This is a Statement of Work and Specifications document for the procurement of DC power infrastructure equipment and installation services for the White Sands Missile Range (WSMR) Information Systems Facility (ISF) under solicitation W9115126QA063. The contract requires the supply and installation of a VERTIV NetSure -48 VDC power system, including two complete sets of NetSure 8200 Power Systems, GNB Absolyte 3-100G29 battery strings (eight 48V strings), eSure 200A rectifiers (46 units), and associated mounting hardware and distribution bay components (BDFB frames and bullet distribution modules). The procurement includes both equipment delivery and comprehensive installation services at WSMR, encompassing battery string assembly, rectifier installation, communication cable runs, and equipment mounting per customer-provided drawings.
The contractor is responsible for equipment mounting to floor slabs, internal power plant testing and turn-up, and coordination with WSMR for interconnection and external device integration. Deliverables include all warranty paperwork, contractor build sheets and technical documentation, completion of security training (AT Level I and iWATCH), and submission of background check information to the Provost Marshal Office. All training completion certificates and NCICIII forms must be submitted to the designated government point of contact within specified timeframes (15-20 calendar days post-award). The work falls under Army installations with associated security and access requirements, and pricing was based on equipment installation on concrete slab flooring with WSMR-provided loading/unloading capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equipment Location.pdf | ||
| Question 19.docx | DOCX document | |
| Amendment 2 Solicitation - W9115126QA063.pdf | ||
| Amendment 1 Solicitation - W9115126QA063.pdf | ||
| Drawing.docx | DOCX document | |
| MICC Questions DC Power V2.docx | DOCX document | |
| Solicitation - W9115126QA063.pdf | ||
| MFR_Limiting_Competition_MUE ISF DC Power Plant 2nd Buy_Redacted.pdf | ||
| Purchase Description.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I understand the requirements of the Procurement Integrity Act (41 USC 2101-2107) and the Provisions of the FAR 3.104 and 15.207
| Part Number Description |
| Qty |
582140000 "NetSure 8200 Power System "
1M830BNA565806
"NCU W 565806 SOFTWARE"
582140000102
"NS8200, MAIN COMB. BAY, A/F PDSC"
582140000131
"NETSURE 8200 AC CAB, 480VAC, 65KAIC"
5821400000A
"KIT,480 VOLT OPTION "
513793
"CB MCB 4P 800A KA 65VDC HYDRAULIC F "
520894DCP
"KIT,4-POS LUG ADAPTER "
582140000 "NetSure 8200 Power System "
1M830BNA565806
"NCU W 565806 SOFTWARE"
582140000102
"NS8200, MAIN COMB. BAY, A/F PDSC"
582140000131
"NETSURE 8200 AC CAB, 480VAC, 65KAIC"
5821400000A
"KIT,480 VOLT OPTION "
513793
"CB MCB 4P 800A KA 65VDC HYDRAULIC F "
520894DCP
"KIT,4-POS LUG ADAPTER "
582140000 "NetSure 8200 Power System "
582140000112
"NS8200, SUP. COMB. BAY, A/F PDSC"
582140000131
"NETSURE 8200 AC CAB, 480VAC, 65KAIC"
5821400000A
"KIT,480 VOLT OPTION "
513793
"CB MCB 4P 800A KA 65VDC HYDRAULIC F "
520894DCP
"KIT,4-POS LUG ADAPTER "
| 582140600 is an internal Vertiv part identifier, not a retail SKU. This is an assembly, subcomponent, or contract‑specific configurations for the ISF DC Power |
| 2 |
58214060009 "BDFB Frame, 8 Panel, 30W x 24D"
58214060015
"BULLET DIST MODULE, 16 POSITION"
58214060043 "Input Shunt Feed Assy, 25mV "
58214060016 "Internal Ground, Full 8 Panel Bay"
1M832DNA563436
"MONITOR W 563436 SOFTWARE"
58214060052 "Dressing Bar, 24"" Deep Bay "
58214060067 "Pre-Installed Load Mtg Hardware"
58214060048 "2400A Internal Ground Assy"
150596 "20A Fuse, White/Green, 450AIC @ 60VDC"
Total Parts
Installation DC Power BU
| Shipping DC Power BU |
| 1 |
All requested parts can be assemblies, subcomponents, contract‑specific configurations or standalone requests for the ISF DC Power.
1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 20 calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.
2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
3. For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 15 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR NLT 20 calendar days after contract award.
5. Installation Scope:
WSMR will receive and store the equipment on site. The movement of equipment on base will either be the responsibility of WSMR unless the equipment is in a warehouse facility with WSMR provided loading and un-loading capabilities.
Vertiv or a verified authorized vendor will be responsible for mounting the equipment to the floor in the new DC Power spaces only. Pricing was based on all equipment being mounted on a slab floor. WSMR will be responsible for interconnecting all the equipment for proper operation.
Vertiv's or a verified authorized vendor shall test and turn-up will be limited to the internal operation of the power plant. Any external connected devices i.e., EPO switches, IP connections or alarms will be the responsibility of WSMR. The test and turn-up can be performed on the same deployment without any down time. If a return trip is required test and turn-up will also be required.
- GNB Absolyte 3-100G29 Battery Strings Mount and assemble (8) -48v strings of GNB Absolyte 3-100G29 batteries in the location shown on the Customer provided drawing.
- Install EEE Battery Disconnects. Install the EEE battery disconnect on each string for GNB 3-100G29 batteries
- Mount NetSure 8200 -48v Main Combo Bays and Associated PDSC’s Mount the (4) NetSure 8200 Main Combo Bays and associated PDSC’s in the location shown on the Customer provided drawing.
- NetSure 8200 Supplemental Combo Bays and Associated PDSC’s Mount the (2) NetSure 8200 Supplemental Combo Bays and Associated PDSC’s in the location shown on the Customer provided drawing.
- NetSure Communication Cable. Run and terminate the NetSure communications cable between the NetSure Main Bay and associated Supplemental Bay.
- eSure 200A Rectifiers. Install (46) Rectifier, eSure, 200A, 48V output, 480V, 3 phase input switch mode rectifiers in the NetSure plant.
- Non-Classified Room 8-LD BDFB #1. Mount the 8-load Non-Classified Room 8-LD BDFB #1 as shown on the Customer drawings
- Non-Classified Room 8-LD BDFB #2. Mount the 8-load Non-Classified Room 8-LD BDFB #2 as shown on the Customer drawings
- Non-Classified Room 8-LD BDFB #3. Mount the 8-load Non-Classified Room 8-LD BDFB #3 as shown on the Customer drawings
- Non-Classified Room 8-LD BDFB #4. Mount the 8-load Non-Classified Room 8-LD BDFB #4 as shown on the Customer drawings
- Classified Room 2-LD BDFB #1. Mount the 2-load Non-Classified Room 2-LD BDFB #1 as shown on the Customer drawings.
6. Deliverables:
6a. All Warranty paperwork shall be delivered upon completion of work.
6b. NCIC‐III form shall be sent to todd.g.kelley.civ@army.mil Government will send to the winning bidder the form required to complete the NCIC‐III for entry to WSMR.
6c. The winning bidder shall send all required training to todd.g.kelley.civ@army.mil 6d. All contractor build sheets or other documentation derived for the required work shall be delivered to todd.g.kelley.civ@army.mil
Procurement Sensitive Information