This document provides an amendment to a solicitation and details of a federal contract opportunity. The amendment publishes questions and answers regarding a workpiece holder requirement. The opportunity solicits proposals for the procurement of two new CNC jig grinders including auxiliary equipment for a Joint Manufacturing and Technology Center. Proposals are due in accordance with FAR Part 12 for commercial items and FAR Part 13.5 for simplified procedures. The grinders must hold tube parts measuring 4.134 inches long with a 0.3122-0.5555 inch outer diameter, 0.189 inch inner diameter to grind the inner diameter to 0.1970 inches with a tolerance of 0.0001 inches to a depth of 0.800 inches on each end to a surface finish of 16 or better. The amendment allows for site visits as needed and maintains all other terms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22Q0009 Amendment-0003.pdf | ||
| 22Q0009 Amendment-0002.pdf | ||
| W9098S22Q0009 Solicitation.pdf | ||
| 23-1-01 CDRL.pdf | ||
| RIPD E4000-23-1-01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see Amendment 0001 Narrative
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9098S22Q0009
X 9B. DATED (SEE ITEM 11)
22-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2022
CODE
ROCK ISLAND ARSENAL (ACC-RI)
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W9098S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9098S22Q0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001 NARRATIVE
The purpose of Amendment 0001 is to:
1. Publish the following questions and answers.
Q1. To compile a full turnkey response, we will need additional information regarding the Clin Item #3 (Workpiece Holder for RIA specified part) in document RIPD E4000-23-1-01. We will need to know how many parts; how much grinding is involved and the technical information for the workpiece holding design:
Ref: CLIN 0003- WORKPIECE HOLDER FOR RIA SPECIFIED PART
6.1.1 The contractor shall provide a workpiece holding device to hold a bulk amount of a singular part. The Jig Grinder(s) shall use the probe to identify locations of the parts being held within the device and the Jig Grinder(s) shall be able to perform the grinding operation on all the parts without the need for operator intervention. Part to be identified by RIA.
A1. It is a tube with the below dimensions, made of A2 tool steel:
4.134” +.003” long
.3122” -.5555” OD
.189” +.004” ID.
In the jig grinding operation, the tube needs to be held so that the ID can be ground to .1970” -.0001”, for a depth of .800” +.020” on each end, with a 16 or better finish.
Concentricity of the bores should be within .0001” to each other.
We currently hold the part in a vee-block, grind one end, then flip it and grind the other end. Ideally, tooling would mimic that and allow the parts to be loaded, ground, indexed, and ground, but more parts to be run more or less unattended.
Q2. In addition to the information requested below, can you explain how the site visit will be set-up so that we can plan accordingly? Ref:
3.4 Responsibilities
3.4.1 SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.
A2. A site inspection is not a requirement, if the bidder does not feel that they need to have a site visit, then they can identify that. However, if a site visit is needed or wanted the bidder is also free to ask questions pertaining to the site location.
2. All other terms and conditions remain unchanged.
END Amendment 0001 Narrative