Technical Exhibit G - WDTC MSS PWS Examples of Contractor Support Request - 3 Oct 19.docx
DOCX document 24 KB Posted
- Solicitation number
- W91151-20-R-0002
About this file
This document provides examples of technical requirements for contractor support services at Dugway Proving Ground/Western Desert Test Center. The examples outline various tasks for laboratory, field, and chamber testing support including providing personnel for test execution and retrograde, operating test equipment, conducting sample analysis using GC and MINICAMS, and coordinating test planning and report development. The related federal contract opportunity is a solicitation from the Department of the Army seeking proposals for non-personal services to support developmental and operational testing at Dugway Proving Ground/Western Desert Test Center. Contractors would provide personnel, management, supplies, equipment, and tools to perform required test support services.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91151-20-R-0002 Technical Exhibit G: Examples of Contractor Support Request
EXAMPLE ONE
| 1. | TEST SUPPORT REQUEST. This is an examples of a test program that the chemical test division would be tasking a contractor to support in a field environment at one of the WDTC test range area. This example outlines various specific requirements however these tasks are not indicative of all field test programs. |
| 2. | PROGRAM TITLE: Field Test |
| 3. | PROGRAM BACKGROUND: Dugway Proving Ground will conduct a chlorine dissemination study, which will take into account the effects urban environments and downwind degradation. |
| 4. | SCOPE: The Contractor shall furnish the necessary personnel, equipment, services, materials, and supplies to accomplish the test support and work requirements listed below. The Government will provide facilities and appropriate Standard Operating Procedures as required. |
| 5. | PERIODS OF OPERATION: Testing support may be required 24-hours per day up to six days per week in order to support weather-dependent test schedules. Daily work schedules will include two 12-hour shifts to accommodate chlorine deliveries, tank fills, recovery scrubber operations, and caustic shipments off post. Test schedule requires between 6 and 9 disseminations/execution trials over the course of up to 20 work days. |
| a. | June 2015 through 09 June 2016 |
| b. | Test Setup: 19 August 2015 through 20 August 2015 |
| c. | Test Execution: 21 Aug 2015 through 12 Sept 2015 |
| d. | Retrograde 12 September 2015 |
| 6. | DETAILED REQUIREMENTS: The Contractor shall perform the following protocol services in coordination with the WDTC COR office, and the CTD Government Test Officer or designated Government POC. |
| 7. | Provide the recommended source of the CI (see background) to conduct chlorine handling and transfer operations including the following tasks. |
| 8. | Provide contractor personnel with experience in chlorine handling and spill response activities. Personnel must possess the following training: 40-hour HAZWOPER, CHLOREP Team Training, and CHLOREP Advanced Training OR. Personnel must have five years of operational experience with liquid chlorine handling. |
| 9. | The contactor personnel shall be expected to provide the following test support; receive chlorine on post via ground transport. Visual tanker inspections of shipping documents. Oversee electronic scaling of tanker before and after deliveries. Scales are located at English Village (EV) Shipping and Receiving. Inspection of housing, valves and piping, compressors, and purge gas supply. |
| 10. | The Contractor personnel shall transfer chlorine from a local chlorine supplier into a 20ton chlorine “mule” tanker for transportation on DPG. Task include grounding and bonding, Pre transfer nitrogen purge operations, tank to tank transfer operations, post transfer nitrogen purge operations. |
| 11. | The Contractor personnel shall inspect the specialized dissemination device provide by the Government for repeated chlorine releases and notify the DPG test lead of any required corrective actions. Task include inspect all fittings, flanges, and valves. Inspect pressure release valves. Visual integrity inspections. Pressure testing to 200 psig with a bubble leak test. Repair and/or correct leaks. |
| 12. | The Contractor personnel shall support DPG test support personnel to remove and replace damaged GFE test instrumentation from the specialized dissemination device. |
| 13. | The Contractor personnel shall conduct posttest flange replacement on the specialized dissemination device. |
| 14. | The Contractor personnel shall operate the nitrogen/dry air purge/pressure-test system. |
| 15. | The Contractor personnel shall operate the chlorine vapor recovery scrubber and manage the associated caustic/bleach inventory. Tasks include integrate the scrubber vessel with the dissemination device. Inspect all fittings, flanges, hose, and valves to include inspect pressure release valves, visual integrity inspections, fill scrubber vessel with 18-20 percent sodium hydroxide solution, and sample sodium hydroxide as required to determine ability to neutralize chlorine. |
| 16. | The Contractor shall provide subject matter expertise and provide standby personnel for emergency response activities if required in the event an uncontrolled chlorine release. |
| 17. | The Contractor shall be required to provide their own transportation, tools, and storage capability. |
| 18. | The Contractor shall provide up to 80 tons of liquid chlorine delivered to DPG. |
| 19. | The Contractor shall provide a 20-ton chlorine cargo tank with 4 angle valves and a pressure release valve for use as a “mule” to transport delivered chlorine on DPG. The tank may be destroyed in the test and contractor must discard of destroyed tank after test. |
| 20. | The Contractor shall provide scrubber liquid (bleach) recovery including shipping and disposition. Anticipate up to 20,000 gallons. Provide up to 8 tons of caustic delivered to DPG as 20% caustic. |
| 21. | The Contractor shall provide nitrogen for purge operations to include transportation. |
| 22. | The Contractor shall provide the following test support equipment; |
| a. | 400ft of 2-inch cross link polyethylene transfer (acid hose) in 25ft and 50ft lengths |
| b. | One titration kit |
| c. | Two 3-inch corrosive transfer pumps to be used for transferring sodium hydroxide (NaOH) and sodium hypochlorite (NaOCl) 120ft of 1-inch Monel hose equipped with Kemper fitting in 20ft sections. |
| d. | 100ft of nitrogen 3/8-inch hose. |
| e. | Pipe fittings for all project activities. |
| f. | Two 1-inch stainless steel (SS) spurge, equipped with cut holes or slots. |
| g. | Two 2-inch CPVC jet pumps and two 1-inch CPVC jet pumps. |
| h. | Four 1-inch James bury Monel valves with actuators. |
| i. | Two 2-inch James bury carbon steel with Teflon seats valves with actuators. |
| j. | Two 2-inch SS check valves (socket weld) and two 1-inch SS check valves (socket weld). |
| k. | One 6000 gallon poly tank with containments. |
| 23. | SECURITY REQUIRMENTS: Unclassified project and performance on this TAR will not require access to classified information. |
| 24. | SUPPLIES AND EQUIPMENT: ALL equipment and supplies for the performance of this TAR will be furnished by the Government. On an exception basis, authorization may be granted to purchase task related equipment and/or materials with the approval of the COR office. |
EXAMPLE TWO
| 1. | FIELD TEST SUPPORT REQUEST. This is an example of a test program that the chemical test division would be tasking a contractor to support in a field environment at the WDTC Decon pad facility. This example outlines various specific tasks however these tasks are not indicative of all field test programs. |
| 2. | ROGRAM TITLE: Contamination Indicator Spray RAM I and RAM II Test |
| 3. | PROGRAM BACKGROUND: The Contamination Indicator Spray is a binary spray that indicates the presence of CWA before decontamination and after decontamination. |
| 4. | SCOPE: The Contractor shall set up the Chemical and Biological Decontamination Facility (Decon Pad), attend Government provided new equipment training, execute nine weeks of testing, and retrograde the Decon Pad. |
| 5. | PERIODS OF OPERATION: |
| a. | February 29, 2016 through May 12, 2016 |
| 6. | DETAILED REQUIREMENTS: The Contractor shall perform the following protocol services in coordination with the WDTC COR office, and the CTD Government Test Officer or designated Government POC. Since the testing is being conducted in March and April, the weather conditions could vary significantly with precipitation and/or cold. The SDS for the indicators are available for contractor review prior to testing. |
| 7. | The Contractor shall provide two individuals to work on the Decon Pad for the duration of the RAM I and RAM II tests. One individual must be aware of the operations of the Decon Pad and one individual (may be the same one) must be able to drive a Family of Medium Tactical Vehicles (FMTV), a HMMWV, and a Light Medium Tactical Vehicle (LMTV). |
| 8. | Contractors shall be provided new equipment training (NET) performed before test execution (1-3 Mar). |
| 9. | The contactor personnel shall execute various mission profiles. A mission will consist of driving a vehicle onto the Decon Pad, spraying the vehicle with spray, spraying the vehicle with water (expect to use a gov’t operator for the M12 for this portion) and then repeating this cycle on the vehicle, and then driving the vehicle off the pad. Nine vehicles (same ones over and over) will be done each mission day. Data collectors (Government proved) will track each spray operation for timing information. |
| 10. | RAM I will consist of three weeks testing. Three different sprays (regular nerve indicator, mock indicator, and training indicator) will be used with one spray each week. |
| 11. | RAM II will consist of the same nine vehicle mission using only the regular nerve indicator for 6 weeks to provide 24 total missions. An M40 mask will be worn during at least a portion of this testing to determine if the spray back splashes onto the mask. |
| 12. | Decon Pad retrograde will occur the week after test execution is complete. Retrograde will be completed per Decon Pad SOP and DPG/WDTC policies and procedures to include disposition of waste products. DPG environmental has determined that the spray and water will be disposed of or pumped into the Decon Pad holding tanks or out into the WDTC designated waste area. |
| 13. | SECURITY REQUIRMENTS: Unclassified project and performance on this TAR will not require access to classified information. |
| 14. | SUPPLIES AND EQUIPMENT: ALL equipment and supplies for the performance of this TAR will be furnished by the Government. On an exception basis, authorization may be granted to purchase task related equipment and/or materials with the approval of the COR office. |
EXAMPLE THREE
| 1. | CHAMBER TEST SUPPORT REQUEST. This is an examples of a test program that the chemical test division would be tasking a contractor to support in a chamber environment at the WDTC Material Test Facility (MTF). This example outlines various specific tasks however these tasks are not indicative of all field test programs. |
| 2. | PROGRAM TITLE: Guide Validation Test |
| 3. | PROGRAM BACKGROUND: The Guide was developed to provide commanders mitigation guidance/procedures for certain chemical events. Over several years, the key procedures were observed, reviewed, captured, developed and incorporated into a guide however, the procedures as drafted, have not been tested or operationally validated. |
| 4. | SCOPE: DPG has been tasked to validate and make possible recommended changes to some of the key procedures against Non-Traditional Chemical Agents. The procedures asked to validate are: Detection (M8 and M256), decontamination (Modified Buddy Team Mission Orientation Protective Posture [MOPP] Exchange with Joint Service Lightweight Integrated Suit Technology (JSLIST), JSLIST Individual Emergency Method MOPP Exchange and Thorough Personnel Decon). The contactor shall be tasked to support this effort and provide individuals to be trained and perform the detections and decontamination procedures as outlined in the specific tasks. |
| 5. | PERIODS OF OPERATION: Friday and Saturday operations will be required for both training and exercise events. No extended duty hours (beyond 0700 – 1730) are expected. |
| a | December 8 2015 through December 11 2015 (Training) |
| b. | December 14 through December 19, 2015 (Exercise) |
| 6. | DETAILED REQUIREMENTS: The Contractor shall perform the following protocol services in coordination with the WDTC COR office, and the CTD Government Test Officer or designated Government POC. Training on the wear of U.S. military uniform, wear of JSLIST clothing, various chemical detection processes, DONNING/DOFFING of the JSLIST and Military uniform, and decontamination processes will be provided the Government. Clothing, detection system and decontamination materials will be provided by the Government. |
| 7. | The Contractor shall provide 10 individuals to participate in a MOPP exchange and thorough personnel decontamination line. Two individuals may be required to work on the Decon line itself and the other eight as roll players; contaminated individuals going through the Decon line (buddy doffing procedures and some wash down). A minimum of one pair (two individuals) of the 8 roll players must be female. |
| 8. | The Contractor shall provide individuals that are training to process through the Decon line and required to wear JSLIST ensembles with M40 masks. Underclothing, M40 masks, and JSLIST ensembles for all roll player individuals undergoing the Decon process will be provided by the Government. A simulate fluorescent tagged silica powder contamination will be applied onto the eight individuals when dressed in the JSLIST ensemble with mask. Black light photography will be conducted with the eight individuals before contamination, after contamination and after removal of the JSLIST ensembles. If all possible male photographers shall be used for male participants and female photographers for the female participants. |
| 9. | The contactor personnel shall be dressed in JSLIST suites with masks and exercise a series of simulated detection sampling routines at a predetermined location followed by various DOFFING scenarios. |
| 10. | SECURITY REQUIRMENTS: Unclassified project and performance on this TAR will not require access to classified information. |
| 11. | SUPPLIES AND EQUIPMENT: ALL equipment and supplies for the performance of this TAR will be furnished by the Government. On an exception basis, authorization may be granted to purchase task related equipment and/or materials with the approval of the COR office. |
EXAMPLE FOUR
| 1. | LABORATORY TEST SUPPORT REQUEST. This is an examples of a test program that the chemical test division would be tasking a contractor to support in a laboratory environment at the WDTC Combined Chemical Test Facility (CCTF). This example outlines various specific tasks however these tasks are not indicative of all field test programs. |
| 2. | PROGRAM TITLE: Assurance Spray Area Coverage Test |
| 3. | PROGRAM BACKGROUND: The Assurance Spray is a binary spray that indicates the presence of CWA before decontamination and after decontamination. |
| 4. | SCOPE: DPG has been tasked to test the spray against various chemical warfare agents on larger surface areas. This testing will be conducted in Bldg. 4165, Lab 126 in the Small Item Decon (SID) Chamber. The Contractor shall be tasked to provide various tasks in support of this test effort. |
| 5. | PERIODS OF OPERATION: No extended duty hours (beyond 0700 – 1730) are expected. |
| a. | May 2, 2016 through July 21, 2016 |
| 6. | DETAILED REQUIREMENTS: The Contractor shall perform the following protocol services in coordination with the WDTC COR office, and the CTD Government Test Officer or designated Government POC. |
| 7. | The Contractor shall provide a Scientist (PS) to coordinate/collaborate with a Government Project Scientist on developing test methodologies. |
| 8. | The Contractor PS shall also participate in running the SID system as necessary. |
| 9. | The Contactor PS shall be involved in the test plan development, data package review/generation, and final report development. |
| 10. | The Contractor shall provide two individuals to operate a large scale applicator and small scale applicator. These operators shall also be involved with test prep by setting up test panels for each trial, trial execution, hazardous waste disposal, and fixture retrograde. The Government will provide applicator training. |
| 11. | The Contractor shall provide one of the applicator operators to work an alternate shift (come in early, but only work standard 10 hours) and be able to mix the indicator for testing. The test requirement is to have the indicator mixed approximately six hours before application. |
| 12. | The Contractor shall provide an agent handler to assist a Government agent handler during test prep, trial execution, and fixture retrograde. The agent handler shall also be involved in data package review. |
| 13. | The Contractor shall provide a laboratory technician trained in preparing standards for MINICAMS and GC analytical analysis. |
| 14. | The Contractor shall provide a qualified and trained laboratory analyst to conduct GC analytical analysis and purity checks on the VX agent. |
| 15. | The Contractor shall provide a qualified and trained safety air MINICAMS operator for laboratory safety air monitoring. |
| 16. | SECURITY REQUIRMENTS: Unclassified project and performance on this TAR will not require access to classified information. |
| 17. | SUPPLIES AND EQUIPMENT: ALL equipment and supplies for the performance of this TAR will be furnished by the Government. On an exception basis, authorization may be granted to purchase task related equipment and/or materials with the approval of the COR office. |
EXAMPLE FIVE
| 1. | LABORATORY SMARTMAN TEST SUPPORT REQUEST. This is an examples of a test program that the chemical test division would be tasking a contractor to support in the laboratory SMARTMAN Test Fixture at the WDTC Combined Chemical Test Facility (CCTF). This example outlines various specific tasks however these tasks are not indicative of all field test programs. |
| 2. | PROGRAM TITLE: Aircrew Mask SMARTMAN Test |
| 3. | PROGRAM BACKGROUND: This SOW provides information to facilitate chemical agent testing support by DPG for SMARTMAN testing of whole-mask systems. Mask testing will be conducted using the DPG SMARTMAN fixtures located in the Combined Chemical Test Facility (CCTF). Whole-mask testing will be conducted using sarin (GB) vapor (GBV), soman (GD) vapor (GDV), VX liquid (VXL) and distilled mustard (HD) liquid vapor (HDLV) challenges. |
| 4. | SCOPE: WDTC will perform SMARTMAN testing on masks. The scope of testing will include four GBV trials, four GDV trials, four VXL trials and four HDLV challenges The Contractor shall be tasked to provide various tasks in support of this test effort. |
| 5. | PERIODS OF OPERATION: No extended duty hours (beyond 0700 – 1730) are expected. |
| a. | May 18, 2015 through Mar 15, 2016 |
| 6. | DETAILED REQUIREMENTS: The Contractor shall perform the following protocol services in coordination with the WDTC COR office, and the CTD Government Test Officer or designated Government POC. |
| a. | Subtask A. Planning. |
| i. | The Contractor shall provide a scientist to comment to SMARTMAN test plan. |
| ii. | The Contactor PS shall be involved in the test plan development, data package review/generation, and final report development. |
| b. | Subtask B. Test Provisioning |
| i. | The Contractor shall be tasked to prepare SMARTMAN test fixtures and laboratories to include relevant laboratory documentation, process and air monitoring initial calibrations. |
| ii. | The Contractor shall be tasked to provide receipt and inspection support for mask test items. |
| iii. | The Contractor shall provide a qualified and trained safety air MINICAMS operator for laboratory safety air monitoring. |
| iv. | The Contractor shall provide a qualified and trained laboratory analyst to conduct GC analytical analysis on agent purity and post vapor sample. |
| c. | Subtask C. Test Conduct |
| i. | The Contractor shall provide one scientist, one analyst, and one test MINICAM operator to support conducting sixteen trials. Testing will include running 24hour trials using MINICAMS breakthrough analysis monitoring. Testing will include mask leak testing, data collection, sample analysis, maintenance of all relevant laboratory log books during testing, air quality monitoring, and cleaning of the fixture and its components. All relevant SOPs will be provided and will be followed. |
| d. | Subtask D. Retrograde |
| i. | The Contractor shall provide a one scientist, one analyst, and one test MINICAM operator to support complete SMARTMAN retrograde activities to include hazardous waste disposal, and related activities necessary to return the laboratory to its pre-test condition in order to facilitate completion the test report. |
| ii. | The Contractor shall provide a scientist and one analyst to complete data analysis and support the Government test officer in generating, editing and finalizing a final test reporting. |
| 7. | SECURITY REQUIRMENTS: Unclassified project and performance on this TAR will not require access to classified information. |
| 8. | SUPPLIES AND EQUIPMENT: ALL equipment and supplies for the performance of this TAR will be furnished by the Government. On an exception basis, authorization may be granted to purchase task related equipment and/or materials with the approval of the COR office. |