Item 0002 Submittal register.pdf
PDF 117 KB Posted
- Solicitation number
- W90VN625RA012
About this file
This is a Submittal Register for a security fence installation project at Osan Air Base. The document lists 21 specific submittal items required for the project, categorized into Preconstruction Submittals, Shop Drawings, Certificates, and Closeout Submittals. Key submittals include the Preliminary Project Schedule, Safety Plan/Accident Prevention Plan, Activity Hazard Analysis, Quality Control Plan, Environmental Protection Plan, and Fence Installation details. All submittals are classified as Government (G) review, indicating they require government review and approval. The project involves installing a security fence surrounding an air traffic control antenna, with specification revisions dated 2014-2015.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 01 30 00 01 Preconstruction Submittals View location map 1.4 G
2 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G
3 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G
4 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G
5 01 32 01.00 10 01 Preconstruction Submittals Schedule status report 3.1.2 G
6 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G
7 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT
PREVENTION PLAN (APP) 1.6 G
8 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7 G
9 01 35 29.13 02 Shop Drawings Work Zones 1.20.1 G
10 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G
11 01 50 00 01 Preconstruction Submittals Construction site plan 1.4 G
12 01 57 20.00 10 01 Preconstruction Submittals Environmental Protection Plan 1.7 G
13 01 58 00 02 Shop Drawings Construction Project Sign 1.2.1 G
14 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G
15 01 78 00 11 Closeout Submittals Interim Form DD1354 1.9 G
16 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G
17 02 41 00 01 Preconstruction Submittals Existing Conditions 1.11 G
18 02 41 00 07 Certificates Deconstruction Plan 1.2.1 G
19 32 31 13.53 02 Shop Drawings Fence Installation 1.3.2 G
20 32 31 13.53 03 Product Data Fence Installation 1.3.2 G
21 32 31 13.53 03 Product Data Concrete 2.6 G
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: INSTALL SECURITY FENCE SURROUNDING AIR TRAFFIC CONTROL ANTENNA BY B363
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
Submittal Register