Attachment 7 Questions and Answers Version 2.pdf
PDF 85 KB Posted
- Attached to
- Communications Infrastructure Upgrade Ft. Cavazos, TX Federal contract opportunity
- Solicitation number
- W9115123Q0078
About this file
This document contains questions and answers regarding solicitation number W9115123Q0078 from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood for communications infrastructure upgrades at Fort Cavazos, Texas. The solicitation involves installing fiber optic cable and conducting related testing. Specifically, the fiber optic cable is to be terminated under a separate future contract and not under this solicitation. The contractor is expected to perform reel or end to end testing of the fiber optic cable with ST connectors in manhole 4112 since the cable will not be installed into building 90132 under this contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 Wage Determination 2015-5237 Revision No 22.pdf | ||
| Amendment W9115123Q00780003.pdf | ||
| Site Visit Sign in.pdf | ||
| Attachment 6 Questions and Answers.pdf | ||
| Attachement 5 Confined Space Entry SOP 5AUG21.pdf | ||
| Amendment W9115123Q00780002.pdf | ||
| Attachment 1 Fort Cavazos Telecommunications Guide v2.pdf | ||
| W9115123Q00780001 Amendment.pdf | ||
| Attachment 4 SANEC VAL.pdf | ||
| RFQ W9115123Q0078.pdf | ||
| Attachment 2 FiberInstall_Map.pdf | ||
| Attachment 1 Ft. Cavazos Telecommunications Guide.pdf | ||
| Attachment 3 Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Version 2 W91151-23-Q-0078
1. 1st sub bullet: Who is expected to complete the installation of fiber into Bldg. 90132 “at a later date”? If it is expected to be completed under this contract what is the delay factor, Para 5.1 1st Sub bullet?
The FOC shall be terminated under another contract/contractor in the future.
There shall be no delay on this contract for this reason.
2. 2nd sub bullet: If the cable is not expected to be installed into Bldg. 90132 under this contract, should this paragraph be amended to reflect the change, Para 5.1 2nd Sub Bullet?
See Updated PWS
3. 3rd sub bullet: If the cable is not expected to be installed into Bldg. 90132 under this contract, what specific tests is govt expecting to receive from contractor, Para 5.1 3rd Sub Bullet?
Reel testing or end to end testing is required. If the FOC must be terminated to be tested, then terminate the FOC with ST connectors in MH4112.