Technical Exhibit AA - HISTORICAL BASELINE STAFFING MODEL - ODC HISTORY.pdf
PDF 135 KB Posted
- Solicitation number
- W91151-20-R-0002
About this file
This technical exhibit provides a historical baseline staffing model and other direct cost history for a federal contract supporting testing activities at Dugway Proving Ground and Western Desert Test Center in Utah. Key personnel requirements included a program manager, business managers, quality control and safety officers, scientists, technicians, and operators. The document outlines the average historical hours per year for 58 labor categories along with associated divisions. It estimates that historical overtime has averaged approximately 5% of total hours. Any future overtime must be approved in accordance with FAR regulations. Additionally, the exhibit estimates historical annual other direct costs of $1,198,300 for expenses such as materials, supplies, and equipment.
Separately, the federal contract opportunity posted by the Mission and Installation Contracting Command seeks proposals for non-personal services to support developmental and operational testing at Western Desert Test Center. The contract would provide personnel, management, supplies, materials, equipment, and tools beyond what the government itself provides.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit AA: HISTORICAL BASELINE STAFFING MODEL and
ODC HISTORY/ESTIMATES
HISTORICAL LABOR MIX Average Historical Productive
Hours Per Year - inclusive of all Prime and Sub Hours - (does not reflect any historical overtime or uncompensated overtime) Program Manager 1,813
Senior Business Manager 2,127 Quality Control Manager 1,864
Facility Security Officer 3,631 Project Manager - BTD 3,714 Project Manager - CTD 1,823 Project Manager - SPD 3,854
Business Manager 2,335 Administrative Supervisor 1,726
Safety Officer 2,098 Scientific Programmer 1,674
Principle Engineer 1,809 Senior Test Manager 11,147
Test Manager 10,888 Project Scientist I 1,713
Project Scientist II 1,861 Project Scientist III 1,786
Assistant Scientist I 2,832 Assistant Scientist II 4,514 Associate Scientist I 1,726
Associate Scientist II 5,392 Chemist I 14,528
Chemist II 3,576 Laboratory Analyst I 5,505
Laboratory Analyst II 10,890 Senior Scientist (BTB) 1,809
Project Manager 3,591
Junior Project Manager 2,239 Facilities Project Manager 3,265
Senior Administrative Associate* 5,642 Administrative Assistant 12,681
Property Clerk 23,954 Drafter 1,834
Electrician 1,864 HVAC Technician 3,411
Senior Electronic Technician 4,689 Electronic Technician 2,545
Senior Mechanical Technician 37,578 Mechanical Technician 13,058
GIS Technician 1,850 Explosive Handler 685
Photographer 2,045 Audio Visual Specialist 1,884
Field Technician 17,190 Heavy Duty Equipment Operator 3,532
Flight Operations/Aviation Technician 10,219 POL/Hazardous Waste Technician 1,759
Laboratory Technician I 14,308 Laboratory Technician II 1,587
Welder 1,705 Training Coordinator 5,741
TOTAL 285,491
BTD = Bio Test Division, CTD = Chemical Test Division, SPD = Special Programs Division DMD = Data Management Division, TSD = Test Support Division, OPS = Operations Division, MET = Meteorological Division, Overall = All Division
*The Senior Administrative Associate category above does not reflect an additional 10 hours per year spent generating the Contractor Manpower Report.
Furthermore, the hours shown above are not prospective nor do they reflect any historical overtime. On the average, historical overtime has been approximately 5% of the total hours reflected above. In accordance with FAR Part 22 Policy, "contractors shall perform all contracts, so far as practicable, without using overtime, particularly as a regular employment practice, except when lower overall costs to the Government will result or when it is necessary to meet urgent program needs”. If it becomes apparent during negotiations of applicable contracts that overtime will be required in contract performance, the contracting officer shall secure from the contractor a request for all overtime to be used during the life of the contract in accordance with FAR 22.103-3.
HISTORICAL (with various estimates) ODC Spend Per Year (Unburdened)
$1,198,300