W90VN8-19-R-0038.pdf

PDF 733 KB Posted

Attached to
Repair Building B127, CP Bonifas
Solicitation number
W90VN819R0038
Issued by

About this file

SOLICITATION

View the file

Other files

File Type Posted
Submittal_Register.pdf PDF
2)_Drawing___ARCH.PDF PDF
1)_Drawing_files___Title.pdf PDF
4)_Drawing___ELEC.PDF PDF
7)_Drawing__FIRE.PDF PDF
5)_Drawing__MECH.PDF PDF
6)_Drawing__STRU.PDF PDF
3)_Drawing___CIVIL.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011350265

Replace building trasceivers and Repair building No. 127 at Camp Bonifas (PROJECT# 138581)

1. This is a Request for Proposal (RFP) issued to existing General Construction Multiple Aw ard Indefinite Delivery Indefinite Quantity (IDIQ) holding contract number(s) listed below ; Contract Numbers W91QVN-18-D-0021, 0022, 0023, 0025, 0026, 0027, 0028, 0030, 0031, 0042, 0044, 0045, 0046, 0050, 0051 and 0162.

2. Site Visit: All MATOC contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site Visit. See Section L for the schedule.

3. If the contractor is unable to submit the proposal in response to this solicitation, the Contractor shall submit the "NO OFFER LETTER" by date and time specif ied in this solicitation.

MR. OM, IK-CHUNG 315-722-1385

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jun-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________24 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CSB, KOREA - IMB

UNIT#15289

APO AP 96205

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 724-6977 TEL: FAX:

W90VN819R0038 29

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN819R0038

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job REPLACE BUILDING - K Work

FFP

WORK CLASS: K

PROJECT#: 138581

Replace building trasceivers and Repair Building No 127, Camp Bonifas

- See attached Specification, Approval Material List and Drawing Information.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011350265

PSC CD: Z2AA

NET AMT

0002 1 Job REPLACE BUILDING - L Work

FFP

WORK CLASS: L

PROJECT#: 138581

Replace building trasceivers and Repair Building No 127, Camp Bonifas

- See attached Specification, Approval Material List and Drawing Information.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011350265

0003 1 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero (0)

FOB: Destination

Section C - Descriptions and Specifications

STATEMENT OF WORK

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

138581 Replace building transceivers Camp Bonifas and repair building No. 127

1. DESCRIPTION: The work to be performed to replace building transceivers and repair building No. 127 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace existing drainage system with new (concrete ditches). (Drawing No. CG101, CG201, C501)

2.1.1.2. Replace existing site items with new (concrete sidewalk and concrete ditch crossing).

(Drawing No. CS101)

2.1.1.3. Replace existing solid sodding with new. (Drawing No. CG101)

2.1.2. Architectural Work

2.1.2.1. Replace existing floor finish with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.2. Replace existing floor finish with cement mortar bed. (Per finish schedule) (Drawing No.

AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.3. Replace existing concrete slab including finish with new. (Per existing and removal floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.4. Clean existing floor material. (Per finish schedule)

2.1.2.5. Replace existing floor finish with cement mortar bed including waterproofing membrane (Type "D" shower area only). (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.6. Replace existing base with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.7. Clean and paint existing wall. (Per finish schedule)

2.1.2.8. Replace existing wall including finish with new including waterproofing membrane. (Type "D" shower area only). (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.9. Saw-cut existing wall. (Per existing and removal floor plan)

2.1.2.10. Add fire rated Gypsum Wall Board (GWB) wall above all of interior existing Concrete Masonry Unit (CMU) wall. (Per cross sections) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.11. Clean existing wall material. (Per finish schedule)

2.1.2.12. Infill existing wall opening. (Per new floor plan)

2.1.2.13. Replace existing ceiling including ceiling frame with new. (Per finish schedule) (Drawing No. AE001, AE101, AE102, AE103, AE201, AE401, AE601)

2.1.2.14. Remove existing ceiling including ceiling frame.

2.1.2.15. Replace existing roof with new standing seam metal roofing including rigid insulation, self-adhesive vapor, air barrier, protected metal fascia, and 12mm thickness cement board. (Drawing No.

AE001, AE101, AE102, AE103, AE201, AE401, AE601)

2.1.2.16. Replace existing door and door frame with new. (Per new floor plan and door schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)

2.1.2.17. Remove existing door and door frame. (Per existing and removal floor plan)

2.1.2.18. Clean existing window and window frame including insect screen. (Per elevation schedule)

2.1.2.19. Replace existing gutter and downspout with new. (Per roof plan, elevation, and exterior finish schedule) (Drawing No. AE001, AE101, AE102, AE201, AE401)

2.1.2.20. Remove existing blind. (Per existing and removal floor plan)

2.1.2.21. Replace existing cabinet with new. (Per new floor plan and interior elevation) (Drawing No.

AE001, AE101, AE102, AE201, AE401)

2.1.2.22. Clean and coating existing Exterior Insulation and Finish System (EIFS). (Per exterior elevation)

2.1.2.23. Remove existing louver. (Per existing and removal floor plan)

2.1.2.24. Clean and varnish existing door including clean and paint existing door frame. (Per floor plan)

2.1.2.25. Clean and varnish existing door and door frame at closet. (Per floor plan)

2.1.2.26. Replace existing signage with new. (Per signage schedule) (Drawing No. AE001, AE101, AE102, AE201, AE602)

2.1.2.27. Remove existing shelter. (Per existing and removal floor plan)

2.1.2.28. Replace existing blind with new. (Per floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)

2.1.2.29. Add concrete stoop. (Per new floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE601)

2.1.2.30. Replace existing louver with new. (Per new floor plan) (Drawing No. AE001, AE101, AE102, AE201, AE401, AE603)

2.1.3. Mechanical Work

2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system

2.1.3.1.1. Replace existing heating hot water boiler, controls, and associated water and fuel oil piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603)

2.1.3.1.2. Replace existing water chiller, controls, and associated piping with new. (Drawing No.

MD101, MH001, MH101, MH102, MH601, MH603)

2.1.3.1.3. Replace existing hot and chilled water circulation pump, expansion tank, air separator, and associated piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH602, MH603)

2.1.3.1.4. Replace existing hot and chilled water piping with new. (Drawing No. MD101, MH001, MH101, MH102, MH603)

2.1.3.1.5. Replace existing exhaust fans, controls, and associated ductwork servicing the toilet rooms with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603, MH604, MH605)

2.1.3.1.6. Replace existing sidewall mounted exhaust fan, controls, and associated ductwork servicing the laundry room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH605)

2.1.3.1.7. Replace existing sidewall mounted exhaust fan and controls servicing the mechanical room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH603)

2.1.3.1.8. Replace existing dryer exhaust cap and associated ductwork with new. (Drawing No.

MD101, MH001, MH101, MH102)

2.1.3.1.9. Replace existing finned tube radiators and associated piping with new. (Drawing No.

MD101, MH001, MH101, MH102, MH601)

2.1.3.1.10. Replace existing electric unit heater servicing the mechanical room with new. (Drawing No. MD101, MH001, MH101, MH102, MH601, MH604)

2.1.3.1.11. Replace existing range hoods, exhaust fans, and ductwork with new range hoods including exhaust fans, wet type chemical fire suppression systems, and associated ductwork.

(Drawing No. MD101, MH001, MH101, MH102, MH602)

2.1.3.1.12. Replace existing concrete pad with new for new mechanical equipment. (Drawing No.

MD101, MH001, MH101, MH102)

2.1.3.1.13. All mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of division 23 - mechanical O&MA standard technical specifications for miscellaneous projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.

2.1.3.2. Plumbing system

2.1.3.2.1. Replace existing oil fired domestic hot water heater, hot water storage tank, water circulation pump, and associated water and fuel oil piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP601, PP602)

2.1.3.2.2. Replace existing domestic hot and cold water piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP602)

2.1.3.2.3. Replace existing sewer and vent piping with new. (Drawing No. MH001, PD101, PP101, PP102)

2.1.3.2.4. Replace existing kitchen sink and associated piping in the living rooms with new. (Drawing No. MH001, PD101, PP101, PP102, PP601)

2.1.3.2.5. Replace existing bathroom plumbing fixtures including water closets, showers, and associated piping with new. (Drawing No. MH001, PD101, PP101, PP102, PP601, PP602)

2.1.4. Electrical Work

2.1.4.1. Replace existing light fixtures and wiring with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)

2.1.4.2. Replace existing switches cover plate with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)

2.1.4.3. Replace existing emergency light with new for building No. 127. (Drawing No. E-001, ED101, EL101, EL501, EL601)

2.1.4.4. Replace existing receptacle cover plate with new for building No. 127. (Drawing No. E-001, ED101, EP101, EP601)

2.1.4.5. Replace existing power connection wires, safety switch, and motor starter with new for building No. 127. (Drawing No. E-001, ED101, EP101)

2.1.4.6. Replace existing telephone outlet cover plate with new for building No. 127. (Drawing No. E-

001, ED101, EP101)

2.1.4.7. Replace existing CATV outlet cover plate with new for building No. 127. (Drawing No. E-001, ED101, EP101)

2.1.4.8. Replace existing fire alarm system with new fire and mass control panel, building transmitter, antenna, alarm audio horn and visual signal strobe (15, 75, 110 candela) including clear lens, manual pull stations, wires and conduits for building No. 127. (Drawing No. E-001, FD101, FA101)

2.1.4.9. Remove and reinstall existing ceiling mounted CCTV camera due to the ceiling renovations for building No. 127. But, reuse existing wiring and conduit.

2.1.4.10. Replace fire alarm building transmitters and associated devices with new fire alarm building transmitters sets (7 sets) including antennas, lighting arresters, coaxial cable, and associated wiring and conduit for 7 buildings (Building No. 112, 128, 130, 134, 137, 138, and 139). (Drawing No.

FA102, FA103, FA104)

2.1.5. Structural Work

2.1.5.1. Replace existing concrete slab with new 150mm thickness concrete slab. (Drawing No.

SF102, SF401)

2.1.5.2. Saw cut existing CMU wall.

2.1.5.3. Replace concrete stoop with new. (Drawing No. SF102, SF401, SF501)

2.1.5.4. Block-up existing opening with CMU.

2.1.5.5. Replace existing high roof with new. (Drawing No. SF102, SF401)

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install concrete pad.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

The Standard Technical Detail Specifications:

The work shall conform to the most current version of the listed standards/specifications below.

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED

MATERIAL

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS

MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET

HOUSING & CHILD OCCUPIED FACILITIES

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 21 23 STEEL JOIST GIRDER FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 – FURNISHINGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 52 00 HEATING BOILERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 49 CARBON MONOXIDE DETECTORS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. Material Approval Submittal:

(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.

(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.

2. The contractor shall have personnel on site for the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificate in Korea is the following which is issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have personnel who are certified for (1) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

3. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention

Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

http://jko.jten.mil/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days including 90 days for procuremnt of US materials after Notice to proceed (NTP) is issed.

* The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

DRAWING INFORMATION

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

and repair building No. 127

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 G-001 TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS

REFERENCING CONVENTIONS

22 APR 19

2 G-002 PROJECT LOCATION PLAN 22 APR 19

3 G-003 ABBREVIATIONS, NOTES, LEGEND & SCOPE OF

WORK (CIVIL)

22 APR 19

4 G-004 ABBREVIATION, MATERIAL INDICATIONS & SYMBOLS

(ARCHITECTURAL)

22 APR 19

5 G-005 LEGEND & ABBREVIATION (MECHANICAL) 22 APR 19

6 G-006 LEGEND AND ABBREVIATIONS (ELECTRICAL) 22 APR 19

7 G-007 GENERAL NOTES-1 (ELECTRICAL) 22 APR 19

8 G-008 GENERAL NOTES-2 (ELECTRICAL) 22 APR 19

CIVIL

9 CD101 REMOVAL PLAN 22 APR 19

10 CS101 SITE LAYOUT PLAN 22 APR 19

11 CG101 DRAINAGE PLAN 22 APR 19

12 CG201 DRAIN LINE PROFILE 22 APR 19

13 C-501 MISC DETAILS 22 APR 19

ARCHITECTURAL

14 AE001 GENERAL NOTES & SCOPE OF WORK 22 APR 19

15 AE002 LIFE SAFETY PLAN 22 APR 19

A-1

16 AE101 EXISTING/REMOVAL FLOOR PLAN 22 APR 19

17 AE102 NEW FLOOR & ROOF PLANS 22 APR 19

18 AE103 REFLECTED CEILING PLAN 22 APR 19

19 AE201 ELEVATIONS & CROSS SECTIONS 22 APR 19

20 AE401 EXTERIOR WALL SECTIONS & INTERIOR ELEVATION 22 APR 19

21 AE601 EXTERIOR/ INTERIOR FINISH SCHEDULE &

MATERIAL/ COLOR SCHEDULE

22 APR 19

22 AE602 SIGNAGE NUMBERING PLAN, SCHEDULE, TYPE &

DETAIL

22 APR 19

23 AE603 DOOR/ LOUVER NUMBERING PLAN, SCHEDULE,

TYPE & DOOR HARDWARE SCHEDULE

22 APR 19

STRUCTURAL

24 SF001 GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS 22 APR 19

25 SF101 EXISTING/REMOVAL GROUND FLOOR & ROOF

FRAMING PLANS

22 APR 19

26 SF102 NEW GROUND FLOOR & ROOF FRAMING PLANS 22 APR 19

27 SF401 BUILDING CROSS SECTIONS 22 APR 19

28 SF501 MISC. DETAILS 22 APR 19

MECHANICAL

29 MH001 GENERAL NOTES & SCOPE OF WORK 22 APR 19

30 MD101 EXISTING / REMOVAL HVAC PLAN 22 APR 19

31 MH101 NEW HVAC DUCT PLAN 22 APR 19

32 MH102 NEW HVAC PIPING PLAN 22 APR 19

33 MH601 MECHANICAL EQUIPMENT SCHEDULE-1 22 APR 19

34 MH602 MECHANICAL EQUIPMENT SCHEDULE-2 22 APR 19

35 MH603 HVAC SYSTEM CONTROL DIAGRAM-1 22 APR 19

36 MH604 HVAC SYSTEM CONTROL DIAGRAM-2 22 APR 19

37 MH605 HVAC SYSTEM CONTROL DIAGRAM-3 22 APR 19

38 PD101 EXISTING / REMOVAL PLUMBING PIPING PLAN 22 APR 19

39 PP101 NEW PLUMBING PIPING PLAN-1 (DCW & DHW PIPING 22 APR 19

40 PP102 NEW PLUMBING PIPING PLAN-2 (VENT & SEWER

PIPING

22 APR 19

41 PP601 PLUMBING EQUIPMENT SCHEDULE 22 APR 19

42 PP602 PLUMBING SYSTEM CONTROL DIAGRAM 22 APR 19

ELECTRICAL

43 E-001 SCOPE OF WORK 22 APR 19

44 ED101 REMOVAL/EXIST ELECTRICAL PLAN 22 APR 19

45 EL101 NEW LIGHTING PLAN 22 APR 19

A-2

46 EL501 NON-STANDARD LIGHT FIXTURE DETAILS 22 APR 19

47 EL601 LIGHT FIXTURE SCHEDULE 22 APR 19

48 EP101 NEW/EXIST ELECTRICAL PLAN 22 APR 19

49 EP601 LOAD SCHEDULES AND CONN. DIAGRAM 22 APR 19

FIRE PROTECTION

50 FD101 REMOVAL FIRE ALARM SYSTEM PLAN 22 APR 19

51 FA101 NEW FIRE ALARM SYSTEM PLAN 22 APR 19

52 FA102 BUILDING TRANSMITTER LOCATION LAYOUT PLAN 22 APR 19

53 FA103 FIRE ALARM BUILDING TRANSMITTER(BT)

REPLACEMENT SCHEDULE

22 APR 19

54 FA104 FA ANTENNA MOUNTING DETAIL & BUILDING

TRANSMITTER CONNECTION DIAGRAM

22 APR 19

SUBMITTAL REGISTER

- SEE ATTACHED SUBMITTAL REGISTER.

MATERIAL LIST FOR APPROVAL

APPENDIX "B"

List of materials for Material Approval Submittal

Submittal Identification

Description of Submittal

LC-1 Concrete "A"=3500psi=240kgf/cm2

LC-2 Deformed Re-Bar, LA-1 SSMR ROOF PANEL

LA-2 PROTECTED METAL SHT, 24 Ga.

LA-3 SELF-ADHESIVE AIR & VAPOR BARRIER MEMBRANE

LA-4 RIGID INSUL BOARD

LA-5 TERA COAT (TOP COAT) ON EXST EIFS

LA-6 CEMENT BOARD, 1,220 x 2,440 x 12T

LA-7 STEEL & WOODEN DOORS

LA-8 HINGES, BUTTS, 114x114, A5111

LA-9 HINGES, BUTTS, 114x114, A5112, NRP

LA-10 LOCKSET, 1000-1 F02

LA-11 LOCKSET, 1000-1 F07

LA-12 LOCKSET, 4000-1 F86

LA-13 EXIT DEVICES, TYPE 1, F08 (Lever type)

LA-14 FLUSH BOLT:LEVER EXTEN.L04081

LA-15 CLOSER, C02011

LA-16 CLOSER, C02021

LA-17 DOOR STOPS, L01371

LA-18 DOOR STOPS, L02141

LA-19 DOOR STOPS, L02161

LA-20 PROTECTED PLATE, J102

LA-21 DUSTPRF STRIKE: L04011

LA-22 WEATHERSTRIP for SGL R0Y 164/414

LA-23 WEATHERSTRIP for DBL R0Y 164/414

LA-24 PUSH PLATE, J301

LA-25 PULL PLATE, J403

LA-26 THRESHOLD, J32100 /SGL.

B-1

Identification

Description of Submittal

LA-27 G.W.B., WALL, TYPE "X" 15.9mm Thk. 1 Hr.F.R

LA-28 G.W.B., CLG., Regular, 12mm Thk.

LA-29 G.W.B., CLG., Water Resistant, 12mm Thk.

LA-30 HARDENER

LA-31 FLOOR CERAMIC TILE

LA-32 GCWT

LA-33 Vinyl Composition Tile, 300x300x3mm

LA-34 Vinyl Cove Base, 100mm Hght.

LA-35 ACST. CLG. TEX, AL FACED

LA-36 LAVATORY BASE CABINET & PLYWD. MIRROR PANEL. W/PLASTIC

LAMINATED (PL-1) FINISH

LA-37 SOLID SURFACING MATERIAL COUNTER TOP

LA-38 KITCHEN WALL, BASE CABINET & PLASTIC LAMINATED (PL-2) FINISH

LA-39 PAINT, Latex/Eggshell

LA-40 PAINT, Epoxy/Gloss

LA-41 PAINT, Alkyd-Semi gloss

LA-42 PAINT, OIL

LA-43 INTERIOR & EXTERIOR SIGNAGE

LM-1 WATER CHILLER

LM-2 SPLIT SYSTEM AIR CONDITIONING UNIT

LM-3 EXPANSION TANK

LM-4 AIR SEPARATOR

LM-5 FAN COIL UNIT

LM-6 GALV. STL SHT

LM-7 DRYER FLEX. HOSE

LM-8 GOOSE NECK W/BIRD SCREEN

LM-9 WALL CAP

LM-10 COPPER TUBE INCLUDING ACCESSORIES , VARIOUS SIZE

LM-11 BLACK STL PIPE INCLUDING ACCESSORIES, VARIOUS SIZE

LM-12 PIPE INSULATION , VARIOUS SIZE

LM-13 BALL CHECK VALVE

LM-14 AUTO SAFETY SHUT-OFF VALVE

LM-15 OIL FILTER

LM-16 COPPER PIPE FLANGE

LM-17 PIPE FLANGE

LM-18 PIPE HANGER

LM-19 CHEMICAL FEEDER

B-2

Identification

Description of Submittal

LM-20 FLOW SWITCH

LM-21 DOMESTIC HOT WATER STORAGE TANK

LM-22 WATER CLOSET

LM-23 KITCHEN SINK

LM-24 SHOWER (W/HEAD)

LM-25 PRESSURE RELIEF VALVE

LM-26 AUTO AIR VENT

LM-27 CAST IRON PIPE INCLUDING ACCESSORIES, VARIOUS SIZE

LM-28 STACK

OM-1 HOT WATER BOILER

OM-2 PUMP

OM-3 FANS

OM-4 ELECTRIC UNIT HEATER

OM-5 ELECTRIC WALL HEATER

OM-6 RANGE HOODS

OM-7 MOTORIZED DAMPER

OM-8 BACK DRAFT DAMPER

OM-9 INTAKE LOUVER W/BIRD SCREEN

OM-10 3-WAY CONTROL VALVE

OM-11 2-WAY CONTROL VALVE

OM-12 SUCTION DIFFUSER

OM-13 PRESSURE GAGE

OM-14 THERMOMETER

OM-15 DOMESTIC HOT WATER HEATER

OM-16 THERMOSTATIC MIXING VALVE

OM-17 BACKFLOW PREVENTER ASS'Y

OM-18 PRESSURE REDUCING VALVE

OM-19 HOSE BIBB

OM-20 WATER METER

LE-1 Lighting fixture, exit sign stencil face LED, red lamp, LED lamp, type "NS-3a"

LE-2 LED lighting fixture, "NS-4a & 4b"

LE-3 LED lighting fixture , "NS-5"

LE-4 LED lighting fixture, "NS-6a & 6b"

LE-5 LED lighting fixture , "NS-7"

LE-6 LED lighting fixture , "NS-8"

LE-7 LED lighting fixture, "NS-9a & 9b"

LE-8 LED lighting fixture , "NS-10"

B-3

Identification

Description of Submittal

LE-9 Electric wires various

LE-10 Rigid steel conduit various

LE-11 Shop drawing for fire alarm control system

OE-1 Duplex receptacle, w/plate, 2P-20A-125VAC, gnd. Type

OE-2 Single receptacle, w/plate, 2P-20A-125VAC, gnd. Type

OE-3 Duplex receptacle, w/plate, 2P-20A-125VAC, GFCI Type

OE-3 Toggle switch, w/plate, 1P-20A-120VAC

OE-4 3-way toggle switch, w/plate, 1P-20A-120VAC

OE-5 Combination type Magnetic motor starter-A (1P-100AF-20AT), 3P-208VAC-60Hz NEMA size "0", NEMA 1 Encl.

OE-6 Combination type Magnetic motor starter-A (3P-100AF-20AT), 3P-208VAC-60Hz NEMA size "0", NEMA 1 Encl.

OE-7 Safety switch, 3PST, 240, 30A, fuses, NEMA 3R Encl.

OE-8 Safety switch, 3PST, 240, 100A, fuses, NEMA 3R Encl.

OE-9 Safety switch-B, DPST, 240V, 30A, non-fusible, NEMA 3r Encl.

OE-10 Manual motor starter, 2P-120V, 1HP(max.), NEMA 1 Encl.

OE-11 Circuit breakers

OE-12 Manual motor starter, 2P-120V, 1HP(max.), NEMA 1 Encl.

OE-13 Panelboard "M1"

OE-14 Addressable fire alarm/mass notification control panel

OE-15 Building Transmitter, BT-XM or approved equal

OE-16 Addressable smoke detector w/sound base

OE-17 Combination fire alarm & MNS Speaker/Strobe

OE-18 Combination fire alarm & MNS Speaker "WP"

OE-19 Addressable module

OE-20 Addressable manual pull station

OE-21 Addressable carbon monoxide detector

OE-22 VHF-FM Antenna, BSA-1 type

OE-23 Lighting arrestor, LA-1 w/Encl

OE-24 Coaxial cable, w/connector, type 1 and 2

OE-25 CATV outlet

LC-1 Concrete 3040kgf/cm2

LC-2 Deformed Re-Bar, LC-3 CONCRETE BLOCK, 8"T(190x190x390)

LC-4 H-125x125x6x9

LC-5 C-200x80x7.5x11

B-4

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs

(a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations

Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or

ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________

Former rank/grade ____________________________________

Last US Government position ___________________________

(ii) Name ______________________________________________

(iii) Name ______________________________________________

Firm ____________________________________________________

Name _____________________________________________________

Signature __________________________________________________

Title _____________________________________________________

Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____

Input VAT on transportation leased/rented for this contract.10% _____

Input VAT on equipment leased/rented for this contract. 10% _____

Input VAT on services purchased for this contract. 10% _____

Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P

Liters w/o Tax Tax/Unit Total Tax Amount

Regular Gasoline ________ (L) ________ w________ w_____________

Premium Gasoline ________ (L) ________ w________ w_____________

Diesel ________ (L) ________ w________ w_____________

Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-

1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPSAL

a. FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ikchung.om2.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/ problem. All questions should be emailed to ikchung.om2.ln@mail.mil within five

(5) days after the solicitation is issued.

b. CLOSING DATE: The electronic offer shall be submitted by 1300 hrs on the closing date of RFP.

3. SUBMISSION REQUIREMENTS

a. PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in

Section B - Supplies or Services and Prices.

b. DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.

c. SECTION K - Representations, Certifications and Other Statements of Offerors

d. SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.

e. SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

f. COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant.