W58RGZ17R0220.pdf

PDF 148 KB Posted

Attached to
Overhaul/Repair of the UH-60 Actuator
Solicitation number
W58RGZ-17-R-0220
Issued by

About this file

Solicitation W58RGZ-17-R-0220

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W58RGZ-17-R-0220 2017AUG03

DAWN PATTERSON (256)842-5181

DAWN.P.PATTERSON2.CIV@MAIL.MIL

2017SEP07 03:00pm

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280 X

X 100

336413

X

X DOA1

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 62

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: DAWN PATTERSON

Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)842-5181

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

1. Reserved.

2. This is a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22

3. There is an adequate Depot Maintenance Work Requirement (DMWR) and applicable Maintenance Engineering Order(s) (MEOs) for the Overhaul/Repair of the UH-60 Actuator. This is a 100% Small Business Set-

Aside.

4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.

5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.

6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.

7. The minimum quantity set forth herein shall be obligated on Delivery Order (DO) 0001, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered.

8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.

9. Reserved.

10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the

Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.

Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).

Ordering Period 2 will be from 366 DACA through 730 DACA.

Ordering Period 3 will be from 731 DACA through 1,095 DACA.

Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.

Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.

11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each

CLIN/SubCLIN.

12. For purposes of Block 12 on page 1, the offer acceptance period is 120 days from the date for receipt of offers specified in Block

9, unless a different period is inserted by the offeror in the blank in Block 12.

13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.

14. Offers shall be submitted in accordance with FAR Clause 52.215-1. Facsimile and electronic submissions are not authorized.

Proposals shall be mailed to:

Army Contracting Command - Redstone

ATTN: Dawn P. Patterson, CCAM-ALM

Bldg. 5303, 2nd Floor

Redstone Arsenal, AL 35898-5280

15. If any offeror chooses to hand carry their proposal, the offeror must reach the appointed location (identified as building 5300, 5300 Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be

2 62

W58RGZ-17-R-0220

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post. Please note that any proposals delivered late as a result of failure to comply with the procedure will not be accepted, IAW FAR 52.215-1 entitled "Instructions to Offerors-Competitive Acquisition".

16. Reserved.

17. Reserved.

18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

19. Reserved.

20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".

21. Access to DLA EMALL is NOT authorized. ___

22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Other Direct Cost

(ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.

23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:

A. https://liw.logsa.army.mil/etmapp/#/etm/home - Technical Manuals and Bulletins

B. http://www.apd.army.mil/ - DA Pamphlets and Army Regulations

24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: _________________________________________

TELEPHONE NUMBER: _____________________________

FAX NUMBER: ___________________________________

E-MAIL ADDRESS: _______________________________

*** END OF NARRATIVE A0001 ***

3 62

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PVA

0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________

SERVICE REQUESTED: PVA

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN represents the Product Verification

Audit (PVA) for the UH-60 ACTUATOR NSN: 1680-01-

261-2044, as shown in CLIN 0002AA.

PVA shall be in accordance with Section E, "Product Verification Audit (PVA) Statement of

Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the Government Quality Office for scheduling of the PVA by email to the following address:

usarmy.redstone.rdecom-amrdec.mbx.qs-contracts@mail.mil

With copy emailed to the Contract Specialist at:

dawn.p.patterson2.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to both email address above.

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-M, Dawn Patterson

Redstone Arsenal, Alabama 35898-5000

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination________________________________________________ for Default of the contract.____________________________

Payment Instructions: The Contractor will go_____________________ into Wide Area Work Flow (WAWF) to receive payment for the PVA. The Contractor shall use

DODAAC W58H0Z when submitting the PVA invoice in

4 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

WAWF.

THE IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 ACTUATOR

NSN: 1680-01-261-2044

Mfr CAGE: 78286

Mfr Part Number: 70400-06641-117

0002AA OVERHAUL/REPAIR OF UH-60 ACTUATOR (US QTY) $ $ __________________________________________ ______________ __________________

COMMODITY NAME: ACTUATOR

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for the Overhaul/Repair of the UH- _______________

60 Blackhawk, Actuator.

Input:

NSN: 1680-01-261-2044

P/N: 70400-06641-117

Output:

NSN: 1680-01-261-2044

P/N: 70400-06641-117

(End of narrative B001)

Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:

ORDERING PERIOD 1- U/P $____________ (FFP) Min

Qty 300 EA US

ORDERING PERIOD 2- U/P $____________ (FFP) Est

Qty 380 EA US

ORDERING PERIOD 3- U/P $____________ (FFP) Est

Qty 380 EA US

ORDERING PERIOD 4- U/P $____________ (FFP) Est

Qty 380 EA US

5 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ORDERING PERIOD 5- U/P $____________ (FFP) Est

Qty 380 EA US

Overhaul/Repair is in accordance with Section

C, entitled Statement of Work/Specifications -

Government Specifications.

This Firm-Fixed-Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in Section C entitled

Statement of Work/Specifications - Government

Specifications.

Delivery of overhauled assets are in accordance with Section F.

THIS IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B002)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

PACKAGING REQUIREMENTS

LOCATION OF PACKAGING/PACKING/SPECS:

ADDENDA: 05

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0003 ACTUATOR

NSN: 1680-01-261-2044

Mfr CAGE: 78286

Mfr Part Number: 70400-06641-117

0003AA OVERHAUL/REPAIR OF UH-60 ACTUATOR (FMS QTY) $ $ ___________________________________________ ______________ __________________

COMMODITY NAME: ACTUATOR

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for the Overhaul/Repair of the UH- _______________

60 Blackhawk, Actuator.

Input:

6 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NSN: 1680-01-261-2044

P/N: 70400-06641-117

Output:

NSN: 1680-01-261-2044

P/N: 70400-06641-117

(End of narrative B001)

This CLIN will be used only if a FMS customer requires this item. If no FMS customer(s) are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection and acceptance points are unknown at this time. FMS quantities cannot exceed

108 each.

Offeror is required to fill in proposed firm-fixed-unit price(s) for the ordering periods 1 to 5:

ORDERING PERIOD 1- U/P $____________ (FFP) Est

Qty 0 EA US

ORDERING PERIOD 2- U/P $____________ (FFP) Est

Qty 91 EA US

ORDERING PERIOD 3- U/P $____________ (FFP) Est

Qty 91 EA US

ORDERING PERIOD 4- U/P $____________ (FFP) Est

Qty 91 EA US

ORDERING PERIOD 5- U/P $____________ (FFP) Est

Qty 91 EA US

Overhaul/Repair is in accordance with Section

C, entitled Statement of Work/Specifications -

Government Specifications.

This Firm-Fixed-Price (FFP) CLIN includes all labor charges, mandatory and non-mandatory replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in Section C entitled

Statement of Work/Specifications - Government

Specifications.

Delivery of overhauled assets are in accordance with Section F.

THIS IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B002)

Packaging and Marking _____________________

7 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

PACKAGING/PACKING/SPECIFICATIONS:

PACKAGING REQUIREMENTS

LOCATION OF PACKAGING/PACKING/SPECS:

ADDENDA: 05

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

0004 SCRAP

0004AA SCRAP OF UH-60 ACTUATOR $ _______________________ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This is a Firm-Fixed-Price CLIN.

(End of narrative B001)

THE GOVERNMENT'S ESTIMATED QUANTITY PER

ORDERING PERIOD IS 10

EACH FOR PROPOSAL EVALUATION PURPOSES ONLY.

Offeror is required to fill in the proposed firm-fixed-unit prices for ordering periods 1 to 5:

ORDERING PERIOD 1 $_____________ Est Qty 10 EA

ORDERING PERIOD 2 $_____________ Est Qty 10 EA

ORDERING PERIOD 3 $_____________ Est Qty 10 EA

ORDERING PERIOD 4 $_____________ Est Qty 10 EA

ORDERING PERIOD 5 $_____________ Est Qty 10 EA

Scrap assets from CLINs 0002AA, and 0003AA shall be in accordance with Section C, entitled Statement of Work/Specifications -

Government Specifications.

Units authorized to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA.

8 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

In the event the Procuring Contracting Officer

(PCO) determines that certain items should be scrapped, the contractor shall scrap such items at the fixed-unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

THIS IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B002)

Deliveries or Performance _________________________

0005 CONTAINERS

0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This is a Firm-Fixed-Price CLIN.

(End of narrative B001)

THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING

PERIOD IS 10 EACH FOR PROPOSAL EVALUATION

PURPOSES ONLY.

Offeror is required to fill in proposed firm fixed unit prices for ordering periods 1 to 5:

ORDERING PERIOD 1 $____________ Est Qty 10 EA

ORDERING PERIOD 2 $____________ Est Qty 10 EA

ORDERING PERIOD 3 $____________ Est Qty 10 EA

ORDERING PERIOD 4 $____________ Est Qty 10 EA

9 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ORDERING PERIOD 5 $____________ Est Qty 10 EA

The contractor shall provide the container in accordance with Section C, entitled Statement of

Work/Specifications - Government Specifications and Section J, Attachment 0005 Packaging

Requirements.

The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.

The Contractor, IAW Section C Statement of Work, should submit a Report of Discrepancy (ROD) SF

Form 364 through the Defense Contract Management

Agency (DCMA) Quality Assurance Representative

(QAR) for verification within 7 working days to the address shown on Exhibit B, Data Item A002.

When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.

This CLIN covers containers for CLINs 0002AA and

0003AA.

THIS IS A FIRM-FIXED-PRICE CLIN.

(End of narrative B002)

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________

Pricing for Data Items shall be included in the applicable unit price of CLINs 0002AA and

0003AA.

The contractor shall provide data items A001-

A004, in accordance with CDRLS, DD Form 1423, Section J, Exhibits A-D.

(End of narrative A001)

A001 TAMMS-A $ ** NSP ** _______ __________________

SERVICE REQUESTED: DATA ITEM A001

10 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DATA ITEM A001 - DI-SESS-81758A- THE ARMY MAINTENANCE

MANAGEMENT SYSTEM - AVIATION (TAMMS-A) - AS REQUIRED

(End of narrative B001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________

DISCREPANCY (ROD) $ ** NSP ** _________________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DI-MGMT-80503 - REPORT OF SHIPPING

(ITEM) AND PACKAGING DISCREPANCY (ROD) - AS REQUIRED

(End of narrative B001)

Deliveries or Performance _________________________

A003 QUALITY DEFICIENCY REPORT (QDR) $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DI-QCIC-80736 - QUALITY DEFICIENCY

REPORT (QDR) - AS REQUIRED

(End of narrative B001)

Deliveries or Performance _________________________

A004 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A004

DATA ITEM A004 - DI-PSSS-81995 - CONTRACT DEPOT

MAINTENANCE PRODUCTION REPORT - AS REQUIRED

(End of narrative B001)

11 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

12 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

TITLE_____ DATE____

C-1 STATEMENT OF WORK/SPECIFICATIONS - GOVERNMENT JUL/2001

SPECIFICATIONS

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and Overhaul/Repair required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the Overhaul/Repair, as applicable, the items shall be packaged as defined in Section D and Attachment 0005 of this contract and shipped to the destination(s) specified in each individual delivery order.

b. Prior to commencement of Overhaul/Repair, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the total cost of such Overhaul/Repair including labor, services, parts and materials. The Contractor shall continue the overhaul/repair process on all end items when the total cost to overhaul/repair does not exceed $12,732.00. The overhaul/repair shown in

Section B for CLINs 0002AA and 0003AA are Firm-Fixed-Price (FFP). The Contractor will be required to complete the overhaul/repair at the

FFP on all end items regardless of the damage as long as the total cost to repair does not exceed $12,732.00. The Contractor will be required to provide other than certified cost and pricing data and a Report of Discrepancy (ROD) signed by the DCMA QAR to the Procuring

Contracting Officer (PCO) to confirm that the total cost to repair will exceed $12,732.00. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A(s), and profit rate.

More information to support the Contractor's price may be requested by the Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts will be provided to the Contractor to complete the overhaul/repair of the end item. The Government cannot guarantee the condition or configuration of the assets sent to the Contractor for overhaul/repair.

c. In the event that the total contractor cost to overhaul/repair is determined (approved by PCO) to exceed $12,732.00, the Contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity.

d. Overhaul/Repair shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)-1-1680-332, Revision Date 05/03/2010, Change #: 2

(Section J, Attachment 0001). In conjunction with the DMWR, Maintenance Engineering Order (MEO) B1737B will also be used (Section J, Attachments 0003).

e. Reserved.

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the

Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW Data Item A002, Exhibit B.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, with change 12, Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-D. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addressees indicated on the DD Form(s) 1423. All RODs and QDRs must be approved/signed by the DCMA QAR prior to submission.

i. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW CLIN 0001AA and the Product Verification Audit (PVA)

Statement of Work, as specified in Section E of the Solicitation/Contract.

j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and Exhibit A attached to the Solicitation/Contract. The Contractor shall complete the forms and records as specified in DA PAM 738-751, TB 1-1500-

341-01, TM 1-1500-328-23 (Section J, Attachments 0009 & 0010).

k. Reserved.

l. Reserved.

13 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

m. Reserved.

n. Inventory Transactions - The Contractor shall prepare the following reports:

1. The contractor shall prepare a Depot Maintenance Production Report IAW DI-PSSS-81995, Data Item A004, Exhibit D and Attachment

0004.

2. The contractor shall complete and maintain the DD Form 1348-1A receipt for reparables on all shipments IAW DI-MISC-80508 and DD

Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22

(signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:

http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf

The contractor shall prepare this data to include the following corresponding receipt information:

A. National Stock Number (NSN) - (Positions 8-22)

B. Condition Code - (Position 71)

C. Unit Price - (Positions 74-80)

D. Total Price - (Block 1)

E. Actual Quantity Received - (Block 10)

F. Nomenclature - (Block 17)

G. Signature and Date - (Blocks 22 and 23)

An example of a 1348-1A filled out correctly is attached (See Attachment 0007).

If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

o. Reserved.

p. Reserved.

q. The Government reserves the right to replace any items scrapped.

r. Reserved.

s. The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736, Data Item A003, Exhibit C.

t. Reserved.

u. Shipping Containers, NSN: 8145-00-485-8256 shall be utilized. Packaging requirements IAW instructions attached to the

Solicitation/Contract, see Attachment 0005. The Contractor must use a method of shipment that provides a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

*** END OF NARRATIVE C0001 ***

14 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

TITLE_____ DATE____

D-1 BAR CODE MARKING JUN/2003

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.Automatic Identification and Data

Capture Techniques - Bar Code Symbology Specification - Code 39.

*** END OF NARRATIVE D0001 ***

15 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2000 OR EQUIVALENT Any equivalent must be approved by the Contracting Officer prior to award.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

TITLE_____ DATE____

E-5 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT DEC/2006

OF WORK

Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from

AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the

"Changes" clause of the contract.

(b) The Contractor shall:

(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN:

QSContracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United

States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC

PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

16 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance

Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.

(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work

Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.

(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.

(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.

Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.

(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the

AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.

1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.

17 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.

(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.

(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten (10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN:

QSContracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:

1. Name and location of contractor

2. Contract number or equivalent

3. Descriptive noun, national stock number, part number, and serial number of the item audited

4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.

5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.

Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA

Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.

(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:

1. Review the Final PVA Report for compliance and completeness

2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.

3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.

4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the

Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government. These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The

Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required

18 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.

(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final

Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)

Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item

(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.

(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.

*** END OF NARRATIVE E0001 ***

TITLE_____ DATE____

E-6 CALIBRATION JAN/2012

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

*** END OF NARRATIVE E0002 ***

19 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.242-15 STOP-WORK ORDER AUG/1989

2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

3 52.247-29 F.O.B. ORIGIN FEB/2006

4 52.247-34 F.O.B. DESTINATION NOV/1991

5 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006

WATER TERMINAL TRANSSHIPMENT POINTS

6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

7 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

8 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

9 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012

10 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016

(a) Definitions. As used in this clause--

"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

"Concatenated unique item identifier" means

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards

Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .