This document is an Asbestos Report of Survey for Osan Air Base in the Republic of Korea, prepared by URS Corporation in May 2002. The survey, conducted from January 14 to February 19, 2002, examined 33 buildings to identify and assess asbestos-containing materials (ACMs). Key findings include:
The survey identified several asbestos-containing materials across multiple buildings, with varying levels of asbestos content and hazard assessments. Specific materials found include black mastic (1-8% Chrysotile), duct insulation (15% Chrysotile/Tremolite/Actinolite), elbow mud (1-80% Chrysotile), pipe insulation, and floor tiles. The hazard assessment categorized materials into three priority levels: Priority 1 (requiring immediate evacuation or isolation), Priority 2 (requiring repair), and Priority 3 (to be managed in place). One Priority 1 material was identified: 4" pipe insulation with 12% Amosite asbestos, located in 100 linear feet. The report emphasizes the need for careful management, potential removal, and ongoing monitoring of these asbestos-containing materials in accordance with AHERA guidelines.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1358
B1357
PROJECT LOCATION
SMYU 25-1061_DEMO STORM DAMAGED GOLF EQUIPMENT
STORAGE, B1357, B1358 DWG NO. A-01
CUI
DEMOLITION BOUNDARY
LEGEND
FENCE TO BE RETAINED
B1358
B1357
TRASH ENCLOSURE
POLY SHEETING SHED
Proposed Demolition Boundary B1357 & B1358 DWG NO. A-02
DWG NO. A-03
Current Condition & Demo plan B1357 & B1358
EXISTING COMM SYSTEM AROUND B1357 & B1358 DWG NO. A-04
REMOVE OR RELOCATE THE COMMUNICATION/CATV CABLE AND
EQUIPMENT NOT USED ANYMORE FOR THE BLDG 1358
* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed
ELECTRICAL DEMOLITION SITE PLAN B1357 & B1358
* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed
CUI
Panel “SE1” (Disconnection Point)
: PROTECT & MAINTAIN
: REMOVAL & DISCONNECTION OF CABLE
※ SYMBOL & LEGENDS
DWG NO. E-01
Remove 1 abandoned CATV pole
COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed
EXISTING WATER SYSTEM AROUND B1357 & B1358 DWG NO. A-06
EXISTING SEWER SYSTEM AROUND B1357 & B1358 DWG NO. A-07
COR and contractor during the Pre-Con meeting on which specific
EXISTING STORM SYSTEM AROUND B1357 & B1358
* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific
DWG NO. A-08
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
File details come from the government source that posted it. Updated .