TECHNICAL EXHIBIT-1, Performance Requirements Summary (PRS).

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
REMEDY
Para 5.2. Sampling and analysis of treated water
Sampling and analysis IAW Monitoring Frequency
All required work has to be

met

100% Inspection
The Contractor shall provide corrective plan, take corrective action and re-perform the analysis
Para 5.3.2. Sampling and analysis of waste water
Sampling and analysis IAW Monitoring Frequency
All required work has to be

met

100% Inspection
The Contractor shall provide corrective plan, take corrective action and re-perform the analysis
Para 5.4.1. Preventive Maintenance
The Contractor shall submit a detailed PM schedule to the COR for approval 30 calendar days prior to the start date of each Contract year.
All reports submitted to COR prior to 30 calendar days of the new contract year.
100% Inspection
Contractor shall perform Re-work within 1 day notification of the COR

Para 5.4.5.

Heat Pumps

Perform all Preventive Maintenance (PM) checks within periodic cycle

No more than 1% of PMs shall be performed out of cycle

Random Inspection

Contractor shall perform Re-work within 2 hours notification of the COR

Para 5.12 Control System

Restore system failures within 24hrs.

All system failures shall meet the standard

100% Inspection
Contractor shall perform Re-work within 4 hours notification of the COR

Para 5.5.1. Emergency Calls

Contractor shall respond to emergency calls within 2 hours working until the emergency condition is fixed.

All emergency calls shall meet the standard

100% Inspection
Contractor shall perform Re-work within 2 hours notification of the COR

Para 5.5.1. Routine Calls Respond and begin work on routine service calls within 24 hours after receipt of the call, and complete all repairs within 7 calendar days.

No more than 1% of total calls shall exceed response time.

Random/ Customer Complaint

Contractor shall perform Re-work within 2 hours notification of the COR

Para 5.5.1.1. Service Call Record and Report

Maintain all service call records and Report to COR prior to 8:30 a.m. each workday.

0 defects

Periodic

Contractor shall perform Re-work within 120 minutes notification of the COR