B08 - 3GEN FLIR DCB LRIP - Attachment 0005 - Price Model_Locked_final3.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
Third Generation Forward Looking Infrared (3GEN FLIR) Dewar Cooler Bench (DCB) Solicitation Amendment 0003
Solicitation number
W909MY-22-R-0001
Issued by

About this file

This document outlines a solicitation for the Third Generation Forward Looking Infrared (3GEN FLIR) Dewar Cooler Bench (DCB) Low Rate Initial Production (LRIP) program. The U.S. Army Contracting Command-Aberdeen Proving Ground intends to award up to two cost-plus-fixed-fee contracts for engineering services and firm-fixed-price contracts for hardware procurement. Engineering services include technical, engineering, test, and logistics support over a 48-month base period. Hardware options include Lots 1 through 8 of DCB production with period of performances ranging from 24 to 29 months. The Army seeks to produce DCBs as government furnished property for integration into the 3GEN FLIR B-Kit as well as for the Next Generation Combat Vehicles Optionally Manned Fighting Vehicle variant. Offerors must submit proposals by November 22, 2021. Award is targeted for the third quarter of fiscal year 2022. The North American Industry Classification System code is 334511 with a $7.5 million size standard.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

TOTAL CONTRACT VALUE
Procurement + Technical Engineering Services
DescriptionProposed Cost
(Dual Award)Proposed Cost

(Single Award)

Long Lead Material$ - 0$ - 0
Hardware$ - 0$ - 0
Services$ - 0$ - 0
TOTAL$ - 0$ - 0

Total Cost $ - 0

Hardware

Procurement - LLM and Options
PWS Sections 3.1.6 & 3.1.7
CLINDescriptionPWS ReferencePart NumberQuantityProposed Unit CostProposed Cost
Base Procurement/Award
0001Base Procurement LLM (In support of Lot 1)3.1.6.1N/AN/AN/A$ - 0
0001Base Procurement LLM (In support of Lot 2)3.1.6.1N/AN/AN/A$ - 0
OPTION - Abrams Production
0002Abrams Procurement - Lot 13.1.7.1N/A24$ - 0$ - 0
0003Abrams Procurement - Lot 23.1.7.2N/A48$ - 0$ - 0
OPTION - Abrams Production
1001Abrams - Option - Lot 33.1.7.3N/A48$ - 0$ - 0
1002Abrams - Option - Lot 43.1.7.4N/A96$ - 0$ - 0
OPTION - Abrams Production
1003Abrams - Option - Lot 53.1.7.5N/A9$ - 0$ - 0
1004Abrams - Option - Lot 63.1.7.6N/A18$ - 0$ - 0
OPTION NGCV/OMFV Production
2001NGCV/OMFV - Option - Lot 73.1.7.7N/A23$ - 0$ - 0
2002NGCV/OMFV - Option - Lot 83.1.7.8N/A46$ - 0$ - 0
TOTAL$ - 0

Note: All above hardware unit costs to be entered at the fully loaded rate inclusive of all burdens, any shipping costs and fees.

Total Services

Support Services
PWS Section 3.4
Proposed Cost
Total Services Labor$0.00
Total Repair-Fabrication Material$0.00
Total Services Travel$0.00
Total Services$0.00

Services Labor

Services Labor - Technical & Engineering, Test, and Logistics Provisioning
PWS Sections 3.4.1, 3.4.2, and 3.4.3
Government EstimateGovernment Estimated HoursContractor AssessmentProposed HoursProposed Labor Rates (Fully Loaded)
#Government Labor CategoriesDescription/QualificationsFY2022FY2023FY2024FY2025FY2026Proposed Labor CategoriesDescription/QualificationsFY2022FY2023FY2024FY2025FY2026FY2022FY2023FY2024FY2025FY2026Evaluated Price
1Systems EngineerPrinciple engineer with 10+ years of experience. Interacts with client staff, plans, conducts major phases of projects, directs the activities of assigned technical staff, and manages the system level integration of functional engineering contributions.211.22352.01344.01248.0888.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2Electrical EngineerComposite labor category covering the senior and electrical engineering staff responsible for the design, development, test, and management of the electrical components and firmware required by the 3GEN FLIR DCB. At least one senior level electrical engineer with 8+ years of experience assumed.232.82640.01560.01464.01044.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3Mechanical EngineerComposite labor category covering the senior and mechanical engineering staff responsible for the design, development, test, and management of the mechanical components of the 3GEN FLIR DCB. At least one senior level electrical engineer with 8+ years of experience assumed.232.82640.01560.01464.01044.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4Software EngineerSenior software engineer(s) with 5+ years experience with software architecture related to the 3GEN FLIR DCB, or similar product. Senior software engineer will formulate and define specifications for program applications. Will maintain, modify (fixes), and perform upgrades to the 3GEN FLIR DCB software applications using engineering releases and specifications provided by the customer.168.01920.01920.01680.01080.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5Test EngineerTest engineer(s) with 5+ years of applicable experience. Responsible for updating and maintaining the 3GEN FLIR DCB test processes and equipment necessary to ensure the 3GEN FLIR DCB meets all performance specifications. Individual(s) must have effective working knowledge of test processes and equipment to account for DCB design modifications and/or upgrades to ensure all performance specifications are met.139.22544.0768.0672.0480.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6Program MgmtComposite rate covering all program/project management activities. Includes the Program Manager with 8+ years of experience and direct support staff to include, but limited to, Financial Management, Risk Management, Schedule Management, Logistics, Supply Chain Management, and other associated management disciplines and administrative labor pools.494.42208.01915.21852.81353.60.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7Operations SupportManufacturing engineer with 5+ years of experience. Interacts with lead principle engineers, supply chain management, quality assurance, and touch labor personnel. Responsible for production facility to ensure timely delivery of hardware while ensuring quality requirements are met.63.4897.6675.8675.8506.90.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8Assembly MfgComposite rate covering all touch labor personnel associated with the assembly of the 3GEN FLIR DCB and DCB subassemblies and components.57.6816.0614.4614.4460.80.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10Notes and assumptions provided below starting on row 108Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
21Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
23Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
24Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
28Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
29Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
33Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
34Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
35Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
36Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
37Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
38Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
39Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
40Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
41Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
43Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
44Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
45Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
46Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
47Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
48Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
49Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
50Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
51Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
53Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
54Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
55Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
56Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
57Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
58Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
59Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
63Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
64Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
65Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
66Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
67Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
68Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
69Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
70Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
71Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
73Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
74Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
75Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
76Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
77Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
78Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
79Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
80Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
81Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
83Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
84Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
85Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
86Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
87Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
88Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
89Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
90Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
91Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
93Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
94Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
95Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
96Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
97Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
98Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
99Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
100Additional Labor Categories can be input in rows 9-1000.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL SERVICES$ - 0
Notes:
(a) The Government estimated hours shown are for informational purposes only, and there is no Offeror obligation to use those values in any way in their proposal.
(b) All above labor rates to be entered at the fully loaded rate inclusive of all burdens and fees.
(c) The Government projects the below assumptions to require a level of effort of approximately 45,000 hours as estimated in the table above.
(d) Above Government Labor Categories and associated hours were estimated to accomplish the services to be performed. In some cases the labor category and description represent composites of multiple labor categories and descriptions with varying levels of experience and education.
(e) Contractor should determine their own labor category mix and associated hours to accomplish the work. Government labor categories above do not have to be fully utilized and other labor categories can be added.
Assumptions:
(1) Eight (8) total repairs between FY24 and FY26. All repairs expected to be minor.
(2) First Article Test (FAT) performed in FY24, single test occurrence.
(3) One (1) engineering effort such as study, hardware fabrication (material costs collected in Repair-Fabrication Material worksheet), or test every year over the life of the LRIP contract, six (6) month PoP.
(4) Six (6) total failure analyses expected over life of contract; each failure to require a root cause and corrective action plan.
(5) Two (2) performance and/or cost trade study and investigation each with a two (2) month PoP.
(6) One (1) production cost reduction redesign and analysis with a PoP of two (2) months.
(7) Two (2) software upgrades and two (2) software maintenance support activities each with a six (6) month PoP.
(8) Support Provisioning Technical Documentation development such as Interactive Electronic Technical Manuals, Repair Parts Special Tools List, Provisioning Parts List, Special Tools Lists, and Engineering Data for Provisioning. Qty during LRIP: One (1), with a one (1) month PoP.
(9) Field Service Representatives (FSR); Fielding Support - Qty during LRIP: Two (2) FSR's, with a one (1) month PoP each. Removal and installation - Qty during LRIP: One (1) FSR, with a one (1) month PoP.
(10) Two (2) delta - qualification efforts to mitigate an obsolete component such as a circuit card or cooler control module each with a three (3) month PoP.

Repair-Fabrication Material

Services Repair/Fabrication Material
PWS Sections 3.4.1, 3.4.2, and 3.4.3
Anticipated Incidents
DescriptionFY2022FY2023FY2024FY2025FY2026
CCA Repair(s)11
CCM Repair(s)11
Flex Assembly Repair(s)11
Services Fabrication1
Total Proposed Material Cost:$ - 0
Evaluated Price:$ - 0
Notes/Assumptions:
(1) The above descriptions represent the number of anticipated incidents by Fiscal Year (FY)
(2) The Total Proposed Material Cost (cell G11) shall represent the total fully loaded cost ($) proposed for all materials and necessary replacement parts, including shipping (no labor), to correct the anticipated incidents identified in the table above.
(3) Services Fabrication pertains to the materials required to perform the engineering effort(s) per assumption 3 of the Services Labor worksheet.

Services Travel

Services Travel
PWS Sections 3.4.1, 3.4.2, and 3.4.3
FY22 CONUSRatesMiles @Other TravelPer Trip CostOther (if applicable)Cost Per Trip# of TripsTotal Cost (TY$)EscalationTOTAL Escalated TravelTravel
OH/Other (%)Travel Subtotal
OverheadTravel
G&A/Other (%)Travel Subtotal
G&ACOMTravel Total

w/ COM

TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
Aberdeen Proving GroundOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.001$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
FY22$0.00$0.00FY22$0.00
FY23 CONUSRatesMiles @Other TravelPer Trip CostCost Per Trip# of TripsTotal Cost (TY$)EscalationTOTAL Escalated TravelTravel
OH/Other (%)Travel Subtotal
OverheadTravel
G&A/Other (%)Travel Subtotal
G&ACOMTravel Total

w/ COM

TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
Yuma Proving GroundOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
FY23$0.00$0.00(FY23$0.00
FY24 CONUSRatesMiles @Other TravelPer Trip CostCost Per Trip# of TripsTotal Cost (TY$)EscalationTOTAL Escalated TravelTravel
OH/Other (%)Travel Subtotal
OverheadTravel
G&A/Other (%)Travel Subtotal
G&ACOMTravel Total

w/ COM

TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
Aberdeen Proving GroundOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
FY24$0.00$0.00FY24$0.00
FY25 CONUSRatesMiles @Other TravelPer Trip CostCost Per Trip# of TripsTotal Cost (TY$)EscalationTOTAL Escalated TravelTravel
OH/Other (%)Travel Subtotal
OverheadTravel
G&A/Other (%)Travel Subtotal
G&ACOMTravel Total

w/ COM

TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
McKinney, TxOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
FY25$0.00$0.00FY25$0.00
FY26 CONUSRatesMiles @Other TravelPer Trip CostCost Per Trip# of TripsTotal Cost (TY$)EscalationTOTAL Escalated TravelTravel
OH/Other (%)Travel Subtotal
OverheadTravel
G&A/Other (%)Travel Subtotal
G&ACOMTravel Total

w/ COM

TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.001.00%$0.000.00%$0.000.00%$0.00
Yuma Proving GroundOfferor Location43$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.002$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
FY26$0.00$0.00FY26$0.00
GRAND TOTAL$ - 0
Notes/Assumptions:
(1) Above travel costs are related to travel required for services only; procurement related travel should be captured within hardware costs
(2) Above cost inputs should be inclusive of inflation relative to the year estimated => Any escalation to columns E through I shall only be applied via column X
(3) All values entered in columns E through J shall be exclusive of any burdens or escalation applied and within the Joint Travel Regulation Guidelines.
(4) All costs proposed as "other" shall be fully articulated with basis and support in the Offeror's Cost Methodology Narrative.

Repair-Fabrication Material (2

Services Repair/Fabrication Material
PWS Sections 3.4.1, 3.4.2, and 3.4.3
Anticipated Incidents
DescriptionFY2022FY2023FY2024FY2025FY2026
CCA Repair(s)11
CCM Repair(s)11
Flex Assembly Repair(s)11
Services Fabrication1
Total Proposed Material Cost:$ - 0
Evaluated Price:$ - 0
Notes/Assumptions:
(1) The above descriptions represent the number of anticipated incidents by Fiscal Year (FY)
(2) The Total Proposed Material Cost (cell G11) shall represent the total fully loaded cost ($) proposed for all materials and necessary replacement parts, including shipping (no labor), to correct the anticipated incidents identified in the table above.
(3) Services Fabrication pertains to the materials required to perform the engineering effort(s) per assumption 3 of the Services Labor worksheet.