3001. PWS CJLOTS_ 26MAY2026..pdf
PDF 613 KB Posted
- Solicitation number
- W90VN926QA040
About this file
This is a Performance Work Statement for CJOLTS FY26 Korea, a contractor support services requirement to provide supplies and services at three locations in South Korea (Dogu Beach, Pier 9 in Pohang, and Camp Mujuk) from June through August 2026.
The contract encompasses 17 contract line items (CLINs) organized into two categories: transportation support services and life support equipment. Transportation services include provision of various vehicles without operators: 4x4 pickup trucks (2 units, 45 days), 15-passenger vans (2 units, 45 days), 9-passenger ambulette vans for medical transport (3 units, 45 days), all-terrain utility vehicles (5 units, 45 days), sedans (2 units, 45 days), SUVs (3 units total across different locations, 43-45 days), and 12-passenger carryalls/vans (8 units, 47-62 days). All vehicles must be delivered clean, fully functional, equipped with safety equipment and air-conditioning, and capable of operating in Korean summer conditions over mixed road surfaces. The contractor is responsible for all scheduled and emergency maintenance, parts, and replacement vehicles within two hours of notification, with the government responsible for fuel and citations.
Life support equipment includes ten Containerized Personal Hygiene Facilities (5 at Camp Mujuk, 5 at Dogu Beach, 32 days) with shower and handwashing capabilities, separate water heaters maintaining 95-110°F, HVAC systems, and daily maintenance services. Additional CLINs require provision of ten trailer-mounted light plants (8 at Dogu Beach, 2 at Pier 9, 36 days), one 20-foot cold storage freezer container (30 days), two CONEX storage containers (31 days), two tracked skid steer loaders with attachments (20 days), one mid-size excavator (20 days), and tent cleaning services for approximately 12 tents. All pricing must be all-inclusive, covering mobilization, demobilization, setup, maintenance, fuel, labor, supervision, and transportation with no separate charges authorized.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
CJOLTS FY26 Korea
OBJECTIVE
The objective of this requirement is to obtain contractor support services to provide supplies and services for CJOLTS FY26 Korea during specified dates of performance.
SCOPE
The scope of this requirement is limited to performing and accomplishing the task as identified in the Statement of Work (SOW).
PLACE OF PERFORMANCE
• Dogu Beach
• Pier 9, Pohang, South Korea
• Camp Mujuk
POINTS OF CONTACT (POC)
LSC Cid, Nancy Email: nancy.s.cid.mil@us.navy.mil
LSC Turner, Stephanie
Email: stephanie.r.turner3@navy.mil
1- (619) 289-3875
COR: Mr. Pak, Chong Hwan
Email: chonghwan.pak2.ln@army.mil
Mobile: (Mobile: 010-9129-6866)
CE2 Thompson
Main POC will be provided upon award.
DESCRIPTION OF SERVICES
The contractor shall furnish labor, equipment and materials, provide and manage the requirements for supplies and services as specified below. Dates and times may be subject to change.
mailto:nancy.s.cid.mil@us.navy.mil https://www.google.com/url?q=mailto%3Astephanie.r.turner3%40navy.mil https://www.google.com/url?q=mailto%3Achonghwan.pak2.ln%40army.mil
NON-PERSONAL SERVICE STATEMENT
Contractor employees performing services under this PWS will be controlled, directed and supervised at all times by management personnel of the Contractor. Contractor management will ensure that employees comply with the performance work standards outlined in the
PWS. Contractor employees will perform their duties independent of, and without the supervision of U.S. Government officials or other Defense Contractors.
MATRIX REQUIREMENT
ITEM SUPPLY/ SERVICE QT UNIT POP DAYS LOCATION
CLIN 0001 4X4 Pickup Truck 2 EA 16JUNE-
30JULY
45 Camp Mujuk
CLIN 0002 15 Passenger Vans 2 EA 16JUNE-
30JULY
45 Camp Mujuk
CLIN 0003 9 Ambulette Passenger Vans
3 EA 16JUNE-
30JULY
45 Pier 9, Dogu Beach, Camp Mujuk
CLIN 0004 UTV 5 EA 16JUNE-
30JULY
45 Camp Mujuk (2), Dogu Beach (3)
CLIN 0005 SEDAN 2 EA 16JUNE-
30JULY
45 Camp Mujuk
CLIN 0006 SUV 1 EA 16JUNE-
30JULY
45 Camp Mujuk
CLIN 0007 SUV 2 EA 18JUNE-
30JULY
43 Camp Henry
CLIN 0008 Carryall & Van 12 Passenger
4 EA 14 JUNE-
14 AUG
62 Camp Henry
CLIN 0009 Carryall & Van 12 Passenger
4 EA 14JUNE-
30 JULY
47 Camp Henry
CLIN 0010 Containerized Personal Hygiene Units
5 EA 20 JUNE-21
JULY
32 Camp Mujuk
CLIN 0011 Containerized Personal Hygiene Units
5 EA 20 JUNE-21
JULY
32 Dogu Beach
CLIN 0012 Light Plant 10 EA 25 JUNE- 30
JULY
36 Dogu Beach (8 EA) Pier 9 (2 EA)
CLIN 0013 Cold Storage Containers (freeze)
1 EA 26 JUNE- 25
JULY
30 Camp Mujuk
CLIN 0014 CONEX Containers 2 EA 26 JUNE- 25
JULY
31 Camp Mujuk
CLIN 0015 Skid Steer Loader (track).
Equipped with Pallet Fork
(Reference
Photo # 3. (any Brand)
2 EA 03JUL-
22JULY
20 Dogu Beach
CLIN 0016 Mid-Size EXCAVATOR (any Brand) Reference #1
1 EA 03JULY-
22JULY
20 Dogu Beach
CLIN 0017 TENT Cleaning (Approximately 12 tents)
1 JOB 20 JULY -21
JULY or TBD
12 Dogu Beach
TRANSPORTATION SUPPORT SERVICES GENERAL VEHICLE REQUIREMENT
• Safety and Legal Compliance. The Contractor shall provide all vehicles in safe, fully operable condition and fully compliant with all applicable Republic of Korea laws, regulations, licensing requirements, and safety standards.
• Condition at Delivery. All vehicles shall be delivered clean, fully functional, free of defects, and equipped with standard safety equipment, including seat belts for all seating positions, an emergency warning triangle, spare tire, jack, and basic tool kit.
• Air-Conditioning Requirement. All vehicles shall have fully functional air-conditioning
(AC) capable of maintaining comfortable interior temperatures during continuous daily use in Korean summer conditions.
• Operational Capability. Vehicles shall be suitable for sustained daily use in support of
CJLOTS-26 operations and capable of operating between Camp Mujuk (LSA), Camp
Henry, Dogu Beach, and the Pier. Vehicles shall support repeated trips over mixed road conditions, including paved, gravel, and unimproved surfaces, as required by mission demands.
• Brand Flexibility. No specific vehicle brand or manufacturer is required, provided the vehicle meets all operational, safety, and performance requirements outlined in this contract.
• Fuel Requirements. All vehicles shall be delivered with a full tank of fuel at the start of the performance period. The Government is responsible for providing all fuel and conducting all refueling operations for equipment furnished under this contract. The government will provide fuel for vehicles furnished under this contract and will conduct or controlling operation through Government-designated fueling procedures.
The contractor is not responsible for fuel costs. The Government reserve the right to designate specific refueling location or procedures to support operational control and accountability. No LPG.
• Government Responsibility for Citations. The Government will be responsible for all road-speed tickets, traffic citations, tolls, and access fees incurred during official
Government use.
• Contractor Maintenance Responsibility. The Contractor shall remain responsible for all scheduled, unscheduled, and emergency maintenance, including repairs, parts, labor, and the provision of replacement vehicles at no additional cost to the
Government.
• Replacement Vehicle Requirement. Replacement vehicles shall be delivered within two hours of notification of breakdown or mechanical failure to ensure uninterrupted mission support.
• Inspection Requirements. All vehicles shall undergo joint Government–Contractor inspections at delivery and pickup to document condition, operability, and accountability.
CLIN 0001: TWO (2) 4X4 PICK UP TRUCKS WITH NO OPERATORS
• Description: The contractor shall provide two (2) pickup trucks that have 4 doors and
4-wheel drive with fuel. The trucks will be required for camp operations. The trucks will be stationed at Camp Mujuk and the estimated number of round trips from
OLCHAN Training site to the Pier and Dogu Beach are based on real time requirements for maintenance checks and supplies movement.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk
• Quantity: 2 Trucks x 45 days
CLIN 0002: TWO (2) 15 PASSENGER VAN WITH NO OPERATORS
• Description: The contractor shall provide two (2) 15 PAX Vans with fuel and refuel.
The vans will be stationed at Camp Mujuk and the estimated amount of round trips from Camp Mujuk to the Pier and Dogu Beach are based on real time requirements for medical camp support transportation.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk
• Quantity: 2 Vans x 45 days
CLIN 0003: THREE (3) 9 PASSENGER AMBULETTE VANS WITH NO OPERATORS
• Description: The contractor shall provide three (3) Vans with fuel and refuel. The vans will be required for medical transportation with capability of laying inured personnel in the back of the Van. The vans will be stationed at Camp Mujuk and the estimated amount of round trips from Camp Mujuk to the Pier and Dogu Beach are based on real time requirements for medical camp support transportation.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk
• Quantity: 3 Vans x 45 days
CLIN 0004: FIVE (5) ALL TERRAIN UTILITY VEHICLES WITHOUT OPERATOR
• Description: The contractor shall provide five (5) 4x4 Passenger all terrain utility vehicles with long bed, Kawasaki Mule equivalent or better, year 2020 or newer with fuel and refuel. Minimum seating capability required is 4 PAX. Required to move
Camp Maintenance and other personnel within the camp. 3 will be delivered to Dogu
Beach and 2 will be delivered to Camp Mujuk. The UTV’s (utility vehicles) will also be used to transport personnel around camp for upkeep and tidiness around the LSA.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk & Dogu Beach
• Quantity: 5 UTV’s x 45 days
CLIN 0005: TWO (2) 5 PASSENGER SEDAN WITH NO OPERATORS
• Description: The contractor shall provide two (2) sedans. The sedans will be required for leadership movement to all locations.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk
• Quantity: 2 sedans x 45 days
CLIN 0006: ONE (1) SUV WITH NO OPERATORS- LSA
• Description: The contractor shall provide one (1) SUV. The SUV will be required for camp operations. The vans will be stationed at LSA and used throughout the beach, LSA, and Pier for various needs.
• Dates: June 16, 2026 to July 30, 2026
• Locations: Camp Mujuk
• Quantity: 1 SUV x 45 days
CLIN 0007: TWO (2) SUV WITH NO OPERATORS- CAMP HENRY
• Description: The contractor shall provide two (2) SUV. The SUVs will be required for logistic operations.
• Dates: June 18, 2026 to July 30, 2026
• Locations: Camp Henry
• Quantity: 2 SUV x 43 days
CLIN 0008: FOUR (4 ) CARRYALL & VAN (12 PASSENGER) WITH NO OPERATORS
• Description: The contractor shall provide eight (4) carryall & van. The vans will be required for camp operations. The vans will be stationed at OLCHAN Training Site and used throughout the beach, LSA, and Pier for various needs.
• Dates: June 14, 2026 to August 14, 2026
• Locations: Camp Henry
• Quantity: 4VAN x 62 days
CLIN 0009: FOUR (4 ) CARRYALL & VAN (12 PASSENGER) WITH NO OPERATORS
• Description: The contractor shall provide four (4) carryall & van. The vans will be required for camp operations. The vans will be stationed at OLCHAN Training Site and used throughout the beach, LSA, and Pier for various needs.
• Dates: June 14, 2026 to July 30, 2026
• Locations: Camp Henry
• Quantity: 4 VAN x 47 days
SUPPORT LIFE SUPPORT
NOTE: All unit prices shall be all-inclusive. Pricing must include mobilization, demobilization, setup, placement, maintenance, repairs, fuel, refueling, operating expenses, labor, supervision, transportation, and all other costs necessary to perform in accordance with the
PWS. No separate or additional charges will be authorized.
CLIN 0010 and CLIN 0011: Containerized Personal Hygiene Facility (CPHF)
Requirement (QUANTITY: 10)
• General: The Contractor shall provide all personnel, equipment, tools, materials, supervision and management necessary to deliver, install, operate, and maintain a
Containerized Personal Hygiene Facility (CPHF) capable of supporting Soldier hygiene requirements in an austere or contingency environment. The CPHF shall be a self-contained, ISO-containerized module that provides shower and handwashing capability and includes all equipment, materials, and components necessary for full, safe, and continuous operation.
• Responsibilities: The Contractor shall be responsible for the followings but not limited to: Replenish toilet papers, soaps, air fresher and paper towels. The
Contractor shall maintain equipment at FMC, remove solid waste as needed, add portable water as needed, remove grey water as needed, refuel power source including electricity as needed and on-call service within two (2) hours after notification by the COR and/or representative on-site.
Minimum Technical Requirements
The CPHF shall, at a minimum, include:
• Each CPHF must have separate instant hot water heater/boiler to maintain water temperature at 35-43.3 degrees Celsius or 95-110 degrees Fahrenheit at all times.
Also it must have separate air conditioning units with lighting fixtures.
• Handwashing Stations — Integrated sinks with potable water supply, soap dispensers, and gray-water drainage.
• Water Heating System — Electric or diesel-fired water heater sized to support continuous operations.
• Gray-Water Management — Onboard storage tanks or connection hardware for site utility tie-in.
• HVAC and Ventilation — Climate control sufficient to maintain safe and sanitary internal temperatures.
• Electrical Distribution — Internal lighting, breaker panel, and external power interface compatible with site power.
• Safety Features — Non-slip flooring, internal drainage, GFCI protection, and fire extinguisher.
Installation and Setup
• The Contractor shall install the CPHF at the designated site and ensure all utilities
(power, water, gray-water) are connected and fully operational. The Contractor shall provide all hoses, fittings, adapters, and ancillary materials required for complete setup.
Operation and Maintenance
The Contractor shall operate and maintain the CPHF for the duration of the Period of
Performance, including:
• Daily on-demand cleaning and sanitation
• Consumable replenishment (soap, paper products, etc.)
• Preventive maintenance and repairs
• Portable water supply/resupply and gray-water removal IAW ROK Environment Laws and Regulations. Emergency water resupplies as directed by the Government.
• Daily inspections to correct all malfunctions immediately.
• Monitor and remove grey water in compliance with local safety/hygiene regulations.
• Clean CPHFs one (1) time a day at a MINIMUM.
• Provide power generation and fuel for generators.
• Provide heating/cooling units to maintain the temperature of 23-29 degrees Celsius
(75-85 degrees Fahrenheit).
• Clean, remove, and dispose of any excretion at an off-base disposal facility IAW ROK
Environmental Laws.
• Maintain sanitary conditions, water tight, fly proof, and neat. Flush sides/bottoms to remove residues.
• Complete clean-up of all spills immediately, notifying the COR at the time of spillage.
Compliance
All equipment and operations shall comply with applicable U.S. Army, USFK, environmental, safety, and sanitation standards, including but not limited to:
• USFK Environmental Governing Standards (EGS)
• OSHA and NEC electrical safety requirements
• Army hygiene and field sanitation standards
• ROK Environmental Laws and Regulations
Deliverables
The Contractor shall provide:
• Installation completion report
• Daily/weekly O&M logs
• Incident or outage reports within 2 hours of occurrence
• Dates: June 20 , 2026, to July 21, 2026
• Location 1: Camp Mujuk, 5 Each
• Location 2: Dogu Beach, 5 Each
• Quantity: 10 CPHFs x 32 days
CLIN 0012: TRAILER MOUNT LIGHT PLANTS RENTAL (QUANTITY 10)
• Description: The contractor shall provide 10 Mounted Light Plants for ample lighting for CJLOTS. L8-4MH LIGHT PLANT powered by diesel engine, equipped with 4-
1,000 watt lightbulbs, 6KW, and trailer mounted. The Contractor will deliver, and set up lights as well as replace any lights that have malfunctions. The intention is to provide uninterrupted lighting to camp location of CJLOTS 2026. 1) The expectation is to provide a qualified contractor on call for scheduled, unscheduled, and emergency maintenance at all times. 2) Light plants tools and fluids shall be provided by contractor such as coolant, oil, fuel, and refueling, etc. 3) Contractor will provide transportation, set up, take down, and training of basic functions to camp maintenance personnel. 4) All Light plants will have spill containments provided.
• Contractor responsibilities: The Contractor shall perform in a professional, cooperative and workman like manner. All equipment shall be in acceptable condition and meet minimum equipment requirements. Repairs to equipment shall be the
Contractor’s responsibility and at no additional cost to the Government.
• Date: June 25, 2026, to July 30, 2026
• Location 1: Dogu Beach (Total 8)
• Location 2: Pier 09. (Total 2)
CLIN 0013: (1) 20FT COLD STORAGE CONTAINERS
• Description of work: The contractor will provide one (1) 20ft cold storage container in
Camp Mujuk, each unit must be able to reach temperatures of -40 degrees
Fahrenheit (Freezer). These will be used for food and ice storage. They will also be responsible for the upkeep and refueling of each one of the containers.
• Contractor responsibilities: Provide power generation for cold storage container with fuel for generator(s). Provide lighting fixtures. Maintain the cold storage container in neat and sanitary condition.
• Date: June 26, 2026 to July 25, 2026
• Total QTY: 1 x 30 days
• Location: Camp Mujik
CLIN 0014: (2) CONTAINER EXPRESS (CONEX) BOX BARRIERS
• Description: The contractor will provide two (2) 20ft storage containers in Camp
Mujuk. They will also be responsible for the upkeep of each one of the containers.
• Contractor responsibilities: Provide the supplies and services described. No lighting fixtures are needed in these CONEX containers.
• Date: June 26, 2026 to July 25, 2026
• Total QTY: 2 x 31 days
• Location: LSA in Camp Mujuk
CLIN 0015: Two (2) Skid Steer Loader (track). Equipped with Pallet Fork
• Description: Two (2) tracked skid steers equipped with bucket and fork attachments.
Fuel required to operate the equipment should be provided. The skid-steers are required to move small equipment and perform surface grading. Transportation of the skid steers to the training site should be provided. Contractor will be on-site within two (2) hours of the initial trouble call if an issue occurs. The skid steers should be a
Caterpillar 299D3 or equivalent.
• Quantity: 2 x 28 days
• Date: 03 July 2026 – 22 July 2026
CLIN 0016: EXCAVATOR WITHOUT OPERATOR
• Description: One mid-size excavator with a net power of at least 146 hp (109 kW), digging depth of at least 23 ft (7 m), and operating weight of at least 45,000 lbs
(20,500 kg). A thumb for the bucket is requested but not required. The excavator is required to dig areas to build temporary ramps for offloading operations.
Transportation of the equipment should be provided. Contractor will be on-site within two (2) hours of the initial travel call if an issue occurs. The excavator should be a
John Deere 200 G-Tier or equivalent.
• Quantity: 1 x 20 days
• Date: 03 July 2026 – 22 July 2026
CLIN 0017: TENT Cleaning
• Description: The Contractor shall provide all skilled personnel, equipment, tools, transportation, materials, material handling equipment, and management necessary for on/off loading, necessary inspection and repair work for tent cleaning services.
The cleaning services must be performed at the Contractor’s facility IAW TM 5-3810-
307-24P.
• Responsibilities: The Contractor is responsible for cleaning all twelve (12) tents at the time of exercise completion at Dogu beach, both interior and exterior, ensuring they are free of sand, dirt, dust, mud, organic material, stains, and any other debris prior to storage. All moisture must be removed prior to storage to prevent mold/mildew.
• Process: Clean with soap and water (brush or wash). No pressure washers. A joint inventory and inspection will be conducted.
• Transportation: Provide transportation of all tents, fuel cans, cages, and crates from
Dogu beach to Contractor facilities and onto Camp Mujuk for final inspection. Provide two (2) days notification prior to delivery.
• Date: July 20, 2026 to July 21, 2026 or TBD
• Total QTY: 12 (HDT Airbeam, Size 20 x 32 ft) x 2 days
REFERENCE #1
REFERENCE #2
REFERENCE #3