SEE ADDENDUM
(No Collect Calls)
W90VN921R0041 23-Aug-2021
b. TELEPHONE NUMBER
315-763-5685
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 17 Sep 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W90VN99. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MR. HONG, YUN PYO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011643463
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W90YG3 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W6B1 USA GARRISON DAEGU
W6B1 USA GARRISON DAEGU
DPW
UNIT 15494
APO AP 96260-5494
TEL: 011-82-53-470-65 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF170
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months (Firm Fixed Price Portion)
FFP
Operate/Maintain Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Operate and Maintain Drinking Water Treatment
Plant (WTP) including Interior and Exterior Water Lines in accordance with Para.
5.2. of the PWS and Technical Exhibit (TE)-3.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011643463
PSC CD: J045
NET AMT
0002 1 Job (Firm Fixed Price Portion)
Maintain automatic "Turbidity" sample, WTP, Carroll FOS. See Encl#8, Page1.
The Contractor shall perform the Maintain Automatic "Turbidity" Sampler in water line and analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
FOB: Destination
0003 12 Months (Firm Fixed Price Portion)
FFP
Sampling and Analysis Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
FOB: Destination
0004 12 Months (Firm Fixed Price Portion)
Operate and Maintain (WWTP), Carroll FOS. See Encl#8, Page1.
The Contractor shall perform Operate and Maintain the Waste Water Treatment
Plant (WWTP) including interior and exterior sewer line in accordance with Para.
5.3. of the PWS and Technical Exhibit (TE)-4
FOB: Destination
0005 140,000 Liter (Requirements Portion)
Removal Sludge, Septic Tanks, WWTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Removal and Disposal of Sludge and other
Deposits in Septic Tanks in accordance with Para. 5.3.3. of the PWS.
FOB: Destination
0006 36 Cubic
Meter
(Requirements Portion)
Removal Sand/Oil, WWTP, Carroll FOS. See Encl#8, Page1.
TThe contractor shall perform the Removal and Disposal of sand, soil, residue, scum, sludge and other debris at sewer manhole, screens and WWTP in accordance with Para. 5.3.4 of the PWS.
FOB: Destination
0007 12 Months (Firm Fixed Price Portion)
Sampling and Analysis of Waste Water, WWTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Waste Water services in accordance with Para. 5.3.2. of the PWS.
FOB: Destination
0008 12 Months (Firm Fixed Price Portion)
Operation/Maintenance HVAC SYS, Carroll FOS.
The Contractor shall perform the Operation and Preventive Maintenance (PM) of
Heating Ventilation Air Conditioning (HVAC) Systems in accordance with the
Para. 5.4 of the PWS and Technical Exhibit (TE)-5.
FOB: Destination
0009 12 Months (Firm Fixed Price Portion)
On-Call Repair SVC, HVAC, Carroll FOS.
On-Call Repair Service for Minor Repair for HVAC, Facilities and Utilities lines including Minor Repair Service. The Contractor shall be responsible for all minor parts less than $100 as a part of preventive maintenance and regular minor repair work in accordance with the Para. 5.5 of the PWS and Technical Exhibit (TE)-6
FOB: Destination
(Requirements Portion)
Major Repair Services.
Composite labor cost (Fixed Hourly Rate) for Major Parts (Government Furnished
Material) Replacement service in accordance with the Para 5.8 of the PWS. Labor rates will be paid on the established Fixed Hourly Rate.
0010AA 200 Hours Craftsman Plumbing, Carroll FOS
FFP
FOB: Destination
0010AB 100 Hours Craftsman Electricity, Carroll FOS.
FFP
FOB: Destination
0010AC 200 Hours Heating/AC Mechanic, Carroll FOS.
FFP
FOB: Destination
0010AD 200 Hours Skilled Facility Repair Craftsman
FFP
Skilled Facility Repair Craftsman, Carroll FOS
FOB: Destination
0010AE 200 Hours Painter, Carroll FOS.
FFP
FOB: Destination
0010AF 200 Hours Masonry, Carroll FOS.
FFP
FOB: Destination
0010AG 300 Hours Common Labor, Carroll FOS.
FFP
FOB: Destination
0011 12 Months (Firm Fixed Price Portion)
Food Duct Cleaning SVC, B#1020, Carroll FOS. See Encl#8, Page1.
The Contractor shall provide Monthly Food Duct Cleaning service at building number 1020 at Forward Operating Site (FOS) in accordance with the Para.5.5 of the PWS.
0012 7 Months (Firm Fixed Price Portion)
Grass Cutting (APR to OCT), Carroll FOS. See Encl#8, Page2.
The contractor shall provide all necessary labor, materials, tools, equipment and transportation required for cutting grass service at Carroll FOS in accordance with the Para 5.6.1 of the PWS.
FOB: Destination
0013 40 Each (Requirement Portion)
Trimming Trees (H30'-60', W15"-30"), Carroll FOS. See Encl#8, Page2.
transportation required for trimming/pruning of shrubs and trees service at Carroll
FOS in accordance with the Para 5.6.2 of the PWS.
0014 60 Each (Requirement Portion)
Trimming Trees (H15'-30', W5"-15"), Carroll FOS. See Encl#8, Page2.
0015 200 Each (Requirement Portion)
Pruning Trees/Shrubs (H-under 3'-5'), Carroll FOS. See Encl#8, Page2.
FOS in accordance with the Para 5.6.2 of the PWS.
FOB: Destination
0016 300 Each (Requirement Portion)
Pruning Trees/Shrubs (H-under 3'), Carroll FOS. See Encl#8, Page2.
FOS in accordance with the Para 5.6.2 of the PWS.
FOB: Destination
0017 250 Each (Requirement Portion)
Pruning Trees/Shrubs (H-under 2'), Carroll FOS. See Encl#8, Page2.
FOS in accordance with the Para 5.6.2 of the PWS.
FOB: Destination
0018 1 Job Accounting for Contract Services
FFP
(Contract Manpower Report) must be reported by 31 October of each year during the life of the contract IAW Performance Work Statement (PWS) Para 3.3.1
NOTE: Not to exceed 20 Man hours for data collection and report.
FOB: Destination
Estimated Cost for War Hazard Losses
FFP
Zero (0)
1001 12 Months OPTION (Firm Fixed Price Portion)
5.2. of the PWS and Technical Exhibit (TE)-3.
1002 1 Job OPTION (Firm Fixed Price Portion)
1003 12 Months OPTION (Firm Fixed Price Portion)
FFP
Sampling and Analysis Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
1004 12 Months OPTION (Firm Fixed Price Portion)
5.3. of the PWS and Technical Exhibit (TE)-4
1005 140,000 Liter OPTION (Requirements Portion)
1006 36 Cubic
OPTION (Requirements Portion) with Para. 5.3.4 of the PWS.
1007 12 Months OPTION (Firm Fixed Price Portion)
1008 12 Months OPTION (Firm Fixed Price Portion)
Para. 5.4 of the PWS and Technical Exhibit (TE)-5.
1009 12 Months OPTION (Firm Fixed Price Portion) parts less than $100 as a part of preventive maintenance and regular minor repair work in accordance with the Para. 5.5 of the PWS and Technical Exhibit (TE)-6
OPTION (Requirements Portion)
1010AA 200 Hours OPTION Craftsman Plumbing, Carroll FOS
FFP
1010AB 100 Hours OPTION Craftsman Electricity, Carroll FOS.
FFP
1010AC 200 Hours OPTION Heating/AC Mechanic, Carroll FOS.
FFP
1010AD 200 Hours OPTION Skilled Facility Repair Craftsman
FFP
Skilled Facility Repair Craftsman, Carroll FOS
1010AE 200 Hours OPTION Painter, Carroll FOS.
FFP
1010AF 200 Hours OPTION Masonry, Carroll FOS.
FFP
1010AG 300 Hours OPTION Common Labor, Carroll FOS.
FFP
1011 12 Months OPTION (Firm Fixed Price Portion)
1012 7 Months OPTION (Firm Fixed Price Portion) the Para 5.6.1 of the PWS.
1013 40 Each OPTION (Requirement Portion)
1014 60 Each OPTION (Requirement Portion)
1015 200 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
1016 300 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
1017 250 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
1018 1 Job OPTION Accounting for Contract Services
FFP
(Contract Manpower Report) must be reported by 31 October of each year during the life of the contract IAW Performance Work Statement (PWS) Para 3.3.1
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Losses
2001 12 Months OPTION (Firm Fixed Price Portion)
5.2. of the PWS and Technical Exhibit (TE)-3.
2002 1 Job OPTION (Firm Fixed Price Portion)
2003 12 Months OPTION (Firm Fixed Price Portion)
FFP
Sampling and Analysis Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
2004 12 Months OPTION (Firm Fixed Price Portion)
5.3. of the PWS and Technical Exhibit (TE)-4
2005 140,000 Liter OPTION (Requirements Portion)
2006 36 Cubic with Para. 5.3.4 of the PWS.
2007 12 Months OPTION (Firm Fixed Price Portion)
2008 12 Months OPTION (Firm Fixed Price Portion)
Para. 5.4 of the PWS and Technical Exhibit (TE)-5.
2009 12 Months OPTION (Firm Fixed Price Portion) parts less than $100 as a part of preventive maintenance and regular minor repair work in accordance with the Para. 5.5 of the PWS and Technical Exhibit (TE)-6
OPTION (Requirements Portion)
2010AA 200 Hours OPTION Craftsman Plumbing, Carroll FOS
FFP
2010AB 100 Hours OPTION Craftsman Electricity, Carroll FOS.
FFP
2010AC 200 Hours OPTION Heating/AC Mechanic, Carroll FOS.
FFP
2010AD 200 Hours OPTION Skilled Facility Repair Craftsman
FFP
Skilled Facility Repair Craftsman, Carroll FOS
2010AE 200 Hours OPTION Painter, Carroll FOS.
FFP
2010AF 200 Hours OPTION Masonry, Carroll FOS.
FFP
2010AG 300 Hours OPTION Common Labor, Carroll FOS.
FFP
2011 12 Months OPTION (Firm Fixed Price Portion)
2012 7 Months OPTION (Firm Fixed Price Portion) the Para 5.6.1 of the PWS.
2013 40 Each OPTION (Requirement Portion)
2014 60 Each OPTION (Requirement Portion)
2015 200 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
2016 300 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
2017 250 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
2018 1 Job OPTION Accounting for Contract Services
FFP
(Contract Manpower Report) must be reported by 31 October of each year during the life of the contract IAW Performance Work Statement (PWS) Para 3.3.1
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Losses
3001 12 Months OPTION (Firm Fixed Price Portion)
5.2. of the PWS and Technical Exhibit (TE)-3.
3002 1 Job OPTION (Firm Fixed Price Portion)
3003 12 Months OPTION (Firm Fixed Price Portion)
FFP
Sampling and Analysis Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
3004 12 Months OPTION (Firm Fixed Price Portion)
5.3. of the PWS and Technical Exhibit (TE)-4
3005 140,000 Liter OPTION (Requirements Portion)
3006 36 Cubic with Para. 5.3.4 of the PWS.
3007 12 Months OPTION (Firm Fixed Price Portion)
3008 12 Months OPTION (Firm Fixed Price Portion)
Para. 5.4 of the PWS and Technical Exhibit (TE)-5.
3009 12 Months OPTION (Firm Fixed Price Portion) parts less than $100 as a part of preventive maintenance and regular minor repair work in accordance with the Para. 5.5 of the PWS and Technical Exhibit (TE)-6
OPTION (Requirements Portion)
3010AA 200 Hours OPTION Craftsman Plumbing, Carroll FOS
FFP
3010AB 100 Hours OPTION Craftsman Electricity, Carroll FOS.
FFP
3010AC 200 Hours OPTION Heating/AC Mechanic, Carroll FOS.
FFP
3010AD 200 Hours OPTION Skilled Facility Repair Craftsman
FFP
Skilled Facility Repair Craftsman, Carroll FOS
3010AE 200 Hours OPTION Painter, Carroll FOS.
FFP
3010AF 200 Hours OPTION Masonry, Carroll FOS.
FFP
3010AG 300 Hours OPTION Common Labor, Carroll FOS.
FFP
3011 12 Months OPTION (Firm Fixed Price Portion)
3012 7 Months OPTION (Firm Fixed Price Portion) the Para 5.6.1 of the PWS.
3013 40 Each OPTION (Requirement Portion)
3014 60 Each OPTION (Requirement Portion)
3015 200 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
3016 300 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
3017 250 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
3018 1 Job OPTION Accounting for Contract Services
FFP
(Contract Manpower Report) must be reported by 31 October of each year during the life of the contract IAW Performance Work Statement (PWS) Para 3.3.1
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Losses
4001 12 Months OPTION (Firm Fixed Price Portion)
5.2. of the PWS and Technical Exhibit (TE)-3.
4002 1 Job OPTION (Firm Fixed Price Portion)
4003 12 Months OPTION (Firm Fixed Price Portion)
FFP
Sampling and Analysis Drinking Water, WTP, Carroll FOS. See Encl#8, Page1.
The contractor shall perform the Sampling and Analysis of Drinking Water in accordance with Para. 5.2.2. of the PWS.
4004 12 Months OPTION (Firm Fixed Price Portion)
5.3. of the PWS and Technical Exhibit (TE)-4
4005 140,000 Liter OPTION (Requirements Portion)
4006 36 Cubic with Para. 5.3.4 of the PWS.
4007 12 Months OPTION (Firm Fixed Price Portion)
4008 12 Months OPTION (Firm Fixed Price Portion)
Para. 5.4 of the PWS and Technical Exhibit (TE)-5.
4009 12 Months OPTION (Firm Fixed Price Portion) parts less than $100 as a part of preventive maintenance and regular minor repair work in accordance with the Para. 5.5 of the PWS and Technical Exhibit (TE)-6
OPTION (Requirements Portion)
4010AA 200 Hours OPTION Craftsman Plumbing, Carroll FOS
FFP
4010AB 100 Hours OPTION Craftsman Electricity, Carroll FOS.
FFP
4010AC 200 Hours OPTION Heating/AC Mechanic, Carroll FOS.
FFP
4010AD 200 Hours OPTION Skilled Facility Repair Craftsman
FFP
Skilled Facility Repair Craftsman, Carroll FOS
4010AE 200 Hours OPTION Painter, Carroll FOS.
FFP
4010AF 200 Hours OPTION Masonry, Carroll FOS.
FFP
4010AG 300 Hours OPTION Common Labor, Carroll FOS.
FFP
4011 12 Months OPTION (Firm Fixed Price Portion)
4012 7 Months OPTION (Firm Fixed Price Portion) the Para 5.6.1 of the PWS.
4013 40 Each OPTION (Requirement Portion)
4014 60 Each OPTION (Requirement Portion)
4015 200 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
4016 300 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
4017 250 Each OPTION (Requirement Portion)
FOS in accordance with the Para 5.6.2 of the PWS.
4018 1 Job OPTION Accounting for Contract Services
FFP
(Contract Manpower Report) must be reported by 31 October of each year during the life of the contract IAW Performance Work Statement (PWS) Para 3.3.1
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Losses
PWS
Performance Work Statement (PWS)
Operation and Maintenance Services for Camp
Carroll * Managed by USAG Daegu
Sep 30, 2021
Table of Contents
INTRODUCTION
1.1 Background
2.0 REQUIREMENTS
2.1.1 Non-Personal Services
General Information
2.1.3 Place of Performance and Hours of Operation
2.1.4 Federal Holidays......………………...…………………...……………………….……………3
2.1.5 Travel/Temporary Duty
2.1.6 Emergency Medical Services
2.1.7 Contract Administration and Management
2.1.8 COR/ACOR Functions
2.1.9 Quality Control (QC)
2.1.10 Subcontract Management
2.1.11 Contractor Employees
2.1.12 Business Relations
2.2.1 Coordination
2.2.2 General Fund Enterprise Business System (GFEBS)
2.3.1 Maintain As-Built
2.3.2 Real Property Records Updates
2.3.3 GIS
2.3.4 GIS Support Services
2.3.5 GIS Files
2.3.6 Other Documents
2.4.1 Repair and Replacement
2.5.1 Security
2.5.2 Security Training
2.5.3 Safety
2.5.4 Training, Physical Requirements, or other Expertise Required
2.5.5 Environmental Requirements
2.5.6 Contingency Plans
2.6.1 Project Support
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX
5.0 COMMON LEVEL OF SUPPORT (CLS)
5.0 Specific Tasks……………………………………………………………………………….. 20
5.1 General Information………………………………………………………………………….20
5.2 Operation and Maintenance of Water Treatment Plant (WTP)………………………………20
5.3 Operation and Maintenance of Waste Water Treatment Plant (WWTP)…………………….23
5.4 Operation and Maintenance of Heating Ventilation Air Conditioning (HVAC) Systems ..…25
5.5 Food duct cleaning service at BLDG 1020 at Carroll*………………………………………27
5.6 Ground Maintenance…………………………………………………………………………28
5.7 On-Call Repair Service for HVAC, facilities and utilities lines including Minor Repair
Service………………………………………………………………………………………………..30
5.8 Major Replacement/Repair Service Works…………………………………………………..35
5.9 Coordination with Contractors and DPW Shops……………………………………………..35
5.10 Warranty Repairs …………………………………………………………………………..36
5.11 Records ……………………………………………………………………………………...36
6.0 DELIVERABLES
7.0 RELATED DOCUMENTS
7.1 Definitions and Acronyms……………………………………………………………………37
7.1.1 Definitions……………………………………………………………………………………37
7.1.2 Acronyms…………………………………………………………………………………….49
7.2 Applicable Directives, Publications………………………………………………………….51
7.3 TECHNICAL EXHIBIT (TE) ................................................................................................................. …..52
7.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)
7.5.1 Contractor-Furnished Material and Responsibilities
7.5.2 Contractor-Furnished Items
7.5.3. Contractor Facilities
W90VN921R0041
Introduction. This is a non-personal service Contract to provide Operation and Maintenance Services (OMS)
(including minor and major repair service) at Carroll* in USAG Daegu. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform as defined in this
Performance Work Statement (PWS) and services as specified in this PWS.
1.1 Background. The area to be serviced is at Carroll*
1.2 Objectives. The objective of this contract is OMS for the Water Treatment Plant (WTP), the Waste Water
Treatment Plant (WWTP), Heating Ventilation Air Conditioning (HVAC) systems, facilities and utilities lines, grass cutting in Carroll*. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, policies, and directives to include, but not limited to, the publications in Paragraph 7.2, Applicable Directives and Publications.
The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the deliverables presented in the Contract. The Contractor shall ensure all work in support of mission requirements are tendered to the Government for acceptance and conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this Contract.
1.3 Climatic Conditions. N/A.
1.4 Facility Access. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the assigned COR and Fire
Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.
1.5 Traffic Flow. N/A.
1.6 Drainage. Maintenance work performed under this contract shall not impede site drainage.
1.7 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government. The Government will decide the method of restoration for trees or whether damaged trees will be removed.
1.8 Dust Suppression. The Contractor shall perform dust suppression as directed by the COR/ACOR.
2.0 Requirements.
2.1 Description of Services. See Section 5.0 for the specific CLS (Common Level of Support) or Functional Area
(FA).
2.1.1 Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the
Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Period of Performance (PoP). The PoP consists of one (1) Base year and four (4) option years. The PoP is as follows:
Base Period 30 September 2021 to 29 September 2022
Option Period 1 30 September 2022 to 29 September 2023
Option Period 2 30 September 2023 to 29 September 2024
Option Period 3 30 September 2024 to 29 September 2025
Option Period 4 30 September 2025 to 29 September 2026
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at Carroll*.
2.1.3.2 The Contractor shall operate Service Calls that shall be able to receive orders by telephone and in person from 0800 – 1700 hours Monday through Friday except on Korean Holidays. In the event of emergencies, a POC shall be appointed for the COR to contact.
2.1.4 Hours of Operation. The Contractor is responsible for conducting business, 0800 (08:00 a.m.) to 1700
(05:00 p.m.) hours Monday through Friday except Korean legal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
Recognized Korean National Holidays:
New Year’s Day Memorial Day
Lunar New Year’s Liberation Day
Independence Movement Day Chusok
Children’s Day National Foundation Day
Buddha’s Birthday Hangul Day
Christmas Day
2.1.4.1 The Contractor shall provide personnel support within 24 hours of notification outside the normal hours of operation as required, including holidays, to support the AREA IV Directorate of Public Works (DPW) mission.
Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO through the COR.
The Contract Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.
2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day which will be mutually beneficial.
2.1.4.3 Inclement Weather Delay. In the event of inclement weather or Acts of God in which the Contractor has no control and prevents the Contractor from completing the work as scheduled, the Contractor shall notify the COR of such conditions immediately. If the Government permits the Contractor from performing the services due to severe weather or
Acts of God, the Contractor shall accomplish the missed work within 24 hours after severe weather or Acts of God have passed. If all make-up work cannot be made within 24 hours, a revised schedule shall be submitted to the COR for review and acceptance or payment for the monthly services will be decremented respectively for the scheduled work not performed.
2.1.5 Travel/Temporary Duty. N/A
2.1.6 Emergency Medical Services. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. Contractor’s employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will in turn notify the COR within 30 minutes of the incident who will contact the KO for these situations.
2.1.6.1 Contractor’s employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the COR immediately who will contact the KO.
2.1.6.2 The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.7 Contract Administration and Management.
2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the 411th Contracting Support Brigade Regional Contracting Office-Daegu (RCO-Daegu)
IAW FAR Subpart 42.5. The KO and COR/ACOR will meet quarterly with the Contractor to review the
Contractor's performance. Written minutes of meetings will be recorded by the Government and signed by both the
Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting.
If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the
Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change(s) at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or
ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s
Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the
COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The
COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the
COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The
COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-
Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9 Quality Control (QC). Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) to the KO for acceptance five (5) business days before contract start. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
2.1.9.1 The Procurement Integrated Enterprise Environment (PIEE)/Post Award Admin under Surveillance and
Performance Monitoring (SPM) shall be used for nomination, tracking, documentation, and management of CORs.
2.1.10 Subcontract Management. In case of subcontractor(s) use, the offeror shall submit copies of the subcontract agreement with official companies who possess the license and permission. Additionally, the offeror shall submit copies of the subcontractor’s specific license and permission issued by Republic of Korea (ROK). All proposed subcontractors shall be approved by the Government in advance, prior to performance.
2.1.11 Contractor Employees.
2.1.11.1 Key Personnel.
2.1.11.1.1 Contract Manager (CM): The Contractor shall provide an on-site Contract Manager (CM) who shall be be employed by the Prime Contractor and physically present during normal duty hours (During normal duty hours (08:00-17:00 hrs., Monday thru Friday) to handle any problems/complaints that may occur, shall conduct overall management, coordination, furnish liaison with the Government and shall be responsible for the performance and management of this contract. The CM shall have at least two (2) years verifiable experience within the last five
(5) years in overall management of similar tasks and responsibilities related to operations and maintenance facility per the PWS identified in this solicitation. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. As a result, the candidate for the CM position should have at a minimum, a TOEIC score of 700. The CM shall have full authority and responsibility to act for the Contractor on all contract matters relating to daily operations under this contract.
2.1.11.1.2 Certain administrative personnel will require a Common Access Card (CAC) to access Government systems. N/A
2.1.11.1.3 All Contractor employees shall be legal U.S. residents. N/A
2.1.11.1.4 Qualification Standards. The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel.
2.1.11.1.4.1 Contractor’s Qualification: Certificate of Business Registration, License and Permission: The
Contractor shall submit all valid and current Certificates of Business Registration, License and Permission: The offeror shall provide the one (1) below identified requirements. In case of subcontractor(s) credentials, the offeror shall submit copies of the subcontract agreement with official companies who possess the license and permission.
Additionally, the offeror shall submit copies of the subcontractor’s specific license and permission issued by
Republic of Korea (ROK).
i) The Contractor shall submit a valid specialized Environmental construction Business Registration
(환경전문공사업등록증) in accordance with the Article 15 of ROK Law “Environmental Technology and industrial support act” (환경기술 및 환경산업지원법).
ii) Drinking Water Analysis Laboratory Requirement. The contractor shall be familiar with the monitoring requirements listed in para 5.2.2.3 as specified in USFK Regulation 201-1. The Contractor should analyze samples by laboratory which has valid certificate of “National Environmental Laboratory Accreditation program (NELAP-국가 환경실험실 인증 프로그램)” issued by National Environmental Laboratory Accreditation
Conference Institute (국가 환경실험실 인증협회). Water laboratory personnel requirement engaged in para
5.2.2.3. The contractor engaged or employed in water sampling and test shall provide a certificate of water sampling course (먹는물 검사기관 기술인력과정, 시료채취과정) issued by Korea Water and Wastewater Works
Association (한국상하수도협회) or National Institute of Environmental Human Resources Development
(국립환경인재 개발원), and complete the refresher course every three years. The contractor will post the certificate on the contractor’s field office and provide it to the COR and Environmental office DPW.
2.1.11.1.4.2 Prior Experience: The Contractor shall have at least two (2) years of verifiable experience in preventive maintenance and repair services in the PWS of various facilities within the last five (5) years from the release date of this solicitation. Offeror(s) shall provide their prior experience information containing the following data:
- Location of the work performed
- Nature of the business area(s) involved
- Contract numbers and types
- Description and relevancy of the work
- Dollar value
- Contract award and completion dates
- Complete point of contact of employer (including name, phone number, email address) and validating personnel
2.1.11.1.4.3 Key Personnel Qualification: The Contractor shall provide sufficient personnel for an Operation, Preventive Maintenance and Repair Team which consists of Contract Manager (CM), Craftsman Air-Conditioning and Refrigerating Machinery, Craftsman Electricity, Craftsman Plumbing, Water/ Waste Water treatment plants operator(s), and Facility Repair Craftsman(s) to accomplish the PWS requirements.
2.1.11.1.4.4 The Contractor shall provide an on-site Contract Manager (CM) who shall be be employed by the Prime
Contractor and physically present during normal duty hours (During normal duty hours (08:00-17:00 hrs., Monday thru Friday) to handle any problems/complaints that may occur, shall conduct overall management, coordination, furnish liaison with the Government and shall be responsible for the performance and management of this contract.
The CM shall have at least two (2) years verifiable experience within the last five (5) years in overall management of similar tasks and responsibilities related to operations and maintenance facility per the PWS identified in this solicitation. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. As a result, the candidate for the CM position should have at a minimum, a Test of
English for International Communication (TOEIC) score of 700. The CM shall have full authority and responsibility to act for the Contractor on all contract matters relating to daily operations under this contract.
2.1.11.1.4.4 The Contractor shall provide an on-site water plant operator who has at least two (2) years verifiable experience within the last five (5) years in the field of water facility or plant. Drinking water treatment operator qualification requirement engaged in para 5.2. The contractor engaged or employed in a operation and maintenance of drinking water treatment facilities shall provide a current certificate of a Drinking Water treatment plant operator course (수도시설운영요원과정) issued by Korea Water and Wastewater Works
Association (한국상하수도협회) or National Institute of Environmental Human Resources Development
(국립환경인재 개발원), and complete the refresher course every three years.
2.1.11.1.4.5 The Contractor shall provide an on-site waste water treatment plant operator who has at least two (2) years verifiable experience within the last five (5) years in the field of waste water treatment facility or plant. Waste water treatment plant operator qualification requirement engaged in para 5.3. The contractor engaged or employed in the operation and maintenance of waste water treatment facilities shall provide a current certificate of waste water treatment plant operator course (공공하수처리시설 운영요원 과정) issued by Korea Water and Wastewater
Works Association (한국상하수도협회) or National Institute of Environmental Human Resources Development
(국립환경인재 개발원), and complete the refresher course every three years. The contractor will post the certificate on the contractor’s field office and provide it to the COR and Environmental office DPW.
2.1.11.1.4.6 Air-Conditioning and Refrigerating Machinery Craftsman (공조냉동기계기능사 자격증)- All the person who will work with refrigeration units and air conditioning units requires to have a license for Air-
Conditioning and Refrigerating Machinery (공조냉동기계기능사 자격증 또는 그 이상) issued by Human
Resources Development of Korea (한국산업인력공단) or EPA 608. (Required by USFK Reg 201-1, Chapter 2-3.
H. (1)) with at least two (2) years of experience within the last five (5) years in mechanical repair and maintenance of HVAC systems.
2.1.11.1.4.7 Skilled Facility Repair Craftsman. The skilled facility repair craftsmen shall be able to perform wall board, plumbing fixture, electricity, tile, and masonry repair with at least two (2) years of experience in this type of work within the last five (5) years.
2.1.11.1.4.7.1 Skilled in painting of interior and exterior walls, windows and door units. Painting services shall include, but are not limited to, surface prep, move, reset, and protect furniture and equipment; mix paints.
2.1.11.1.4.7.2 Skilled in masonry work which shall include repair of foundations, walls, floor slabs, sidewalks, steps, tile and grout and brick.
2.1.11.1.5 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. Each employee, when working under this contract, shall have a badge in the upper right portion of the chest area. The employees' name, company name and the words “Carroll* Maintenance Contractor” shall be printed legibly on the badge. Two samples of the badge shall be submitted to the COR for approval within Five (5) calendar days after award.
2.1.11.1.6 Standards of Conduct. Contractor personnel’s conduct shall not discredit the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that all Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The
Contractors employees will also refrain from interfering with any competitive acquisition by providing inside Government information to third parties. The Contractor shall ensure no Contractor employees conduct political related activities or events on the installation.
2.1.11.1.7 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former
Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.11.1.8 Organizational Conflict of Interest (OCI). N/A
2.1.11.1.9 Management Approach: The Contractor shall provide Organization Chart, Staffing Plan, Quality
Control Plan (QCP), and Personnel Recruitment, Development, Retention, and Training Plan as a part of technical proposals and proposal submission as follows:
2.1.11.1.9.1 Organization Chart: The Contractor shall provide an Organization Chart to the COR within 10 calendar days after award which clearly demonstrates existence of command and control and which identifies at a minimum the following, but not limited to:
- Clear and logical lines of communications, command and control.
- Logical Organization Hierarchy with photos.
- Operation in all locations and facilities that fall under Carroll* control.
2.1.11.1.9.2 Staffing Plan: The Contractor shall provide a staffing plan that clearly demonstrates how the
Contractor performs the preventive maintenance and repair and operating services described in paragraph 5 at
Carroll* in USAG Daegu and clearly identifies the labor mix and quantities by major task and location, identifies the replacement strategy, backup policy, retention policy, sub-Contractor plan and any other information pertinent to the execution of this requirement. In the event of a change of employee or change of duty, the Contractor shall advise the COR of the change and shall furnish an updated list of employees prior to the employee's starting performance under the contract. The Contractor shall provide the COR with an up-to-date list of employees at all times.
2.1.11.1.9.3 Personnel Recruitment, Development, Retention and Training Plan. The Contractor shall ensure qualified personnel are recruited, developed, retained and trained to make certain that all support provided under this contract is up-to-date in emerging concepts and technologies and valid to fully meet the requirements of the
PWS.
2.1.11.1.9.4 Equipment plan: The Contractor shall submit their equipment plan to the COR prior to commencing performance of the contract according to the scope of work described. The Contractor shall provide the evidence that all materials, vehicles and equipment are in his possession or that he/she has the ability to secure required equipment in time for full performance.
2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within two (2) days. The
Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.2 Work Management. Applicable only for Common Level of Support (CLS) 411, 414, and 420.
2.2.1. Coordination. The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.
2.2.1.1 For Environmental Related Issue: The Contractor shall coordinate/contact/report through the COR/ACOR to Environmental Division POC @ Mr. Kwon, Kyong Min, Environmental Engineer at DSN 763-2196, Cell 010-
9201-2204.
2.2.2 General Fund Enterprise Business System (GFEBS). N/A
2.2.2.1 GFEBS Certification. N/A.
2.2.2.2 Preventive Maintenance Orders (PMO). N/A.
2.2.2.3 Operations Work Orders (OWO). N/A
2.2.2.4 GFEBS Support. N/A
2.2.2.4.1 Database Tasks/Requirements. N/A
2.3 As-Built and Geospatial Information System (GIS). As-Built for WTP and WWTP will be provided to the contractor.
2.3.1 Maintain As-Built. N/A
2.3.1.1 Support. N/A
2.3.1.2 Training. N/A
2.3.2 Real Property Records Updates. N / A
2.3.3 GIS. N/A
2.3.4 GIS Support Services. N/A
2.3.5 GIS Files. N/A
2.3.6 Other Documents. The Contractor shall update and maintain other documents, which include the following:
1-The Contractor shall maintain the Service Call log book that records minor and major repair work together
2-The Contractor shall maintain a facility maintenance folder for each building.
3-The Contractor shall submit a completed Service Order, with requester signature, name and phone number, weekly Report by every Monday 0900 hours
4-The Contractor shall submit the Contractor schedule to the COR for review and approval in the first week of each month.
2.4 Historic Property or Archaeological Site. N/A.
2.4.1 Repair and Replacement. N/A
2.5 Special Requirements.
2.5.1 Security
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and their subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The
Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by
Department of Defense (DOD), Headquarters Department of the Army (HQDA), and local policy. The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.5.1.2 Base Passes: Upon notice of award, the Contractor shall obtain all the passes and necessary vehicle permits required for entry by authorized Contractor personnel in accordance with base policy. The point of contact information for this action will be provided up on contract award. The Contractor shall complete USFK Form 82-E, Application for Post Pass for all new employees prior to reporting to the Pass and ID Section. The Contractor shall retrieve all identification media, including vehicle decals from employees who depart for any reason before the contract expires. The retrieved identification media and vehicle decals shall be turned into the COR within one (1) day of such action.
2.5.1.3 Escort Privilege: Escort privileges may be limited by the base security operations. Ensure that any escort requirements are coordinated with the base/ROK MND/35th ADA (RA) prior to date of escort.
2.5.1.4 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR within five (5) days after contract award.
2.5.1.5 Contractor Vehicle Registration. The Contractor shall register all Contractor-owned or operated vehicles and trailers operating on the installation within ten (10) working days of contract start date. The Contractor shall complete all applications with the Provost Marshal Vehicle Registration section located in Camp Carroll. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.5.1.6 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost Marshall Office, Director of Emergency Services, or
Security Office.
2.5.1.7 Physical Security. The Contractor and its employees entering AREA IV shall comply with all security…