This is a Questions and Answers document addressing clarifications for the ISF DC Power solicitation at White Sands Missile Range (WSMR). The document confirms equipment quantities for the VERTIV NetSure 8200 DC Power System, including 6 power systems, 4 Network Control Units, 4 main combination bays, 2 supplemental combination bays, 6 AC cabinets, 6 480-volt option kits, 36 circuit breakers, and 36 four-position lug adapter kits. Part number 582140600 is identified as an internal Vertiv assembly or subcomponent for the ISF DC Power with a quantity of two units; further details on configuration are not specified in the Q&A response.

Installation responsibilities are clearly delineated, with WSMR responsible for equipment receipt, storage, movement on base, interconnection of equipment, and final acceptance. Vertiv or a verified authorized vendor is responsible for floor mounting, positioning, anchoring, integration, software configuration, startup, testing, and commissioning of the power plant's internal operations, with external device connections managed by WSMR. Commercial AC power infrastructure is already in place with a 1200-amp breaker panel, and cable runs are being installed for interconnections. Vertiv will determine required certifications and authorization for contractor personnel. Delivery is FOB destination to White Sands Missile Range, Transportation ATEC 1870, Aberdeen, NM 88002-5000, with site visit availability to be determined. Warranty is specified as one year or longer if manufacturer warranties exceed that period. Partial shipments and invoicing are authorized, and installation may commence before all equipment arrives.

View the file

Other files

File Type Posted
Question 19.docx DOCX document
Equipment Location.pdf PDF
Amendment 2 Solicitation - W9115126QA063.pdf PDF
Drawing.docx DOCX document
SOW SPECS MUE ISF DC Power Plant 2nd Buy V2.docx DOCX document
Amendment 1 Solicitation - W9115126QA063.pdf PDF
Purchase Description.docx DOCX document
MFR_Limiting_Competition_MUE ISF DC Power Plant 2nd Buy_Redacted.pdf PDF
Solicitation - W9115126QA063.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.Equipment quantities: The Purchase Description contains two identical blocks for the NetSure 8200 Main Combination Bay equipment. Please confirm whether this repetition is intentional and whether the following aggregated quantities are correct:
oNetSure 8200 Power System, PN 582140000: 6
oNCU with 565806 Software, PN 1M830BNA565806: 4
oMain Combination Bay, PN 582140000102: 4
oSupplemental Combination Bay, PN 582140000112: 2
oNetSure 8200 AC Cabinet, PN 582140000131: 6
o480-Volt Option Kit, PN 5821400000A: 6
oCircuit Breaker, PN 513793: 36
oFour-Position Lug Adapter Kit, PN 520894DCP: 36

1A. The repetition is intentional. The manufacturer divided the items into each Rectifier cabinet. Each cabinet contains components that may be the same.

2. Missing description: Please provide the description and required configuration for PN 582140600, quantity two.

2A. 582140600 is an internal Vertiv part identifier, not a retail SKU. This is an assembly, subcomponent, or contract‑specific configurations for the ISF DC Power. All requested parts can be assemblies, subcomponents, contract‑specific configurations or standalone requests for the ISF DC Power.

3. Installation scope: Please provide the detailed installation Statement of Work, including contractor responsibilities for unloading, positioning, anchoring, wiring, cabling, grounding, integration, software configuration, startup, testing, commissioning, and final acceptance.

3A. WSMR will receive and store the equipment on WSMR. The movement of equipment on base will either be the responsibility of WSMR unless the equipment is in a warehouse facility with WSMR provided loading and un-loading capabilities.

Vertiv or a verified authorized vendor shall be responsible for mounting the equipment to the floor in the new DC Power spaces only. Pricing was based on all equipment being mounted on a slab floor. WSMR will be responsible for interconnecting all the equipment for proper operation.

Installers see revised SOW for required WSMR training and access to WSMR.

Vertiv or a verified authorized vendor shall test and turn-up will be limited to the internal operation of the power plant. Any external connected devices i.e., EPO switches, IP connections or alarms will be the responsibility of WSMR. The test and turn-up can be performed on the same deployment without any down time. Otherwise, If a return trip is required test and turn-up will also be required.

Vertiv or a verified authorized vendor shall be responsible for positioning, anchoring, integration, software configuration, startup, testing, and commissioning.

Final acceptance will be in charge of WSMR management and DC Power Project POC.

4. Existing infrastructure: Please identify which AC/DC electrical infrastructure, conduit, conductors, cabling, grounding, breakers, terminations, battery systems, and supporting equipment will be Government-furnished or already installed.

4A. Commercial AC Power is in place connected to a 1200Amp breaker panel that will feed the rectifier cabinets. Cable runs are being installed to interconnect the Rectifier cabinets with the BDFB's and to the end equipment cabinets and the Batteries to the Rectifier cabinets.

5. VERTIV authorization: Must the contractor and installation technicians be VERTIV-authorized or factory-certified? If so, please identify the required certification or authorization documentation.

5A. VERTIV authorized or factory-certified shall be determined by VERTIV for authorizing or required certifications .

6. Drawings and site information: Please provide the applicable Basis of Design, one-line diagrams, equipment-room layout, electrical drawings, cable schedules, connection diagrams, and available site photographs required to prepare the installation quotation.

6A. The Government will have to obtain this information from the CORe. Authorized vendors can also request the information from VERTIVE.

7. Site visit: Will the Government conduct a site visit or permit prospective contractors to inspect the installation location before submitting quotations?

7A. Currently the building does not belong to WSMR. WSMR will contact the CORe to see if a site visit will be allowed.

8. Shipping address: Please provide the complete FOB Destination delivery address associated with Ship-To DoDAAC W81C39, including building number, receiving instructions, delivery restrictions, and receiving POC.

8A. Identified on the PR Ship To: Transportation # ATEC 1870 ABERDEEN, WHITE SANDS MISSILE NM 88002-5000 Attn: Josue Anchondo josue.h.anchondo.civ@army.mil

9. Security and access: Please identify all WSMR badging, background-check, citizenship, escort, vehicle-access, security, and classified-facility requirements applicable to installation personnel.

9A. Identified in the revised SOW, SPECS MUE ISF DC Power Plant 2nd buy V2

10. Testing and training: Please confirm the required factory testing, onsite acceptance testing, commissioning reports, operator training, warranty documentation, as-built drawings, and other closeout deliverables.

10A. Reference the SOW identified in question 9.

11. Warranty: Please confirm the minimum required warranty period for the equipment, installation workmanship, software, and system commissioning.

11A. Warranty is 1 year or longer if OEMs warranty is longer.

12. Partial deliveries: Please confirm whether partial or phased shipments are permitted and whether installation may begin before all equipment has arrived.

12a. Partial shipments and invoicing are authorized.