IC-OUM-09043_v1.1_B3.pdf
PDF 163 KB Posted
- Attached to
- eXportable Combat Training Capability (XCTC)
- Solicitation number
- W900KK-19-R-0003
About this file
This document contains an operator user manual and federal contract opportunity notice. The operator user manual provides instructions for HVAC systems used in MAARC tents, detailing equipment descriptions, operating principles, controls, maintenance procedures, and troubleshooting steps. The federal contract opportunity is a pre-solicitation notice for the Army National Guard's eXportable Combat Training Capability program. It seeks to develop adaptive leaders and train platoon proficiency through force-on-force and live-fire training. Interested offerors are encouraged to submit questions on the draft solicitation by March 4, 2019 to help improve the final RFP.
TDP Item 42 - HVAC, MAARC Tent Manual
View the file
Other files
Show 40 more
Latest 50 of 233 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IC-OUM-09043 Rev 1.1 12/11/2017
Operator User Manual for the (HVAC, MAARC TENT)
Date: 11 December 2017
Prepared by: Georgana Wright
Operator User Manual for the (HVAC, MAARC TENT)
CHANGE LOG
CHANGE / REVISION RECORD
Revision Page(s) Description of Change Made By Date Approved By
1.0 All Initial Release G. Wright
1.1 4,5,6
Removal of not applicable, removed extra line, correction to verbiage and removal of unnecessary wording
G. Wright
12/11/17
1.1a Added contract number and fixed
OUM number J DePersis
1/3/18 J DePersis
Operator User Manual for the (HVAC, MAARC TENT)
Table of Contents
1. Introduction
1.1 General Information
1.1.1 Scope
1.1.2 Safety
1.1.3 Security
1.1.4 List of Abbreviations/Acronyms
1.2 Equipment Description
1.2.1 Equipment Characteristics, Capabilities, and Features
1.2.2 Equipment Data
1.3 Principles of Operation
2. Operating Instructions
2.1 Description and Use of Operator’s Controls and Indicators
2.2 Operation under Usual Conditions
2.2.1 Preparation for Operation
2.2.2 Operation
2.2.3 Termination
2.2.4 Removal
2.2.5 Preparation for Storage
2.2.6 Preparation for Shipment
2.3 Operation under Unusual Conditions
2.3.1 Unusual Environment
2.3.2 Emergency Procedures
3. Operator Maintenance Instructions
3.1 Troubleshooting
3.2 Maintenance Procedures
4. Special Tools/Installation Equipment
5. Appendix
Operator User Manual for the (HVAC, MAARC TENT)
1. Introduction
1.1 General Information
1.1.1 Scope
This operator’s manual for the HVAC system for the Mobile After Action Review Center (MAARC) focuses on functionality and proper operation within the FlexTrain program.
1.1.2 Safety
These instructions are intended as an aid to qualified service personnel for the proper installation and operation of the current make and model HVAC system utilized in conjunction with the MAARC Tent package. Read these instructions as well as appropriate manufactures installation/operation manuals thoroughly before attempting installation or operation. Failure to follow these instructions may result in improper installation, service, or maintenance possibly causing electrocution, fire, equipment damage, personal injury or death.
1.1.3 Security
Not Applicable
1.1.4 List of Abbreviations/Acronyms
HVAC – Heating, Ventilation and Air Conditioning
MAARC – Mobile After-Action Review Center
1.2 Equipment Description
Refer to appropriate manufactures manuals for specific descriptions of the various make/models currently utilized within the FlexTrain program.
1.2.1 Equipment Characteristics, Capabilities, and Features
Refer to appropriate manufactures manuals for specific characteristics, capabilities and features of the various make/models currently utilized within the FlexTrain program.
Operator User Manual for the (HVAC, MAARC TENT)
1.2.1.1 Functions of HVAC System
HVAC systems contain current technologies utilized for indoor environmental comfort. Ravenswood Solutions utilizes various makes and models of HVAC systems in conjunction with the MAARC package to provide ideal environmental comfort to clientele during after action reviews.
1.2.2 Equipment Data
Refer to appropriate manufacture data sheets and manuals for the various make/models currently utilized within the FlexTrain program. HVAC systems contain three basic components: the air handler, heat/ cooling system, and the heat exchanger.
1.3 Principles of Operation
Principles of Operation include
Heating – amount of thermal energy needed to be added
Cooling - amount of thermal energy needed to be removed
Humidifying – increasing water vapor into the system
Dehumidifying – removing water vapor from the given space
Cleaning – removal of dust, smoke, pollen from given space
Air Movement – ample movement of the air to maintain a comfortable space
2. Operating Instructions
2.1 Description and Use of Operator’s Controls and Indicators Refer to appropriate manufacture manuals for description and use of operator controls and indicators relevant to each make/model currently utilized within the FlexTrain program.
2.2 Operation under Usual Conditions
2.2.1 Preparation for Operation
Prior to installing the HVAC system at a MAARC location, familiarization of the HVAC system is needed.
Installer should inventory each system and ensure all components are present. Once the system is inventoried and location of the MAARC tent with HVAC is noted, installation can commence.
2.2.1.1 Installation...
Refer to the appropriate manufacture’s manual for proper installation instructions.
2.2.1.2 Power-up and Initialize
Refer to the appropriate manufacture’s manual for proper power-up and initialization instructions. HVAC systems will be turned on an hour prior to the start of any scheduled meetings usage.
Operator User Manual for the (HVAC, MAARC TENT)
2.2.2 Operation
Refer to the appropriate manufacture’s manual for proper operation.
2.2.3 Termination
After the final usage of the day, all HVAC systems will be shut down for energy/fuel savings.
When HVAC system is no longer required it should be properly shut down and disassembled for removal.
2.2.4 Removal
To remove the HVAC systems, refer to the appropriate operator manual and follow the instruction in reverse order.
2.2.5 Preparation for Storage
All components of the HVAC system need to be cleaned and inspected for damage. All damaged or missing equipment is noted, red tagged and reported. HVAC components placed back into the appropriate transit case.
2.2.6 Preparation for Shipment
HVAC transit cases, once all components are stored, replace the lid, lock up the case. Transit case is now ready for loading. Utilize appropriate forklift to maneuver case to and from trailer.
2.3 Operation under Unusual Conditions
See Usual Conditions section. Operation of HVAC system components are not affected by adverse weather. Care should be taken to keep cable connectors clean, free of debris.
2.3.1 Unusual Environment
HVAC systems are designed to withstand varying environments with minimal affects. Care should be taken to inspect the system daily for any obvious signs of damage. Routine maintenance schedule is required.
2.3.1.1 Lightning
HVAC systems and any connected electrical generators should be properly grounded during setup. Avoid working on the HVAC system or generator during severe lightning storms. If lightening damage is suspected, immediately power down the HVAC system, generators and thoroughly check for lightening damage.
2.3.1.2 Strong Winds
HVAC systems are ground level and should not experience strong wind conditions.
Operator User Manual for the (HVAC, MAARC TENT)
2.3.1.3 Cold
Outside HVAC systems are designed to function in various weather conditions. The system should be checked periodically for general maintenance and upkeep.
2.3.2 Emergency Procedures
Refer to appropriate manufacture’s manuals for emergency shut off procedures.
3. Operator Maintenance Instructions HVAC system requires maintenance and repair by a properly trained service technician. Work by unauthorized personnel may void product warranty. Operator level maintenance includes replacing the air filter, maintain free outdoor coil airflow, cleaning the finish. Review the appropriate owner’s manual for specific operator maintenance allowed. Call authorized dealer for additional routine maintenance options for the system.
3.1 Troubleshooting
a. Observation
Insufficient heating or cooling
b. Solutions
Clean or replace air filters, check supply registers and return grills for blockage, clear away leaves or other debris.
a. Observation
Failure to operate
b. Solutions
Verify main switch is in ON position, reset circuit breaker or replace burned-out fuses, check setting, adjust thermostat
a. Observation
Trouble shooting HVAC system
b. Solutions
Refer to manufacture’s owner’s manual for specific trouble shooting tips for each unit.
Operator User Manual for the (HVAC, MAARC TENT)
3.2 Maintenance Procedures
Refer to specific manufactures owner’s manual for periodic maintenance procedures, annual maintenance checks and operator daily maintenance checks.
4. Special Tools/Installation Equipment Refer to appropriate manufactures manuals and owner guides for list of required tools
5. Appendix Not Applicable
| 1. Introduction |
| 1.1 General Information |
| 1.1.1 Scope |
| 1.1.2 Safety |
| 1.1.3 Security |
| 1.1.4 List of Abbreviations/Acronyms |
| 1.2 Equipment Description |
| 1.2.1 Equipment Characteristics, Capabilities, and Features |
| 1.2.1.1 Functions of HVAC System |
1.2.2 Equipment Data
1.3 Principles of Operation
| 2. Operating Instructions |
| 2.1 Description and Use of Operator’s Controls and Indicators |
| 1.1 Operation under Usual Conditions |
| 2.2 |
| 2.2.1 Preparation for Operation |
| 2.2.1.1 Installation... |
| 2.2.1.2 Power-up and Initialize |
| 2.2.2 Operation |
| 2.2.3 Termination |
| 2.2.4 Removal |
| 2.2.5 Preparation for Storage |
| 2.2.6 Preparation for Shipment |
| 2.3 Operation under Unusual Conditions |
| 2.3.1 Unusual Environment |
| 2.3.1.1 Lightning |
| 2.3.1.2 Strong Winds |
| 2.3.1.3 Cold |
2.3.2 Emergency Procedures
| 3. Operator Maintenance Instructions |
| 3.1 Troubleshooting |
| 3.2 Maintenance Procedures |
| 4. Special Tools/Installation Equipment |
| 5. Appendix |