SOLICITATION_Amendment_(Released)_17-B-0014_REPURPOSE_AREA_CYS_Bldg._36000_14_Aug_2017.pdf

PDF 168 KB Posted

Attached to
Repurpose Area CYS Building 36000 Federal contract opportunity
Solicitation number
W91151-17-B-0014
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Solicitation amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Repurpose Area CYS Building 36000, newest first.
File Type Posted
BID_OPENING_Sign_in_Roster_(IFB)17-B-0014_Repurpose_Area_CYS_Bldg_36000_Ft_Hood_31_Aug_17.doc.pdf PDF
BID_OPENING_Abstract_(IFB)17-B-0014_Repurpose_Area_CYS_Bldg_36000_Ft_Hood_31_Aug_17.xls.pdf PDF
Technical_Exhibit_E_Drawing_AD-101B_17-B-0014_Repupose_Area_CYS_Bldg_36000_24_Aug_17.pdf PDF
Technical_Exhibit_D_Drawing_A-101B_17-B-0014_Repupose_Area_CYS_Bldg_36000_24_Aug_17.pdf PDF
SOLICITATION_Amendment_17-B-0014-0003_REPURPOSE_AREA_CYS_Bldg._36000_24_Aug_2017.pdf PDF
Technical_Exhibit_B_-_Drawings_(Revised)_17-B-0014_REPURPOSE_AREA_FOR_CYS__BLDG_36000_FT_Hood_21_Aug_17.pdf PDF
HazMat_Report_17-B-0014_Repupose_Area_CYS_Bldg_36000_16_Aug_17.pdf PDF
SOLICITATION_Amendment_(Released)__17-B-0014-0002REPURPOSE_AREA_CYS_Bldg._36000_18_Aug_2017.pdf PDF
Site_visit_agenda__17-B-0014_Repurpose_Area_Bldg_36000_Ft_Hood_3_Aug_17.pdf PDF
Site_visit_Roster_17-B-0014_Repurpose_Area_CYS_Bldg_36000_Ft_Hood_3_Aug_17.doc.pdf PDF
Technical_Exhibit_A-Specifications_1-11-16__17-B-0014_REPURPOSE_AREA_FOR_CYS_OPS_BLDG_36000_FT_Hood_4_April_17.pdf PDF
SOLICITATION_Released_17-B-0014_REPURPOSE_AREA_CYS_Bldg._36000_27_July_2017.pdf PDF
Technical_Exhibit_B_-_Drawings_17-B-0014_REPURPOSE_AREA_FOR_CYS_OPS_BLDG_36000_FT_Hood_4_April_17.pdf PDF
Technical_Exhibit_C_Attachment_1-Appendix_A_05-10-2016__17-B-0014_REPURPOSE_AREA_FOR_CYS_OPS_BLDG_36000_FT_Hood_4_April_17.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010995714 CA009605P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. This amendment is issued to extend the due date for the Government to provide responses to the questions recieved from industry from 14 August 2017 to 17 August 2017.

B. This amendment is issued to extend the due date of the BID OPENING from 22 August 2017 to 31 August 2017 at 1:00 P.M in DPW Building 4610, Engineer Drive Fort Hood, Texas 76544

C. This amendment is issued to inform Bidders that theyare required to provide a CD copy of their bid documents w ith their IFB submission.

D. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-17-B-0014

X 9B. DATED (SEE ITEM 11)

27-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2017

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91151-17-B-0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 22-Aug-2017 01:00 PM to 31-Aug-2017 01:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS FOR BIDDING

Any bids received in response to this solicitation SHALL carry a 120 day acceptance period before prices need to be verified, extended or re-negotiated.

1. Submission of Bids

The priced bid shall be supported by a draft progress schedule that demonstrates the offeror's understanding of the work requirements, estimated time frames for ordering and installing equipment.

Bidders are required to provide a CD copy of their bid documents w ith their IFB submission.

2. Public Bid Openings:

Please refer to Block 13A of the 1442. Anyone wishing to attend the bid opening MUST notify the Contracting Officer (kay.d.brown.civ@mail.mil) and Contract Specialist (fredicinda.d.jones.civ@mail.mil) by email no later than 30 August 2017 by 12:00 P.M CST with a firm commitment to attend.

MAILING ADDRESS

Directorate of Public Works ATTN: Engineering Division

(CONTRACTING SECTION)

Building 4610 Engineer Drive Fort Hood, TX 76544

PUBLIC BID OPENING

31 August 2017 at 1:00 P.M DPW-Fort Hood Bldg 4610 Engineer Drive DPW COR Conference Room Fort Hood, TX 76544

3. Pre-requisites for Specialty Trade licensure and certification:

Mechanical HVAC license class A (with minimu 5 years of experience), Certification Master electrician, Certification

In responding to this solicitation for bids, the bidder shall provide copies of certifications/training identified above and below as a part of the bid. Failure to provide this documentation will render the bid non- responsive and no further consideration will be given to that bidder for award of this contract. No substitution of the individual possessing the required pre-qualifications will be authorized without the written approval of the Contracting Officer, and no time will be allowed for the contractor to acquire the required training/certification after the contract is awarded.

4. Work Experience:

The prime contractor shall demonstrate that it possesses general construction contract management by providing at least three examples of relevant work experience in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, and the period of time allocated for completion of the work. Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.

5. Mandatory Attendance – Pre-Bid and Pre-Construction Conferences

The Contracting Officer shall conduct a pre-bid/pre-proposal conference in conjuction with the site visit. Information on the scheduled Site Visit is located in FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) of this solicitation. When such conference is scheduled, all potential bidders attending the site visit will be required to attend the pre-bid/pre- proposal conference. Space limitations dictate that no more than two representatives from each company attend. The Contracting Officer will review Bid submission requirements, and other administrative matters critical for successful and timely performance of the work.

The Contractor shall attend a Government coordinated pre-construction conference within 10 calendar days of contract award. As a minimum, the conference shall be attended by thecontractor’s appointed project manager, the superintendent, the QCM, and administrative personnel responsible for preparation of contract documents, certified payroll records and invoices. The contractor shall deliver letter appointments of its key personnel that include each individual’s duties, roles and responsibilities.

6. SUBCONTRACTOR LIST

Bidder shall submit a list of proposed subcontractors as an attachment to their BID. If bidder does not intend on utilizing subcontractors (self-perform), bidder shall state so in their bid.

7. AMENDMENTS TO SOLICITATION

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, or (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a quote. The Government must receive the acknowledgment by the date and time specified for receipt of proposals indicated in block 10 of the SF1442.

8. FALSE STATEMENTS IN BIDS

Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.

The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

9. EXPLANATION TO PROSPECTIVE BIDDERS

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by the date and time specified in FAR Clause 52.236-27. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidder as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidder.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(a) An organized site visit has been scheduled for 3 August 2017 at 9:00 A.M C.S.T

(b) Participants will meet at

MICC-FH (Old Darnall Hospital) 36000 Darnall Loop Main Conference Room Room 1527 Fort Hood, Texas 76544

(c) Contractors interested in attending the scheduled site visit MUST notify the Contracting Officer of record in this solicitation no later than 2 August 2017 by 12:00 P.M. with a firm commitment to attend.

Due to heightened security requirements within Department of Defense and Fort Hood, no contractor will be allowed entry to the building without having provided this notification. The notification must include the names and position titles of representatives attending the pre-bid conference; due to space constraints, each contractor is allowed to name two representatives in the notification.

(d) Fort Hood is a closed access installation. All visitors must obtain a visitors’ pass at the Main Gate Visitor's Center before being allowed on post. Consequently, participants should allow at least one hour prior to the site visit for obtaining this pass.

(e)All questions resulting from the site visit must be submitted electronically to the email below prior to 10 August 2017 by 12:00 P.M fredicinda.d.jones.civ@mail.mil

All contractors must have a prime representative at the scheduled briefing and site visit in order to be considered.

(f) Remarks and explanations made by the government representative during the course of the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a written amendment issued by a warranted contracting officer. All RFIs and clarifications considered as a result of inquiries from contractors at the site visit will be incorporated in one or more amendments to the solicitation, all of which will be provided to the contractor and or posted to FBO.gov in sufficient time to allow contractors to finalize bids prior to submission.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to provide bonds within 15 calendar days of contract award then to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 Calendar days, making the total completion calendar days for this project 195 days.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date..

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .