Attachment 6 Questions and Answers.pdf

PDF 113 KB Posted

Attached to
Communications Infrastructure Upgrade Ft. Cavazos, TX Federal contract opportunity
Solicitation number
W9115123Q0078
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document contains questions and answers regarding communications infrastructure upgrade work at Fort Cavazos, Texas under solicitation W91151-23-Q-0078 from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. The questions and answers specify connector types, fiber assignments, locations for terminating fibers and grounding equipment, procedures for pumping manholes if necessary, and references for mule tape strength. No other salient details are provided regarding required products or services.

View the file

Other files for this federal contract opportunity

Other files attached to Communications Infrastructure Upgrade Ft. Cavazos, TX, newest first.
File Type Posted
Attachment 7 Questions and Answers Version 2.pdf PDF
Attachment 3 Wage Determination 2015-5237 Revision No 22.pdf PDF
Amendment W9115123Q00780003.pdf PDF
Site Visit Sign in.pdf PDF
Attachement 5 Confined Space Entry SOP 5AUG21.pdf PDF
Amendment W9115123Q00780002.pdf PDF
Attachment 1 Fort Cavazos Telecommunications Guide v2.pdf PDF
W9115123Q00780001 Amendment.pdf PDF
Attachment 4 SANEC VAL.pdf PDF
RFQ W9115123Q0078.pdf PDF
Attachment 2 FiberInstall_Map.pdf PDF
Attachment 1 Ft. Cavazos Telecommunications Guide.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers W91151-23-Q-0078

1. What type of connectors will be on the bulkheads of the panels? i.e. SC/UPC, SC/APC, LC/UPC

“ST” type connectors shall be installed in B91078. B90132 does not require connectors as the FOC shall be coiled in the MH.

2. How many fibers will need to be terminated in each panel or existing splice enclosure?

The install depicts a 12 FOC shall be installed & all 12 fibers shall be terminated with “ST” type connectors.

3. What are the fiber assignments for the existing fiber enclosure?

The FOC name is: 91078 FOC 27, 1-12.

4. We were instructed at the onsite visit to leave 200' on the last manhole outside bldg. 90132.

Can you please provide the manhole number?

MH4112

5. In Building 91078 can you please specify the rack number, RU number, and panel number where the fiber will land?

Rack 3, Shelf 4, F 1-12

6. In Building 91078 can you please confirm the location of the grounding/bonding bus bar we are to use for a double-hole lug?

The ground bus bar is located at the top of Rack 4.

7. Do all Manholes have a built-in ladder?

No, all Manholes do not have ladders.

8. If we need to pump the manhole, what is the direction/process to pump, and are there any environmental issues we need to monitor?

All pumped water shall be diverted to either grass or dirt areas. Water shall not be directed to hard surface roads which will allow water to enter storm drains. The NEC POC shall be available for more conformation if manholes need to be pumped.

10. What strength mule tape needs to be left in the duct bank?

Reference the T-IDG, Section 6.11.1, f.