B08_RFP Amendment.0004.pdf
PDF 140 KB Posted
- Attached to
- Dirab Airbase (Saudi Arabia) Construction & Repair Federal contract opportunity
- Solicitation number
- W90BRJ-22-R-0005
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide industry w ith Attachment 0013, Industry Questions Follow ing Amendment 0003, dated 18 February 2022 and Attachment 0013, Industry Questions Follow ing Amendment 0003, dated 18 February 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90BRJ22R0005
X 9B. DATED (SEE ITEM 11)
07-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Feb-2022
CODE
USA CONTRACTING COMMAND
ACC-RI CONTRACTING COMMAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299
W90BRJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90BRJ22R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004 SECTION A NARR
SECTION A NARRATIVE.
Army Contracting Command - Rock Island (ACC-RI) hereby issues amendment 0004 to Request for Proposal (RFP)
W90BRJ-22-R-0005.
The purpose of this amendment is as follows:
1. Incorporate Attachment 0013, Industry Questions Following Amendment 0003, dated 18 February 2022.
2. Incorporate Attachment 0012, Statement of Work for Dirab Airbase Follow on Repair and Modification, dated 17 February 2022.
3. Offeror(s) interested in submitting proposals are instructed to send complete proposal packages, as described in the Solicitation Narrative, RFP W90BRJ-22-R-0005, to Amanada Smith, at email address Amanada.l.smith.civ@army.mil, Ms. Rabekah Stone, at email address Rebekah.e.stone.civ@army.mil and Mr. Derek Schnorrenberg, derek.m.schnorrenberg.civ@army.mil, before 1100 hrs, US Central Time on February 28th, 2022.
Please be advised, no further questions from industry will be accepted.
All other terms and conditions of RFP W90BRJ-22-R-0005 remain unchanged.
SECTION 00 01 15 - LIST OF DRAWING SHEETS
The following have been modified:
LIST OF ATTACHMENTS
Attachment 0001 - Request for Information Attachment 0002 - Submittal Registry Attachment 0003 - Guardrail on Catwalk Attachment 0004 - Dirab SOW References(revised) Attachment 0005 - Dirab Statement Of Work Attachment 0006 - Clause Addendum_Dirab Attachment 0007 – Engineer Drawings Attachment 0008 –03 Feb 2022 Site Visit Photos W90BRJ-22-R-0005_combined Attachment 0009 – Questions & Answers Attachment 0010- Addendum to Statement of Work Attachment 0011- Concrete Survey Attachment 0012- Statement of Work for Dirab Airbase Follow on Repair and Modification, dated 17 February Attachment 0013- Industry Questions Following Amendment 0003, dated 18 February 2022 Drawing No. 1 - Building Section C-C
W90BRJ22R0005
Drawing No. 2 - Floor Plans Drawing No. 3 - Roof Deck Details Drawing No. 4 - Elevations and Section Views (Tower Cap) Drawing No. 5 - Framing Plan & Details_Top of Slab Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details
SECTION 00 10 00 - SOLICITATION
The required performance has changed from Request for Information, Attachment 0001Submittal Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW References, Attachment 0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec 2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R-0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Attachment 0010 - Addendum to Dirab AB Repair SOW.pdfAttachment 0011 - B000-DAB-AB-C-671-01_concrete survey.pdfDrawing No. 1 - Building Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing No. 3 - Roof Deck Details, 06 Nov 2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov 2019Drawing No. 5 - Framing Plan & Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details, 19 Feb 2013Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug 2013 to Request for Information, Attachment 0001Submittal Registry, Attachment 0002, Nov 2015 Guardrail on Catwalk, Attachment 0003Dirab SOW References, Attachment 0004, 07 July 2020 Dirab Statement Of Work (SOW), Attachment 0005, 21 Dec 2021Clause Addendum, Attachment 0006Engineer Drawings, Attachment 0007Site Visit Photos W90BRJ-22-R- 0005_combined, Attachment 0008, 03 Feb 2022 Questions & Answers,Attachment 0009, 09 Feb 2022Attachment 0010 - Addendum to Dirab AB Repair SOW.pdfAttachment 0011 - B000-DAB-AB-C-671-01_concrete survey.pdfAttachment 0012- Dirab Airbase Follow-on Repair and Modification, dated 17 February 2022Attachment 0013, Industry Questions Following Amendment 0003, dated 18 February 2022.Drawing No. 1 - Building Section C-C, 22 Dec 2016Drawing No. 2 - Floor Plans, 18 Nov 2014Drawing No. 3 - Roof Deck Details, 06 Nov 2019Drawing No. 4 - Elevations and Section Views (Tower Cap), 06 Nov 2019Drawing No. 5 - Framing Plan & Details_Top of Slab, 06 Nov 2019Drawing No. 6 - Khashm Alaan ATCT_Tower Cap Details, 19 Feb 2013Drawing No. 7 - Khashm Alaan ATCT_Tower Cap Roof Details, 22 Aug 2013.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .