Dirab Amendment 0003_SIGNED.pdf

PDF 201 KB Posted

Attached to
Dirab Airbase (Saudi Arabia) Construction & Repair Federal contract opportunity
Solicitation number
W90BRJ-22-R-0005
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Dirab Airbase (Saudi Arabia) Construction & Repair, newest first.
File Type Posted
Attachment 0013_Industry Questions Following Amendment 0003.pdf PDF
Attachment 0012_SOW_Titled_Dirab Airbase Follow on Repair and Modification_17 February 2022.pdf PDF
B08_RFP Amendment.0004.pdf PDF
Attachment 0011 - B000-DAB-AB-C-671-01_concrete survey.pdf PDF
Attachment 0010 - Addendum to Dirab AB Repair SOW.pdf PDF
Attachment 0008- picture (6 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0008- picture (1 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0008- picture (5 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0008- picture (2 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0008- picture (3 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0008- picture (4 of 6)_ 03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005.pdf PDF
Attachment 0007- Engineer Drawings.pdf PDF
Attachment 0009- Questions and Answers.pdf PDF
RFP Amendment.0002.pdf PDF
22-R-0005 DRAWINGS.zip ZIP file
RFP W90BRJ-22-R-0005.pdf PDF
Attachment 0006 - Clause Addendum_Dirab.pdf PDF
Attachment 0001 - Request for Information.pdf PDF
Attachment 0002 - Submittal Registry.pdf PDF
Attachment 0005 - Dirab Statement Of Work.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Incorporate updated Statement of Work, Concrete Survey, and extend the due date for receipt of offers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90BRJ22R0005

X 9B. DATED (SEE ITEM 11)

07-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Feb-2022

CODE

USA CONTRACTING COMMAND

ACC-RI CONTRACTING COMMAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299

W90BRJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W90BRJ22R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003 SECTION A NARRA

Army Contracting Command - Rock Island (ACC-RI) hereby issues amendment 0003 to Request for Proposal

W90BRJ-22-R-0005.

The purpose of this amendment is to incorporate the following:

1. Attachment 0010 Statement of Work – Addendum

2. Attachment 0011 - Concrete Survey for repairs and construction at MNG Aviation Airbase in

Dirab, south-west of Riyadh, Kingdom of Saudi Arabia (KSA).

As a result of this amendment 0003, the due date for receipt of proposal submissions has been extended to 28

February 2022 at 1100 US Central Time.

All other terms and conditions of RFP W90BRJ-22-R-0005 remain in force and full effect.

SECTION 00 01 15 - LIST OF DRAWING SHEETS

The following have been modified:

LIST OF ATTACHMENTS

Attachment 0001 - Request for Information

Attachment 0002 - Submittal Registry

Attachment 0003 - Guardrail on Catwalk

Attachment 0004 - Dirab SOW References(revised)

Attachment 0005 - Dirab Statement Of Work

Attachment 0006 - Clause Addendum_Dirab

Attachment 0007 – Engineer Drawings

Attachment 0008 –03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005_combined

Attachment 0009 – Questions & Answers

Attachment 0010- Addendum to Statement of Work

Attachment 0011- Concrete Survey

Drawing No. 1 - Building Section C-C

Drawing No. 2 - Floor Plans

Drawing No. 3 - Roof Deck Details

Drawing No. 4 - Elevations and Section Views (Tower Cap)

Drawing No. 5 - Framing Plan & Details_Top of Slab

Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details

Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details

SECTION 00 10 00 - SOLICITATION

The required performance has changed from Request for Information, Attachment 0001Submittal

W90BRJ22R0005

Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW References, Attachment

0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec 2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R-0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Drawing No. 1 - Building

Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing No. 3 - Roof Deck Details, 06 Nov

2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov 2019Drawing No. 5 - Framing Plan &

Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details, 19 Feb 2013Drawing

No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug 2013 to Request for Information, Attachment

0001Submittal Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW

References, Attachment 0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec

2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R-

0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Attachment

0010 - Addendum to Dirab AB Repair SOW.pdfAttachment 0011 - B000-DAB-AB-C-671-01_concrete survey.pdfDrawing No. 1 - Building Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing

No. 3 - Roof Deck Details, 06 Nov 2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov

2019Drawing No. 5 - Framing Plan & Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan

ATCT_Tower Cap Details, 19 Feb 2013Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug

2013.

(End of Summary of Changes)

2022-02-14T16:08:18-0600
SCHNORRENBERG.DEREK.M.1291665230