This document contains a Data Item Description template and instructions for a Task Implementation Plan. The template provides guidance for contractors to develop a Task Implementation Plan or Immediate Resource Requirement that details the technical approach, schedule, staffing, costs, and resources required to accomplish a new task requirement. Contractors must submit the plan to the government Contracting Officer's Representative as a cover letter, technical approach in a format such as PowerPoint slides, and cost attachments identified by the task requirement number and title. Plans should include the point of contact responsible for task accomplishment. Technical approaches must describe the methodology and procedures, milestone and delivery schedules, staffing, potential problems and solutions, required government actions, and exceptions to requirements. Cost estimates should itemize direct labor, overtime, overhead, fringe benefits, general and administrative costs, fixed fee, travel, commercial supplies and shipping, subcontracts, Government-Furnished supplies and materials, facilities maintenance, insurance, and other cost factors. The plan must also identify any required resources currently unavailable and their estimated costs.
The related federal contract opportunity is a pre-solicitation for base and test support services under solicitation number W91151-19-R-0003, previously numbered W91151-18-R-0107. The contractor will provide administrative, field test, data collection, database management, data entry, and technical support to operational tests, including preparation and maintenance of test sites and use of Government Furnished Property. Additional requirements include maintenance and operation of test support vehicles and generators, use of Government-provided instrumentation, and supply actions in support of testing. The agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
Task Implementation Plan
View the file
Other files for this federal contract opportunity
Show all 50
Base and Test Support Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form Approved OMB No. 0704-0188
Page 1 of 1 Pages PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)
DATA ITEM DESCRIPTION
1. TITLE
A003, Task Implementation Plan (TIP)
2. IDENTIFICATION NUMBER
3. DESCRIPTION/PURPOSE
To provide a written description of how the contractor intends to accomplish an assigned tasking, the dollar amount, and what resources are required.
4. APPROVAL DATE
(YYYYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
This Task implementation Plan (TIP) is the contractorôs plan for executing tasks described in the Task Authorization Request (TAR), along with an estimate of the resources (e.g., labor, hours, logistics, government furnished property, funding) required to accomplish the work. Before the contractor can provide services under a TAR, the Contracting Officer must approve the associated TIP.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
10.1 The contractor shall provide one of the following TIP formats: an oral TIP, or an Immediate Resource Requirement (IRR).
10.2 The TIP shall be submitted to the Government (COR) as one document consisting of a cover letter, technical approach) (e.g., Power Point Slides – see attach format) and costing attachments, identified by the TAR number and title. The contractor shall also identify the POC or TSC Lead responsible for accomplishing the task, with telephone number.
a. The TIP combines streamlined procedures (technical approach) with thorough coverage of essential tasks and resources with estimated costs.
b. An IRR does not include slides: it consists of a formal letter detailing the need for immediate support pending development of a TIP and the
IRR cost. This format should only be used to request immediate support for a new TAR.
10.3 How to accomplish the requirement (TIP)
a. Technical Approach:
(1) Describe the proposed methodology, procedures, and plans to accomplish the requirement.
(2) List the milestone and delivery schedule.
(3) Staffing.
(4) List potential problems and recommended solutions.
(5) List actions or situations requiring Government action.
(6) List exceptions to the Government requirement.
(7) Estimated Cost Summary.
11. DISTRIBUTION STATEMENT
Distribution Statement A: Approved for public release; distribution is unlimited.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
Downloaded from http://www.everyspec.com
USAOTC G4
A003, Task Implementation Plan (TIP) Continued
b. Address the following when applicable:
(1) Property administration.
(2) Safety and security (including computer viruses) measures.
(3) Maintenance of GFP and post test repair of equipment and instrumentation to operational status.
(4) Communications capabilities and procedures.
(5) Data collection and data management.
(6) Physical and COMSEC security measures.
(7) Instrumentation development.
(8) Logistics and instrumentation support
10.4. Estimate of Required Resources.
a. Labor Requirement and Costs Shows the labor requirements by job position and man hours to the nearest man-hour, the hourly burdened rate and the total cost of each position.
Provide subtotals for man-hour and costs.
(1) Direct Labor.
(2) Overtime.
(3) Overhead, fringe, G&A, Fixed Fee
b. Non-Labor Requirements and Costs. Show all requirements, their costs and subtotals for the following:
(4) Travel.
(5) Commercial supplies, materials and shipping.
(6) Subcontracts. List all subcontracting efforts and suggested sources of supply.
(7) GSA, MILSTRIP, GBL, and POL supplies and materials.
(8) DOL maintenance.
(9) Insurance, fees and other cost factors as required.
c. ITR items will be broken into two sections: Government purchased and TSC purchased.
d. Required resources currently not available, including estimated costs.
e. Total costs
Blank Page
File details come from the government source that posted it. Updated .