AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment #0003 is to provide the Government response to received vendor questions, provide updated Government POCs, and to provide a revised closing date.

The REVISED Closing date is TUESDAY, 30 MARCH 2021 @ 3:00pm CDT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9098S21Q0008

X 9B. DATED (SEE ITEM 11)

01-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2021

CODE

ROCK ISLAND ARSENAL (ACC-RI)

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9098S21Q0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

1. The purpose of this Amendment 0003 is to:

a. Provide the Government’s response to received vendor questions.

b. Revise the Closing date for quote submission.

c. Update Government point of contacts.

2. The REVISED CLOSING DATE is: TUESDAY 30 MARCH 2021 @ 3:00PM CDT.

3.The REVISED Government: All communication shall be sent to the following POCs from this date forward.

Contract Specialist: Carrie Holub, Email: carrie.l.holub.civ@mail.mil, Contracting Officer: Kurt Kleinlein, Email: kurt.l.kleinlein.civ@mail.mil

4. Vendor questions with the Government’s responses are as follows:

Question 1: What level of tracking does the Government require for the items? For example does the Government just want to know how many of an item is used from a bin OR does the Government need to know who (Employee), how much was taken, program level or job, etc.?

Government Response: PWS Paragraph 4.4.1 Bi-weekly consumption Report and Paragraph

4.4.2. Weekly Stock Report provides guidance on the level of traceability and types of items the Government requires the contractor to track under this requirement.

Question 2: What is the preferred off-loading location? Is the contractor responsible for transporting any deliveries that come into Bldg. 299 Central Receiving to the stocking areas?

Government Response: The contractor will be responsible for their own stock deliveries into RIA-JMTC. Access to Bldg. 220 4th floor will be granted through the far-east end of Bldg. 220 (overhead door). Delivery trucks will have access to the building inside the fence and are (at times) able to enter the building. NOTE: All Delivery trucks and personnel are subject to RIA security checks and procedures for entry to a Government facility. (See Installation Access Info).

For those items that are small enough to be easily carried or with the use of a small hand-truck, the Bldg. 220 east-end entrance will be the preferred entry. For those items that are too large to hand carry or need larger equipment to move, the shipments shall be delivered to Bldg. 299- Central Receiving. All shipments to Bldg. 299 must be labeled as “VMI Materials

W9098S21DXXTBDXXX”.

Contractors are to coordinate large item deliveries with the designated COR prior to shipment/arrival to ensure adequate space and equipment is available.

In the event that a contractor needs assistance, the Government (through the COR) will coordinate forklift and operator for loading and unloading. See PWS Paragraph 4.1.5 entitled “Stocking and Additional Deliveries”.

Question 3: Will RIA-JMTC provide assistance with off-loading of stock, movement of drop shipments from central receiving, and /or provide a forklift, etc. to help with off-loading and placement?

Government Response: See response to Question #2 and PWS Paragraph 4.1.5.

Question 4: Is MIL-STD 129 labeling under 252.223-7001 required or not?

Government Response: Yes, MIL-STD 129 labeling under FAR 252.223-7001 is required for any and all products supplied under this solicitation/contract that are deemed to be hazardous materials. Refer to PWS, Paragraph 3.4.1 entitled “Material Safety Data Sheets” and Attachment0005_CDRL0004.

Question 5: There have been multiple items identified that potentially are not Made in America. Will an exemption be provided to clause 252.232-7001?

Government Response: Contractors are to comply with the Buy American Act for all supplies and materials provided under the solicitation/contract. A complete list of qualifying countries can be found at www.acq.osd.mil/dpap/dars/ If proposing an item(s) is not Buy American Act compliant, Contractors must provide the item specifications (to include country of origin) for Government consideration.

Question 6: For the purpose of W9098S21Q0008, are the steel, aluminum, and foundry sand items considered COTS items?

Government Response: Yes, All items under the solicitation W9098S21Q0008 are considered Commercial Off-the-Shelf (COTS) items.

Question 7: PWS 4.5 Ownership of items. We understand that you want transfer of ownership when the product is removed from the storage location. Unfortunately, this is difficult for the following reasons:

- Logistics for delivery and chain of custody of product are very problematic.

- Delivery and stowage of steel is reliant on Arsenal forklift and personnel.

- Turn rates for many items are not sufficient to warrant the consignment of goods.

- While the technology exists, the additional cost for a totally secure system is not warranted by the relatively low value of many of the goods.

Will the Government consider a proposal where ownership is transferred upon delivery with all other aspects of the PWS VMI remaining?

Government Response: Per PWS, Paragraph 4.5 entitled “Ownership of Items”, the government (RIA-JMTC) will assume ownership of the product/items when it is taken/removed from the designated cabinet and racks at RIA-JMTC.

Question 8: If a proposed system requires installation of electronic magnetic locks on the crib gates, would the government provide an electrician to wire 110volt power supply to each gate?

Government Response: Per PWS, Paragraph 4.2 entitled “Vending Machine/Cabinet specifications”, the Government will provide 110/220 single phase or 220/440 three phase electrical power to each location.

Question 9: If a proposed system where the steel crib and tool crib operate on the same system that communications via an Ethernet cable between the two cribs. Would the Government be willing to provide installation of such a cable?

Government Response: The Government will not provide ethernet cable or LAN access. Internet is only available through the contractor’s own connections. LAN connectivity is prohibited due to Rock Island Arsenal Security policies. See PWS, Paragraph 4.2.1.2.1 entitled “Network Connectivity”.

Question 10: Many of the low-value hardware items are only provided in commercially available package quantities. Is the Government willing to accept the package quantity as the minimum order quantity?

Government Response: Per PWS, paragraph 4, the contractor shall supply, stock, and manage tool and fixture making hardware as described by Attachment 0001. The contractor shall maintain items in accordance with the minimum and maximum stock level provided in Attachment 0001.

At any time during execution of this PWS, Minimum means “no less than” and maximum means “no more than”.

In the event of manufacturer’s shipping or packaging efficiencies (minimums), the contractor shall provide the alternate measures as part of their proposal for government evaluation. The Government will evaluate on a case by case basis.

(End of Amendment 0003)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Mar-2021 03:00 PM to 30-Mar-2021 03:00 PM.

(End of Summary of Changes)