AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Incorporate updated Statement of Work, Concrete Survey, and extend the due date for receipt of offers.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90BRJ22R0005
X 9B. DATED (SEE ITEM 11)
07-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Feb-2022
CODE
USA CONTRACTING COMMAND
ACC-RI CONTRACTING COMMAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299
W90BRJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90BRJ22R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003 SECTION A NARRA
Army Contracting Command - Rock Island (ACC-RI) hereby issues amendment 0003 to Request for Proposal
W90BRJ-22-R-0005.
The purpose of this amendment is to incorporate the following:
1. Attachment 0010 Statement of Work – Addendum
2. Attachment 0011 - Concrete Survey for repairs and construction at MNG Aviation Airbase in
Dirab, south-west of Riyadh, Kingdom of Saudi Arabia (KSA).
As a result of this amendment 0003, the due date for receipt of proposal submissions has been extended to 28
February 2022 at 1100 US Central Time.
All other terms and conditions of RFP W90BRJ-22-R-0005 remain in force and full effect.
SECTION 00 01 15 - LIST OF DRAWING SHEETS
The following have been modified:
LIST OF ATTACHMENTS
Attachment 0001 - Request for Information
Attachment 0002 - Submittal Registry
Attachment 0003 - Guardrail on Catwalk
Attachment 0004 - Dirab SOW References(revised)
Attachment 0005 - Dirab Statement Of Work
Attachment 0006 - Clause Addendum_Dirab
Attachment 0007 – Engineer Drawings
Attachment 0008 –03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005_combined
Attachment 0009 – Questions & Answers
Attachment 0010- Addendum to Statement of Work
Attachment 0011- Concrete Survey
Drawing No. 1 - Building Section C-C
Drawing No. 2 - Floor Plans
Drawing No. 3 - Roof Deck Details
Drawing No. 4 - Elevations and Section Views (Tower Cap)
Drawing No. 5 - Framing Plan & Details_Top of Slab
Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details
Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details
SECTION 00 10 00 - SOLICITATION
The required performance has changed from Request for Information, Attachment 0001Submittal
W90BRJ22R0005
Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW References, Attachment
0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec 2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R-0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Drawing No. 1 - Building
Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing No. 3 - Roof Deck Details, 06 Nov
2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov 2019Drawing No. 5 - Framing Plan &
Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details, 19 Feb 2013Drawing
No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug 2013 to Request for Information, Attachment
0001Submittal Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW
References, Attachment 0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec
2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R-
0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Attachment
0010 - Addendum to Dirab AB Repair SOW.pdfAttachment 0011 - B000-DAB-AB-C-671-01_concrete survey.pdfDrawing No. 1 - Building Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing
No. 3 - Roof Deck Details, 06 Nov 2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov
2019Drawing No. 5 - Framing Plan & Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan
ATCT_Tower Cap Details, 19 Feb 2013Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug
2013.
(End of Summary of Changes)