Attachment 0003 - Maintenance and Overhaul Guidance.pdf
PDF 4 KB Posted
- Attached to
- Absorber Assembly
- Solicitation number
- W58RGZ-20-R-0125
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/23/2019
M629PRID 234N0003-1Part Number
1560-01-117-1084NSN CH-47System
ABSORBER ASSEMBLYNomenclature
YAdequate DMWR Available?
DMWR-1-1560-275DMWR ID
03/01/2016DMWR Date
DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
See DMWR 1-1560-275 paragraph 4-2 for Final Performance Check procedures. The overhaul facility shall have special tools and test/inspection equipment as specified in DMWR 1-1560-275 paragraphs 2-3 through 2-4. All substitute and equivalent tooling shall require Government approval. The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools.
2. Confirmed requisitions for the required tools.
3. Confirmed arrangements for subcontracting the processes requiring the special tools.
4. Specific plans describing their technical approach to develop equivalent tools.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Absorber Assembly at the time of this review.
Special Airworthiness Considerations
AED Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 13 August 2019. The part is Non-CSI and Non-NST. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs D2017A, D2018, and D2019.
Other Requirements / Comments (Part II)
AED Notes ; FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM database on 6 September 2019. The NHA is still Non-CSI and Non-NST. There are no required changes.JC
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
10/23/2019
M629PRID 234N0003-1Part Number
1560-01-117-1084NSN CH-47System
D2017A
D2018
D2019
D2047
D2539
D2540
D2571
See Tables 2-1 and 2-2 of DMWR 1-1560-275 for special tools, inspection and test equipment.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .