ATTACHMENT_1_QASP_PMHS_Services_BPA_QASP_20190205b.docx

DOCX document 37 KB Posted

Attached to
Post Mortem Human Subject (PMHS) Services
Solicitation number
W81XWH19R0022
Issued by

About this file

Attachment 1 QASP

View the file

Other files

File Type Posted
19R0022_0002.pdf PDF
Additional_QUESTION_and_ANSWER_Amendment_2_19R0022_PMHS.docx DOCX document
QUESTION_and_ANSWER_19R0022_PMHS.docx DOCX document
19R0022_0001.pdf PDF
ATTACHMENT_4__Non_Disclosure_Statement.docx DOCX document
ATTACHMENT_2_Past_Performance_Evaluation_Questionnaire.docx DOCX document
W81XWH19R0022.pdf PDF
ATTACHMENT_3__OCI_(Revised_11_May_2018).DOCX DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1:

Quality Assurance Surveillance Plan for Post Mortem Human Subject (PMHS) Services

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place?

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO:

Organization or Agency: US Army Medical Research Acquisition Activity Telephone: Phone: 301-619-xxx Email: xxxx.civ@mail.mil

b. Contracting Officer’s Representative (COR) – The COR is located at the U.S. Army Aeromedical Research Laboratory. The COR will be responsible for technical administration of this contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. A COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Primary COR: Kimberly Vasquez Telephone: 334-255-6949 Email: kimberly.b.vasquez.civ@mail.mil

Alternate COR: Ed Claunch Telephone: 334-255-6797 Email: edward.g.claunch.civ@mail.mil

3. CONTRACTOR REPRESENTATIVES:

The following employee of the contractor will serve as the contractor’s Program Manager for this contract.

Program Manager:

Title:

Telephone:

Email:

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Table 1. Performance Requirements

Performance Objective
PWS
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
1. Donor Consent, Handling, and Preparation
3.1.1.
a) STD: Contractor maintains capability to consent potential donors, retrieve and prepare the donors in the specified anatomies listed in Table 1.
AQL: Donors are consented IAW Army Cadaver Policy for use in military research environment and no schedule delays related to contractor’s subject matter expertise.
Observation of performance.
2. Donor Summaries and Screening
3.1.2.
a) STD: Contractor supplies donor summaries and serology results for COR review.

b) STD: Contractor supplies x-rays, at the request of the COR.

AQL: Contractor provides necessary documentation for PMHS pre-approval.
100% Inspection.
3. Shipping
3.1.3.
a) STD: Contractor promptly coordinates and ships PMHS and are accompanied by tickets or slips.

b) STD: Contractor supplies return shipping labels and materials.

AQL: Contractor conducts PMHS shipping IAW all local, state, and federal laws and all tickets or slips contain minimum specified information.
100% Inspection.
4. Final Disposition
3.1.4.
a) STD: Contractor coordinates final disposition.
AQL: Contractor executes final disposition IAW next-of-kin/donor wishes, or Contractor policy and local, state, federal laws in absence of next-of-kin/donor direction.
Observation of performance.
5. Temporary Storage
3.1.5.
a) STD: At the request of the Government, the Contractor will provide short-term storage.
AQL: Contractor coordinates short-term storage of pre-approved PMHS before shipping.
Observation of performance.
6. Additional Medical Imaging
3.1.6
a) STD: At the request of the Government, the Contractor will provide additional medical imaging modalities, such as CT or DEXA.
AQL: Contractor promptly performs specified medical image modality and provides to the COR.
100% Inspection.
7. Invoicing
3.1.7.
a) STD: Invoices are in accordance with requirements.
AQL: Invoices are supportable and correct the first time.
100% Inspection.

5. METHODS OF QUALITY ASSURANCE SURVEILLANCE.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

· Feedback from Oversight Board

· Feedback from Government Users

· Feedback from Property Book Officers

· Direct Observation

· 100% Inspection

· Review of Quarterly Reports (various)

· Review of Monthly Reports (various)

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

· DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

· MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)

· PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled as required.

· Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)

· Performance reporting.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause and the Inspection of Supplies clause in the Contract becomes the basis for the KO’s actions.

6. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Example 1:

EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY:
Performance meets contractual requirements.
UNSATISFACTORY:
Performance does not meet contractual requirements.

7. DOCUMENTING PERFORMANCE.

a. ACCEPTABLE PERFORMANCE.

The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

b. UNACCEPTABLE PERFORMANCE.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

8. FREQUENCY OF MEASUREMENT.

a. Frequency of Measurement.

During contract/order performance, the COR shall take periodic measurements, quarterly as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

PERFORMANCE REPORT

1. Contract Number: TBD

2. Prepared by: COR Name Entered At Time of Award

3. Date and time of observation:

4. Observation:

<Examples of items to include in a report are:

- Method of surveillance.

- How frequently you conducted surveillance.

- Surveillance results.

- Number of observations.>

Prepared by: COR

_______________________________________________________
Signature – Contracting Officer’s RepresentativeDate

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: TBD

2. To: (Contractor Task Manager or on-site representative)

3. From: TBD

4. Date and time observed discrepancy:

5. Discrepancy or Problem:

<Describe in detail. Identify any attachments.>

6. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: COR

________________________________________________________________
Signature – Contracting Officer’s RepresentativeDate

Received by:

_________________________________________________________________
Signature - Contractor Task Manager or on-site representativeDate

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.

File details come from the government source that posted it.