Amendment 5 - RFI Clarification#2-16Jan2020.pdf
PDF 220 KB Posted
- Attached to
- Solicitation Amendment # 6 W91151-19-R-0015
- Solicitation number
- W9115119R0015
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011324022-0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment is issued to provide RFI clarif ication responses to RFI # 10, 16, 38, 45, and 53.
2. This amendment is issued to revise Technical Exhibit (TE) –A, version dated, 16 January 2020 to reflect the RFI clarif ication responses to
RFI # 10, 16, 38, 45, and 53.
3. This amendment is issued to acknow ledge that Technical Exhibit (TE) –A, version dated, 14 January 2010 w as a "typo" that w as intended to read 14 January 2020.
4. All other terms and conditions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115119R0015
X 9B. DATED (SEE ITEM 11)
04-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jan-2020
CODE
MICC - FORT HOOD
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115119R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI CLARIFICATIONRESPONSES#2
10. Question. In Technical Exhibit A, Scenario 6 the total number of hours 60 (it should be 180 hours) does not compute correctly for the government requirements of 15 Male CRP for 12 hours per day. Please confirm.
Answer. 180 hours.
Revised Answer: The total hours is 180. Calculation is as follows: CRP 60 + FLS 120 hours = 180 total hours
16. Question. (ref: Document: TE A Scenarios_W91151-19-R-0015.pdf) Scenario 6: Finance Customers; Shouldn’t the(M) CRP/HRS 15/12 be changed to 5 CRPs?
Answer. 5 CRPs .
Revised Answer: Yes, 5 CRPs is correct. Not 15. TE-A Scenario list has been revised to reflect this change.
38. Question. TE A Scenarios Page 8 Scenario 6; The Personnel list 15 CRP but the scenario and remarks address only 5 CRPs. What is the number of CRPs required for Scenario 6?
Answer. 5 CRPs.
Revised Answer: Yes, 5 CRPs is correct. Not 15. TE-A Scenario list has been revised to reflect this change.
45. Question. SCENARIO 6: - Male CRP's should be total of 5XCRP and not 15XCRPs?
Answer. 5X CRP
Revised Answer: Yes, 5 CRPs is correct. Not 15. TE-A Scenario list has been revised to reflect this change.
53. Question. In Scenario 6, there is a request for 15 male CRPs at 12 hours each, but the total shows a request for 5 total CRPs with a total of 60 hours. Can the government clarify the number of CRPs and hours required for the scenario?
Answer. The total CRP HRS is 180.
Revised Answer: The total hours is 180. Calculation is as follows: CRP 60 + FLS 120 hours = 180 total hours
The following have been deleted:
REVISED PWS - DATED 14 JAN2020
RFI CLARIFICATIONRESPONSES
W9115119R0015
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
TE AND ATTACHMENTS
TECHNICAL EXHIBITS AND ATTACHMENTS
DOCUMENT TYPE DESCRIPTION
Technical Exhibit A Scenarios
Technical Exhibit A- Revised Scenarios-2 Revised 08 January 2020
Technical Exhibit A- Revised Scenarios-1 thru 8, Revised 14 January 2020
Technical Exhibit A- Revised Scenarios-6, Revised 16 January 2020
Technical Exhibit B Government Provided Material
Technical Exhibit C Scenario Price List
(End of Summary of Changes)
File details come from the government source that posted it. Updated .