AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to delete the follow ing from Paragraph 4 of the PWS;
4.2.a All tents must be clean and serviceable 4.2.b.All tents must be w eatherproof (generally free of w ater / w ind leakage) 4.2.c. All tents shall have double doors, front and back w hich shall be serviceable through the exercise
1. CONTRACT ID CODE PAGE OF PAGES
1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W90VN821R0002
X 9B. DATED (SEE ITEM 11)
03-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Feb-2021
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO CASEY
UNIT#15289
APO AP 96224-6224
UNITED STATES
W90VN8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN821R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
Installation/Maintenance/Removal of Life Support Area on K16
1.0. General. The Contractor shall provide equipments and services for Life Support Area as specified in Para 5 of the PWS for command post training exercise at K16 (US Portion of Seoul Air Base) 01 March-2021 through 21 March 2021.
1.1. Scope of Work. The period of performance is from the contract award date to 21 Mar 2021. The contractor shall prepare site and complete site set up for LSA occupation from the contract award date all through to 28 February 2021, and provide all maintenance services from 1 March 2021-21 March 2021 at K16 US Base in Seoul.
The Contractor shall provide all personnel, equipment, tools, materials, supervision, and maintenance necessary to install, manage, and take down Life Support tents during period of performance as defined in paragraph 5 in this Performance Work Statement (PWS) except as specified in paragraph 3.0.
1.2. Qualification of Contractor:
a. Contractor Manager (CM). The Contractor shall provide a qualified CM who shall be responsible for the overall performance of the work. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. The CM has at minimum of one time exercise support experience within the last ten (10) years for this type of services or similar type of services as specified in PWS. This may be commercial market or US Government requirement.
b. The Contractor(s) shall submit evidence proving that they have had a minimum of two (2) exercise supports experience within the last ten (10) years for this type of services or similar type of services as specified in PWS. This may be commercial market or US Government requirement.
c. The Contractor shall provide adequate personnel to complete this requirement in the time period required.
Contractor’s employees and representatives shall be required to have proper identification prior to entering a Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.
d. The Contractor shall possess a valid Business Registration (사업자등록증) granted by the Republic of
Korea (ROK) authorities and translate the registration into English, and provide a copy of both the English and Korean version with offeror’s initial proposal.
e. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification
Card while on any U.S Government installation.
f. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR or Contracting Officer within ten (10) days after contract award
g. The Contractor shall ensure all employees that operate on U.S. Installations have approved access and that service vehicles are registered with installation provost marshal.
h. The Contractor shall ensure all employees that operate on U.S. Installations comply with all COVID-19 mitigation measures including, but not limited to wear of face masks.
1.3. Quality Assurance. FAR Part 46 governs the Contractor’s Quality Assurance/Quality Control Relationship.
The Contractor should understand the roles that the Government assumes as far as the execution of particular quality assurance methods to monitor the contract. The Contractor shall understand the Quality Control Methods that they shall employ to insure the fewest services delays and product/service deficiencies. The Government shall audit, or use inspection methods or other methods to assure that the Contractor is providing the services or products required by the contract. The Contractor shall not present goods or services to the Government which the Contractor has failed to perform appropriate Quality Control methods as generally outlined by FAR Clause 52.246-4 and as dictated by the particular services or products.
a. The Government bases, but does not limit, its primary quality assurance procedures on random sampling of the recurring critical output products of the contract using the concepts of MIL-STD-105D. The Government will monitor contract requirements using Contractor reports and customer complaints (DA Form 5477). The Government reserves the right to perform 100% inspection or other inspection methods as might be applicable to the circumstances.
b. For areas monitored by sampling: The Criteria is derived from MIL-STD-105D based on the lot size, sample size and AQL for each contract requirement. When the number of defects in the Contractor’s performance are discovered by the Quality Assurance Evaluator (QAE) and exceed the unacceptable level, the COR shall be required to complete a Contract Deficiency Report (CDR) DD form 2772. The CDR requires the Contractor to explain in writing why performance was unacceptable, how they will return performance to acceptable levels, and how the Contractor will prevent the recurrence of the problem(s) in the future. CDRs should answer the following questions in the Corrective Action Plan (CAP) which is to be provided as part of the answer to the CDR.
1) What is the Root Cause of the Deficiency?
2) What action was taken to correct the specific deficiency?
3) What action was taken to correct and prevent recurrence of the Root Cause of the Deficiency?
4) What action was taken to determine if other product is affected by the same or similar deficiency and action taken regarding other susceptible product?
5) What action was taken to correct the weakness which allowed deficient product to be presented to the Government or COR for acceptance?
6) What are the target dates for implementation of the Contractor’s identified corrective action?
Other requirements. The criteria for non-sampled requirements were derived from estimates of the level of performance experienced when Government personnel did the service or are the level of performance deemed acceptable to the Government. The use of the CDR as described above applies to these requirements as well.
1.4. Quality Control Program (QCP). The Contractor shall institute the U.S. Military’s Quality Assurance Methods insuring that the Quality Control system meets the requirements of FAR Clause 52.246-4 and FAR Part 46 previously mentioned. The Contractor shall develop and maintain a Quality Control plan which is applicable to the processing of product IAW this Performance Statement of Work which shall meet the requirements of the FAR clause 52.246-4 previously mentioned. The QCP must be forwarded to and accepted by the Government. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies and previously discussed in par 1.3 above. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. A copy of the Quality Control Program shall be provided to the COR within 10 days after contract award date or no later than the post award conference. The Contractor shall institute and ensure a viable customer comment system is in place utilizing DA Form 5477, Customer Complaint Record and applicable methods which would allow for customer satisfaction of the particular service outlined in the contract.
1.5. Physical/Operational Security Antiterrorism.
a. This provision and / or contract text is for Contractor employees with an area of performance within an Army controlled installation, facility, or area. All Contractor employees, to include subContractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training with 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subContractor employee to the Receiving Officer or to the Contracting Officer, if a Receiving Officer is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https//atlevel1.dtic.mil/at.
b. Access and General Protection / Security Policy and Procedures. Contractor and all associated sub-
Contractors employees shall comply with applicable installation, facility and area commander installation facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Conditions (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
c. iWATCH Training. The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activities to the Receiving Officer. This training shall be completed within 15 calendar days of contract award and with 15 days of new employees commencing performance with the results reported to the COR NLT 30 days after contract award.
d. The Contractor and his employees must comply with all security requirements imposed by the local installation commander at all times while performing the requirements of this contract on all military installations or exercise areas.
1.6. Hours of Operation.
Location Period of Performance Number of Tents & Size at Minimum
LSA at K16 (US Air Base) The award date through 21 March
40 Each/Size: 20 Feet 6 inches long by 48 Feet long
1.7. Conservation of Utilities. Not Applicable
1.8. Environmental Controls. Not Applicable
1.9. Government Observations. At any time deemed appropriate by the Receiving Officer, he or she may inspect the Contractor’s facilities for compliance with this contract, however, the COR may set up dates and times with the Contractor for routine inspections and quality assurance visits. The Contractor will be notified at least 24 hours in advance of any other civilian or military personnel associated with the US Army Garrison K16 desiring to view the Contractor’s facilities and or operations.
2.0. Safety Requirements. The Contractor will comply with all U.S. Occupational Safety & Health Administration (OSHA) regulations and is subject to the USAG Safety Officer inspections of all Government Owned/Contractor Operated (GOCO) property for compliance with governing regulations.
2.1. Definitions. None.
2.2. Technical definitions. Acceptable Quality Level (AQL). AQL is a designated value of percent defective (or defects per hundred units) for which lots will be accepted most of the time by the sampling procedure being used.
3.0. Government Furnished Property and Services. 40x US Army GP Large frame tents (20 Feet 6 inches long by 48 Feet long) and 400 cots.
4.0. Contractor Furnished Items and Services. The Contractor shall furnish all items and services necessary to provide Life Support as defined in this PWS except as specified in paragraph 3.0 as Government furnished.
4.1. General. Except for those items or services specifically stated to be Government furnished in Section 3.0; the Contractor shall furnish everything required to perform this contract.
4.2. Minimum Quality Standards. All tents must meet the following criteria,
a. All tents must be clean and serviceable upon setup
b. All tents must be weatherproof (generally free of water/wind leakage)
c. All tents shall have double doors front and back which shall be serviceable through the exercise.
d. All tents must have flooring for the entire inside of the tent space.
e. All tents must have lighting, to provide for illumination where an individual shall be able to read a standard text book at any location within the tent where seating is provided.
f. All tents must have the minimum required number of fire extinguishers as required by fire code and smoke/carbon monoxide detectors to cover the area of the entire tent and provide an alarm audible in the local area of the tent.
g. All tents must have heated/Air Conditioned and provide air circulation to allow for a temperature between 65 and 80 degrees Fahrenheit.
h. All tents must have 110Voltage Alternating Current (VAC) outlets (minimum 10 outlets in each unit).
i. All tents must be free standing and cannot require staking into the field surface to secure them, weights can be used to secure the tents
j. Contractor must provide power generation to all tents. All electrical systems will be each grounded via single point earth ground to insure safety. See Recommended methods as per CECOM TR-96-2 Earth Grounding Pamphlet on the DITEC website www.dtic.mil
4.3. Government Reimbursements. Not Applicable
5.0. Specified Task: Set Up Tents/: The Contractor shall install the tents as the requirements specified in paragraph 4.2 above into the requirements specified in para 5.0 thru 5.3. Tents shall be established at times in locations and in requisite quantities as specified in paragraph 1.6. Contractor ensures heating, air conditioning, flooring, fire extinguishers, smoke/carbon monoxide detectors, and minimum 10 110V outlets per tent. Install 40 US Army Tents. Each tent must be connected to power generation.
5.1 Service Power Generators: Ensure power generators are properly maintained, monitor fuel levels and refill as applicable.
5.2 Specified Tasks:
5.2.1 The Contactor shall provide all personnel, tools, supervision and management necessary for the installation and removal of government provided tents (Quantity: 40) on a field with dimensions 89M/291.99ft wide x 117M/386.86ft long. Each tent measures 20 Feet 6 inches long by 48 Feet long
5.2.2 The Contactor shall provide all personnel, tools, material, supervision and management necessary for the installation and removal of flooring panels for each of the tent (Quantity: 40)
5.2.3 The contractor shall provide all personnel, tools, supervision, and management necessary for the setting up of 400 government provided cots measuring 30 inches wide x 78 inches long. The contractor shall set up a minimum of 10 cots in each tent. Each cot must have two (2) meters separation on all sides to mitigate the spread of COVID-19
5.2.4 The Contractor shall provide all personnel, equipment, tools, materials, supervision, and management necessary to deliver, install, manage, and remove HVAC units for the tents.
5.2.5 Heating/AC units must be capable of maintaining the tent’s temperature between 65-80 degrees Fahrenheit.
5.2.6 The Contractor shall provide all personnel, equipment, tools, materials, supervision, and management necessary to deliver, install, manage, and remove power generating units for the supply of power for lighting, heater/AC, and power outlets.
5.2.7 The contractor shall be responsible for fueling the power generators, and the overall maintenance of the equipment. The contractor shall ensure there is containment for the power generating sets to contain all spillage or leakage and execute all spill clean up
5.2.8 The contractor shall provide all personnel, equipment, tools, materials, supervision and management to deliver, install, manage and remove electrical wiring and power outlets in all tents.
5.2.9 The contractor shall ensure power cables do not create a tripping hazard. Containment is required to ensure the power generation units cannot leak onto the field, track or earth.
5.2.10 Each tent must have adequate lighting, fire extinguishers, smoke detectors, carbon monoxide detectors, heating/AC, and 110v outlets (minimum of 10 power outlets in each tent)
5.2.11 All tents must be free standing and cannot require staking into the field surface, weights, (for example sand bags) can be used to secure the tents
5.2.12 The contractor shall rectify all maintenance issues within 12 hours of receiving the report of the issues
5.2.13 The field site must be returned to original condition prior to the release of the contractor. Location ,start, and days specified in paragraph 1.6
5.3 Quality Control: The Contractor shall annotate and initial/sign a service log at each location each time service is performed
5.4 Fire Prevention: The Contractor shall comply with the provisions of the installations’ Fire Protection Program and NFPA 70 (National Fire Protections Agency).
6.0 Applicable Publications:
The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
- Useful reference documents for Contractors working with the U.S. Government are available at http://www.aca.army.mil/
- Federal Joint Ethics Regulation (JER) 5500.7-R is available at www.dod.mil/dodgc/defense_ethics/ethics_regulation/
- Overseas Environmental Baseline Guidance is available at www.dtic.mil/
- Federal Acquisition Regulations are available at https://www.acquisition.gov/far/
- AR 385-10, Army Safety Program
7.0 Technical Exhibit / Attachment Listing:
7.1 Technical Exhibit 1: Performance Requirements Summary
Performance Objective Standard
PERFORMANCE
THRESHOLD
Method of
Surveillance PRS # 1 (See PWS, para 5.2.1)
Comply with para 5.2.1.
Zero deviation.
Periodic inspections / validated customer complaint
PRS # 2 (See PWS, para 5.2.2)
Comply with para 5.2.2 Zero deviation. Periodic inspections
PRS # 3 (See PWS, para 5.2.3)
Comply with para 5.2.3. Zero deviation. Periodic inspections
PRS # 4 (See PWS, para 5.2.4)
Comply with para 5.2.4. Zero deviation. Periodic inspections
PRS # 5(See PWS, para 5.2.5)
Comply with para 5.2.5. Zero deviation. Periodic inspections
PRS # 6 (See PWS, para 5.2.6)
Comply with para 5.2.6.
Zero deviation.
Periodic inspections / validated customer
PRS #7(See PWS, para 5.2.7)
Comply with para 5.2.7. Zero deviation. Periodic inspections
PRS # 8 (See PWS, para 5.2.8)
Comply with para 5.2.8. Zero deviation. Periodic inspections
PRS #9 (See PWS, para 5.2.9)
Comply with para 5.2.9. Zero deviation. Periodic inspections
PRS # 10 (See PWS, para 5.2.10)
Comply with para 5.2.10. Zero deviation. Periodic inspections
PRS # 11 (See PWS, para 5.2.11)
Comply with para 5.2.11. Zero deviation Periodic inspections
PRS # 12 (See PWS, para 5.2.12)
Comply with para 5.2.12. Zero deviation Periodic inspections
PRS # 13 (See PWS, para 5.2.13)
Comply with para 5.2.13. Zero deviation Periodic inspections
7.2 Attachment Listing:
a. Site Layout for Tents
b. Site dimensions
8. Accounting for Contract Services:
Contractor Manpower Reporting (CMR) Requirement
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including subContractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the CMR information in the format using the following web address: https://cmra.army.mil. However, before the Contractor can begin reporting CMR data in this website, he or she must first register as a User. In order to register, the Contractor must have a Cage Code.
Cage Code
If you are a Korean company needing a Cage Code, at Telephone #82-2-2079-4639, FAX 82-2-773-7587, EMAIL CAGEKR@dapa.go.kr , Address: The Standard Planning Team of the Standard Management Bureau Defense Acquisition Program Division (23 Yongsangogyogil), #2-15 Yongsan 2 ga dong, Yongsan-gu, Seoul (140-841), Republic of Korea.
If you are a U.S. company needing a Cage Code, you must register with the Central Contractor Registration (CCR) at www.ccr.gov. Once your company registration is activated in CCR, a Cage Code notification will be mailed to your company address via the U.S. Postal Service.
CAGE CODE – What it is and How to Obtain One
A CAGE Code is a five-position code that identifies Contractors doing business with the U.S. Federal Government, NATO member nations, and other foreign Governments. The CAGE Code is used to support a variety of mechanized systems throughout the Government and provides for a standardized method of identifying a given facility at a specific location. The Code may be used for a Facility Clearance, a Pre-award survey, automated Bidders Lists, identification of Debarred Contractors, fast pay processes, etc.
(http://www.dlis.dla.mil/cageserv.asp.)
FOR NON-U.S. COMPANIES
Non-U.S. companies are issued NATO Cage Codes (NCAGE) by contacting the designated Point of Contact (POC) at the National Codification Bureau (NCB) of the country where the company is located. For a list of addresses and POCs, go to http://www.dlis.dla.mil/nato_poc.asp .
Please note: Organizations with an address containing APO, FPO or AE do not need an NCAGE assigned by an Allied Nation or NATO-sponsored NCB. Instead, these companies must register in the CCR to receive a U.S. Cage Code.
The POC for South Korea is:
The Standard Planning Team Of the Standard Management Bureau Defense Acquisition Program Division (23 Yongsangogyogil) #2-15 Yongsan 2 ga dong Yongsan-gu SEOUL (140-841) Republic of Korea
TEL: +82-2-2079-4639
FAX: +82-2-773-7587
E-MAIL: CAGEKR@dapa.go.kr
After submitting the Cage Code request application to Ms. Cho, sometimes she is able to provide a NATO Cage Code to the Korean Contractor.
NATO Cage Code 신청 및 주의 사항 (Instruction on Registering for NATO Cage Code)
신청 절차
1. 방위사업청 국방전자조달 홈페이지(www.d2b.go.kr)에 접속 합니다.
2. 방위사업청 국방전자조달 홈페이지 메인화면의 민원서비스 - 나토생산자(Ncage)부호 신청을 클릭 합니다.
로긴(Login) 없이 접속 가능 3.나토생산자부호(Ncage) 부여요청을 위한 Login 화면에서 회원가입을 합니다.
*유의사항: 아이디와 비밀번호는 요청및 결과확인용으로 가능하며 국방전달조달 메뉴에 있는 기타 다른 업무에는 사용할 수 없습니다.
4. 회원가입시 번호부여대상이 회사인 경우에는 사업자등록증번호, 개인일 경우에는 DUNS번호를
기입합니다.
5. 가입한 아이디와 비밀번호로 로긴하여 접속 후 온라인 나토생산자부호 요청서에 해당업체에 대한 정보를 기록합니다.
6. 회사인 경우에는 사업자등록증, 개인일 경우에는 DUNSNUMBER 부여결과서를 스캔하여 EDM에
*.jpg화일로 첨부합니다.
7. 등록한 후 재조회를 하여 업체자료가 정상적으로 신청이 되었는지 확인합니다.
8. 신청서 접수 및 진도는 요청서 상단 진행산태를 확인합니다.
*진행상태: 신청완료, 접수완료, 작업완료등 빨간색으로 변경 *처리소요기간: 1일-2일 *비용: 무료
업무 담당자
1. 담당부서 : 방위사업청 표준관리부 목록체계팀 ① 생산자부호 담당 전화번호 : 02)-2079-4639
② 표준관리부 FAX : 02)-2079-4629
③ 목록체계팀 E-mail : cagekr@dapa.go.kr
Once the CAGE code is issued for your company, your company is ready to do CMR registration. For CMR registration, please follow the instruction in the solicitation/contract titled ―Accounting for Contract Services.‖ After your company‘s CMR registration application is reviewed by U.S Department of Army. You will receive e-mail notification within 2 to 3 working days whether your CMR registration application is approved or not. If it is disapproved, please read carefully the comments provided by DA and correct registration application as commented. After your company‘s CMR registration is approved, your company is ready to do CMR report. There will be short lesson giving how you report CMR on the web site.
CAGE code 가 발급되면 CMR registration 을 할수가 있읍니다. CMR registration 을 위해서는 두번째 첨부를 참조 바랍니다. 귀사의 CMR registration은 미 국방부 에서 검토하고 그 승인 여부 결과를 이 메일로 귀사에 통보 될것입니다. 만약 승인이 거부되면 승인거부 사유를 잘읽어 보시고, CMR registration 부적격한 부분을 수정하시기 바랍니다. 귀사의 CMR registration 이 승이되면 CMR report 를 할수있게 됩니다.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .