D 1255 Aug 13, 2014 2
Replacement of n-Propyl Bromide with Vertrel SDG in
DMWR 55-1650-399
Administrative
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
MEO CHANGE TYPE
3) High - Has a business or process impactPRIORITY IMPLEMENTATION CATEGORY
CH47 DAA
DMWR 55-1650-399 dated 7 JUN 2013 TTS TN134633
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
Replacement of n-Propyl-Bromide with Vertrel SDG because of upcoming environmental regulatory changes.
DINH.DEREK.
H.1232217053
Digitally signed by
DINH.DEREK.H.1232217053
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=DINH.DEREK.H.1232217053 Date: 2014.08.05 14:28:31 -05'00'
THOMAS.JOHN.
G.III.1501151030
Digitally signed by
THOMAS.JOHN.G.III.1501151030
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=THOMAS.JOHN.G.III.1501151030 Date: 2014.07.11 09:23:12 -05'00'
John G. Thomas III
BRYCHTA.RON.J
AMES.124577228
Digitally signed by
BRYCHTA.RON.JAMES.1245772285
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BRYCHTA.RON.JAMES.1245772285 Date: 2014.08.08 12:54:29 -05'00'
Derek Dinh for Robert Peter PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
Replace n-Propyl-Bromide warning statement with the following:
VERTREL SDG specialty fluid WARNING
VERTREL SDG specialty fluid is combustible, toxic to eyes, skin, and respiratory tract, and decomposes into other hazardous products when exposed to extreme heat. Wear chemical protective gloves and goggles/face shield. Avoid repeated or prolonged contact. Avoid breathing vapors or mist. Use only in well-ventilated areas. If ventilation is not adequate, use approved respirator as determined by local safety/industrial hygiene personnel. Keep away from open flames, sparks, or other sources of ignition. Refer to MSDS for specific requirements about components, reactivity, physical hazards, spill procedures, health hazards, first aid procedures, and
PPE.
b
Formatted Cont. Sheet
Continuation Sheet 2
3-10
3-11
C-1
3-12.d.
Warning
3-12.d.
Appendix C
Replace n-Propyl-Bromide warning statement with following:
VERTREL SDG specialty fluid is combustible, toxic to eyes, skin, and respiratory tract, and decomposes into other hazardous products when exposed to extreme heat. Wear chemical protective gloves and goggles/face shield. Avoid repeated or prolonged contact. Avoid breathing vapors or mist. Use only in well-ventilated areas. If ventilation is not adequate, use approved respirator as determined by local safety/industrial hygiene personnel. Keep away from open flames, sparks, or other sources of ignition. Refer to MSDS for specific requirements about components, reactivity, physical hazards, spill procedures, health hazards, first aid procedures, and
PPE.
Within Paragraph: 3-12.d. Replace:
n-Propyl Bromide (Item 31, Appendix C) with:
VERTREL SDG specialty fluid (Item 31, Appendix C)
Replace:
31 6850-01-450-6165 Cleaning Compound, Solvent, n-Propyl Bromide GL 0338-01
With:
31 6850-01-626-7714 VERTREL SDG specialty fluid 55GL
PN: M2S-SDGD (9V583)
D 1255
Formatted Cont. Sheet
RDMR-AEM
MEMORANDUM FOR RECORD:
SUBJECT: Impact of AED Maintenance Engineering Order (MEO) on maintenance using ,affecting system:
Enclosed MEO is issued by this office and is provided as part of our Technical Data user support mission.
4. THIS MEO CHANGES THE FOLLOWING (Check all that apply):
1.
Consumables
Materials
Expendables
Repairable Bill of Materials (RBOM)Impact
3. PRIORITY IMPLEMENTATION CATEGORY :
6. Comments:
7. Point of contact for this action is
2. FOR AMCOM ACQUISITION CENTER USE ONLY:
This MEO was written as a request from a contractor/KO on an active M&O contract.
Request that MEO be transmitted to the contractor as soon as possible.
b.Items checked in this area are considered Normal Priority Implementation Category.
Illustrated Parts Breakdown Change Mandatory Replacement Part
TSO/TSN Change Configuration Change
Publication New Change
Hardware Tooling Equipment
New/Revised Procedure/Process
Process Improvement Project Inspection
Special Process Testing Cost Savings a.Items checked in this area are considered High Priority Implementation Category.
5. Reason(s) MEO Written:
Other
Other
D 1255
DMWR 55-1650-399 dated 7 JUN 2013 CH47
D 1255
3) High - Has a business or process impact
Environmental Review
Derek Dinh, RDMR-AEM, 361-961-2039, or e-mail: Derek H. Dinh.civ@mail.mil
DINH.DEREK.H.123221705
Digitally signed by DINH.DEREK.H.1232217053 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=DINH.DEREK.H.1232217053 Date: 2014.08.05 14:28:02 -05'00'