This document is an Asbestos Report of Survey for Osan Air Base in the Republic of Korea, prepared by URS Corporation in May 2002. The survey, conducted from January 14 to February 19, 2002, examined 33 buildings to identify and assess asbestos-containing materials (ACMs). Key findings include:

The survey identified several asbestos-containing materials across multiple buildings, with varying levels of asbestos content and hazard assessments. Specific materials found include black mastic (1-8% Chrysotile), duct insulation (15% Chrysotile/Tremolite/Actinolite), elbow mud (1-80% Chrysotile), pipe insulation, and floor tiles. The hazard assessment categorized materials into three priority levels: Priority 1 (requiring immediate evacuation or isolation), Priority 2 (requiring repair), and Priority 3 (to be managed in place). One Priority 1 material was identified: 4" pipe insulation with 12% Amosite asbestos, located in 100 linear feet. The report emphasizes the need for careful management, potential removal, and ongoing monitoring of these asbestos-containing materials in accordance with AHERA guidelines.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B1358

B1357

PROJECT LOCATION

SMYU 25-1061_DEMO STORM DAMAGED GOLF EQUIPMENT

STORAGE, B1357, B1358 DWG NO. A-01

CUI

DEMOLITION BOUNDARY

LEGEND

FENCE TO BE RETAINED

B1358

B1357

TRASH ENCLOSURE

POLY SHEETING SHED

Proposed Demolition Boundary B1357 & B1358 DWG NO. A-02

DWG NO. A-03

Current Condition & Demo plan B1357 & B1358

EXISTING COMM SYSTEM AROUND B1357 & B1358 DWG NO. A-04

REMOVE OR RELOCATE THE COMMUNICATION/CATV CABLE AND

EQUIPMENT NOT USED ANYMORE FOR THE BLDG 1358

* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed

ELECTRICAL DEMOLITION SITE PLAN B1357 & B1358

* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed

CUI

Panel “SE1” (Disconnection Point)

: PROTECT & MAINTAIN

: REMOVAL & DISCONNECTION OF CABLE

※ SYMBOL & LEGENDS

DWG NO. E-01

Remove 1 abandoned CATV pole

COR and contractor during the Pre-Con meeting on which specific utility lines should be removed and where the cap will be placed

EXISTING WATER SYSTEM AROUND B1357 & B1358 DWG NO. A-06

EXISTING SEWER SYSTEM AROUND B1357 & B1358 DWG NO. A-07

COR and contractor during the Pre-Con meeting on which specific

EXISTING STORM SYSTEM AROUND B1357 & B1358

* This drawing is just for information only. 51 CES/CEO will inform the COR and contractor during the Pre-Con meeting on which specific

DWG NO. A-08

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8

File details come from the government source that posted it. Updated .