MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 5-DEC-09 1401-R-E
D 1326 Sep 8, 2014 3
Vaneaxial Fan Assembly (Combiner Transmission) Part Number 41360-2 (145DS518-6) Integrated Parts Breakdown Revision.
Administrative
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
4) Normal - Can be implemented with normal priorityPRIORITY IMPLEMENTATION CATEGORY
CH47 DAA
DMWR 55-4140-225 dated 30 August 2013
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
To modify DMWR 55-4140-225 Figure 3.2 and the associated parts table.
DINH.DEREK.
H.1232217053
Digitally signed by
DINH.DEREK.H.1232217053
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=DINH.DEREK.H.1232217053 Date: 2014.09.05 14:52:47 -05'00'
WILLIAS.PHILIP.
JOSEPH.110232
Digitally signed by
WILLIAS.PHILIP.JOSEPH.1102320146
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=WILLIAS.PHILIP.JOSEPH.1102320146 Date: 2014.09.04 09:32:08 -05'00'
Philip J. Willias (Camber Corporation)
PETER.ROBERT.
ARTHUR.JR.108
7823942
Digitally signed by
PETER.ROBERT.ARTHUR.JR.1087823942
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=PETER.ROBERT.ARTHUR.JR.108782394 Date: 2014.09.05 15:14:38 -05'00'
Derek Dinh Robert A. Peter, Jr.
PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
3-21
3-22
3-2
3-2
REPLACE Figure 3-2 with the image on page 3 of this MEO.
REVISE Illustrated Parts Breakdown Table Information as follows:
Item 21 Part Number:
Description: SCREW, DRIVE Units per Assy: 8
Item 22 Part Number: 41387-1 Description: PLATE, INSTRUCTION Units per Assy: 1
Item 23 Part Number: MS21318-1 Description: SCREW, DRIVE Units per Assy: 2
Distribution Statement D:- Distribution authorized to Department of Defense and U.S. DoD contractors only to protect critical technology effective as of 26 June 2014. Other requests for this document must be referred to U.S. Army Aviation and Missile Research, Development and Engineering Center, ATTN: RDMR -AEM , Corpus Christi, TX 78419-5211
MED FORM 26 JUN 2014
Continuation Sheet
MEO NO.
PAGE of
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
MED FORM 15-DEC-09 1401-R-E
3-22 3-2 Item 24 Part Number: 41362-1 Description: HOUSING ASSEMBLY Units per Assy: 1
Item 25 Part Number: MS51991-205 Description: INSERT Units per Assy: 12
Item 26 Part Number: MS51990-105P Description: LOCKRING Units per Assy: 12
MED FORM 26 JUN 2014
D 1326
Formatted Cont. Sheet
Continuation Sheet
MEO NO.
PAGE of
MED FORM 15-DEC-09 1401-R-E
MED FORM 26 JUN 2014
D 1326
Formatted Cont. Sheet
RDMR-AEM
MEMORANDUM FOR RECORD:
SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using ,affecting system:
Enclosed MEO is issued by this office and is provided as part of our Technical Data user support mission.
4. THIS MEO CHANGES THE FOLLOWING (Check all that apply):
1.
Consumables
Materials
Expendables
Repairable Bill of Materials (RBOM)Impact
3. PRIORITY IMPLEMENTATION CATEGORY :
6. :
. Point of contact for this action is
2. FOR AMCOM ACQUISITION CENTER USE ONLY:
This MEO was written as a request from a contractor/KO on an active M&O contract.
Request that MEO be transmitted to the contractor as soon as possible.
b.Items checked in this area are considered Normal Priority Implementation Category.
Illustrated Parts Breakdown Change Mandatory Replacement Part
TSO/TSN Change Configuration Change
Publication New Change
Hardware Tooling Equipment
New/Revised Procedure/Process
Process Improvement Project Inspection
Special Process Testing Cost Savings a.Items checked in this area are considered High Priority Implementation Category.
5. Reason(s) MEO Written:
Other
Other
D 1326
DMWR 55-4140-225 dated 30 August 2013 CH47
D 1326
4) Normal - Can be implemented with normal priority
CCAD Request
No
Derek Dinh, RDMR-AEM Engineer, phone (361)-961-2039, email derek.h.dinh.civ@mail.mil
DINH.DEREK.H.123221705
Digitally signed by DINH.DEREK.H.1232217053 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=DINH.DEREK.H.1232217053 Date: 2014.09.05 14:52:32 -05'00'
File details come from the government source that posted it.