Attachment 7 Questions and Answers Version 2.pdf

PDF 85 KB Posted

Attached to
Communications Infrastructure Upgrade Ft. Cavazos, TX Federal contract opportunity
Solicitation number
W9115123Q0078
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document contains questions and answers regarding solicitation number W9115123Q0078 from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood for communications infrastructure upgrades at Fort Cavazos, Texas. The solicitation involves installing fiber optic cable and conducting related testing. Specifically, the fiber optic cable is to be terminated under a separate future contract and not under this solicitation. The contractor is expected to perform reel or end to end testing of the fiber optic cable with ST connectors in manhole 4112 since the cable will not be installed into building 90132 under this contract.

View the file

Other files for this federal contract opportunity

Other files attached to Communications Infrastructure Upgrade Ft. Cavazos, TX, newest first.
File Type Posted
Attachment 3 Wage Determination 2015-5237 Revision No 22.pdf PDF
Amendment W9115123Q00780003.pdf PDF
Site Visit Sign in.pdf PDF
Attachment 6 Questions and Answers.pdf PDF
Attachement 5 Confined Space Entry SOP 5AUG21.pdf PDF
Amendment W9115123Q00780002.pdf PDF
Attachment 1 Fort Cavazos Telecommunications Guide v2.pdf PDF
W9115123Q00780001 Amendment.pdf PDF
Attachment 4 SANEC VAL.pdf PDF
RFQ W9115123Q0078.pdf PDF
Attachment 2 FiberInstall_Map.pdf PDF
Attachment 1 Ft. Cavazos Telecommunications Guide.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Version 2 W91151-23-Q-0078

1. 1st sub bullet: Who is expected to complete the installation of fiber into Bldg. 90132 “at a later date”? If it is expected to be completed under this contract what is the delay factor, Para 5.1 1st Sub bullet?

The FOC shall be terminated under another contract/contractor in the future.

There shall be no delay on this contract for this reason.

2. 2nd sub bullet: If the cable is not expected to be installed into Bldg. 90132 under this contract, should this paragraph be amended to reflect the change, Para 5.1 2nd Sub Bullet?

See Updated PWS

3. 3rd sub bullet: If the cable is not expected to be installed into Bldg. 90132 under this contract, what specific tests is govt expecting to receive from contractor, Para 5.1 3rd Sub Bullet?

Reel testing or end to end testing is required. If the FOC must be terminated to be tested, then terminate the FOC with ST connectors in MH4112.