RFP_Industry_Q_and_A_20171026_(STRYKER_MTS)_2.pdf

PDF 54 KB Posted

Attached to
Stryker Maintenance Training System (Stryker-MTS)
Solicitation number
W900KK-17-R-0016
Issued by

About this file

Industry Questions and Answers 2

View the file

Other files

File Type Posted
Exhibit_C,_Stryker-MTS-Phase-V_Annex_to_Exhibit_C_PBTMs_rev1.pdf PDF
Attachment_10_Stryker_Phase_V_PWBS.pdf PDF
Attachment_2,_Stryker_MTS_Phase_V_PRF-PT-684_2017_10_12_ver_2.2_pdf.pdf PDF
Exhibit_C,_Stryker_Phase_V_CDRLs_C002_and_C003.pdf PDF
Amendment_001_W900KK-17-R-0016_Stryker_MTS_10-20-17.pdf PDF
RFP_Industry_Q_and_A_20171020_(STRYKER_MTS).pdf PDF
Amendment_001_W900KK-17-R-0016_Stryker_MTS_10-20-17_(Conform_Copy).pdf PDF
RFP_Industry_Q_and_A_20171016_(STRYKER_MTS).pdf PDF
Industry_Q_and_A_20170929_Continued.pdf PDF
Industry_Q_and_A_20170928_(STRYKER_MTS).pdf PDF
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170921_ver_2.1.1.pdf PDF
Attachment_1_Stryker_MTS_Phase_V_SOW_2017_09_01_Rev_2.1.1.pdf PDF
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170921_ver_2.1.1 —
B001-B005.pdf PDF
Attachment_5_Data_Transmittal_Template.docx DOCX document
Stryker_Annex_to_Exhibit_A_LPD.pdf PDF
Stryker__Annex_to_Exhibit_B.pdf PDF
Attachment_4_Data_Rights.pdf PDF
Attachment_8_Solicitation_Question_and_Comment_Form.pdf PDF
Stryker_Annex_Exhibit_C_PBTMs.pdf PDF
FINAL_RFP_W900KK-17-R-0016_Stryker_MTS_9-27-17.doc DOC document
Attachment_6_QASP.docx DOCX document
Attachment_9_-_DD254.pdf PDF
Attachment_1_Stryker_MTS_Phase_V_SOW_2017_09_01_Rev_2.1.1 —
C001-C003.pdf PDF
Attachment_7_Past_Performance_Questionare.docx DOCX document
Attachment_3_GFP_Smartform.pdf PDF
Stryker__Annex_to_Exhibit_B.pdf PDF
Stryker_Annex_Exhibit_C_PBTMs.pdf PDF
Stryker_Annex_to_Exhibit_A_LPD.pdf PDF
Stryker-Annex_to_Ex_A_TPs_rev1.pdf PDF
Exhibit_B_CDRLS_B001-B005.pdf PDF
Attachment_7_Past_Performance_Questionare.docx DOCX document
Exhibit_C_CDRLs_C001-C003.pdf PDF
Attachment_5,_Data_Item_Transmittal_Template.docx DOCX document
Attachment_1_SOW_Stryker_MTS_Phase_V_20170726.pdf PDF
Exhibit_A_CDRLS_A001-A00U.pdf PDF
Attachment_4,_Data_Rights.pdf PDF
Attachment_6,_QASP.docx DOCX document
Attachment_3_GFP.pdf PDF
Attachment_8_Solicitation_Question_and_Comment_Form.pdf PDF
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170726.pdf PDF
DRAFT_RFP_W900KK-17-R-0016_Stryker_MTS.pdf PDF
Draft_Program_Contract_Documentation_Redacted.pdf PDF
Stryker_Phase_V_Distribution_Agreement.pdf PDF
STRYKER_MTS_2016_MARKET_RESEARCH_BASIC_RESEARCH_FORM_2016_11_22.doc DOC document
Stryker_MTS_Industry_Day_Package.pdf PDF
Stryker_MTS_Phase_V_DRAFT_SRD_2016_10_31.docx DOCX document
Stryker-MTS-Phase-V-SOW_2016_11_08.docx DOCX document
Stryker_MTS_Phase_V_DRAFT_SRD_2016_10_27.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stryker MTS FINAL RFP Industry Q & A

20 October 2017

# Industry Question Government Response

1. Does the Government desire a fully functional vehicle intercom system?

a. If not, to what fidelity should the intercom system function?

2. Will the intercom system also communicate with the

IOS?

a. If so, will the IOS require an intercom headset?

1. A fully functional vehicle intercom is not required. The fidelity requirements for the vehicles are provided in paragraph 3.3.1 of the Stryker Phase V SRD and apply to all TTLs.

SRD Paragraph 3.3.1.1 - Upon completion of a TTL, the student shall be able to perform a complete checkout of the MGS starting with an empty system, load training ammunition, and ending with a simulated firing and cartridge removal.

21. REMOVE AMMUNITION FROM

REPLENISHER

24. RESTOCK REPLENSIHER WITH

105MM AMMUNITION

SRD Paragraph 3.3.1.2 -

n. Upon completion of a TTL, the student shall be able to perform any of the following tasks.

1. LOAD TOW LAUNCHER

12. UNLOAD TOW LAUNCHER

Each of these tasks require communications between the loader and the commander/gunner.

2. There is no requirement for an intercom between the HOTs and the IOS.

Paragraph 3.1, System-Wide Design, includes this statement:

The C7 Power Pack Assembly PTT and MCV HOT will not be instrumented and does not connect to any IOS or the TMS. The following is a functional block diagram of the current Stryker MTS components and MTS interfaces

Paragraph 3.10.4 includes this statement:

One IOS shall communicate to all five HOT workstations per MGS, ATGM, and MC variant

These two statements appear to be in conflict.

Questions:

1. What is the Government's intent with regards to an IOS and/or SWS for the MC HOT and the C7 Power Pack?

2. Should there be one IOS for each group of trainers to allow the instructor to record lesson progress?

3. Should there be an SWS in the vicinity of each device to allow the student to record lesson progress?

Stryker Phase V SRD version 2.0 , Paragraph 3.10.4 states " One IOS shall communicate to all five HOT workstations per MGS, ATGM, and MC variant"

However the latest version of the Stryker Phase V SRD, version 2.2, , Paragraph

3.10.4 states "One IOS shall communicate to all 5 MGS HOT workstations and one IOS shall communicate to all 5 ATGM workstation"

The Stryker Phase V SRD Version 2.2 is posted on FedBizOpss.

File details come from the government source that posted it. Updated .