This document outlines a requirements contract solicitation for facility repair services at Fort Hood, Texas. The Directorate of Public Works at Fort Hood is seeking to establish an indefinite-delivery/indefinite-quantity contract to perform repairs to architectural features at buildings on the installation. Work will include mold and asbestos abatement, replacement of flooring, ceiling tiles and doors, painting of facilities, and cleaning of building exteriors. The solicitation number is W91151-22-B-0007 and it was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The base period of performance is one year with four one-year option periods that may be exercised. Pricing will be obtained using firm fixed unit prices for pre-defined repair items. Award is anticipated within 90 days of the February 15th submission deadline.

View the file

Other files

File Type Posted
Sign In Sheet Bid Opening W91151-22-B-0007.pdf PDF
Bid Abstract W91151-22-B-0007 (2).pdf PDF
Technical Exhibit C - Line Item Specifications r02.pdf PDF
Technical Exhibit D - OEFM Bid Sheet r02.pdf PDF
Amendment 0004 Solicitation W91151-22-B-0007 R-R IDIQ.pdf PDF
Technical Exhibit C - Line Item Specifications r02.pdf PDF
Technical Exhibit D - OEFM Bid Sheet r02.pdf PDF
Questions W91151-22-B-0007 - Response.pdf PDF
Revised Technical Exhibit C - Line Item Specifications r01.pdf PDF
RFI Questions W91151-22-B-0007 - DPW Response.pdf PDF
Amendment 0003 Solicitation W91151-22-B-0007 R-R IDIQ-HOOD-HOODNBMICCFH334.pdf PDF
Amendment 0002 Solicitation W91151-22-B-0007 R-R IDIQ-HOODNBMICCFH334.pdf PDF
Site Visit Sign In Sheet W91151-22-B-0007 21 July 2022.pdf PDF
2a. Technical Exhibit B FY22 Divisioin 1 Specifications 30-NOV-2021 (1).pdf PDF
Amendment 0001 Solicitation W91151-22-B-0007 R-R IDIQ.pdf PDF
4.2. Technical Exhibit D FY122 IDIQ OEFM Estimate Sheet - BLANK 30-NOV-2021 (1).pdf PDF
Questions.docx DOCX document
Technical Exhibit A Statement of Work.docx DOCX document
3a. Technical Exhibit C FY22 - Line Item Specifications 30-NOV-2021.pdf PDF
2a. Technical Exhibit B FY22 Divisioin 1 Specifications 30-NOV-2021 (1).pdf PDF
Solicitation W91151-22-B-0007 R-R IDIQ.pdf PDF
FY22 IDIQ R - R Contract - Attachment 1 Appendix A 30-NOV-2021.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL COST

$0.00

01-0100 As-Built Drawings EA $0.00 40 $0.00

02-0100 Demolition of Joint Sealants LF $0.00 20,000 $0.00

02-0200 Demolition of Interior Doors EA $0.00 160 $0.00

02-0300 Demolition of Exterior Doors EA $0.00 80 $0.00

02-0400 Demolition of Carpet SF $0.00 20,000 $0.00

02-0500 Demolition of VCT/Vinyl Flooring SF $0.00 80,000 $0.00

02-0600 Demolition of Vinyl/Rubber Wall Base LF $0.00 9,000 $0.00

02-0700 Demolition of Corner Guards LF $0.00 3,000 $0.00

02-0800 Demolition of Gypsum Wallboard SF $0.00 80,000 $0.00

02-0900 Demolition of Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

02-1000 Demoltion of Acoustical Ceiling Tiles and Grid (Complete) SF $0.00 80,000 $0.00

02-1100 Demolition of Miscellaneous Wall Mounted Equipment ( < 18"x18") EA $0.00 200 $0.00

02-1200 Demolition of Miscellaneous Wall Mounted Equipment ( > 18"x18") EA $0.00 100 $0.00

02-1300 Demolition of Bored Locksets EA $0.00 100 $0.00

02-1400 Demolition of Mortised Locksets EA $0.00 100 $0.00

02-1500 Demolition of Window Blinds/Shades LF $0.00 96 $0.00

02-1600 Demolition of Window Screen SF $0.00 4,000 $0.00

03-0100 Self-Leveling Underlayment SF $0.00 30,000 $0.00

03-0200 Cast-in-Place Concrete;

03-0210 Equipment Pad or Sidewalk (4,000 psi), 4-in Thick w/ No. 5 @ 24" O.C. SF $0.00 500 $0.00

03-0220 Slab on Grade (4,000 psi), 6-in Thick w/ No. 5 @ 24" O.C. SF $0.00 1,000 $0.00

04-0100 High Pressure Washing of Building Exterior - 1 Story SF $0.00 100,000 $0.00

04-0200 High Pressure Washing of Building Exterior - 2nd Story SF $0.00 60,000 $0.00

04-0300 Concrete Masonry Wall, Normal Weight, 8"x16"x8" Thick, Reinf w/ Grouted Cells & No.4 @ 48" O.C. LF $0.00 1,000 $0.00

05-0100 Painting Handrails LF $0.00 8,000 $0.00

07-0100 Joint Sealants LF $0.00 20,000 $0.00

Task Order Description:

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

Project Number

WORK DESCRIPTION UNIT Unit Price Quantity

07 - THERMAL & MOISTURE PROTECTION

03 - CONCRETE

04 - MASONRY

05 - METALS

LINE ITEM#

02 - SELECTIVE DEMOLITION

01 - GENERAL REQUIREMENTS

07-0200 Replacement of Weatherstripping and Door Sweeps (3'x7' Door) Opening $0.00 20 $0.00

07-0300 Spray-on Insulation; $0.00

07-0310 Closed Cell, Spray Polyurethane Foam, 2pcf, 3-in Thick SF $0.00 25,000 $0.00

07-0320 Closed Cell, Spray Polyurethane Foam, 2pcf, 6-in Thick SF $0.00 25,000 $0.00

08-0100 Solid Core Wood Doors EA $0.00 96 $0.00

08-0200 Insulated Metal Doors EA $0.00 96 $0.00

08-0300 Exterior Metal Double Doors and Frames EA $0.00 45 $0.00

08-0400 Hollow Metal Frames - 3'x7' EA $0.00 96 $0.00

08-0500 Cipher Locksets EA $0.00 12 $0.00

08-0600 Keyed Locksets EA $0.00 200 $0.00

08-0700 Non-keyed Locksets EA $0.00 100 $0.00

08-0800 Replace Small Format Interchangeable Core (Rekey) EA $0.00 200 $0.00

08-0900 Replace Mortise Housing EA $0.00 100 $0.00

08-1000 Window Screens SF $0.00 1,024 $0.00

09-0100 Carpet Tile SY $0.00 40,000 $0.00

09-0200 VCT SF $0.00 80,000 $0.00

09-0300 Resilient Tile and LVT SF $0.00 40,000 $0.00

09-0400 Floor Shield Concrete Coating SF $0.00 25,000 $0.00

09-0500 Ceramic Tile (Floor or Wall) SF $0.00 10,000 $0.00

09-0600 Gypsum Wall Assemblies; $0.00

09-0610 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C., Insulate LF $0.00 5,000 $0.00

09-0620 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0630 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0640 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0650 Wall Furring 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 1 side w/ 18 ga. x 7/8-in wide, Steel Hat Channel @16-in O.C. LF $0.00 5,000 $0.00

09-0700 Gypsum Ceiling Suspension System SF $0.00 25,000 $0.00

09-0800 Wall Coating, Rhino Shield SF $0.00 12,500 $0.00

09-0900 Transition Strip (12' EA) EA $0.00 100 $0.00

09-1000 Vinyl Wall Base (4") LF $0.00 30,000 $0.00

09-1100 Vinyl Wall Base (6") LF $0.00 10,000 $0.00

09-1200 Resilient Stair Tread LF $0.00 200 $0.00

09-1300 Gypsum Board SF $0.00 48,000 $0.00

09-1400 Painting Walls - Interior SF $0.00 320,000 $0.00

09-1500 Painting Walls - Exterior SF $0.00 28,000 $0.00

08 - OPENINGS

09 - FINISHES

09-1600 Painting Doors - Interior EA $0.00 160 $0.00

09-1700 Painting Doors - Exterior EA $0.00 80 $0.00

09-1800 Painting Door Frames - Interior EA $0.00 160 $0.00

09-1900 Painting Door Frames - Exterior EA $0.00 80 $0.00

09-2000 Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

09-2100 Acoustical Ceilings (Complete) SF $0.00 80,000 $0.00

09-2200 Small Wall Patches (Below 4" Dia.) EA $0.00 4,000 $0.00

09-2300 Painting of Misc. Interior Trim LF $0.00 16,000 $0.00

09-2400 VCT Stripping and Polishing MSF $0.00 200 $0.00

09-2500 Carpet Cleaning MSF $0.00 200 $0.00

11-0100 Movement of Furniture - Rolling Chairs and Wheeled Equip. EA $0.00 128 $0.00

11-0200 Movement of Furniture - Desks and Tables EA $0.00 128 $0.00

11-0300 Movement of Furniture - Bookcases and Storage Cabinets EA $0.00 128 $0.00

11-0400 Remounting Misc. Wall Mounted Equipment EA $0.00 300 $0.00

12-0100 Cover Plates (1-Gang Size) EA $0.00 1,050 $0.00

12-0200 9"x9" Room Signage EA $0.00 240 $0.00

12-0300 Horizontal Metal Window Blinds EA $0.00 150 $0.00

12-0400 Vinyl Window Shades EA $0.00 250 $0.00

12-0500 Roller Shades EA $0.00 600 $0.00

12-0600 Solid Surface Countertop SF $0.00 250 $0.00

12-0700 Solid Surface Vanity Top SF $0.00 250 $0.00

12-0800 Hardwood Casework - Base & Overhead Cabinets EA $0.00 10 $0.00

22-0100 Urinal, Wall Hung, with hanger & self-closing valve EA $0.00 15 $0.00

22-0200 Water Closet; $0.00

22-0210 Wall Hung, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0220 Floor Mounted, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0300 Wall Mounted Hand-dryer Module, Paper Towel, sensor operated EA $0.00 10 $0.00

22-0400 Wall Mounted Tissue Dispenser EA $0.00 10 $0.00

22-0500 Wall Mounted Trash Bin EA $0.00 10 $0.00

22-0600 Wall Mounted Vanity Mirror EA $0.00 15 $0.00

22-0700 ADA Grab Bars LF $0.00 50 $0.00

22-0800 Water Closet & Urinal Partitions LF $0.00 100 $0.00

22-0900 Lavatory EA $0.00 10 $0.00

22 - Plumbing

11 - EQUIPMENT

12 - FURNISHINGS

22-1000 Water Cooler, Wall Mounted, Dual Height (Two Units) EA $0.00 10 $0.00

22-1100 Domestic Water Heater; $0.00

22-1110 Instantaneous Electric Water Heater, Tankless, 50 GPH EA $0.00 10 $0.00

22-1120 Instantaneous Gas Water Heater, Tankless, 50 GPH EA $0.00 5 $0.00

22-1130 Electric Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1140 Gas Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1150 Electric Water Heater, 100 Gallon EA $0.00 5 $0.00

22-1160 Gas Water Heater, 100 Gallon EA $0.00 5 $0.00

23-0100 Flexible Air Duct LF $0.00 500 $0.00

23-0200 Rectangular Metal Duct, Galvanized Steel LB $0.00 1,200 $0.00

23-0300 Round & Flat-Oval Spiral Duct LB $0.00 1,200 $0.00

23-0400 Duct Cleaning LF $0.00 2,000 $0.00

23-0500 Complete Mechanical System TON $0.00 10 $0.00

49-0100 Initial Asbestos, Lead-Based Paint, Mold Building Survey;

49-0110 Area Up to 5000 SF EA $0.00 20 $0.00

49-0120 Area Greater than 5000 SF, Up to 10,000 SF EA $0.00 5 $0.00

49-0130 Area Greater than 10,000 SF, Up to 20,000 SF EA $0.00 5 $0.00

49-0140 Area Greater than 20,000 SF EA $0.00 3 $0.00

49-0200 Construction / Post-Construction Hazmat Sample Testing EA $0.00 33 $0.00

49-0300 Mold Fee EA $0.00 33 $0.00

49-0400 Asbestos Fee EA $0.00 33 $0.00

49-0500 Mold Remediation SF $0.00 10,000 $0.00

49-0600 Lead-Based Paint Removal SF $0.00 5,000 $0.00

49-0700 Remove Gypsum Wallboard with ACH, Complete SF $0.00 24,000 $0.00

49-0800 Remove Asbestos Floor Tile SF $0.00 40,000 $0.00

49-0900 Remove Carpet Glued with Asbestos Contaminated Mastic SF $0.00 40,000 $0.00

49-1000 Remove Asbestos Contaminated Suspended Ceilings SF $0.00 33,000 $0.00

49-1100 Remove Asbestos Containing Glazing and Putty SF $0.00 8,000 $0.00

50-0100 DO NOT BID ON THIS LINE ITEM.

Privatized Utility Project Fees

EA 0 $0.00

50-0200

DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR

PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE

BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.

EA 0 $0.00

50-0300 Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL

BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S

RATE

50 - MISCELLANIOUS

23 - Heating Ventilation Air Conditioning

49 - ASBESTOS AND MOLD

01-0100 As-Built Drawings EA $0.00 40 $0.00

02-0100 Demolition of Joint Sealants LF $0.00 20,000 $0.00

02-0200 Demolition of Interior Doors EA $0.00 160 $0.00

02-0300 Demolition of Exterior Doors EA $0.00 80 $0.00

02-0400 Demolition of Carpet SF $0.00 20,000 $0.00

02-0500 Demolition of VCT/Vinyl Flooring SF $0.00 80,000 $0.00

02-0600 Demolition of Vinyl/Rubber Wall Base LF $0.00 9,000 $0.00

02-0700 Demolition of Corner Guards LF $0.00 3,000 $0.00

02-0800 Demolition of Gypsum Wallboard SF $0.00 80,000 $0.00

02-0900 Demolition of Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

02-1000 Demoltion of Acoustical Ceiling Tiles and Grid (Complete) SF $0.00 80,000 $0.00

02-1100 Demolition of Miscellaneous Wall Mounted Equipment ( < 18"x18") EA $0.00 200 $0.00

02-1200 Demolition of Miscellaneous Wall Mounted Equipment ( > 18"x18") EA $0.00 100 $0.00

02-1300 Demolition of Bored Locksets EA $0.00 100 $0.00

02-1400 Demolition of Mortised Locksets EA $0.00 100 $0.00

02-1500 Demolition of Window Blinds/Shades LF $0.00 96 $0.00

02-1600 Demolition of Window Screen SF $0.00 4,000 $0.00

03-0100 Self-Leveling Underlayment SF $0.00 30,000 $0.00

03-0200 Cast-in-Place Concrete;

03-0210 Equipment Pad or Sidewalk (4,000 psi), 4-in Thick w/ No. 5 @ 24" O.C. SF $0.00 500 $0.00

03-0220 Slab on Grade (4,000 psi), 6-in Thick w/ No. 5 @ 24" O.C. SF $0.00 1,000 $0.00

04-0100 High Pressure Washing of Building Exterior - 1 Story SF $0.00 100,000 $0.00

04-0200 High Pressure Washing of Building Exterior - 2nd Story SF $0.00 60,000 $0.00

04-0300 Concrete Masonry Wall, Normal Weight, 8"x16"x8" Thick, Reinf w/ Grouted Cells & No.4 @ 48" O.C. LF $0.00 1,000 $0.00

05-0100 Painting Handrails LF $0.00 8,000 $0.00

07-0100 Joint Sealants LF $0.00 20,000 $0.00

07 - THERMAL & MOISTURE PROTECTION

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

Task Order Description:

Project Number

LINE ITEM# WORK DESCRIPTION UNIT Unit Price Quantity

01 - GENERAL REQUIREMENTS

02 - SELECTIVE DEMOLITION

03 - CONCRETE

04 - MASONRY

05 - METALS

07-0310 Closed Cell, Spray Polyurethane Foam, 2pcf, 3-in Thick SF $0.00 25,000 $0.00

07-0320 Closed Cell, Spray Polyurethane Foam, 2pcf, 6-in Thick SF $0.00 25,000 $0.00

08-0100 Solid Core Wood Doors EA $0.00 96 $0.00

08-0200 Insulated Metal Doors EA $0.00 96 $0.00

08-0300 Exterior Metal Double Doors and Frames EA $0.00 45 $0.00

08-0400 Hollow Metal Frames - 3'x7' EA $0.00 96 $0.00

08-0500 Cipher Locksets EA $0.00 12 $0.00

08-0600 Keyed Locksets EA $0.00 200 $0.00

08-0700 Non-keyed Locksets EA $0.00 100 $0.00

08-0800 Replace Small Format Interchangeable Core (Rekey) EA $0.00 200 $0.00

08-0900 Replace Mortise Housing EA $0.00 100 $0.00

08-1000 Window Screens SF $0.00 1,024 $0.00

09-0100 Carpet Tile SY $0.00 40,000 $0.00

09-0200 VCT SF $0.00 80,000 $0.00

09-0300 Resilient Tile and LVT SF $0.00 40,000 $0.00

09-0400 Floor Shield Concrete Coating SF $0.00 25,000 $0.00

09-0500 Ceramic Tile (Floor or Wall) SF $0.00 10,000 $0.00

09-0600 Gypsum Wall Assemblies; $0.00

09-0610 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C., Insulate LF $0.00 5,000 $0.00

09-0620 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0630 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0640 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0650 Wall Furring 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 1 side w/ 18 ga. x 7/8-in wide, Steel Hat Channel @16-in O.C. LF $0.00 5,000 $0.00

09-0700 Gypsum Ceiling Suspension System SF $0.00 25,000 $0.00

09-0800 Wall Coating, Rhino Shield SF $0.00 12,500 $0.00

09-0900 Transition Strip (12' EA) EA $0.00 100 $0.00

09-1000 Vinyl Wall Base (4") LF $0.00 30,000 $0.00

09-1100 Vinyl Wall Base (6") LF $0.00 10,000 $0.00

09-1200 Resilient Stair Tread LF $0.00 200 $0.00

09-1300 Gypsum Board SF $0.00 48,000 $0.00

09-1400 Painting Walls - Interior SF $0.00 320,000 $0.00

09-1500 Painting Walls - Exterior SF $0.00 28,000 $0.00

09-1800 Painting Door Frames - Interior EA $0.00 160 $0.00

09-1900 Painting Door Frames - Exterior EA $0.00 80 $0.00

09-2000 Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

09-2100 Acoustical Ceilings (Complete) SF $0.00 80,000 $0.00

09-2200 Small Wall Patches (Below 4" Dia.) EA $0.00 4,000 $0.00

09-2300 Painting of Misc. Interior Trim LF $0.00 16,000 $0.00

09-2400 VCT Stripping and Polishing MSF $0.00 200 $0.00

09-2500 Carpet Cleaning MSF $0.00 200 $0.00

11-0100 Movement of Furniture - Rolling Chairs and Wheeled Equip. EA $0.00 128 $0.00

11-0200 Movement of Furniture - Desks and Tables EA $0.00 128 $0.00

11-0300 Movement of Furniture - Bookcases and Storage Cabinets EA $0.00 128 $0.00

11-0400 Remounting Misc. Wall Mounted Equipment EA $0.00 300 $0.00

12-0100 Cover Plates (1-Gang Size) EA $0.00 1,050 $0.00

12-0200 9"x9" Room Signage EA $0.00 240 $0.00

12-0300 Horizontal Metal Window Blinds EA $0.00 150 $0.00

12-0400 Vinyl Window Shades EA $0.00 250 $0.00

12-0500 Roller Shades EA $0.00 600 $0.00

12-0600 Solid Surface Countertop SF $0.00 250 $0.00

12-0700 Solid Surface Vanity Top SF $0.00 250 $0.00

12-0800 Hardwood Casework - Base & Overhead Cabinets EA $0.00 10 $0.00

22-0100 Urinal, Wall Hung, with hanger & self-closing valve EA $0.00 15 $0.00

22-0200 Water Closet; $0.00

22-0210 Wall Hung, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0220 Floor Mounted, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0300 Wall Mounted Hand-dryer Module, Paper Towel, sensor operated EA $0.00 10 $0.00

22-0400 Wall Mounted Tissue Dispenser EA $0.00 10 $0.00

22-0500 Wall Mounted Trash Bin EA $0.00 10 $0.00

22-0600 Wall Mounted Vanity Mirror EA $0.00 15 $0.00

22-0700 ADA Grab Bars LF $0.00 50 $0.00

22-0800 Water Closet & Urinal Partitions LF $0.00 100 $0.00

22-0900 Lavatory EA $0.00 10 $0.00

11 - EQUIPMENT

22 - Plumbing

22-1110 Instantaneous Electric Water Heater, Tankless, 50 GPH EA $0.00 10 $0.00

22-1120 Instantaneous Gas Water Heater, Tankless, 50 GPH EA $0.00 5 $0.00

22-1130 Electric Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1140 Gas Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1150 Electric Water Heater, 100 Gallon EA $0.00 5 $0.00

22-1160 Gas Water Heater, 100 Gallon EA $0.00 5 $0.00

23-0100 Flexible Air Duct LF $0.00 500 $0.00

23-0200 Rectangular Metal Duct, Galvanized Steel LB $0.00 1,200 $0.00

23-0300 Round & Flat-Oval Spiral Duct LB $0.00 1,200 $0.00

23-0400 Duct Cleaning LF $0.00 2,000 $0.00

23-0500 Complete Mechanical System TON $0.00 10 $0.00

49-0100 Initial Asbestos, Lead-Based Paint, Mold Building Survey;

49-0110 Area Up to 5000 SF EA $0.00 20 $0.00

49-0120 Area Greater than 5000 SF, Up to 10,000 SF EA $0.00 5 $0.00

49-0130 Area Greater than 10,000 SF, Up to 20,000 SF EA $0.00 5 $0.00

49-0140 Area Greater than 20,000 SF EA $0.00 3 $0.00

49-0200 Construction / Post-Construction Hazmat Sample Testing EA $0.00 33 $0.00

49-0300 Mold Fee EA $0.00 33 $0.00

49-0400 Asbestos Fee EA $0.00 33 $0.00

49-0500 Mold Remediation SF $0.00 10,000 $0.00

49-0600 Lead-Based Paint Removal SF $0.00 5,000 $0.00

49-0700 Remove Gypsum Wallboard with ACH, Complete SF $0.00 24,000 $0.00

49-0800 Remove Asbestos Floor Tile SF $0.00 40,000 $0.00

49-0900 Remove Carpet Glued with Asbestos Contaminated Mastic SF $0.00 40,000 $0.00

49-1000 Remove Asbestos Contaminated Suspended Ceilings SF $0.00 33,000 $0.00

49-1100 Remove Asbestos Containing Glazing and Putty SF $0.00 8,000 $0.00

50-0100 DO NOT BID ON THIS LINE ITEM.

Privatized Utility Project Fees

EA 0 $0.00

50-0200

DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR

PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE

BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.

EA 0 $0.00

50-0300 Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL

BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S

RATE

49 - ASBESTOS AND MOLD

50 - MISCELLANIOUS

01-0100 As-Built Drawings EA $0.00 40 $0.00

02-0100 Demolition of Joint Sealants LF $0.00 20,000 $0.00

02-0200 Demolition of Interior Doors EA $0.00 160 $0.00

02-0300 Demolition of Exterior Doors EA $0.00 80 $0.00

02-0400 Demolition of Carpet SF $0.00 20,000 $0.00

02-0500 Demolition of VCT/Vinyl Flooring SF $0.00 80,000 $0.00

02-0600 Demolition of Vinyl/Rubber Wall Base LF $0.00 9,000 $0.00

02-0700 Demolition of Corner Guards LF $0.00 3,000 $0.00

02-0800 Demolition of Gypsum Wallboard SF $0.00 80,000 $0.00

02-0900 Demolition of Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

02-1000 Demoltion of Acoustical Ceiling Tiles and Grid (Complete) SF $0.00 80,000 $0.00

02-1100 Demolition of Miscellaneous Wall Mounted Equipment ( < 18"x18") EA $0.00 200 $0.00

02-1200 Demolition of Miscellaneous Wall Mounted Equipment ( > 18"x18") EA $0.00 100 $0.00

02-1300 Demolition of Bored Locksets EA $0.00 100 $0.00

02-1400 Demolition of Mortised Locksets EA $0.00 100 $0.00

02-1500 Demolition of Window Blinds/Shades LF $0.00 96 $0.00

02-1600 Demolition of Window Screen SF $0.00 4,000 $0.00

03-0100 Self-Leveling Underlayment SF $0.00 30,000 $0.00

03-0200 Cast-in-Place Concrete;

03-0210 Equipment Pad or Sidewalk (4,000 psi), 4-in Thick w/ No. 5 @ 24" O.C. SF $0.00 500 $0.00

03-0220 Slab on Grade (4,000 psi), 6-in Thick w/ No. 5 @ 24" O.C. SF $0.00 1,000 $0.00

04-0100 High Pressure Washing of Building Exterior - 1 Story SF $0.00 100,000 $0.00

04-0200 High Pressure Washing of Building Exterior - 2nd Story SF $0.00 60,000 $0.00

04-0300 Concrete Masonry Wall, Normal Weight, 8"x16"x8" Thick, Reinf w/ Grouted Cells & No.4 @ 48" O.C. LF $0.00 1,000 $0.00

05-0100 Painting Handrails LF $0.00 8,000 $0.00

07-0100 Joint Sealants LF $0.00 20,000 $0.00

07 - THERMAL & MOISTURE PROTECTION

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

Task Order Description:

Project Number

LINE ITEM# WORK DESCRIPTION UNIT Unit Price Quantity

01 - GENERAL REQUIREMENTS

02 - SELECTIVE DEMOLITION

03 - CONCRETE

07-0310 Closed Cell, Spray Polyurethane Foam, 2pcf, 3-in Thick SF $0.00 25,000 $0.00

07-0320 Closed Cell, Spray Polyurethane Foam, 2pcf, 6-in Thick SF $0.00 25,000 $0.00

08-0100 Solid Core Wood Doors EA $0.00 96 $0.00

08-0200 Insulated Metal Doors EA $0.00 96 $0.00

08-0300 Exterior Metal Double Doors and Frames EA $0.00 45 $0.00

08-0400 Hollow Metal Frames - 3'x7' EA $0.00 96 $0.00

08-0500 Cipher Locksets EA $0.00 12 $0.00

08-0600 Keyed Locksets EA $0.00 200 $0.00

08-0700 Non-keyed Locksets EA $0.00 100 $0.00

08-0800 Replace Small Format Interchangeable Core (Rekey) EA $0.00 200 $0.00

08-0900 Replace Mortise Housing EA $0.00 100 $0.00

08-1000 Window Screens SF $0.00 1,024 $0.00

09-0100 Carpet Tile SY $0.00 40,000 $0.00

09-0200 VCT SF $0.00 80,000 $0.00

09-0300 Resilient Tile and LVT SF $0.00 40,000 $0.00

09-0400 Floor Shield Concrete Coating SF $0.00 25,000 $0.00

09-0500 Ceramic Tile (Floor or Wall) SF $0.00 10,000 $0.00

09-0600 Gypsum Wall Assemblies; $0.00

09-0610 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C., Insulate LF $0.00 5,000 $0.00

09-0620 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0630 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0640 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0650 Wall Furring 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 1 side w/ 18 ga. x 7/8-in wide, Steel Hat Channel @16-in O.C. LF $0.00 5,000 $0.00

09-0700 Gypsum Ceiling Suspension System SF $0.00 25,000 $0.00

09-0800 Wall Coating, Rhino Shield SF $0.00 12,500 $0.00

09-0900 Transition Strip (12' EA) EA $0.00 100 $0.00

09-1000 Vinyl Wall Base (4") LF $0.00 30,000 $0.00

09-1100 Vinyl Wall Base (6") LF $0.00 10,000 $0.00

09-1200 Resilient Stair Tread LF $0.00 200 $0.00

09-1300 Gypsum Board SF $0.00 48,000 $0.00

09-1400 Painting Walls - Interior SF $0.00 320,000 $0.00

09-1500 Painting Walls - Exterior SF $0.00 28,000 $0.00

09-1800 Painting Door Frames - Interior EA $0.00 160 $0.00

09-1900 Painting Door Frames - Exterior EA $0.00 80 $0.00

09-2000 Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

09-2100 Acoustical Ceilings (Complete) SF $0.00 80,000 $0.00

09-2200 Small Wall Patches (Below 4" Dia.) EA $0.00 4,000 $0.00

09-2300 Painting of Misc. Interior Trim LF $0.00 16,000 $0.00

09-2400 VCT Stripping and Polishing MSF $0.00 200 $0.00

09-2500 Carpet Cleaning MSF $0.00 200 $0.00

11-0100 Movement of Furniture - Rolling Chairs and Wheeled Equip. EA $0.00 128 $0.00

11-0200 Movement of Furniture - Desks and Tables EA $0.00 128 $0.00

11-0300 Movement of Furniture - Bookcases and Storage Cabinets EA $0.00 128 $0.00

11-0400 Remounting Misc. Wall Mounted Equipment EA $0.00 300 $0.00

12-0100 Cover Plates (1-Gang Size) EA $0.00 1,050 $0.00

12-0200 9"x9" Room Signage EA $0.00 240 $0.00

12-0300 Horizontal Metal Window Blinds EA $0.00 150 $0.00

12-0400 Vinyl Window Shades EA $0.00 250 $0.00

12-0500 Roller Shades EA $0.00 600 $0.00

12-0600 Solid Surface Countertop SF $0.00 250 $0.00

12-0700 Solid Surface Vanity Top SF $0.00 250 $0.00

12-0800 Hardwood Casework - Base & Overhead Cabinets EA $0.00 10 $0.00

22-0100 Urinal, Wall Hung, with hanger & self-closing valve EA $0.00 15 $0.00

22-0200 Water Closet; $0.00

22-0210 Wall Hung, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0220 Floor Mounted, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0300 Wall Mounted Hand-dryer Module, Paper Towel, sensor operated EA $0.00 10 $0.00

22-0400 Wall Mounted Tissue Dispenser EA $0.00 10 $0.00

22-0500 Wall Mounted Trash Bin EA $0.00 10 $0.00

22-0600 Wall Mounted Vanity Mirror EA $0.00 15 $0.00

22-0700 ADA Grab Bars LF $0.00 50 $0.00

22-0800 Water Closet & Urinal Partitions LF $0.00 100 $0.00

22-0900 Lavatory EA $0.00 10 $0.00

11 - EQUIPMENT

22-1110 Instantaneous Electric Water Heater, Tankless, 50 GPH EA $0.00 10 $0.00

22-1120 Instantaneous Gas Water Heater, Tankless, 50 GPH EA $0.00 5 $0.00

22-1130 Electric Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1140 Gas Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1150 Electric Water Heater, 100 Gallon EA $0.00 5 $0.00

22-1160 Gas Water Heater, 100 Gallon EA $0.00 5 $0.00

23-0100 Flexible Air Duct LF $0.00 500 $0.00

23-0200 Rectangular Metal Duct, Galvanized Steel LB $0.00 1,200 $0.00

23-0300 Round & Flat-Oval Spiral Duct LB $0.00 1,200 $0.00

23-0400 Duct Cleaning LF $0.00 2,000 $0.00

23-0500 Complete Mechanical System TON $0.00 10 $0.00

49-0100 Initial Asbestos, Lead-Based Paint, Mold Building Survey;

49-0110 Area Up to 5000 SF EA $0.00 20 $0.00

49-0120 Area Greater than 5000 SF, Up to 10,000 SF EA $0.00 5 $0.00

49-0130 Area Greater than 10,000 SF, Up to 20,000 SF EA $0.00 5 $0.00

49-0140 Area Greater than 20,000 SF EA $0.00 3 $0.00

49-0200 Construction / Post-Construction Hazmat Sample Testing EA $0.00 33 $0.00

49-0300 Mold Fee EA $0.00 33 $0.00

49-0400 Asbestos Fee EA $0.00 33 $0.00

49-0500 Mold Remediation SF $0.00 10,000 $0.00

49-0600 Lead-Based Paint Removal SF $0.00 5,000 $0.00

49-0700 Remove Gypsum Wallboard with ACH, Complete SF $0.00 24,000 $0.00

49-0800 Remove Asbestos Floor Tile SF $0.00 40,000 $0.00

49-0900 Remove Carpet Glued with Asbestos Contaminated Mastic SF $0.00 40,000 $0.00

49-1000 Remove Asbestos Contaminated Suspended Ceilings SF $0.00 33,000 $0.00

49-1100 Remove Asbestos Containing Glazing and Putty SF $0.00 8,000 $0.00

50-0100 DO NOT BID ON THIS LINE ITEM.

Privatized Utility Project Fees

EA 0 $0.00

50-0200

DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR

PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE

BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.

EA 0 $0.00

50-0300 Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL

BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S

RATE

49 - ASBESTOS AND MOLD

01-0100 As-Built Drawings EA $0.00 40 $0.00

02-0100 Demolition of Joint Sealants LF $0.00 20,000 $0.00

02-0200 Demolition of Interior Doors EA $0.00 160 $0.00

02-0300 Demolition of Exterior Doors EA $0.00 80 $0.00

02-0400 Demolition of Carpet SF $0.00 20,000 $0.00

02-0500 Demolition of VCT/Vinyl Flooring SF $0.00 80,000 $0.00

02-0600 Demolition of Vinyl/Rubber Wall Base LF $0.00 9,000 $0.00

02-0700 Demolition of Corner Guards LF $0.00 3,000 $0.00

02-0800 Demolition of Gypsum Wallboard SF $0.00 80,000 $0.00

02-0900 Demolition of Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

02-1000 Demoltion of Acoustical Ceiling Tiles and Grid (Complete) SF $0.00 80,000 $0.00

02-1100 Demolition of Miscellaneous Wall Mounted Equipment ( < 18"x18") EA $0.00 200 $0.00

02-1200 Demolition of Miscellaneous Wall Mounted Equipment ( > 18"x18") EA $0.00 100 $0.00

02-1300 Demolition of Bored Locksets EA $0.00 100 $0.00

02-1400 Demolition of Mortised Locksets EA $0.00 100 $0.00

02-1500 Demolition of Window Blinds/Shades LF $0.00 96 $0.00

02-1600 Demolition of Window Screen SF $0.00 4,000 $0.00

03-0100 Self-Leveling Underlayment SF $0.00 30,000 $0.00

03-0200 Cast-in-Place Concrete;

03-0210 Equipment Pad or Sidewalk (4,000 psi), 4-in Thick w/ No. 5 @ 24" O.C. SF $0.00 500 $0.00

03-0220 Slab on Grade (4,000 psi), 6-in Thick w/ No. 5 @ 24" O.C. SF $0.00 1,000 $0.00

04-0100 High Pressure Washing of Building Exterior - 1 Story SF $0.00 100,000 $0.00

04-0200 High Pressure Washing of Building Exterior - 2nd Story SF $0.00 60,000 $0.00

04-0300 Concrete Masonry Wall, Normal Weight, 8"x16"x8" Thick, Reinf w/ Grouted Cells & No.4 @ 48" O.C. LF $0.00 1,000 $0.00

05-0100 Painting Handrails LF $0.00 8,000 $0.00

07-0100 Joint Sealants LF $0.00 20,000 $0.00

07 - THERMAL & MOISTURE PROTECTION

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

Task Order Description:

Project Number

LINE ITEM# WORK DESCRIPTION UNIT Unit Price Quantity

01 - GENERAL REQUIREMENTS

02 - SELECTIVE DEMOLITION

03 - CONCRETE

07-0310 Closed Cell, Spray Polyurethane Foam, 2pcf, 3-in Thick SF $0.00 25,000 $0.00

07-0320 Closed Cell, Spray Polyurethane Foam, 2pcf, 6-in Thick SF $0.00 25,000 $0.00

08-0100 Solid Core Wood Doors EA $0.00 96 $0.00

08-0200 Insulated Metal Doors EA $0.00 96 $0.00

08-0300 Exterior Metal Double Doors and Frames EA $0.00 45 $0.00

08-0400 Hollow Metal Frames - 3'x7' EA $0.00 96 $0.00

08-0500 Cipher Locksets EA $0.00 12 $0.00

08-0600 Keyed Locksets EA $0.00 200 $0.00

08-0700 Non-keyed Locksets EA $0.00 100 $0.00

08-0800 Replace Small Format Interchangeable Core (Rekey) EA $0.00 200 $0.00

08-0900 Replace Mortise Housing EA $0.00 100 $0.00

08-1000 Window Screens SF $0.00 1,024 $0.00

09-0100 Carpet Tile SY $0.00 40,000 $0.00

09-0200 VCT SF $0.00 80,000 $0.00

09-0300 Resilient Tile and LVT SF $0.00 40,000 $0.00

09-0400 Floor Shield Concrete Coating SF $0.00 25,000 $0.00

09-0500 Ceramic Tile (Floor or Wall) SF $0.00 10,000 $0.00

09-0600 Gypsum Wall Assemblies; $0.00

09-0610 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C., Insulate LF $0.00 5,000 $0.00

09-0620 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0630 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0640 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0650 Wall Furring 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 1 side w/ 18 ga. x 7/8-in wide, Steel Hat Channel @16-in O.C. LF $0.00 5,000 $0.00

09-0700 Gypsum Ceiling Suspension System SF $0.00 25,000 $0.00

09-0800 Wall Coating, Rhino Shield SF $0.00 12,500 $0.00

09-0900 Transition Strip (12' EA) EA $0.00 100 $0.00

09-1000 Vinyl Wall Base (4") LF $0.00 30,000 $0.00

09-1100 Vinyl Wall Base (6") LF $0.00 10,000 $0.00

09-1200 Resilient Stair Tread LF $0.00 200 $0.00

09-1300 Gypsum Board SF $0.00 48,000 $0.00

09-1400 Painting Walls - Interior SF $0.00 320,000 $0.00

09-1500 Painting Walls - Exterior SF $0.00 28,000 $0.00

09-1800 Painting Door Frames - Interior EA $0.00 160 $0.00

09-1900 Painting Door Frames - Exterior EA $0.00 80 $0.00

09-2000 Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

09-2100 Acoustical Ceilings (Complete) SF $0.00 80,000 $0.00

09-2200 Small Wall Patches (Below 4" Dia.) EA $0.00 4,000 $0.00

09-2300 Painting of Misc. Interior Trim LF $0.00 16,000 $0.00

09-2400 VCT Stripping and Polishing MSF $0.00 200 $0.00

09-2500 Carpet Cleaning MSF $0.00 200 $0.00

11-0100 Movement of Furniture - Rolling Chairs and Wheeled Equip. EA $0.00 128 $0.00

11-0200 Movement of Furniture - Desks and Tables EA $0.00 128 $0.00

11-0300 Movement of Furniture - Bookcases and Storage Cabinets EA $0.00 128 $0.00

11-0400 Remounting Misc. Wall Mounted Equipment EA $0.00 300 $0.00

12-0100 Cover Plates (1-Gang Size) EA $0.00 1,050 $0.00

12-0200 9"x9" Room Signage EA $0.00 240 $0.00

12-0300 Horizontal Metal Window Blinds EA $0.00 150 $0.00

12-0400 Vinyl Window Shades EA $0.00 250 $0.00

12-0500 Roller Shades EA $0.00 600 $0.00

12-0600 Solid Surface Countertop SF $0.00 250 $0.00

12-0700 Solid Surface Vanity Top SF $0.00 250 $0.00

12-0800 Hardwood Casework - Base & Overhead Cabinets EA $0.00 10 $0.00

22-0100 Urinal, Wall Hung, with hanger & self-closing valve EA $0.00 15 $0.00

22-0200 Water Closet; $0.00

22-0210 Wall Hung, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0220 Floor Mounted, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0300 Wall Mounted Hand-dryer Module, Paper Towel, sensor operated EA $0.00 10 $0.00

22-0400 Wall Mounted Tissue Dispenser EA $0.00 10 $0.00

22-0500 Wall Mounted Trash Bin EA $0.00 10 $0.00

22-0600 Wall Mounted Vanity Mirror EA $0.00 15 $0.00

22-0700 ADA Grab Bars LF $0.00 50 $0.00

22-0800 Water Closet & Urinal Partitions LF $0.00 100 $0.00

22-0900 Lavatory EA $0.00 10 $0.00

11 - EQUIPMENT

22-1110 Instantaneous Electric Water Heater, Tankless, 50 GPH EA $0.00 10 $0.00

22-1120 Instantaneous Gas Water Heater, Tankless, 50 GPH EA $0.00 5 $0.00

22-1130 Electric Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1140 Gas Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1150 Electric Water Heater, 100 Gallon EA $0.00 5 $0.00

22-1160 Gas Water Heater, 100 Gallon EA $0.00 5 $0.00

23-0100 Flexible Air Duct LF $0.00 500 $0.00

23-0200 Rectangular Metal Duct, Galvanized Steel LB $0.00 1,200 $0.00

23-0300 Round & Flat-Oval Spiral Duct LB $0.00 1,200 $0.00

23-0400 Duct Cleaning LF $0.00 2,000 $0.00

23-0500 Complete Mechanical System TON $0.00 10 $0.00

49-0100 Initial Asbestos, Lead-Based Paint, Mold Building Survey;

49-0110 Area Up to 5000 SF EA $0.00 20 $0.00

49-0120 Area Greater than 5000 SF, Up to 10,000 SF EA $0.00 5 $0.00

49-0130 Area Greater than 10,000 SF, Up to 20,000 SF EA $0.00 5 $0.00

49-0140 Area Greater than 20,000 SF EA $0.00 3 $0.00

49-0200 Construction / Post-Construction Hazmat Sample Testing EA $0.00 33 $0.00

49-0300 Mold Fee EA $0.00 33 $0.00

49-0400 Asbestos Fee EA $0.00 33 $0.00

49-0500 Mold Remediation SF $0.00 10,000 $0.00

49-0600 Lead-Based Paint Removal SF $0.00 5,000 $0.00

49-0700 Remove Gypsum Wallboard with ACH, Complete SF $0.00 24,000 $0.00

49-0800 Remove Asbestos Floor Tile SF $0.00 40,000 $0.00

49-0900 Remove Carpet Glued with Asbestos Contaminated Mastic SF $0.00 40,000 $0.00

49-1000 Remove Asbestos Contaminated Suspended Ceilings SF $0.00 33,000 $0.00

49-1100 Remove Asbestos Containing Glazing and Putty SF $0.00 8,000 $0.00

50-0100 DO NOT BID ON THIS LINE ITEM.

Privatized Utility Project Fees

EA 0 $0.00

50-0200

DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR

PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE

BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.

EA 0 $0.00

50-0300 Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL

BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S

RATE

49 - ASBESTOS AND MOLD

01-0100 As-Built Drawings EA $0.00 40 $0.00

02-0100 Demolition of Joint Sealants LF $0.00 20,000 $0.00

02-0200 Demolition of Interior Doors EA $0.00 160 $0.00

02-0300 Demolition of Exterior Doors EA $0.00 80 $0.00

02-0400 Demolition of Carpet SF $0.00 20,000 $0.00

02-0500 Demolition of VCT/Vinyl Flooring SF $0.00 80,000 $0.00

02-0600 Demolition of Vinyl/Rubber Wall Base LF $0.00 9,000 $0.00

02-0700 Demolition of Corner Guards LF $0.00 3,000 $0.00

02-0800 Demolition of Gypsum Wallboard SF $0.00 80,000 $0.00

02-0900 Demolition of Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

02-1000 Demoltion of Acoustical Ceiling Tiles and Grid (Complete) SF $0.00 80,000 $0.00

02-1100 Demolition of Miscellaneous Wall Mounted Equipment ( < 18"x18") EA $0.00 200 $0.00

02-1200 Demolition of Miscellaneous Wall Mounted Equipment ( > 18"x18") EA $0.00 100 $0.00

02-1300 Demolition of Bored Locksets EA $0.00 100 $0.00

02-1400 Demolition of Mortised Locksets EA $0.00 100 $0.00

02-1500 Demolition of Window Blinds/Shades LF $0.00 96 $0.00

02-1600 Demolition of Window Screen SF $0.00 4,000 $0.00

03-0100 Self-Leveling Underlayment SF $0.00 30,000 $0.00

03-0200 Cast-in-Place Concrete;

03-0210 Equipment Pad or Sidewalk (4,000 psi), 4-in Thick w/ No. 5 @ 24" O.C. SF $0.00 500 $0.00

03-0220 Slab on Grade (4,000 psi), 6-in Thick w/ No. 5 @ 24" O.C. SF $0.00 1,000 $0.00

04-0100 High Pressure Washing of Building Exterior - 1 Story SF $0.00 100,000 $0.00

04-0200 High Pressure Washing of Building Exterior - 2nd Story SF $0.00 60,000 $0.00

04-0300 Concrete Masonry Wall, Normal Weight, 8"x16"x8" Thick, Reinf w/ Grouted Cells & No.4 @ 48" O.C. LF $0.00 1,000 $0.00

05-0100 Painting Handrails LF $0.00 8,000 $0.00

07-0100 Joint Sealants LF $0.00 20,000 $0.00

07 - THERMAL & MOISTURE PROTECTION

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

Task Order Description:

Project Number

LINE ITEM# WORK DESCRIPTION UNIT Unit Price Quantity

01 - GENERAL REQUIREMENTS

02 - SELECTIVE DEMOLITION

03 - CONCRETE

07-0310 Closed Cell, Spray Polyurethane Foam, 2pcf, 3-in Thick SF $0.00 25,000 $0.00

07-0320 Closed Cell, Spray Polyurethane Foam, 2pcf, 6-in Thick SF $0.00 25,000 $0.00

08-0100 Solid Core Wood Doors EA $0.00 96 $0.00

08-0200 Insulated Metal Doors EA $0.00 96 $0.00

08-0300 Exterior Metal Double Doors and Frames EA $0.00 45 $0.00

08-0400 Hollow Metal Frames - 3'x7' EA $0.00 96 $0.00

08-0500 Cipher Locksets EA $0.00 12 $0.00

08-0600 Keyed Locksets EA $0.00 200 $0.00

08-0700 Non-keyed Locksets EA $0.00 100 $0.00

08-0800 Replace Small Format Interchangeable Core (Rekey) EA $0.00 200 $0.00

08-0900 Replace Mortise Housing EA $0.00 100 $0.00

08-1000 Window Screens SF $0.00 1,024 $0.00

09-0100 Carpet Tile SY $0.00 40,000 $0.00

09-0200 VCT SF $0.00 80,000 $0.00

09-0300 Resilient Tile and LVT SF $0.00 40,000 $0.00

09-0400 Floor Shield Concrete Coating SF $0.00 25,000 $0.00

09-0500 Ceramic Tile (Floor or Wall) SF $0.00 10,000 $0.00

09-0600 Gypsum Wall Assemblies; $0.00

09-0610 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C., Insulate LF $0.00 5,000 $0.00

09-0620 Stud Wall 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0630 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 4-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0640 Stud Wall 18-ft (To Deck), 5/8-in Gypsum Board, Tape & Finish 2 sides w/ 18 ga. x 6-in wide, Steel Studs @16-in O.C. LF $0.00 5,000 $0.00

09-0650 Wall Furring 8-ft to 12-ft high, 5/8-in Gypsum Board, Tape & Finish 1 side w/ 18 ga. x 7/8-in wide, Steel Hat Channel @16-in O.C. LF $0.00 5,000 $0.00

09-0700 Gypsum Ceiling Suspension System SF $0.00 25,000 $0.00

09-0800 Wall Coating, Rhino Shield SF $0.00 12,500 $0.00

09-0900 Transition Strip (12' EA) EA $0.00 100 $0.00

09-1000 Vinyl Wall Base (4") LF $0.00 30,000 $0.00

09-1100 Vinyl Wall Base (6") LF $0.00 10,000 $0.00

09-1200 Resilient Stair Tread LF $0.00 200 $0.00

09-1300 Gypsum Board SF $0.00 48,000 $0.00

09-1400 Painting Walls - Interior SF $0.00 320,000 $0.00

09-1500 Painting Walls - Exterior SF $0.00 28,000 $0.00

09-1800 Painting Door Frames - Interior EA $0.00 160 $0.00

09-1900 Painting Door Frames - Exterior EA $0.00 80 $0.00

09-2000 Acoustical Ceiling Tiles EA $0.00 40,000 $0.00

09-2100 Acoustical Ceilings (Complete) SF $0.00 80,000 $0.00

09-2200 Small Wall Patches (Below 4" Dia.) EA $0.00 4,000 $0.00

09-2300 Painting of Misc. Interior Trim LF $0.00 16,000 $0.00

09-2400 VCT Stripping and Polishing MSF $0.00 200 $0.00

09-2500 Carpet Cleaning MSF $0.00 200 $0.00

11-0100 Movement of Furniture - Rolling Chairs and Wheeled Equip. EA $0.00 128 $0.00

11-0200 Movement of Furniture - Desks and Tables EA $0.00 128 $0.00

11-0300 Movement of Furniture - Bookcases and Storage Cabinets EA $0.00 128 $0.00

11-0400 Remounting Misc. Wall Mounted Equipment EA $0.00 300 $0.00

12-0100 Cover Plates (1-Gang Size) EA $0.00 1,050 $0.00

12-0200 9"x9" Room Signage EA $0.00 240 $0.00

12-0300 Horizontal Metal Window Blinds EA $0.00 150 $0.00

12-0400 Vinyl Window Shades EA $0.00 250 $0.00

12-0500 Roller Shades EA $0.00 600 $0.00

12-0600 Solid Surface Countertop SF $0.00 250 $0.00

12-0700 Solid Surface Vanity Top SF $0.00 250 $0.00

12-0800 Hardwood Casework - Base & Overhead Cabinets EA $0.00 10 $0.00

22-0100 Urinal, Wall Hung, with hanger & self-closing valve EA $0.00 15 $0.00

22-0200 Water Closet; $0.00

22-0210 Wall Hung, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0220 Floor Mounted, rough-in, supply, waste and vent, single WC EA $0.00 10 $0.00

22-0300 Wall Mounted Hand-dryer Module, Paper Towel, sensor operated EA $0.00 10 $0.00

22-0400 Wall Mounted Tissue Dispenser EA $0.00 10 $0.00

22-0500 Wall Mounted Trash Bin EA $0.00 10 $0.00

22-0600 Wall Mounted Vanity Mirror EA $0.00 15 $0.00

22-0700 ADA Grab Bars LF $0.00 50 $0.00

22-0800 Water Closet & Urinal Partitions LF $0.00 100 $0.00

22-0900 Lavatory EA $0.00 10 $0.00

11 - EQUIPMENT

22-1110 Instantaneous Electric Water Heater, Tankless, 50 GPH EA $0.00 10 $0.00

22-1120 Instantaneous Gas Water Heater, Tankless, 50 GPH EA $0.00 5 $0.00

22-1130 Electric Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1140 Gas Water Heater, 50 Gallon EA $0.00 5 $0.00

22-1150 Electric Water Heater, 100 Gallon EA $0.00 5 $0.00

22-1160 Gas Water Heater, 100 Gallon EA $0.00 5 $0.00

23-0100 Flexible Air Duct LF $0.00 500 $0.00

23-0200 Rectangular Metal Duct, Galvanized Steel LB $0.00 1,200 $0.00

23-0300 Round & Flat-Oval Spiral Duct LB $0.00 1,200 $0.00

23-0400 Duct Cleaning LF $0.00 2,000 $0.00

23-0500 Complete Mechanical System TON $0.00 10 $0.00

49-0100 Initial Asbestos, Lead-Based Paint, Mold Building Survey;

49-0110 Area Up to 5000 SF EA $0.00 20 $0.00

49-0120 Area Greater than 5000 SF, Up to 10,000 SF EA $0.00 5 $0.00

49-0130 Area Greater than 10,000 SF, Up to 20,000 SF EA $0.00 5 $0.00

49-0140 Area Greater than 20,000 SF EA $0.00 3 $0.00

49-0200 Construction / Post-Construction Hazmat Sample Testing EA $0.00 33 $0.00

49-0300 Mold Fee EA $0.00 33 $0.00

49-0400 Asbestos Fee EA $0.00 33 $0.00

49-0500 Mold Remediation SF $0.00 10,000 $0.00

49-0600 Lead-Based Paint Removal SF $0.00 5,000 $0.00

49-0700 Remove Gypsum Wallboard with ACH, Complete SF $0.00 24,000 $0.00

49-0800 Remove Asbestos Floor Tile SF $0.00 40,000 $0.00

49-0900 Remove Carpet Glued with Asbestos Contaminated Mastic SF $0.00 40,000 $0.00

49-1000 Remove Asbestos Contaminated Suspended Ceilings SF $0.00 33,000 $0.00

49-1100 Remove Asbestos Containing Glazing and Putty SF $0.00 8,000 $0.00

50-0100 DO NOT BID ON THIS LINE ITEM.

Privatized Utility Project Fees

EA 0 $0.00

50-0200

DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL ONLY BE USED FOR

PROJECTS WHERE NO PRE-PRICED LINE ITEMS EXIST ELSEWHERE IN THE

BID SCHEDULE. IT WILL BE NEGOTIATED AT TIME OF OCCURRENCE.

EA 0 $0.00

50-0300 Bond (X% of Total) DO NOT BID ON THIS LINE ITEM. THIS LINE ITEM WILL

BE APPLIED AT THE AWARD OF THE TASKORDER PER THE CONTRACTOR'S

RATE

49 - ASBESTOS AND MOLD

POC:

TOTAL

BASE YEAR

TOTAL

1ST OPTION YEAR

TOTAL

2ND OPTION YEAR

TOTAL

3RD OPTION YEAR

TOTAL

4TH OPTION YEAR TOTAL BID

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

DPW - Design Branch Chief, Frank Lamas

FACILITY REPAIRS REQUIREMENTS CONTRACT

CONTRACT NO. W91151-22-B-XXXX [BASE + 4 YEAR IDIQ CONTRACT]

DESC: FOR OFFICIAL USE ONLY - PROCUREMENT SENSITIVE - PRIVACY SENSITIVE Any misuse or unauthorized disclosure can result in both civil and criminal penalties.

Facility Repairs Req BASE YEAR
1st Option Year
2nd Option Year
3rd Option Year
4th Option Year
TOTAL BID PRICE