Attachment_10_Stryker_Phase_V_PWBS.pdf

PDF 188 KB Posted

Attached to
Stryker Maintenance Training System (Stryker-MTS) Federal contract opportunity
Solicitation number
W900KK-17-R-0016
Issued by
Department of the Army Materiel Command Contracting Command Orlando Contracting Center

About this file

Attachment 10, PWBS

View the file

Other files for this federal contract opportunity

Other files attached to Stryker Maintenance Training System (Stryker-MTS), newest first.
File Type Posted
RFP_Industry_Q_and_A_20171026_(STRYKER_MTS)_2.pdf PDF
Exhibit_C,_Stryker_Phase_V_CDRLs_C002_and_C003.pdf PDF
Exhibit_C,_Stryker-MTS-Phase-V_Annex_to_Exhibit_C_PBTMs_rev1.pdf PDF
Amendment_001_W900KK-17-R-0016_Stryker_MTS_10-20-17.pdf PDF
RFP_Industry_Q_and_A_20171020_(STRYKER_MTS).pdf PDF
Amendment_001_W900KK-17-R-0016_Stryker_MTS_10-20-17_(Conform_Copy).pdf PDF
Industry_Q_and_A_20170929_Continued.pdf PDF
Industry_Q_and_A_20170928_(STRYKER_MTS).pdf PDF
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170921_ver_2.1.1.pdf PDF
Attachment_1_Stryker_MTS_Phase_V_SOW_2017_09_01_Rev_2.1.1.pdf PDF
Stryker_Annex_to_Exhibit_A_LPD.pdf PDF
Stryker__Annex_to_Exhibit_B.pdf PDF
Attachment_8_Solicitation_Question_and_Comment_Form.pdf PDF
Stryker_Annex_Exhibit_C_PBTMs.pdf PDF
FINAL_RFP_W900KK-17-R-0016_Stryker_MTS_9-27-17.doc DOC document
B001-B005.pdf PDF
Attachment_4_Data_Rights.pdf PDF
Attachment_6_QASP.docx DOCX document
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170921_ver_2.1.1 —
Attachment_1_Stryker_MTS_Phase_V_SOW_2017_09_01_Rev_2.1.1 —
C001-C003.pdf PDF
Attachment_7_Past_Performance_Questionare.docx DOCX document
Attachment_3_GFP_Smartform.pdf PDF
Attachment_9_-_DD254.pdf PDF
Attachment_5_Data_Transmittal_Template.docx DOCX document
Stryker_Annex_to_Exhibit_A_LPD.pdf PDF
Stryker-Annex_to_Ex_A_TPs_rev1.pdf PDF
Stryker-Annex_to_Ex_A_TPs_rev1.pdf PDF
Stryker__Annex_to_Exhibit_B.pdf PDF
Stryker_Annex_Exhibit_C_PBTMs.pdf PDF
Stryker_Annex_to_Exhibit_A_LPD.pdf PDF
Attachment_1_SOW_Stryker_MTS_Phase_V_20170726.pdf PDF
Exhibit_A_CDRLS_A001-A00U.pdf PDF
Attachment_6,_QASP.docx DOCX document
Attachment_5,_Data_Item_Transmittal_Template.docx DOCX document
DRAFT_RFP_W900KK-17-R-0016_Stryker_MTS.pdf PDF
Attachment_8_Solicitation_Question_and_Comment_Form.pdf PDF
Attachment_2_Stryker_MTS_Phase_V_PRF-PT-684_20170726.pdf PDF
Attachment_3_GFP.pdf PDF
Exhibit_B_CDRLS_B001-B005.pdf PDF
Attachment_7_Past_Performance_Questionare.docx DOCX document
Exhibit_C_CDRLs_C001-C003.pdf PDF
Draft_Program_Contract_Documentation_Redacted.pdf PDF
Stryker_Phase_V_Distribution_Agreement.pdf PDF
STRYKER_MTS_2016_MARKET_RESEARCH_BASIC_RESEARCH_FORM_2016_11_22.doc DOC document
Stryker_MTS_Industry_Day_Package.pdf PDF
Stryker_MTS_Phase_V_DRAFT_SRD_2016_10_31.docx DOCX document
Stryker_MTS_Phase_V_DRAFT_SRD_2016_10_27.docx DOCX document
Stryker_MTS_Phase_V_SOW_2016_10_26.docx DOCX document
Stryker_MTS_Phase_V_DRAFT_SRD_2016_10_27.docx DOCX document
Show all 50

Stryker Maintenance Training System (Stryker-MTS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRYKER Maintenance Training System Phase V PWBS

1.0 Stryker MTS Devices

1.1 Product

Components

1.1.1 HOT

1.1.1.1 Student Station

1.1.1.2 Instr/Oper

Station

1.1.2 PTT

1.2 Program

Management

1.2.1 Subcontractor

Mgmt.

1.2.2 Intg.

Master Plan

1.2.3 Intg.

Master Sch.

1.2.4 Financial Mgmt.

1.2.5 Config.

Mgmt.

1.2.6 Tech.

Perf. Measures

1.2.7 Risk

Mgmt.

1.2.8 Mgmt.

Reviews

1.2.9 Visitor

Support

1.2.10 IDE

1.2.11 Data

Mgnt.

1.2.12 OPSEC

& Security

1.3 Systems

Engineering

1.3.1 System

Design

1.3.2 Hardware (HW) Eng.

1.3.3 Software

(SW) Eng.

1.3.4 HW &

SW Intg.

1.3.6 Specialty

Eng.

1.3.7 Design

Reviews

1.3.8 Prod.

Def. Data

1.4 Logistics

1.4.1 Initial

Spares

1.4.2 Tech.

Pubs

1.4.3 IUID

1.4.4 SW

Support Env.

1.4.5 Test

Meas. &

Diag. Equip.

1.4.6 Training Products

1.5 Integrated

Testing

1.5.1 Test

Readiness

Review

1.5.2 Contractor Dev.

Testing

1.5.3 Govt.

Dev. Testing

1.6 Cybersecurity

(CS)

1.6.1 CS Program

Mgmt.

1.6.2 CS System

Eng.

1.6.3 CS

Compliance

1.7 Site

Activation

1.7.1 Site Survey

1.7.2 Installation

Program

1.7.3 Installation

Tools & Equipment

1.7.4 Installation

Spares

1.8 On Call Maint.

Support

File details come from the government source that posted it. Updated .