W90VN8-19-R-0038.pdf
PDF 733 KB Posted
- Attached to
- Repair Building B127, CP Bonifas
- Solicitation number
- W90VN819R0038
About this file
SOLICITATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Submittal_Register.pdf | ||
| 2)_Drawing___ARCH.PDF | ||
| 1)_Drawing_files___Title.pdf | ||
| 4)_Drawing___ELEC.PDF | ||
| 7)_Drawing__FIRE.PDF | ||
| 5)_Drawing__MECH.PDF | ||
| 6)_Drawing__STRU.PDF | ||
| 3)_Drawing___CIVIL.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011350265
Replace building trasceivers and Repair building No. 127 at Camp Bonifas (PROJECT# 138581)
1. This is a Request for Proposal (RFP) issued to existing General Construction Multiple Aw ard Indefinite Delivery Indefinite Quantity (IDIQ) holding contract number(s) listed below ; Contract Numbers W91QVN-18-D-0021, 0022, 0023, 0025, 0026, 0027, 0028, 0030, 0031, 0042, 0044, 0045, 0046, 0050, 0051 and 0162.
2. Site Visit: All MATOC contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site Visit. See Section L for the schedule.
3. If the contractor is unable to submit the proposal in response to this solicitation, the Contractor shall submit the "NO OFFER LETTER" by date and time specif ied in this solicitation.
MR. OM, IK-CHUNG 315-722-1385
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Jun-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CSB, KOREA - IMB
UNIT#15289
APO AP 96205
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 724-6977 TEL: FAX:
W90VN819R0038 29
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W90VN819R0038
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job REPLACE BUILDING - K Work
FFP
WORK CLASS: K
PROJECT#: 138581
Replace building trasceivers and Repair Building No 127, Camp Bonifas
- See attached Specification, Approval Material List and Drawing Information.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011350265
PSC CD: Z2AA
NET AMT
0002 1 Job REPLACE BUILDING - L Work
FFP
WORK CLASS: L
PROJECT#: 138581
Replace building trasceivers and Repair Building No 127, Camp Bonifas
- See attached Specification, Approval Material List and Drawing Information.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011350265
0003 1 Lot War Hazard
FFP
Estimated Cost for War Hazard Losses is Zero (0)
FOB: Destination
Section C - Descriptions and Specifications
STATEMENT OF WORK
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
138581 Replace building transceivers Camp Bonifas and repair building No. 127
1. DESCRIPTION: The work to be performed to replace building transceivers and repair building No. 127 is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace existing drainage system with new (concrete ditches). (Drawing No. CG101, CG201, C501)
2.1.1.2. Replace existing site items with new (concrete sidewalk and concrete ditch crossing).
(Drawing No. CS101)
2.1.1.3. Replace existing solid sodding with new. (Drawing No. CG101)
2.1.2. Architectural Work
2.1.2.1. Replace existing floor finish with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.2. Replace existing floor finish with cement mortar bed. (Per finish schedule) (Drawing No.
AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.3. Replace existing concrete slab including finish with new. (Per existing and removal floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.4. Clean existing floor material. (Per finish schedule)
2.1.2.5. Replace existing floor finish with cement mortar bed including waterproofing membrane (Type "D" shower area only). (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.6. Replace existing base with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.7. Clean and paint existing wall. (Per finish schedule)
2.1.2.8. Replace existing wall including finish with new including waterproofing membrane. (Type "D" shower area only). (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.9. Saw-cut existing wall. (Per existing and removal floor plan)
2.1.2.10. Add fire rated Gypsum Wall Board (GWB) wall above all of interior existing Concrete Masonry Unit (CMU) wall. (Per cross sections) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.11. Clean existing wall material. (Per finish schedule)
2.1.2.12. Infill existing wall opening. (Per new floor plan)
2.1.2.13. Replace existing ceiling including ceiling frame with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE103, AE201, AE401, AE601)
2.1.2.14. Remove existing ceiling including ceiling frame.
2.1.2.15. Replace existing roof with new standing seam metal roofing including rigid insulation, self-adhesive vapor, air barrier, protected metal fascia, and 12mm thickness cement board. (Drawing No.
AE001, AE101, AE102, AE103, AE201, AE401, AE601)
2.1.2.16. Replace existing door and door frame with new. (Per new floor plan and door schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)
2.1.2.17. Remove existing door and door frame. (Per existing and removal floor plan)
2.1.2.18. Clean existing window and window frame including insect screen. (Per elevation schedule)
2.1.2.19. Replace existing gutter and downspout with new. (Per roof plan, elevation, and exterior finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401)
2.1.2.20. Remove existing blind. (Per existing and removal floor plan)
2.1.2.21. Replace existing cabinet with new. (Per new floor plan and interior elevation) (Drawing No.
AE001, AE101, AE102, AE201, AE401)
2.1.2.22. Clean and coating existing Exterior Insulation and Finish System (EIFS). (Per exterior elevation)
2.1.2.23. Remove existing louver. (Per existing and removal floor plan)
2.1.2.24. Clean and varnish existing door including clean and paint existing door frame. (Per floor plan)
2.1.2.25. Clean and varnish existing door and door frame at closet. (Per floor plan)
2.1.2.26. Replace existing signage with new. (Per signage schedule) (Drawing No. AE001, AE101, AE102, AE201, AE602)
2.1.2.27. Remove existing shelter. (Per existing and removal floor plan)
2.1.2.28. Replace existing blind with new. (Per floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)
2.1.2.29. Add concrete stoop. (Per new floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)
2.1.2.30. Replace existing louver with new. (Per new floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)
2.1.3. Mechanical Work
2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system
2.1.3.1.1. Replace existing heating hot water boiler, controls, and associated water and fuel oil piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603)
2.1.3.1.2. Replace existing water chiller, controls, and associated piping with new. (Drawing No.
MD101, MH001, MH101, MH102, MH601, MH603)
2.1.3.1.3. Replace existing hot and chilled water circulation pump, expansion tank, air separator, and associated piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH602, MH603)
2.1.3.1.4. Replace existing hot and chilled water piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH603)
2.1.3.1.5. Replace existing exhaust fans, controls, and associated ductwork servicing the toilet rooms with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603, MH604, MH605)
2.1.3.1.6. Replace existing sidewall mounted exhaust fan, controls, and associated ductwork servicing the laundry room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH605)
2.1.3.1.7. Replace existing sidewall mounted exhaust fan and controls servicing the mechanical room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603)
2.1.3.1.8. Replace existing dryer exhaust cap and associated ductwork with new. (Drawing No.
MD101, MH001, MH101, MH102)
2.1.3.1.9. Replace existing finned tube radiators and associated piping with new. (Drawing No.
MD101, MH001, MH101, MH102, MH601)
2.1.3.1.10. Replace existing electric unit heater servicing the mechanical room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH604)
2.1.3.1.11. Replace existing range hoods, exhaust fans, and ductwork with new range hoods including exhaust fans, wet type chemical fire suppression systems, and associated ductwork.
(Drawing No. MD101, MH001, MH101, MH102, MH602)
2.1.3.1.12. Replace existing concrete pad with new for new mechanical equipment. (Drawing No.
MD101, MH001, MH101, MH102)
2.1.3.1.13. All mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of division 23 - mechanical O&MA standard technical specifications for miscellaneous projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.
2.1.3.2. Plumbing system
2.1.3.2.1. Replace existing oil fired domestic hot water heater, hot water storage tank, water circulation pump, and associated water and fuel oil piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP601, PP602)
2.1.3.2.2. Replace existing domestic hot and cold water piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP602)
2.1.3.2.3. Replace existing sewer and vent piping with new. (Drawing No. MH001, PD101, PP101, PP102)
2.1.3.2.4. Replace existing kitchen sink and associated piping in the living rooms with new. (Drawing No. MH001, PD101, PP101, PP102, PP601)
2.1.3.2.5. Replace existing bathroom plumbing fixtures including water closets, showers, and associated piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP601, PP602)
2.1.4. Electrical Work
2.1.4.1. Replace existing light fixtures and wiring with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)
2.1.4.2. Replace existing switches cover plate with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)
2.1.4.3. Replace existing emergency light with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)
2.1.4.4. Replace existing receptacle cover plate with new for building No. 127. (Drawing No. E-001, ED101, EP101, EP601)
2.1.4.5. Replace existing power connection wires, safety switch, and motor starter with new for building No. 127. (Drawing No. E-001, ED101, EP101)
2.1.4.6. Replace existing telephone outlet cover plate with new for building No. 127. (Drawing No. E-
001, ED101, EP101)
2.1.4.7. Replace existing CATV outlet cover plate with new for building No. 127. (Drawing No. E-001, ED101, EP101)
2.1.4.8. Replace existing fire alarm system with new fire and mass control panel, building transmitter, antenna, alarm audio horn and visual signal strobe (15, 75, 110 candela) including clear lens, manual pull stations, wires and conduits for building No. 127. (Drawing No. E-001, FD101, FA101)
2.1.4.9. Remove and reinstall existing ceiling mounted CCTV camera due to the ceiling renovations for building No. 127. But, reuse existing wiring and conduit.
2.1.4.10. Replace fire alarm building transmitters and associated devices with new fire alarm building transmitters sets (7 sets) including antennas, lighting arresters, coaxial cable, and associated wiring and conduit for 7 buildings (Building No. 112, 128, 130, 134, 137, 138, and 139). (Drawing No.
FA102, FA103, FA104)
2.1.5. Structural Work
2.1.5.1. Replace existing concrete slab with new 150mm thickness concrete slab. (Drawing No.
SF102, SF401)
2.1.5.2. Saw cut existing CMU wall.
2.1.5.3. Replace concrete stoop with new. (Drawing No. SF102, SF401, SF501)
2.1.5.4. Block-up existing opening with CMU.
2.1.5.5. Replace existing high roof with new. (Drawing No. SF102, SF401)
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
2.2.1. Civil Work
2.2.1.1. Install concrete pad.
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 23 STEEL JOIST GIRDER FRAMING
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 49 CARBON MONOXIDE DETECTORS
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. Material Approval Submittal:
(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.
(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.
2. The contractor shall have personnel on site for the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificate in Korea is the following which is issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have personnel who are certified for (1) below.
(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)
3. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention
Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.
Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil
B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
http://jko.jten.mil/
Section F - Deliveries or Performance
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days including 90 days for procuremnt of US materials after Notice to proceed (NTP) is issed.
* The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section J - List of Documents, Exhibits and Other Attachments
DRAWING INFORMATION
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
and repair building No. 127
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 G-001 TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS
REFERENCING CONVENTIONS
22 APR 19
2 G-002 PROJECT LOCATION PLAN 22 APR 19
3 G-003 ABBREVIATIONS, NOTES, LEGEND & SCOPE OF
WORK (CIVIL)
22 APR 19
4 G-004 ABBREVIATION, MATERIAL INDICATIONS & SYMBOLS
(ARCHITECTURAL)
22 APR 19
5 G-005 LEGEND & ABBREVIATION (MECHANICAL) 22 APR 19
6 G-006 LEGEND AND ABBREVIATIONS (ELECTRICAL) 22 APR 19
7 G-007 GENERAL NOTES-1 (ELECTRICAL) 22 APR 19
8 G-008 GENERAL NOTES-2 (ELECTRICAL) 22 APR 19
CIVIL
9 CD101 REMOVAL PLAN 22 APR 19
10 CS101 SITE LAYOUT PLAN 22 APR 19
11 CG101 DRAINAGE PLAN 22 APR 19
12 CG201 DRAIN LINE PROFILE 22 APR 19
13 C-501 MISC DETAILS 22 APR 19
ARCHITECTURAL
14 AE001 GENERAL NOTES & SCOPE OF WORK 22 APR 19
15 AE002 LIFE SAFETY PLAN 22 APR 19
A-1
16 AE101 EXISTING/REMOVAL FLOOR PLAN 22 APR 19
17 AE102 NEW FLOOR & ROOF PLANS 22 APR 19
18 AE103 REFLECTED CEILING PLAN 22 APR 19
19 AE201 ELEVATIONS & CROSS SECTIONS 22 APR 19
20 AE401 EXTERIOR WALL SECTIONS & INTERIOR ELEVATION 22 APR 19
21 AE601 EXTERIOR/ INTERIOR FINISH SCHEDULE &
MATERIAL/ COLOR SCHEDULE
22 APR 19
22 AE602 SIGNAGE NUMBERING PLAN, SCHEDULE, TYPE &
DETAIL
22 APR 19
23 AE603 DOOR/ LOUVER NUMBERING PLAN, SCHEDULE,
TYPE & DOOR HARDWARE SCHEDULE
22 APR 19
STRUCTURAL
24 SF001 GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS 22 APR 19
25 SF101 EXISTING/REMOVAL GROUND FLOOR & ROOF
FRAMING PLANS
22 APR 19
26 SF102 NEW GROUND FLOOR & ROOF FRAMING PLANS 22 APR 19
27 SF401 BUILDING CROSS SECTIONS 22 APR 19
28 SF501 MISC. DETAILS 22 APR 19
MECHANICAL
29 MH001 GENERAL NOTES & SCOPE OF WORK 22 APR 19
30 MD101 EXISTING / REMOVAL HVAC PLAN 22 APR 19
31 MH101 NEW HVAC DUCT PLAN 22 APR 19
32 MH102 NEW HVAC PIPING PLAN 22 APR 19
33 MH601 MECHANICAL EQUIPMENT SCHEDULE-1 22 APR 19
34 MH602 MECHANICAL EQUIPMENT SCHEDULE-2 22 APR 19
35 MH603 HVAC SYSTEM CONTROL DIAGRAM-1 22 APR 19
36 MH604 HVAC SYSTEM CONTROL DIAGRAM-2 22 APR 19
37 MH605 HVAC SYSTEM CONTROL DIAGRAM-3 22 APR 19
38 PD101 EXISTING / REMOVAL PLUMBING PIPING PLAN 22 APR 19
39 PP101 NEW PLUMBING PIPING PLAN-1 (DCW & DHW PIPING 22 APR 19
40 PP102 NEW PLUMBING PIPING PLAN-2 (VENT & SEWER
PIPING
22 APR 19
41 PP601 PLUMBING EQUIPMENT SCHEDULE 22 APR 19
42 PP602 PLUMBING SYSTEM CONTROL DIAGRAM 22 APR 19
ELECTRICAL
43 E-001 SCOPE OF WORK 22 APR 19
44 ED101 REMOVAL/EXIST ELECTRICAL PLAN 22 APR 19
45 EL101 NEW LIGHTING PLAN 22 APR 19
A-2
46 EL501 NON-STANDARD LIGHT FIXTURE DETAILS 22 APR 19
47 EL601 LIGHT FIXTURE SCHEDULE 22 APR 19
48 EP101 NEW/EXIST ELECTRICAL PLAN 22 APR 19
49 EP601 LOAD SCHEDULES AND CONN. DIAGRAM 22 APR 19
FIRE PROTECTION
50 FD101 REMOVAL FIRE ALARM SYSTEM PLAN 22 APR 19
51 FA101 NEW FIRE ALARM SYSTEM PLAN 22 APR 19
52 FA102 BUILDING TRANSMITTER LOCATION LAYOUT PLAN 22 APR 19
53 FA103 FIRE ALARM BUILDING TRANSMITTER(BT)
REPLACEMENT SCHEDULE
22 APR 19
54 FA104 FA ANTENNA MOUNTING DETAIL & BUILDING
TRANSMITTER CONNECTION DIAGRAM
22 APR 19
SUBMITTAL REGISTER
- SEE ATTACHED SUBMITTAL REGISTER.
MATERIAL LIST FOR APPROVAL
APPENDIX "B"
List of materials for Material Approval Submittal
Submittal Identification
Description of Submittal
LC-1 Concrete "A"=3500psi=240kgf/cm2
LC-2 Deformed Re-Bar, LA-1 SSMR ROOF PANEL
LA-2 PROTECTED METAL SHT, 24 Ga.
LA-3 SELF-ADHESIVE AIR & VAPOR BARRIER MEMBRANE
LA-4 RIGID INSUL BOARD
LA-5 TERA COAT (TOP COAT) ON EXST EIFS
LA-6 CEMENT BOARD, 1,220 x 2,440 x 12T
LA-7 STEEL & WOODEN DOORS
LA-8 HINGES, BUTTS, 114x114, A5111
LA-9 HINGES, BUTTS, 114x114, A5112, NRP
LA-10 LOCKSET, 1000-1 F02
LA-11 LOCKSET, 1000-1 F07
LA-12 LOCKSET, 4000-1 F86
LA-13 EXIT DEVICES, TYPE 1, F08 (Lever type)
LA-14 FLUSH BOLT:LEVER EXTEN.L04081
LA-15 CLOSER, C02011
LA-16 CLOSER, C02021
LA-17 DOOR STOPS, L01371
LA-18 DOOR STOPS, L02141
LA-19 DOOR STOPS, L02161
LA-20 PROTECTED PLATE, J102
LA-21 DUSTPRF STRIKE: L04011
LA-22 WEATHERSTRIP for SGL R0Y 164/414
LA-23 WEATHERSTRIP for DBL R0Y 164/414
LA-24 PUSH PLATE, J301
LA-25 PULL PLATE, J403
LA-26 THRESHOLD, J32100 /SGL.
B-1
Identification
Description of Submittal
LA-27 G.W.B., WALL, TYPE "X" 15.9mm Thk. 1 Hr.F.R
LA-28 G.W.B., CLG., Regular, 12mm Thk.
LA-29 G.W.B., CLG., Water Resistant, 12mm Thk.
LA-30 HARDENER
LA-31 FLOOR CERAMIC TILE
LA-32 GCWT
LA-33 Vinyl Composition Tile, 300x300x3mm
LA-34 Vinyl Cove Base, 100mm Hght.
LA-35 ACST. CLG. TEX, AL FACED
LA-36 LAVATORY BASE CABINET & PLYWD. MIRROR PANEL. W/PLASTIC
LAMINATED (PL-1) FINISH
LA-37 SOLID SURFACING MATERIAL COUNTER TOP
LA-38 KITCHEN WALL, BASE CABINET & PLASTIC LAMINATED (PL-2) FINISH
LA-39 PAINT, Latex/Eggshell
LA-40 PAINT, Epoxy/Gloss
LA-41 PAINT, Alkyd-Semi gloss
LA-42 PAINT, OIL
LA-43 INTERIOR & EXTERIOR SIGNAGE
LM-1 WATER CHILLER
LM-2 SPLIT SYSTEM AIR CONDITIONING UNIT
LM-3 EXPANSION TANK
LM-4 AIR SEPARATOR
LM-5 FAN COIL UNIT
LM-6 GALV. STL SHT
LM-7 DRYER FLEX. HOSE
LM-8 GOOSE NECK W/BIRD SCREEN
LM-9 WALL CAP
LM-10 COPPER TUBE INCLUDING ACCESSORIES , VARIOUS SIZE
LM-11 BLACK STL PIPE INCLUDING ACCESSORIES, VARIOUS SIZE
LM-12 PIPE INSULATION , VARIOUS SIZE
LM-13 BALL CHECK VALVE
LM-14 AUTO SAFETY SHUT-OFF VALVE
LM-15 OIL FILTER
LM-16 COPPER PIPE FLANGE
LM-17 PIPE FLANGE
LM-18 PIPE HANGER
LM-19 CHEMICAL FEEDER
B-2
Identification
Description of Submittal
LM-20 FLOW SWITCH
LM-21 DOMESTIC HOT WATER STORAGE TANK
LM-22 WATER CLOSET
LM-23 KITCHEN SINK
LM-24 SHOWER (W/HEAD)
LM-25 PRESSURE RELIEF VALVE
LM-26 AUTO AIR VENT
LM-27 CAST IRON PIPE INCLUDING ACCESSORIES, VARIOUS SIZE
LM-28 STACK
OM-1 HOT WATER BOILER
OM-2 PUMP
OM-3 FANS
OM-4 ELECTRIC UNIT HEATER
OM-5 ELECTRIC WALL HEATER
OM-6 RANGE HOODS
OM-7 MOTORIZED DAMPER
OM-8 BACK DRAFT DAMPER
OM-9 INTAKE LOUVER W/BIRD SCREEN
OM-10 3-WAY CONTROL VALVE
OM-11 2-WAY CONTROL VALVE
OM-12 SUCTION DIFFUSER
OM-13 PRESSURE GAGE
OM-14 THERMOMETER
OM-15 DOMESTIC HOT WATER HEATER
OM-16 THERMOSTATIC MIXING VALVE
OM-17 BACKFLOW PREVENTER ASS'Y
OM-18 PRESSURE REDUCING VALVE
OM-19 HOSE BIBB
OM-20 WATER METER
LE-1 Lighting fixture, exit sign stencil face LED, red lamp, LED lamp, type "NS-3a"
LE-2 LED lighting fixture, "NS-4a & 4b"
LE-3 LED lighting fixture , "NS-5"
LE-4 LED lighting fixture, "NS-6a & 6b"
LE-5 LED lighting fixture , "NS-7"
LE-6 LED lighting fixture , "NS-8"
LE-7 LED lighting fixture, "NS-9a & 9b"
LE-8 LED lighting fixture , "NS-10"
B-3
Identification
Description of Submittal
LE-9 Electric wires various
LE-10 Rigid steel conduit various
LE-11 Shop drawing for fire alarm control system
OE-1 Duplex receptacle, w/plate, 2P-20A-125VAC, gnd. Type
OE-2 Single receptacle, w/plate, 2P-20A-125VAC, gnd. Type
OE-3 Duplex receptacle, w/plate, 2P-20A-125VAC, GFCI Type
OE-3 Toggle switch, w/plate, 1P-20A-120VAC
OE-4 3-way toggle switch, w/plate, 1P-20A-120VAC
OE-5 Combination type Magnetic motor starter-A (1P-100AF-20AT), 3P-208VAC-60Hz NEMA size "0", NEMA 1 Encl.
OE-6 Combination type Magnetic motor starter-A (3P-100AF-20AT), 3P-208VAC-60Hz NEMA size "0", NEMA 1 Encl.
OE-7 Safety switch, 3PST, 240, 30A, fuses, NEMA 3R Encl.
OE-8 Safety switch, 3PST, 240, 100A, fuses, NEMA 3R Encl.
OE-9 Safety switch-B, DPST, 240V, 30A, non-fusible, NEMA 3r Encl.
OE-10 Manual motor starter, 2P-120V, 1HP(max.), NEMA 1 Encl.
OE-11 Circuit breakers
OE-12 Manual motor starter, 2P-120V, 1HP(max.), NEMA 1 Encl.
OE-13 Panelboard "M1"
OE-14 Addressable fire alarm/mass notification control panel
OE-15 Building Transmitter, BT-XM or approved equal
OE-16 Addressable smoke detector w/sound base
OE-17 Combination fire alarm & MNS Speaker/Strobe
OE-18 Combination fire alarm & MNS Speaker "WP"
OE-19 Addressable module
OE-20 Addressable manual pull station
OE-21 Addressable carbon monoxide detector
OE-22 VHF-FM Antenna, BSA-1 type
OE-23 Lighting arrestor, LA-1 w/Encl
OE-24 Coaxial cable, w/connector, type 1 and 2
OE-25 CATV outlet
LC-1 Concrete 3040kgf/cm2
LC-2 Deformed Re-Bar, LC-3 CONCRETE BLOCK, 8"T(190x190x390)
LC-4 H-125x125x6x9
LC-5 C-200x80x7.5x11
B-4
Section K - Representations, Certifications and Other Statements of Offerors
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
(a) The offeror certifies that --
(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –
(i) Those prices,
(ii) The intention to submit an offer, or
(iii) The methods of factors used to calculate the prices offered:
(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --
(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or
(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and
(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs
(a)(1) through (a)(3) of this provision.
(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
(End of Provision)
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations
Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS
(a) SUBCONTRACTING:
If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or
ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.
(b) AFFILIATED OFFERORS:
(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.
(2) Each offeror shall furnish, below, the following information:
(i) Whether the offeror has any affiliates;
(ii) The names and addresses of all affiliates of the offeror; and
(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.
AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)
(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):
Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.
(d) STANDARDS OF CONDUCT CERTIFICATION:
This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.
(i) Name ______________________________________________
Former rank/grade ____________________________________
Last US Government position ___________________________
(ii) Name ______________________________________________
(iii) Name ______________________________________________
Firm ____________________________________________________
Name _____________________________________________________
Signature __________________________________________________
Title _____________________________________________________
Date of Execution ____________________________________________
(e) TAXES:
(1) References:
(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
This item will be imported specifically for this contract? Yes _____ No _____
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. 10% _____
Input VAT on transportation leased/rented for this contract.10% _____
Input VAT on equipment leased/rented for this contract. 10% _____
Input VAT on services purchased for this contract. 10% _____
Output VAT on total contract amount. 10% _____
(iv) Special Excise (Petroleum) Tax:
No. of U/P
Liters w/o Tax Tax/Unit Total Tax Amount
Regular Gasoline ________ (L) ________ w________ w_____________
Premium Gasoline ________ (L) ________ w________ w_____________
Diesel ________ (L) ________ w________ w_____________
Other ________ (L) ________ w________ w_____________
(v) Education Tax.
(3) Name of the oil company from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.
Signed (Chop)
(f) CERTIFICATIONS AND REPRESENTATIONS
By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.
The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.
Section L - Instructions, Conditions and Notices to Bidders
INSTRUCTION TO OFFEROR
1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL
a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-
1(f)(4).
b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
2. SUBMISSION OF PROPSAL
a. FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ikchung.om2.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/ problem. All questions should be emailed to ikchung.om2.ln@mail.mil within five
(5) days after the solicitation is issued.
b. CLOSING DATE: The electronic offer shall be submitted by 1300 hrs on the closing date of RFP.
3. SUBMISSION REQUIREMENTS
a. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in
Section B - Supplies or Services and Prices.
b. DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.
c. SECTION K - Representations, Certifications and Other Statements of Offerors
d. SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.
e. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.
f. COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant.
This is the start of the file's text. The full file is on GovTribe.