10/23/2019

M629PRID 234N0003-1Part Number

1560-01-117-1084NSN CH-47System

ABSORBER ASSEMBLYNomenclature

YAdequate DMWR Available?

DMWR-1-1560-275DMWR ID

03/01/2016DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

See DMWR 1-1560-275 paragraph 4-2 for Final Performance Check procedures. The overhaul facility shall have special tools and test/inspection equipment as specified in DMWR 1-1560-275 paragraphs 2-3 through 2-4. All substitute and equivalent tooling shall require Government approval. The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools.

2. Confirmed requisitions for the required tools.

3. Confirmed arrangements for subcontracting the processes requiring the special tools.

4. Specific plans describing their technical approach to develop equivalent tools.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Absorber Assembly at the time of this review.

Special Airworthiness Considerations

AED Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 13 August 2019. The part is Non-CSI and Non-NST. DEM

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEOs D2017A, D2018, and D2019.

Other Requirements / Comments (Part II)

AED Notes ; FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM database on 6 September 2019. The NHA is still Non-CSI and Non-NST. There are no required changes.JC

Other Requirements / Comments (Part III)

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

10/23/2019

M629PRID 234N0003-1Part Number

1560-01-117-1084NSN CH-47System

D2017A

D2018

D2019

D2047

D2539

D2540

D2571

See Tables 2-1 and 2-2 of DMWR 1-1560-275 for special tools, inspection and test equipment.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus