Tent Technical Manual (002).pdf

PDF 2 MB Posted

Attached to
K-16 Life Support Area (LSA) Requirements Federal contract opportunity
Solicitation number
W90VN8-21-R-0002
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMY *TM 10-8340-224-13

AIR FORCE TO 35E5-6-1

NAVY NAVFAC-P-337.A

TECHNICAL MANUAL

OPERATOR, UNIT, AND DIRECT SUPPORT

MAINTENANCE MANUAL

FOR

TENT, EXTENDABLE, MODULAR, PERSONNEL

(TEMPER)

TYPE I, 64 x 20 SURGICAL WORK, GREEN, NSN: 8340-01-185-2616 TYPE II, 64 x 20 MEDICAL. GREEN, NSN: 8340-01-185-2617 TYPE Ill, 48 x 20 UTILITY, GREEN, NSN: 8340-01-185-2615 TYPE IV. 32 x 20 PERSONNEL, GREEN, NSN: 8340-01-196-6272 TYPE V, 16 x 20 MEDICAL. GREEN, NSN: 8340-01-185-2614 TYPE VI, 16 x 20 CENTRAL MED SUPPLY, GREEN, NSN: 8340-01-185-2618 TYPE VII, 16 x 20 UTILITY. GREEN, NSN: 8340-01-185-2613 TYPE VIII, 96 x 20 MEDICAL WARD, GREEN, NSN: 8340-01-257-8468 TYPE IX, 80 x 20 MEDICAL SURGICAL. GREEN, NSN: 8340-01-257-8469 TYPE X. 64 x 20 MEDICALSUPPORT, GREEN, NSN: 8340-01-257-8470 TYPE XI. 32 x 20 MEDICAL SUPPORT, GREEN, NSN: 8340-01-257-8471 TYPE XII, 16 x 20 CS SUPPORT, GREEN, NSN: 8340-01-257-8472 TYPE XIII, 96 x 20 MEDICAL WARD TROP., GREEN, NSN: 8340-01-257-8473 TYPE XIV. 32 x 20 MEDICAL SUPPORT TROP., GREEN, NSN: 8340-01-257-8474 TYPE XV, 48 x 20 KITCHEN, GREEN, NSN: 8340-01-325-0131 TYPE XVI, 32 x 20 SANITATION CENTER, GREEN, NSN: 8340-01-324-7971

TYPE I, 64 x 20 SURGICAL WORK, TAN, NSN: 8340-01-212-9468 TYPE II, 64 x 20 MEDICAL, TAN, NSN: 8340-01-212-9469 TYPE Ill, 48 x 20 UTILITY, TAN, NSN: 8340-01-212-9470 TYPE IV, 32 x 20 PERSONNEL, TAN, NSN: 8340-01-185-2628 TYPE V, 16 x 20 MEDICAL, TAN, NSN: 8340-01-212-9471 TYPE VI, 16 x 20 CENTRAL MED SUPPLY, TAN, NSN: 8340-01-212-9472 TYPE VII, 16 x 20 UTILITY, TAN, NSN: 8340-01-212-9473 TYPE VIII, 96 x 20 MEDICAL WARD, TAN, NSN: 8340-01-257-8475 TYPE IX, 80 x 20 MEDICAL SURGICAL. TAN, NSN: 8340-01-257-8476 TYPE X. 64 x 20 MEDICAL SUPPORT, TAN, NSN: 8340-01-257-8477 TYPE XI. 32 x 20 MEDICAL SUPPORT, TAN, NSN: 8340-01-257-8478 TYPE XII. 16 x 20 CS SUPPORT, TAN, NSN: 8340-01-257-8479 TYPE XIII, 96 x 20 MEDICAL WARD TROP., TAN, NSN: 8340-01-258-6482 TYPE XIV, 32 x 20 MEDICAL SUPPORT TROP., TAN, NSN: 8340-01-257-8480 TYPE XV, 48 x 20 KITCHEN. TAN, NSN: (UNASSIGNED) TYPE XVI, 32 x 20 SANITATION CENTER, TAN, NSN: (UNASSIGNED)

DISTRIBUTION STATEMENT A: Approved for public release;

distribution is unlimited.

* This manual together with TM 10-8340-224-23P, dated 31 October 1994, supersede TM 10-8340-224-13&P, dated 28 February 1986.

HEADQUARTERS, DEPARTMENT OF THE ARMY, AIR FORCE AND NAVY

1 MARCH 1993

ARMY TM 10-8340–224–13

NAVY NAVFAC-P–337.A

WARNINGS

Lethal voltage is present when light set is connected to power source. Disconnect from power source before inspecting or repairing any electrical component. Electrical shock or death may result from failure to heed this warning.

Lethal voltage is present when the power control system is connected to power source.

Disconnect from power source before inspecting or repairing any electrical component.

Electrical shock or death may result from failure to heed this warning.

Lethal voltage is present when cables are connected to power control system. Ensure cables are disconnected from power source when working with cables or fixtures. Electrical shock or death may result from failure to heed this warning.

Seam sealer and solvent are extremely flammable and the fumes toxic. Do not smoke or use seam sealer or solvent near open flame.

Use seam sealer and solvent with goggles and gloves, and indoors with respirator or in an open, well ventilated area, away from sources of combustion. Death or severe injury may result from explosion or fire. Inhalation of fumes may cause toxic sickness.

Frame assembly hinges can pinch or crush hands and fingers. Keep hands and fingers away from frame assembly ridges and eaves.

Assembled tent assembly is extremely heavy.

Two soldiers should be placed at each arch leg to raise frame . Lift tent from correct squatting position, using legs. Back injury could result if lifted improperly.

Do not lock handle toward diagonal brace. Arch may collapse causing injury to personnel or damage to equipment if improperly locked.

Two men are required to lift light set case to avoid injury to personnel.

a

ARMY TM 10-8340-224-13

NAVY NAVFAC-P-337.A

Stakes, guy lines and frame feet must be used to prevent excessive movement of the extendable modular tents in high winds.

Failure to stake and tie down tent may result in personal injury or damage to equipment.

All tent lines and frame feet must be staked down. Failure to stake and tie down tent may result in injury to personnel and damage to equipment.

Eliminate the possibility of tripping. Clear fabric and guy lines. Injury to personnel may result from falls.

CAUTIONS

Do not twist or turn frame components when handling. Damage to equipment may result.

Do not step on tent components. Material may be torn and dirt ground into material.

Avoid folding wall fabric into joints.

Material may rip or tear if caught in joint.

Insert quick release pins towards inside of tent on end assemblies. Tent fabric may tear if inserted towards outside.

Orient hitch clip pins towards inside of vestibule at vestibule door frame. Vestibule door fabric may tear if oriented towards outside.

Tent frame must be raised uniformly to avoid twisting or turning. Damage to frame may result.

Lift door ramps prior to placing weight on door frame. Damage to piano hinge may result.

Clear and level ground before installing floor. Sharp objects or depressions can damage tent floor.

Allow slack in electrical cables. Strain on cable can damage equipment.

b

AIR FORCE TO 35E5–6-1

NAVY NAVFAC–P-337.A

Avoid damage to fabric and guy lines. Clear all fabric and guy lines from hinge joints.

Do not stand on fabric or guy lines. Material may rip or lacerate.

Unpack components carefully. Improper or hasty handling may result in damage to the TEMPER components and accessories.

c/(d blank)

AIR FORCE TO 35E9-6-1

NAVY NAVFAC-P-337.A

HEADQUARTERS

CHANGE DEPARTMENT OF THE ARMY

NO. 3 WASHINGTON, DC, 30 SEPTEMBER 2005

TECHNICAL MANUAL

OPERATOR, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL

FOR

TENT, EXPANDABLE, MODULAR, PERSONNEL (TEMPER)

TYPE I, 64 x 20 SURGICAL WORK, GREEN, NSN: 8340-01-185-2616 TYPE II, 64 x 20 MEDICAL, GREEN, NSN: 8340-01-185-2617 TYPE Ill, 48 x 20 UTILITY, GREEN, NSN: 8340-01-185-2615 TYPE IV, 32 x 20 PERSONNEL, GREEN, NSN: 8340-01-196-6272 TYPE V, 16 x 20 MEDICAL, GREEN, NSN: 8340-01-185-2614 TYPE VI, 16 x 20 CENTRAL MED SUPPLY, GREEN, NSN: 8340-01-185-2618 TYPE VII, 16 x 20 UTILITY, GREEN, NSN: 8340-01-185-2613 TYPE VIII, 96 x 20 MEDICAL WARD, GREEN, NSN: 8340-01-257-8468 TYPE IX, 80 x 20 MEDICAL SURGICAL, GREEN, NSN: 8340-01-257-8469 TYPE X, 64 x 20 MEDICAL SUPPORT, GREEN, NSN: 8340-01-257-8470 TYPE XI, 32 x 20 MEDICAL SUPPORT, GREEN, NSN: 8340-01-257-8471 TYPE XII, 16 x 20 CS SUPPORT, GREEN, NSN: 8340-01-257-8472 TYPE XIII, 96 x 20 MEDICAL WARD TROP., GREEN, NSN: 8340-01-257-8473 TYPE XIV, 32 x 20 MEDICAL SUPPORT TROP., GREEN, NSN: 8340-01-257-8474 TYPE XV, 48 x 20 KITCHEN, GREEN, NSN: 8340-01-325-0131 TYPE XVI, 32 x 20 SANITATION CENTER, GREEN, NSN: 8340-01-324-7971 TYPE I, 64 x 20 SURGICAL WORK, TAN, NSN: 8340-01-212-9468 TYPE II, 64 x 20 MEDICAL, TAN, NSN: 8340-01-212-9469 TYPE Ill, 48 x 20 UTILITY, TAN, NSN: 8340-01-212-9470 TYPE IV, 32 x 20 PERSONNEL, TAN, NSN: 8340-01-185-2628 TYPE V, 16 x 20 MEDICAL, TAN, NSN: 8340-01-212-9471 TYPE VI, 16 x 20 CENTRAL MED SUPPLY, TAN, NSN: 8340-01-212-9472 TYPE VII, 16 x 20 UTILITY, TAN, NSN: 8340-01-212-9473 TYPE VIII, 96 x 20 MEDICAL WARD, TAN, NSN: 8340-01-257-8475 TYPE IX, 80 x 20 MEDICAL SURGICAL, TAN, NSN: 8340-01-257-8476 TYPE X, 64 x 20 MEDICAL SUPPORT, TAN, NSN: 8340-01-257-8477 TYPE XI, 32 x 20 MEDICAL SUPPORT, TAN, NSN: 8340-01-257-8478 TYPE XII, 16 x 20 CS SUPPORT, TAN, NSN: 8340-01-257-8479 TYPE XIII, 96 x 20 MEDICAL WARD TROP., TAN, NSN: 8340-01-258-6482 TYPE XIV, 32 x 20 MEDICAL SUPPORT TROP., TAN, NSN: 8340-01-257-8480 TYPE XV, 48 x 20 KITCHEN, TAN, NSN: (UNASSIGNED) TYPE XVI, 32 x 20 SANITATION CENTER, TAN, NSN: (UNASSIGNED)

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

TM 10-8340-224-13, dated 1 March 1993, is changed as follows:

1. File this sheet in the front of the manual for reference.

2. This change implements Army Maintenance Transformations and changes the

Maintenance Allocation Chart (MAC) to support Field and Sustainment Maintenance.

3. New or updated text is indicated by a vertical bar in the outer margin of the page.

4. Added illustrations are indicated by a vertical bar adjacent to the figure number.

Changes illustrations are indicated by a miniature hand adjacent to the updated area and a vertical bar adjacent to the figure number.

5. Remove old pages and insert new pages as indicated below:

Remove Pages Insert Pages A/(B blank) B-1 – B-8 B-1 – B-7/(B-8 blank) Electronic 2028 Instructions/blank Sample 2028 Sample 2028 –Front/Back 2028/Envelope 2028 – Front/Back 2028 – Front/Back 2028 – Front/Back

NAVY NAVFAC-P-337.A

C3

By Order of the Secretaries of the Army, Air Force, and Navy (Including the Marine Corps):

PETER J. SCHOOMAKER

General, United States Army Chief of Staff

Official:

SANDRA R. RILEY

Administrative Assistant to the Secretary of the Army 0525010

MICHAEL E. RYAN

GENERAL, USAF

Official:

GEORGE T. BABBETT

General, USAF Commander, Air Force Materiel Command

D.G. MORRAL

Rear Admiral, USN Program Executive Officer For Expeditionary Warfare Naval Sea Systems Command

R.P. SHOCKEY

Director, Program Support Marine Corps Systems Command

DISTRIBUTION:

To be distributed in accordance with initial distribution IDN 252545, requirements for

TM 10-8340-224-13.

CHANGE

NO. 2

TM 10-8340-224-13

T.O. 35E5-6-1

NAVFAC-P-337.A

C2

HEADQUARTERS

DEPARTMENTS OF THE ARMY

AIR FORCE AND NAVY

WASHINGTON, D.C., 13 JANUARY 1995

OPERATOR, UNIT AND DIRECT SUPPORT

MAINTENANCE MANUAL

FOR

TENT, EXTENDABLE, MODULAR, PERSONNEL

(TEMPER)

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited

TM 10-8340-224-13/T.O. 35E5-6-1/NAVFAC-P-337.A, 1 March 1993, is changed as follows:

1. Remove and insert pages as indicated below. New or changed text material is indicated by a vertical bar in the margin. An illustration change is indicated by a miniature pointing hand.

Remove pages Insert pages i and ii i and ii Cover Cover

2. Retain this sheet in front of manual for reference purposes.

By Order of the Secretaries of the Army, Air Force and Navy:

Official:

Administrative Assistant to the Secretary of the Army

07858

GORDON R. SULLIVAN

General, United States Army

TM 10-8340-224-13

NAVFAC-P-337.A

T.O. 35E5-6-1

C 2

MERRILL A. McPEAK General, USAF Chief of Staff

RONALD W. YATES

General, USAF Commander, Air Force Materiel Command

DAVID E. BOTTORFF

Rear Admiral, CEC, US Navy Commander Navy Facilities Engineering Command

DISTRIBUTION:

To be distributed in accordance with DA Form 12-25-E, block no. 2545, requirements for

CHANGE

NO. 1

ARMY TM 10-8340-224-13

AIR FORCE TO 35E5-6-1

NAVY NAVFAC-P-337.A

C 1

HEADQUARTERS

DEPARTMENTS OF THE ARMY, AIR FORCE, AND NAVY

WASHINGTON, D.C., 28 FEBRUARY 1994

OPERATOR, UNIT, AND DIRECT SUPPORT

MAINTENANCE MANUAL

FOR

TENT, EXTENDABLE, MODULAR, PERSONNEL

(TEMPER)

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

TM 10–8340-224-13/T0 35E5-6-1/NAVFAC–P-337.A, 1 March 1993, is changed as follows:

1. Remove and insert pages as indicated below. New or changed text material is indicated by a vertical bar in the margin. An illustration change is indicated by a miniature pointing hand.

Remove pages Insert pages i and ii i and ii

1-3 and 1-4 1-3 and 1-4 5-9 and 5-10 5-9 and 5-10

2. Retain this sheet in front of manual for reference purposes.

AIR FORCE TO 35 E5-6-1

NAVY NAVFAC-P-337.A

C 1

By Order of the Secretaries of the Army, Air Force, and Navy:

GORDON R. SULLIVAN

General, United States Army

Official: Chief of Staff

MILTON H. HAMILTON

Administrative Assistant to the

Secretary of the Army 06138

MERRILL A. McPEAK General, USAF Chief of Staff

Official:

RONALD W. YATES

General, USAF Commander, Air Force Materiel Command

DAVID E. BOTTORFF

Rear Admiral, CEC, US Navy Commander Navy Facilities Engineering Command

DISTRIBUTION:

To be distributed in accordance with DA Form 12-25-E, block no. 2545, requirements for

INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.

Change 3 A/(B blank)

USA

LIST OF EFFECTIVE PAGES

NOTE: The portion of text affected by the changes is indicated by a vertical line in the outer margins of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands. Zero in the “Change No.” column indicates an original page.

Dates of issue for original and changed are:

Original .. 0 .. 1 March 1993 Change .. 1 .. 28 February 1994 Change .. 2 .. 13 January 1995 Change .. 3 .. 30 September 2005

TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 240, CONSISTING OF THE FOLLOWING:

Page No.

Change No.

Page No.

Change No.

Title 0 B-1 - B-7/(B-8 blank) 3 a - c/(d blank) 0 C-1 - C-32 0 i 2 D-1/(D-2 blank) 0 ii - iv 0 E-1 - E-3 0 1-0 - 1-3 0 F-1 - F-9/(F-10 blank) 0 1-4 1 Glossary-1/(Glossary-2 blank) 0 1-5 - 1-18 0 Index 1 - Index 3/(Index 4 blank) 0 2-1 - 2-78 0 Back Cover 0 3-1 - 3-7/(3-8 blank) 0 4-1 - 4-11/(4-12 blank) 0 5-1 - 5-26 0 A-1 - A-2 0

*ARMY TM 10-8340-224-13

NAVY NAVFAC-P-337.A

TECHNICAL MANUAL HEADQUARTERS

DEPARTMENTS OF THE ARMY,

AIR FORCE AND NAVY

NO. 10-8340-224-13 WASHINGTON D.C., 1 MARCH 1993

TECHNICAL MANUAL

Operator, Unit, Direct Support Maintenance Manual

For

TENT, EXTENDABLE, MODULAR, PERSONNEL (TEMPER)

REPORTING ERRORS AND RECOMMENDING IMPROVEMENTS

You can help improve this manual. If you find any mistakes or if you know of a way to improve these procedures, please let us know. Mail your letter or DA Form 2028 (Recommended Changes to Publications and Blank Forms), or DA Form 2028-2 located in the back of this manual directly to: Commander, US Army Aviation and Troop Command, ATTN: AMSAT-I-MP, 4300 Goodfellow Blvd, St. Louis, MO 63120-1798. A reply will be furnished directly to you.

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

TABLE OF CONTENTS

Chapter/Section PAGE

CHAPTER 1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

S e c t i o n I General Information . . . . . . . . . . . . . . . . . . . . . . . . 1-1 S e c t i o n I I Equ ipment Descr ip t ion . . . . . . . . . . . . . . . . . . . . . 1-3 S e c t i o n I I I Technical Principles of Operation . . . . . . . 1-18

CHAPTER 2 OPERATING INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

S e c t i o n I Descr ip t ion and Use o f Opera tor 's Cont ro ls and I n d i c a t o r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2

S e c t i o n I I Opera tor Prevent ive Main tenance Checks and Services (PMCS) . . . . . . . . . . . . . . . 2-4

S e c t i o n I I I Operations Under Usual Conditions . . . . . . . 2-17

S e c t i o n I V Operations Under Unusual conditions . . . . 2-76

CHAPTER 3 OPERATOR MAINTENANCE INSTRUCTIONS . . . . . . . . . . . . 3-1

S e c t i o n I L u b r i c a t i n g I n s t r u c t i o n s . . . . . . . . . . . . . . . . . . 3-1 S e c t i o n I I Opera tor Troub leshoot ing Procedures . . . . 3-1

S e c t i o n I I I Operator Maintenance Procedures . . . . . . . . . 3-5

* This manual together with TM 10-8340-224-23P, dated 31 October 1994, supersede TM 10-8340-224-13&P, dated 28 February 1986.

Change 2 i

NAVY NAVFAC-P-337.A

Chapter/Section

CHAPTER 4

S e c t i o n I

S e c t i o n I I

S e c t i o n I I I

S e c t i o n I V

Sec t ion V

CHAPTER 5

S e c t i o n I

S e c t i o n I I

S e c t i o n I I I

APPENDIX A

APPENDIX B

APPENDIX C

APPENDIX D

APPENDIX E

APPENDIX F

i i

TABLE OF CONTENTS CONT'D.

Page

UNIT MAINTENANCE INSTRUCTIONS . . . . . . . . 4-1

R e p a i r P a r t s , Special Tools, TMDE and Support Eqipment . . . . . . . . . . . . . . . . . 4 -2

Service Upon Receipt . . . . . . . . . . . . . . . . . . 4-2

Un i t T roub leshoo t i ng . . . . . . . . . . . . . . . . . 4 -3

Unit Maintenance Procedures . . . . . . . . . . 4-4

Preparat ion for Storage or Shipment . . 4-11

DIRECT SUPPORT MAINTENANCE

INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . 5 -1

R e p a i r P a r t s , S p e c i a l T o o l s ; T e s t Measurement Diagnost ic Equipment (TMDE) and Support Equipment . . . . . . . . . 5-1

T roub leshoo t i ng . . . . . . . . . . . . . . . . . . . . . . 5-1

Maintenance Procedures . . . . . . . . . . . . . . . 5-2

REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

MAINTENANCE ALLOCATION CHART . . . . . . . . . B-1

COMPONENTS OF END ITEM AND

BASIC ISSUE ITEMS LIST . . . . . . . . . . . . . . . C-1

ADDITIONAL AUTHORIZATION LIST . . . . . . . . D-1

EXPENDABLE/DURABLE SUPPLIES AND

MATERIALS LIST . . . . . . . . . . . . . . . . . . . . . . . E-1

ILLUSTRATED LIST OF

MANUFACTURED ITEMS . . . . . . . . . . . . . . . . . . . F-1

*U.S. GOVERNMENT PRINTING OFFICE: 1995-655-121/20030

Chapter/Section

AIR FORCE TO 35E5-6-1

NAVY NAVFAC-P-337.A

TABLE OF CONTENTS CONT’D.

Page

GLOSSARY . . . . . . . . . . . . . . . ..GLOSSARY-1

ALPHABETICAL INDEX . . .. . . . . . . . ..INDEX-1

iii

NAVY NAVFAC-P-337.A

HOW TO USE THIS MANUAL

This manual, (TM 10-8340-224-13), contains general information, operating instructions, PMCS instructions, troubleshooting steps, and maintenance instructions for the Tent, Extendable, Modular, Personnel (TEMPER). Use the front cover index and thumb bleeds at the edge of the pages to quickly find the sections of the manual shown on the cover.

The manual has been divided into chapters, sections and paragraphs that are numbered in sequence. Pages, paragraphs, and illustrations are numbered by chapter. For example, chapter 2, page 3 is marked 2-3; chapter 3, paragraph 5 is marked 3-5;

figure 2-3 is the third illustration in chapter 2. To quickly find specific information, use the table of contents. For example, the front cover index states that chapter 1 begins on page 1-1. The table of contents on page i tells you the exact page where the paragraph you want is located.

iv

NAVY NAVFAC-P-337.A

TENT, EXTENDABLE, MODULAR, PERSONNEL (TEMPER)

1-0

NAVY NAVFAC–P–337.A

Subject

CHAPTER 1

INTRODUCTION

Section/Paragraph

General Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..I Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 Maintenance Forms and Records . . . . . . . . . . . . . . . . . . . . . . ...1-2 Corrosion Prevention and Control (CPC) . . . . . . . . . . . . . . . . . . ...1-3 Destruction of Material to Prevent Enemy Use . . . . . . . . . . . . . ..1-4 Preparation for Storage or Shipment . .. . . . . . . . . . . . . . . . ..1–5 Quality Assurance (QA) . . . . . . . . . . . . . . . . . . . . . . . . . ...1-6 Reporting Equipment Improvement Recommendations (EIR) .. . ...1-7 Warranty Information . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . ..1–8 Nomenclature Cross-Reference . .. . . . . . . . . . . . . . . . . . . . . ...1-9 List of Abbreviations and Terms . . . . . . . . . . . . . . . . . . . . . ..1–10

Equipment Description . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II Equipment Characteristics, Capabilities and Features . . . . .. ..1-11 Location and Description of Major Parts . . . . . . . . . . . . . . . . ...1-12 Differences Between Models . . . . . . . . . . . . . . . . . . . . . . . . . ...1-13 Equipment Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...1-14

Technical Principles of Operation . . . . . . . . . . . . . . . . . . . . . . . . . . ...III Operation of the TEMPER. . . . . . . . . . . . . . . . . . . . . . . . ...1-15

Section I. GENERAL INFORMATION

1-1. SCOPE.

a. Type of Manual. Operator, Unit, and Direct Support Maintenance Manual that provides instructions for the set-up, operation, take down, maintenance, and repair procedures for components of the Tent, Extendable Modular (TEMPER).

b. Purpose of Equipment. Provide environmental protection support command and control, medical, supply and personnel housing operations.

c. Special Feature. Tent sections allow the tent layout to configured as necessary to suit tactical considerations.

d. Model Number and Equipment Name. Figure 1-6 shows the various tent configurations and nomenclature.

all to be

1-2. MAINTENANCE FORMS AND RECORDS. Department of the Army forms and procedures used for equipment maintenance will be those prescribed by DA PAM 738-750, The Army Maintenance Management System (TAMMS).

1-1

ARMY TM 10–8340–224–13

AIR FORCE TO 35E5–6–1

NAVY NAVFAC–P–337.A

1-3.

1-4.

1-5.

1-6.

1-7.

1-8.

1-2

CORROSION PREVENTION AND CONTROL (CPC). Corrosion Prevention and Control (CPC) of Army material is a continuing concern. It is important that any corrosion problems with this item be reported so that the problem can be corrected and improvements made to prevent the problem in future items. While corrosion is typically associated with rusting of metals, it can also include deterioration of other materials, such as rubber and plastic. Unusual cracking, softening, swelling, or breaking of the materials may be corrosion problems. If a corrosion problem is identified, it can be reported using Standard Form 368, Product Quality Deficiency Report. Use key words such as “rust”, “deterioration”, “corrosion”, or “cracking” to ensure that the information is identified as a CPC problem.

The form should be submitted to the address specified in DA Pam 738–750.

DESTRUCTION OF MATERIAL TO PREVENT ENEMY USE. Destruction procedures for TEMPER components covered in this manual are described in TM 750-244-3.

PREPARATION FOR STORAGE OR SHIPMENT. Refer to paragraphs 4- 13 and 4-15 to prepare the TEMPER for storage or shipment.

QUALITY ASSURANCE (QA). All maintenance actions will be inspected to assure that applicable Quality Assurance standards are met. Refer to FM 10–16, TM 9–450 and TM 9–237 for fabric repair, metal repair and welding standards respectively.

REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR). If your TEMPER components need improvement, let us know. Send us an EIR. You, the user, are the only one who can tell us what you don’t like about your equipment. Let us know why you don’t like the design or performance. Put it on an SF 368 (Product Quality Deficiency Report). Mail it to us at:

Commander, U.S. Army Aviation and Troop Command, ATTN:

AMSAT–I–MDO 4300 Goodfellow BLVD., St. Louis, MO 63120-1798.

WARRANTY INFORMATION. The TEMPER is warranted by the manufacturer. The warranty starts on the date found on DA Form 2410 or DA Form 2408–16 in the Logbook. Report all defects in material or workmanship to your supervisor who will take appropriate action.

NAVY NAVFAC-P-337.A

1-9. NOMENCLATURE CROSS-REFERENCE.

COMMON NAME OFFICIAL NAME

TEMPER Tent, Extendable, Modular, Personnel

Light Set Light Set, Portable, Fluorescent, Type I

1-10. LIST OF ABBREVIATIONS AND TERMS.

CPC

Cu Ft

DS2

EIR

ESC

HZ

MWO

NBC

Pkg Cu Sq Ft U/M

UOC

VAC

STB

V-agent

Corrosion Prevention and Control Cubic Foot/Feet Decontamination Solution (ready–to–use) Equipment Improvement Report Equipment Serviceability Criteria Hertz - Unit of frequency equal to one cycle per second Modification Work Order Nuclear, Biological, Chemical Package Cubic Foot/Feet Square Foot/Feet Unit of Measure Usable On Code Volts Alternating Current - Measure of electrical potential Supertropical Bleach - Decontamination Agent Vector agent

Section II. EQUIPMENT DESCRIPTION

1-11. EQUIPMENT CHARACTERISTICS, CAPABILITIES AND FEATURES. The TEMPER is available in green or tan color for use in different types of climate. Except for color, the characteristics, capabilities and features of both versions are identical.

a. Characteristics.

● Usable in a variety of climates.

● Constructed of lightweight materials.

● Deployed in forward battle areas.

● Provides blackout protection.

● Modular configuration permits layout flexibility.

1-3

ARMY TM 10-8340-224–13

NAVY NAVFAC–P–337.A

1-11. EQUIPMENT CHARACTERISTICS, CAPABILITIES AND FEATURES

b. Capabilities and Features.

CONT

Can be set up quickly under normal operating conditions.

TEMPER sections are interchangeable to form different configurations.

Frame assembly consists of collapsible sections made of aluminum tube that unfold and connect to form a single frame.

TEMPER is made of water resistant, flame resistant, mildew resistant, polyester duck fabric.

Can be equipped with single phase or 3–phase electrical power.

Can be heated or cooled through external sources.

Designed for steady wind of 50 mph and gusts of 65 mph.

1-12. LOCATION AND DESCRIPTION OF MAJOR PARTS.

a. Tent Sections. The major components of the tent sections are identified in Figure 1–1, and described in paragraphs (1) through (17) below.

1–4 Change 1

NAVY NAVFAC-P-337.A

Figure 1-1.

TENT SECTIONS

1-5

NAVY NAVFAC-P-337.A

1-12. LOCATION AND DESCRIPTION OF MAJOR PARTS (CONT)

(1) End Section. The end section is “A” shaped and constructed of 13.5 oz. mildew and flame resistant, coated, polyester duck. Two screened windows are sewn into the end section. Each window consists of a clear plastic window and blackout flap. Both the window and blackout flap may be rolled up and tied above the window opening. A zipper operated door with inner screen door is located in the center of the end section.

Two large air ducts and electrical cable sleeve are located at the bottom left of the door. A ventilator with weather flaps is located in the roof portion of the end section.

(2) Door Section (Temperate). The door section (temperate) is rectangular shaped and constructed of 13.5 oz. mildew and flame resistant, coated, polyester duck. A door, similar in design to that in the end section, is located in each side portion of the door section. An adapter to connect a vestibule or double bump through door to the door section is sewn along the perimeter of both door openings.

(3) Door Section (Desert/Tropical). The door section (desert/tropical) is rectangular shaped and constructed of 13.5

oz. mildew and flame resistant, coated, polyester duck. A door, similar in design to that in the end section, is located in each side portion of the door section. An adapter to connect a vestibule or double bump through door to the door section is sewn along the perimeter of both door openings. Two large screened openings with weather flaps are located in the center roof portions.

(4) Window Section (Temperate). The window section (temperate) is rectangular shaped and constructed of 13.5 OZ.

mildew and flame resistant, coated, polyester duck. A large window similar in design to those in the end section, is located in each side of the window section. A large air duct sleeve is located under one window and a stovepipe opening with weather flap is located in one of the center roof portions.

(5) Window Section (Desert/Tropical). The window section (desert/tropical) is rectangular shaped and constructed of 13.5

oz. mildew and flame resistant, coated, polyester duck. A large window similar in design to those in the end section, is located in each side of the window section. Two large screened openings with weather flaps are located in the center roof portions.

(6) Fly (8 & 16 foot). The tent flys are constructed of

13.5 oz. mildew and flame resistant, coated, polyester duck. One stovepipe opening with weather flap is located in the 8 foot fly and two stovepipe openings are located in the 16 foot fly.

1-6

NAVY NAVFAC-P-337.A

(7) End Section Liner (Temperate). The end section liner (Temperate) is constructed of 6.8 oz. flame and mildew resistant, natural color, cotton, oxford cloth. It consists of an “A” shaped end liner and an intermediate liner (Temperate) sewn together to form an end section liner. Two clear plastic windows, a door opening with flap and an air duct opening with flap are located in the end liner. An additional opening with flap is provided next to the door opening for easy access to the electrical distribution box.

(8) End Section Liner (Desert/Tropical). The end section liner (Desert/Tropical) is constructed of 6.8 oz. flame and mildew resistant, natural color, cotton, oxford cloth. It consists of an “A” shaped end liner and an intermediate liner (Desert/Tropical) sewn together to form an end section liner. Two clear plastic windows, a door opening with flap and an air duct opening with flap are located in the end liner. An additional opening with flap is provided next to the door opening for easy access to the electrical distribution box.

(9) Intermediate Liner (Temperate). The intermediate liner (temperate) is constructed of 6.8 oz. flame and mildew resistant, natural color, cotton, oxford cloth and is rectangular in shape.

Two combination door/window openings are provided at opposite ends of the liner. Two stovepipe openings with weather flaps are located in the center roof portions. An air duct opening with weather flaps is located in one of the door/window flaps.

(10) Intermediate Liner (Desert/Tropical). The intermediate liner (desert/tropical) is constructed of 6.8 oz.

flame and mildew resistant, natural color, cotton, oxford cloth and is rectangular in shape. Two combination door/window openings are provided at opposite ends of the liner. Two large openings with weather flaps are located in the center roof portions.

(11) Floor. Floors may be either single ply or insulated.

Single-ply floors are 21 feet long and come in widths of 8, 24, and 40 feet. The 24 and 40 foot widths are used when a non-sectionalized floor is desired. Single–ply floors are black on one side and either pale green or gray on the other, depending on the intended application. Hook and pile tape is used to attach the floor sections together, while tie tapes are used to secure the floor to the tent frame. The insulated tent floor is 20 feet long and 8 feet wide, and is made from 1/2 inch thick foam sandwiched between two plies of coated cloth. Hook and pile tape is used to connect floor sections. Tie tapes are not used, since the insulated floor sections are simply laid on top of the single-ply floor.

1-7

NAVY NAVFAC-P-337.A

1-12. LOCATION AND DESCRIPTION OF MAJOR PARTS (CONT)

(12) Vestibule. The vestibule is made from 13.5 oz mildew and flame resistant, coated, polyester duck. It is supported by three aluminum vestibule frame assemblies. Becket loops and grommets are used to attach a removable door to the vestibule, and for attaching the other side of the vestibule to either a tent end section or door section adapter. The vestibule without a door can be used as a passageway when connecting one tent to another.

(13) Plenum, Endwall 16 Foot. The Endwall Plenum is constructed of coated, lightweight, nylon material. The endwall plenum consists of a horizontal body and an extension located at one end. The horizontal body is 16 feet long with a semi-cylindrical shape approximately 3 feet wide. One body section end is capped with a removable plenum cover that is attached with hook and pile fastener tape, the other body end is sealed. The 16 foot body portion of all plenums contains openings with fastener tape flaps that can be opened or closed to adjust the amount of conditioned air entering the tent. Extendable plenum sections can be connected to the capped end, after removal of the cap, with hook and pile fastener tape. A tubular extension approximately 12 inches in diameter is sewn into the plenum near the closed end.

The opposite end of the extension is open. Tie lines are provided at the open end of the tubular extension to secure the plenum to the endwall air duct. Tie tapes are provided at the plenum top to secure it to the tent frame.

(14) Plenum, Side Entrance, 16 Foot. The side entrance plenum is constructed of the same material as the endwall plenum.

The design, consisting of a horizontal body and an extension,is similar to the endwall plenum however, it is configured to be used where air ducts enter the sidewall of the tent.

(15) Plenum, Extendable, 16 Foot. The extendable plenum is constructed of the same material as the endwall and side entrance plenums. It is a semi-cylindrical tube 3 feet wide and 16 feet long. Both ends are provided with hook and pile fastener tape and a cover to connect either endwall, sidewall, or additional extendable plenums.

(16) Modesty Curtain. The modesty curtain is constructed of 6.8 oz. flame and mildew resistant, natural color, cotton, oxford cloth. The curtain consists of two identical halves and a cable assembly. The curtain halves attach to the cable assembly by snaphooks. The cable assembly attaches to the tent frame at the eaves.

1-8

NAVY NAVFAC-P-337.A

(17) Partition. The partition is constructed of 6.8 oz.

flame and mildew resistant, natural color, cotton, oxford cloth.

It has a door opening in the center and a “U” shaped opening at the top center which allows the air plenum to pass through.

b. Frame Sections. Three unique frame sections in various quantities compose the TEMPER Tent: End Section, Type I;

Extendable Section, Type II; Extendable Door Section, Type III.

Each section is composed of interchangeable major components:

Arch Assembly; Header Assembly; Purlin Assembly; Eave Extender Assembly; Ridge Extender Assembly; Frame Sections Cover Assembly.

Additionally, the Extendable Door Section incorporates two additional components, the Door Sill Assembly and Vestibule Frame Assembly. These major components are illustrated in Figure 1-2 and described in paragraphs (1) through (8).

Figure 1-2.

FRAME SECTION COMPONENTS

1-9

NAVY NAVFAC-P-337.A

1-12. LOCATION AND DESCRIPTION OF MAJOR PARTS (CONT)

(1) Arch Assembly. The arch assembly consists of two aluminum side arch assemblies and an aluminum roof arch assembly.

The arch assembly can easily be folded into a closed “W” configuration for easy handling and transport. A non-sectionalized arch assembly and a sectionalized arch assembly are currently fielded. The difference between both types is that the sectionalized arch assembly consists of two interlocking pieces that are joined and held together by a quick release pin. The non-sectionalized arch assembly overall length is 113 inches and the sectionalized arch assembly overall length is 98 inches allowing easy transport by USAF aircraft.

(2) Header Assembly. The header assembly is made from aluminum rectangular tubing with a cross section of 1 1/4 x 2 1/2 inches and has an overall length of 98 inches. Steel plates are riveted to the ends to allow attachment to the arch assembly.

(3) Purlin Assembly. The purlin assembly is made from tubular aluminum approximately 96 inches long x 1 1/2 inches in diameter. Folding diagonal braces which have “U” shaped cross sections are riveted to each end of the purlin. At the end of each brace is a rotating brace stud and brace shackle. The brace stud and the purlin end fitting lock into slots in the arch assembly. Five purlins, one at the ridge, one at both eaves and one at each base are required to join two arch assemblies.

(4) Eave Extender Assembly. The cave extender assembly is made from tubular aluminum with a single foot, web–reinforced base welded to the bottom of the center length of tubing. Two hitch clip pins are fastened to the extender.

(5) Ridge Extender Assembly. The ridge extender assembly is made from tubular aluminum with a two-footed, web–reinforced base welded to the bottom of the center length of tubing. A hitch clip pin is fastened to the extender

(6) Frame Sections Cover Assembly. The frame sections cover assembly is diaper shaped, made of heavyweight, coated cloth with interior straps to secure frame components and exterior straps which bind the assembly together.

(7) Door Sill Assembly. The door sill assembly is made from tubular aluminum with a four foot long rotating door sill bolted to the center of the tubular section. Folding diagonal braces which have a “U” shaped cross section are riveted to each end of the door sill assembly. At the end of each brace is a rotating brace stud and brace shackle. The brace stud and the door sill end fitting lock into slots at the base of the arch assembly.

1-10

NAVY NAVFAC-P-337.A

(8) Vestibule Frame Assembly. The vestibule assembly is composed of three components made of aluminum tubing: two upright poles with attached baseplate, and a header. Holes in the baseplate permit the assembly to be staked to the ground.

Three vestibule frame assemblies are required to support a vestibule with door.

c. Double Bump-Throuqh Door Assembly. The double bump-through doors consist of two spring-loaded swinging doors (1) mounted in an outer frame. The doors are constructed of a honeycombed core sandwiched between aluminum skins. A window (2) and blackout flap (3) are located on each door. Hinged ramps (4) at the bottom of the frame permit easy access by wheeled items. The double bump-through doors are designed for use with tent end section adapters, tent door section adapters, and vestibules. A vestibule door cap must be used to provide complete weather resistance. The doors can also be used at end sections with the adapter rolled back and tied in place. Extenders (5) are supplied with the door and are only used in the end section application.

The double bump-through door is illustrated in Figure 1-3.

Figure 1-3.

DOUBLE BUMP-THROUGH DOOR ASSEMBLY

1-11

NAVY NAVFAC-P–337.A

1-12. LOCATION AND DESCRIPTION OF MAJOR PARTS (CONT)

d. Power Control. Either a 120V or a 208V power control system is provided with the TEMPER. The power control system consists of a power distribution box (1), convenience outlets (2), extension cables in 103, 156, 173, 254, and 408-inch lengths (3), and power panel stands (4). External power is provided to the power distribution box which distributes and controls power to the lights and convenience outlets. The power control components are illustrated in Figure 1-4.

Figure 1-4.

POWER CONTROL SYSTEM

1-12

NAVY NAVFAC-P-337.A

e. Light Set, Type I. The light set consists of a storage container (1) and four luminaires (2). The storage container is lined with protective foam and holds a spare lamp, spare fuse and fuseholder, and support straps in addition to the luminaires.

The storage container is secured with two latches and has a rubber coated, spring-actuated carrying handle at each end and in the center. Each luminaire consists of a fluorescent lamp mounted in a reinforced plastic tube with a molded cap and cable assembly at each end. The cap with the male power cable contains an On/Off switch and fuseholder. The cap with the female cable assembly contains a spare fuse. The light set is illustrated in Figure 1-5.

Figure 1-5.

LIGHT SET, TYPE I

f. Light Cables, Type I & II. The Type I & II Light Cable is a set of two incandescent lights with individual streamers molded to an electrical cable. The cable is fitted with a male and female plug. The light cable may be substituted for the Type I Light Set and is currently in use by the U.S. Air Force only. The light cable is illustrated in Figure 1-6.

Figure 1-6.

LIGHT CABLES, TYPE I & II

1-13

NAVY NAVFAC-P-337.A

1-13. DIFFERENCES BETWEEN MODELS.

Figure 1–7

MODEL DIFFERENCES

1-14

ARMY TM 10–8340–224-13

NAVY NAVFAC-P-337.A

Figure 1-7 (CONT)

1-15

NAVY NAVFAC-P-337.A

1-13. DIFFERENCES BETWEEN MODELS (CONT)

Figure 1-7 (CONT)

1-16

NAVY NAVFAC-P-337.A

1-14. EQUIPMENT DATA. Table 1-1. lists the dimensions, weights, quantity required, as well as packaged dimensions for the separate TEMPER components. Class I denotes green and Class II denotes tan tents.

Table 1-1. Equipment Data

Tent Type

Type I, Class I Type II, Class I Type III, Class I Type IV, Class I Type V, Class I Type VI, Class I Type VII, Class I Type VIII, Class I Type IX, Class I Type X, Class I Type XI, Class I Type XII, Class I Type XIII, Class I Type XIV, Class I Type XV, Class I Type XVI, Class I

Type I, Class II Type II, Class II Type III, Class II Type IV, Class II Type V, Class II Type VI, Class II Type VII, Class II Type VIII, Class II Type IX, Class II Type X, Class II Type XI, Class II Type XII, Class II Type XIII, Class II Type XIV, Class II Type XV, Class II Type XVI, Class II

Length

64' 64'

48’ 32’ 16’ 16’ 16’ 96’ 80’ 64'

32’ 16’ 96’ 32' 48’ 32’

64' 64’ 48’ 32' 16’ 16’ 16’ 96’ 80’ 64’ 32'

16’ 96’ 32’ 48’ 32'

Weight

Pkg cu.

Height at Eaves 6 feet 9 inches

Height at Ridge 10 feet 1/2 inches

Width at Base 20 feet 6 inches

Power Requirements: 120/208 V

1-17

NAVY NAVFAC-P-337.A

SECTION III. TECHNICAL PRINCIPLES OF OPERATION

1-15. OPERATION OF THE TEMPER.

The Tent, Extendable, Modular, Personnel (TEMPER) is an extendable, modular, frame–supported shelter consisting of a collapsible aluminum frame covered with a coated polyester fabric. Modules are 20 feet, 6 inches wide, and can be extended in 8-foot increments.

The modules can be configured by using becket loops and grommets to attach any combination of window and/or door sections, along with vestibules for module connections. A tent fly is used to reduce solar loading and provide increased environmental protection.

Single-ply and insulated floor sections and liners, modesty curtains, partitions, electrical distribution systems, fluorescent and incandescent lights, air distribution plenums, and double bump–through doors are available to allow configurations that satisfy user requirements.

1-18

ARMY TM 10-8340–224-13

NAVY NAVFAC-P-337.A

CHAPTER 2

OPERATING INSTRUCTIONS

Subject Section/Paragraph

Description and Use of Operator’s Controls and Indicators. . . . . .I General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Operator’s Controls and Indicators . . . . . . . . . . . . . . . . . . . . . .2–2

Operator Preventive Maintenance Checks and Services (PMCS) . . .II Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–3

Operation Under Usual Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . .III Assembly and Preparation for Use . . . . . . . . . . . . . . . . . . . . . . . .2–4 Frame Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–5 Initial Placement of Window and Door Sections . . . . . . . . . . . . . . . . .2–6 Placement of End Section . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–7 Placement of Tent Flys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–8 Becket Lacing Window and Door Sections, End Sections,and Tent Flys . . . . . . . . . . . . . . . . . . . . . . . .2–9

Install Guy Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–10 Raising the Frame to Partially–Erect Position. . . . . . . . . . .2–11 Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-12 Install Luminaires. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–13 Fully Erecting the Frame . . . . . . . . . . . . . . . . . . . . . . . . . . ..2–14 Final Installation of Floor and Liner. . . . . . . . . . . . . . . . . . .2–15 Electrical Components . . . . . . . . . . . . . . . . . . . . . . . . . . . ..2-16 Complete Becket Lacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–17 Stakes and Guy Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–18 Vestibule Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2–19 Install Double Bump-Through Doors in Vestibule or Vestibule Adapter . . . . . . . . . . . . . . . . . . . . . . . . . ..2–20

Install Double Bump–Through Doors in End Section . . . . . . . .2–21 Modesty Curtain . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..2–22 Partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..2–23 Operation of Doors, Windows and Vents . . . . . . . . . . . . . . . . . ..2–24 Decals and Instruction Plates . . . . . . . . . . . . . . . . . . . . . . ..2–2.5 Preparation for Movement . . . . . . . . . . . . . . . . . . . . . . . . . ..2–26

Operation Under Unusual Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . ..IV General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...2-27

2-1

NAVY NAVFAC-P-337.A

SECTION I

2-1. GENERAL.

DESCRIPTION AND USE OF OPERATOR’

INDICATORS

The TEMPER has been designed for

S CONTROLS AND

use in forward combat areas and has relatively few moving parts. Electrical controls are found on the electrical distribution boxes for the power control system and on the light set as described in paragraph 2-2 below.

2-2. OPERATOR’S CONTROLS AND INDICATORS. Refer to table 2-1.

Figure 2-1.

ELECTRICAL DISTRIBUTION BOX CONTROLS

Table 2-1 Electrical Distribution Box Controls

Control or Indicator Function

On/Off Switch (1) Turns left or right bank electrical circuits on or off.

Circuit Breakers (2) Provides overload or short-circuit protection. Circuit is interrupted when breaker is out. Push to reset.

2-2

NAVY NAVFAC-P-337.A

Figure 2-2.

LUMINAIRE CONTROLS

Table 2-2 Luminaire Controls

Control or Indicator Function

On/Off Switch (1) Turns lamp in luminaire on or off.

Fuse (2) Protects light set from overload and shorting.

Spare Fuse (3) Provides for back-up fuse in case of failure.

2-3

NAVY NAVFAC-P-337.A

SECTION II. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES

(PMCS)

2-3. INTRODUCTION. The TEMPER components must be inspected regularly to find and correct defects. Record all defects found during the performance of PMCS and the steps taken to correct them on a DA Form 2404, Equipment Inspection and Maintenance Worksheet. Instructions for reporting /correcting noted deficiencies are contained in DA Pam 738-750

a. General. Table 2-3 (PMCS Table) has been provided so you can keep your equipment in good operating condition and ready for its primary mission.

b. Warnings and Cautions. Always observe the WARNINGS and CAUTIONS appearing in your PMCS table. Warnings and cautions appear before applicable procedures. You must observe these WARNINGS and CAUTIONS to prevent serious injury to yourself and others or to prevent your equipment from being damaged.

c. Explanation of table entries.

(1) Item number column. Numbers in this column are for reference. When completing DA Form 2404 (Equipment Inspection and Maintenance Worksheet), include the item number for the check/service indicating a fault. Item numbers also appear in the order that you must do checks and services for the intervals listed.

(2) Interval column. This column tells you when you must do the procedure in the procedure column. BEFORE procedures must be done before you operate or use the equipment for its intended mission. DURING procedures must be done during the time you are operating or using the equipment for its intended mission. AFTER procedures must be done immediately after you have operated or used the equipment.

(3) Location, check/service column. This column provides the location and the item to be checked or serviced. The item location is underlined.

(4) Procedure column. This column gives the procedure you must do to check or service the item listed in the Check/Service column to know if the equipment is ready or available for its intended mission or for operation. You must do the procedure at the time stated in the interval column.

2-4

NAVY NAVFAC-P-337.A

(5) Not fully mission capable if:column. Information in this column tells You what faults will keep your equipment from being capable of performing its primary mission. If you perform check and service procedures that show faults listed in this column, do not operate the equipment. Follow standard operating procedures for maintaining the equipment or reporting equipment failure.

d. Other table entries. Be sure to observe all special information and notes that appear in your table.

2-5

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable Modular, Personnel (TEMPER).

Item Interval Location Procedure Not Fully No Item to Mission

Check/ Capable If:

Service

1 Before Fabric Check for tears, Fabric During Assys punctures, rips, ripped or After seams that may torn. Sep-have separated arated seams in walls (1), or fabric liners (2),tent punctures.

fly (3),and floor (4).

2 Before Grommets Check for Grommets are During grommets that missing or After are torn away torn away from or out of from material. material causing fabric to tear.

2-6

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable, Modular, Personnel (TEMPER) (CONT)

Item Interval Location Procedure Not Fully No Item to Mission

Check/ Capable If:

Service

3 Before Slide Check for smooth Slide During Fasteners operation, Fastener After missing teeth binds, does and separated not open or seams. close, or is torn away from fabric.

4 Before Hook and Inspect hook and Fasteners do During Pile pile fasteners not hold After Fastener for proper when pressed alignment and together.

cleanliness. Strips Remove dirt by loose.

brushing fastener strips.

2-7

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable, Modular, Personnel (TEMPER) (CONT).

Item Interval Location Procedure Not Fully No Item to Mission

Check/ Capable If:

Service

5 Before Tent Lines Inspect tent Tent lines During lines (1) for are cut, After cuts or fraying. frayed, or excessively worn.

6 During Check for and tighten loose tent lines (1).

7 Before Tent Line Inspect for Tent line Slips broken tent line slips broken slips (2). or missing.

8 Before Straps Check interior Straps loose After and exterior or missing.

straps (3,4) for fraying or tears.

2-8

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable, Modular, Personnel (TEMPER) (CONT).

Item Interval Location Procedure Not Fully No Item to Mission

Check/ Capable If:

Service

2-9

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable, Modular, Personnel (TEMPER) (CONT).

Item Interval Location Procedure Not Fully No Item to Mission

Check/ Capable If:

Service

9 Before Frame Check condition Sectional After Components of arch (1), arch does header (2), not fold, purlin (3), cave locking tabs

(4) and ridge on purlin

(5) extenders, and door door sill assy sill do not (6), vestibule rotate and frame assy (7), lock, quick and frame release pins sections cover and hitch assy (8). Look clip pins

. for bends or are missing other damage. or broken.

Check for free movement. Ensure quick release pins (9) and hitch clip pins

(10) are present and in proper working order.

Inspect binding strap assembly

(11) for fraying and presence of buckles.

2-10

NAVY NAVFAC-P-337.A

Table 2-3. Preventive Maintenance Checks and Services for Tent, Extendable,…