QC program, and maintaining and providing the design team with accurate, up-to-date redline and as-built documentation. The Contractor shall require and manage the active involvement of key trade subcontractors in the above activities.
VALUE ENGINEERING AFTER AWARD
(a) In reference to Federal Acquisition Regulation (FAR) 52.248-3, Value Engineering-Construction, the Government may refuse to entertain a "Value Engineering Change Proposal" (VECP) for those "performance oriented" aspects of the Solicitation documents which were addressed in the Contractor's accepted contract proposal and which were evaluated in competition with other offerors for award of this contract.
(b) The Government may consider a VECP for those "prescriptive" aspects of the Solicitation documents, not addressed in the Contractor's accepted contract proposal or addressed but evaluated only for minimum conformance with the Solicitation requirements.
(c) For purposes of this clause, the term "performance oriented" refers to those aspects of the design criteria or other contract requirements which allow the offeror or Contractor certain latitude, choice of and flexibility to propose in its accepted contract offer a choice of design, technical approach, design solution, construction approach or other approach to fulfill the contract requirements. Such requirements generally tend to be expressed in terms of functions to be performed, performance required or essential physical characteristics, without dictating a specific process or specific design solution for achieving the desired result.
(d) In contrast, for purposes of this clause, the term "prescriptive" refers to those aspects of the design criteria or other Solicitation requirements wherein the Government expressed the design solution or other requirements in terms of specific material, approaches, systems, and/or processes to be used. Prescriptive aspects typically allow the offerors little or no freedom in the choice of design approach, materials, fabrication techniques, methods of installation, or any other approach to fulfill the contract requirements.
GOVERNMENT RE-USE OF DESIGN
In conjunction with the Defense Federal Acquisition Regulation Supplement (DFARS) 252.227-7022, Government Rights (Unlimited), the Government will not ask for additional originals or copies of the design works after the Contractor provides all required design documentation and as-built documentation under the instant contract.
Further, if the Government uses the design for other projects without additional compensation to the Contractor for re-use, the Government releases the Contractor from liability in the design on the other projects, due to defects in the http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_246.htm#P1618_232413 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_227.htm#P1980_152582 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_227.htm#P1980_152582 design that are not the result of fraud, gross mistake as amounts to fraud, gross negligence or intentional misrepresentation.
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
Section 00 72 00 W911KB-17-R-0003
Section 00 72 00 Page 1
SECTION 00 72 00
TABLE OF CONTENTS FOR CONTRACT CLAUSES
52.202-1 Definitions 52.203-3 Gratuities 52.203-5 Covenant Against Contingent Fees 52.203-6 Restrictions On Subcontractor Sales To The Government 52.203-7 Anti-Kickback Procedures 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity 52.203-12 Limitation On Payments To Influence Certain Federal Transactions 52.203-13 Contractor Code of Business Ethics and Conduct 52.203-14 Display of Hotline Poster(s)
Display of Hotline Poster(s) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights 52.204-4 Printed or Copied Double-Sided on Post Consumer Fiber Content Paper 52.204-9 Personal Identity Verification of Contractor Personnel 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.204-13 System for Award Management Maintenance 52.204-18 Commercial and Government Entity Code Maintenance 52.204-21 Basic Safeguarding of Covered Contractor Information Systems
System for Award Management Maintenance Commercial and Government Entity Code Maintenance Basic Safeguarding of Covered Contractor Information Systems
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations 52.210-1 52.211-10 Alt I
Market Research Commencement, Prosecution, and Completion of Work
52.211-12 Liquidated Damages--Construction 52.211-15 Defense Priority And Allocation Requirements 52.211-18 Variation in Estimated Quantity 52.215-2 Audit and Records--Negotiation 52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications 52.215-13 Subcontractor Cost or Pricing Data--Modifications 52.215-21 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--
Modifications 52.217-7 Option for Increased Quantity – Separately Priced Line Item 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns 52.219-8 Utilization of Small Business Concerns 52.219-9 Small Business Subcontracting Plan 52.219-16 Liquidated Damages-Subcontracting Plan 52.219-28 Post-Award Small Business Program Rerepresentation 52.222-3 Convict Labor 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation 52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-13 Compliance with Davis-Bacon and Related Act Regulations.
52.222-14 Disputes Concerning Labor Standards 52.222-15 Certification of Eligibility
Section 00 72 00 Page 2
52.222-21 Prohibition Of Segregated Facilities 52.222-26 Equal Opportunity 52.222-27 Affirmative Action Compliance Requirements for Construction 52.222-35 Equal Opportunity For Veterans 52.222-36 Affirmative Action For Workers With Disabilities 52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other
Eligible Veterans 52.222-40 Notification of Employee Rights Under the National Labor Relations Act 52.222-50 Combating Trafficking in Persons 52.222-54 Employment Eligibility Verification 52.222-62 Paid Sick Leave Under Executive Order 13706 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts 52.223-3 Hazardous Material Identification and Material Safety Data 52.223-4 Recovered Material Certification 52.223-5 Pollution Prevention and Right-to-Know Information 52.223-6 Drug-Free Workplace 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons 52.223-15 Energy Efficiency in Energy-Consuming Products 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts 52.223-18 Contractor Policy to Ban Text Messaging While Driving 52.223-20 Aerosols 52.223-21 Foams 52.225-11 Buy American Act--Construction Materials Under Trade Agreements 52.225-13 Restrictions on Certain Foreign Purchases 52.227-1 Authorization and Consent 52.227-2 Notice And Assistance Regarding Patent And Copyright Infringement 52.227-4 Patent Indemnity-Construction Contracts 52.228-2 Additional Bond Security 52.228-5 Insurance - Work On A Government Installation 52.228-11 Pledges Of Assets 52.228-12 Prospective Subcontractor Requests for Bonds 52.228-14 Irrevocable Letter of Credit 52.228-15 Performance and Payment Bonds--Construction 52.229-3 Federal, State And Local Taxes 52.232-5 Payments under Fixed-Price Construction Contracts 52.232-17 Interest 52.232-18 Availability of Funds 52.232-23 Assignment Of Claims 52.232-27 Prompt Payment for Construction Contracts 52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration 52.232-39 Unenforceability of Unauthorized Obligations 52.232-40 Providing Accelerated Payments to Small Business Subcontractors 52.233-1 Disputes 52.233-3 Protest After Award 52.233-4 Applicable Law for Breach of Contract Claim 52.236-1 Performance of Work by the Contractor 52.236-2 Differing Site Conditions 52.236-3 Site Investigation and Conditions Affecting the Work 52.236-4 Physical Data 52.236-5 Material and Workmanship 52.236-6 Superintendence by the Contractor 52.236-7 Permits and Responsibilities 52.236-8 Other Contracts 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
Section 00 72 00 Page 3
52.236-10 Operations and Storage Areas 52.236-11 Use and Possession Prior to Completion 52.236-12 Cleaning Up 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I 52.236-14 Availability and Use of Utility Services 52.236-15 Schedules for Construction Contracts 52.236-17 Layout of Work 52.236-21 Specifications and Drawings for Construction 52.236-25 Requirements for Registration of Designers 52.236-26 Preconstruction Conference 52.242-13 Bankruptcy 52.242-14 Suspension of Work 52.243-4 Changes 52.243-6 Change Order Accounting 52.244-2 Subcontracts 52.245-1 Alt I Government Property 52.245-9 Use and Charges 52.244-6 Subcontracts for Commercial Items 52.246-12 Inspection of Construction 52.246-21 Alt I Warranty of Construction 52.248-3 Value Engineering-Construction 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) - Alternate I 52.249-10 Default (Fixed-Price Construction) 52.249-5000 Basis for Settlement of Proposals 52.252-6 Authorized Deviations in Clauses 52.253-1 Computer Generated Forms 252.201-7000 Contracting Officer's Representative 252.203-7000 Requirements Relating to Compensation of Former DOD Officials 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies 252.203-7002 Requirement to Inform Employees of Whistleblower Rights 252.203-7003 Agency Office of the Inspector General 252.203-7004 Display of Hotline Posters 252.204-7000 Disclosure Of Information 252.204-7003 Control Of Government Personnel Work Product 252.204-7004 Alt A Alternate A, System for Award Management 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting 252.205-7000 Provision of Information to Cooperative Agreement Holders 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist
Country 252.215-7000 Pricing Adjustments 252.219-7003 Small Business Subcontracting Plan (DOD Contracts) 252.222-7000 Restriction on Employment of Personnel 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements 252.223-7001 Hazard Warning Labels 252.223-7004 Drug Free Work Force 252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials 252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native
Hawaiian Small Business Concerns 252.227-7022 Government Rights (Unlimited) 252.227-7033 Rights in Shop Drawings 252.231-7000 Supplemental Cost Principles 252.232-7010 Levies on Contract Payments 252.236-7000 Modification Proposals-Price Breakdown 252.236-7001 Contract Drawings, and Specifications 252.236-7005 Airfield Safety Precautions
Section 00 72 00 Page 4
252.236-7013 Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers
252.243-7001 Pricing Of Contract Modifications 252.243-7002 Requests for Equitable Adjustment 252.244-7000 Subcontracts for Commercial Items and Commercial Components (DoD Contracts) 252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System 252.246-7008 Sources of Electronic Parts 252.247-7023 Transportation of Supplies by Sea 252.247-7024 Notification Of Transportation Of Supplies By Sea
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries Resolved Between 29-Jun-17 and 19-Oct-17
Project: F-35A Aircraft Weather Shelters (Squadron 1) Review: EIE378 Bidder Inquiry (00001) (sorted by CommentID ) Displaying 174 inquiries.
Id Discipline Sheet Detail Spec 7139544 Architectural Section 3.5.6.2 Masonry Base Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
This section calls for a Precast Concrete Cap. On past projects we have used an integral color masonry cap. Please confirm if a masonry cap is acceptable.
On: Sep 06 2017.
Government Response. . The substitution is NOT acceptable.
Per 01 10 00, 3.5.6.2 - "Masonry style shall incorporate a precast concrete cap with integral color." On: Sep 18 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7145484 Architectural Section 01 10 00 Statement of Work Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph 3.5.8.3 B calls for the walls of the wash bays to be sealed masonry to 10'AFF then Insulated walls per
3.5.6.5 covered with FRP from 10' to structure. The Room Criteria sheet for the Wash Bay just calls for the Insulated Wall from 10' to Structure. Please confirm the wall construction at the Wash Bays.
On: Sep 11 2017.
Government Response. . Wall construction for the wash bays shall feature sealed masonry to 10'-0" AFF. Above 10'-0" AFF walls are to be constructed to meet the fire resistance rating noted in 3.7.9.6 and finished with glass mat gypsum board and metal liner panels up to the bottom of the roof deck. Refer to AM#4 issued 26 Sep 17, 01 10 00 para 3.5.8.3 B was modified. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7146827 Architectural 01 10 00 Statement of Work Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph 3.4.2.3 (H) calls for 3" 100psi under slab rigid insulation. Paragraph 3.5.6.7 calls for R15 or 3" thick 100 psi rigid insulation under the slab. Please clarify the thickness and R Value required for the under slab rigid insulation.
On: Sep 11 2017.
Government Response. . Provide minimum 2 inches of insulation and minimum R-value of 10. Reference Section 01 10 00-3.4.2.3.H and amended Section 01 10 00-3.5.6.7 (modified in AM#4 on 26 Sep 17). On:
Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147250 Architectural Room Criteria Sheets Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Room criteria sheets for the Mechanical, Electrical, and Fire Protection Rooms are calling for all walls to be CMU.
Please clarify if these walls are to be full height masonry or only to 10' AFF and then can be Metal Stud, Batts, and GWB or IMP similar to the hangar bays.
On: Sep 11 2017.
Government Response. . CMU (up to 10'-0" AFF) is only required when adjacent to a hangar bay. When not adjacent to a hangar bay, metal studs with specified finish and fire rating shall be provided for interior
Page 1 of 40ProjNet: Logged In User
10/19/2017https://www.projnet.org/projnet/binKornHome/index.cfm walls. Exterior walls shall follow Section 3.5.6. Room criteria sheets were updated in AM#4 on 26 Sep 17.
On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147359 General 00 22 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 00 22 20, 4.0 Phase 2 Proposal Contents and related evaluation factors, subfactors and Elements (Page 3) references a Tab E Air Force MILCON Sustainability Worksheet that is missing under the 5.0 Volume 1 - Factor 1 - Design Technical detailed requirements. Please advise what is required to be submitted under this Tab.
On: Sep 11 2017.
Government Response. . Submit a filled-out Air Force MILCON Sustainability Worksheet. An excel version of the worksheet can be downloaded by following the link included in Section 01 33 16.00 29/3.5.6.
Or follow direct link at http://www.wbdg.org/ffc/af-afcec/sustainable-design-development-sdd/sustainability-tracking-reporting. Select the AF Sustainability Requirements Scoresheet, GP Version. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147435 Architectural Room Criteria Sheets Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The electrical and Fire Protection rooms are calling for Hard Lid painted ceilings. These rooms are typically open to structure with exposed structure being painted. Please confirm ceiling requirements for these rooms.
On: Sep 11 2017.
Government Response. . Rooms open to a painted structure are acceptable provided ceiling assembly meets required fire resistance ratings. Room Criteria Sheets were updated to reference rating paragraphs in AM#4 on 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147464 General 00 22 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that on page 19 of section 00 22 20 - 6.3 should read TAB C - REQUIRED PRE-AWARD INFORMATION and page 20 of section 00 22 20 - 6.4 should read TAB D - SUBCONTRACTING PLAN.
On: Sep 11 2017.
Government Response. . Reference AM#4 issued on 26 Sep 17, Section 00 22 20 paragraph 6.3 has been corrected to read "TAB C" and paragraph 6.4 has been corrected to read "TAB D" in AM#4. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147467 Sustainability 01 33 29 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Throughout the RFP and amendment there is reference to Section 01 33 29 - SUSTAINABILITY REPORTING but it appears this section was not provided in the RFP or amendments. Please advise where this section can be located.
On: Sep 11 2017.
Government Response. . Reference RFP Section 01 10 00-3.10.3.5. Specification Section 01 33 29 Sustainability Reporting is to be developed by the successful Offeror. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147971 Mechanical 01 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm the desire is to have fixed, i.e. non-portable avionics cooling units as part of the project.
Page 2 of 40ProjNet: Logged In User
On: Sep 12 2017.
Government Response. . All ACA units are to be of fixed type. Reference AM#4 issued 26 Sep 17, 01 10 00/3.6.15.1 G. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147993 Mechanical 23 00 99 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm piping material from the Avioincs cooling unit to the point of connection to the flex hose is to be stainless steel?
On: Sep 12 2017.
Government Response. . Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter. Reference AM#4 issued 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7147998 Mechanical 23 00 99 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification section was written for avionics air cooling termination pit application. Please confirm location of monitoring points?
On: Sep 12 2017.
Government Response. . There are no termination pits in this project. Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter. Reference AM#4 issued 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148029 Mechanical 23 00 99 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The two manufacturers listed in the specification do not have avionics cooling units designed to operate in EIE winter temperatures. Is the expectation that the units will run with the hangar doors open and the room at ambient outside air conditions?
On: Sep 12 2017.
Government Response. . Units are not intended to be operated while the overhead doors are open.
Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter.
Reference AM#4 issued 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148042 Mechanical 01 10 00 3.6.16.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section states avionics cooling air to be at prescribed temperature, pressure and flow at aircraft. Government is providing 50 ft. flexible hose, what pressure & temperature loss is to be expected through the government provided hose?
On: Sep 12 2017.
Government Response. . The Designer of Record shall be responsible for estimating/calculating pressure and temperature loss. Actual performance data is not available. The hose primarily used is NSN 4720-01- 255-5843; 8.125 inches in diameter, 15 feet in length (multiple sections required), 4-ply. The 1st, 2nd and 4th plies are PLASTIC POLYAMIDE AND RUBBER CHLOROPRENE. The 3rd ply is FIBERGLASS AND PLASTIC POLYAMIDE. There is a steel reinforcing wire on the exterior. Minimum bend radius is 4 inches, and it can handle 27 psi. On: Oct 03 2017
Page 3 of 40ProjNet: Logged In User
Current Request Status: Request Closed Information for this report is procurement sensitive.
7148084 Mechanical 23 00 99 & 01 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Appears the intent is to have manual valving to change position on avionics cooling air supply location between the two bays, please confirm.
On: Sep 12 2017.
Government Response. . Confirmed. Manually operated valves are required. Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter. Reference AM#4 issued 26 Sep
17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148098 Mechanical 23 00 99 & 01 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For the avionics cooling system control is the intent to have a master controller in each bay? This would allow for startup and purge mode observation by personnel within each bay? Or is a single master controller intended for each unit and personnel will walk between bays.
On: Sep 12 2017.
Government Response. . Multiple controllers for ACA operation is not required. Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter. Reference AM#4 issued on 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148110 Mechanical 23 00 99 & 01 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For the avionics cooling air distribution piping is a prescribed amount of insulation to be provided based on past experience by the government to ensure the precise temperature at the unit is achieved or is it on the design build contractor to calculate the temperature loss and select the appropriate type and amount of insulation?
On: Sep 12 2017.
Government Response. . Offeror shall calculate the amount of insulation required to ensure delivery of air at prescribed conditions. Sample Specification Section 23 00 99 provides the minimum requirements for the ACAs and is to be edited per amended RFP Section 01 10 00-3.6.15.1.G.3, to be applicable for this Weather Shelter. Reference AM#4 issued 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148131 Contracting Appendix A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are EIE382 65% mechanical, electrical, structural plans to be provided for reference?
On: Sep 12 2017.
Government Response. . No, these plans will not be provided. On: Oct 03 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148133 CAD-BIM Appendix A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are BIM or CADD files to be provided for the 65% EIE378 plan PDFs provided?
On: Sep 12 2017.
Page 4 of 40ProjNet: Logged In User
Government Response. . Electronic files for EIE378 survey data, General Series drawings, Manhole LP- 41, and Electrical site plans have been provided via amendment. CADD or BIM files associated with the adjacent weather shelter (EIE382) will NOT be provided. On: Oct 19 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148371 Architectural RFP 01 10 00; 3.5.6.13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
3.5.6.13 states doors may be recessed from the plane of the wall a 'minimum' of three feet.
3.5.6.15 states doors may be recessed into the face of the building a 'maximum' of three feet.
Please clarify if door recesses can be anything other than three feet?
On: Sep 12 2017.
Government Response. . Concur - depth of recess was removed from Section 01 10 00-3.5.6.13.F in Amendment #4, issued on 26 Sep 17. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148455 Architectural RFP 01 10 00 3.5.6.17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
3.5.6.17 notes metal hoods to be installed at louvers as required to prevent condensation and snow drift infiltration;
however, there are no hoods shown on the example drawings. Are hoods required at louvers?
On: Sep 12 2017.
Government Response. . Hoods are required in locations as noted in 3.6.15.1.R and 3.6.15.3.E.
Drawings included are exhibit drawings provided as a reference only and are not representative of all requirements listed in RFP. On: Sep 26 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148463 CAD-BIM Appendix A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide the appendix drawings in AutoCAD for our use in preparing proposals and pricing documents.
Specifically the G, Survey, D, ED, and ES series of drawings.
On: Sep 12 2017.
Government Response. . Electronic files for EIE378 survey data, General Series drawings, Manhole LP- 41, and Electrical site plans were provided via AM#5 on 10-06-17. CADD or BIM files associated with the adjacent weather shelter (EIE382) will NOT be provided. On: Oct 06 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148465 Civil Plans Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the EIE 382 65% civil drawings be provided for reference?
On: Sep 12 2017.
Government Response. . EIE382 Civil drawings pertinent to EIE378 have been provided in Appendix A.
On: Oct 03 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148473 Civil 01 10 00 - 3.3.13 A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per RFP language, Transitions, finish grades, and structural sections between the weather shelter project and apron paving project EIE399.
Please provide the pertinent information from EIE 399 including: subgrade transitions, earthwork sections, finish
Page 5 of 40ProjNet: Logged In User grades, pavement sections, etc.
Will there be any consideration to modifying EIE 399 drawings if the offerer proposes a different grading scheme at the point of connection to the taxiway; or conversely, are the EIE 399 grades assumed to be fixed and remain unchanged?
On: Sep 12 2017.
Government Response. . Pertinent information from the PRELIMINARY design of EIE399 was provided with AM#5 on 10-06-17. Consideration of proposed modifications to EIE399 during project development/coordination must be on a case-by-case basis. No blanket assurance can be provided one way or the other (reference Section 01 10 00-3.3.10). NOTE: Paragraph 3.3.10.A was revised to remove the statement that USACE will establish the EIE378 floor elevation. EIE378 floor elevation will be determined by the successful offeror. On: Oct 06 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
7148567 Civil C-808 and C-880 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm need to supply 2" CW pipe from MH LP-41 to EIE378 in addition to the 8" CW pipe. It appears the 8" would adequately serve the hydrant and domestic needs of the facility.
On: Sep 12 2017.
Government Response. .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .