ATTACHMENT 1 - PERFORMANCE REQUIREMENT SUMMARY
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W58RGZ-16-R-0035
26 April 2016
ATTACHMENT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall monitor Contractor performance according to the Acceptable Quality Level (AQL).
PWS
Paragraph
Task Performance
Standard
Acceptable Quality
Levels (AQL)
Surveillance Method /
By Whom/Frequency
C.5.5.11 and C.5.5.12
Preventative
Sustainment maintenance under Routine Work Orders
The Contractor shall perform On-site maintenance support within 95% of the scheduled time.
5% failure to perform on-site maintenance support according to preventative maintenance schedule.
Periodic Inspection. COR will review monthly work order logs.
C.5.5.11
C.5.5.12
Repair under Routine Maintenance shall perform On-site repair support within 95% of the scheduled time each month.
perform on-site repair within the scheduled time each month.
will review
C.5.5.9 and C.5.5.10
System Repairs under Emergency and Urgent shall perform system repairs under Urgent and Emergency Work Orders within 98% of the scheduled time.
2% failure to perform system repairs within the established timeframes each month.
will review
C.5.6 – C.5.7
Training Instruction and Materials shall develop and provide training instruction and materials in a prepared, organized, manner that conveys a mastery of the subject matter.
No more than 1 valid complaint pertaining to instructor, materials, or subject matter per class
100% inspection of class surveys.
C.5.7
Training Schedule shall perform System Training within 95% of the time according to training perform System Training within the established timeframe.
will review training attendance rosters.
CDRLs A001 through A019
Submit CDRLs as required shall submit CDRLs on-time within 95% of the time.
meet CDRL submission due date.
Monthly Review – COR will review submission of required data
Attachment
Maintenance Repair Parts shall deliver maintenance repair parts to negotiated delivery schedule 95% of the time.
deliver maintenance repair parts within the established timeframes.
Monthly Review – COR will review deliveries versus Maintenance Repair parts
C.1.5, C.1.6
C.1.7
Adherence to
CCAD
regulations (Safety, security, fire environmental).
shall adhere to
CCAD
regulations (Safety, security, fire and environmental) 100% of the
0% failure to adhere to CCAD regulations (Safety, security, fire and environmental).
Inspection – CCAD Safety Office will review submission, work site and monthly work logs.
C.5.2.2
FTM evaluation remediation of degradation/ damage of all 7 FTMs.
A complete analysis and remediation of all issues identified from degradation and/or damage have been completed.
96% of degradation/ damage have been identified and remediated.
Inspection – Combination of objective quality evidence which shall include:
written documentation of repair procedure and witnessing of repair process by
COR.
C.5.2.3
Repair voids under mounting plates for
FTM-1A and
FTM-1B
Defective voids under mounting plates shall be repaired in such a manner as to bring the mounting system to a condition that meets or exceeds the original design intent.
100%. Both test cells will be shown to exhibit acceptable repair of the pre-existing defect.
Combination of objective quality evidence which shall include:
written documentation of repair procedure, witnessing of repair process by COR, and non-destructive testing of repair using bore scope or “hammer test” to verify complete coverage of repair. One time.
C.5.2.4
Energize primary transformer for
FTM-1A
Successful energizing of all electrical components required to power up FTM- 1A
100% This task is self-explanatory, as power is required in order to proceed with functional testing of FTM-1A
COR witnessing of energizing procedures and subsequent equipment checks. One
C.5.2.5
Commissioning of FTM-3
Demonstrate
FTM is fully functional and capable of meeting DMWR test requirements.
100%.
Contractor shall successfully demonstrate all machine functions and capabilities and provide a printed copy of final commissioning test run.
Witnessing of test runs and review of final test print out by various
CCAD SME and the COR. One of FTM-2A functional and capable of meeting DMWR successfully demonstrate all machine functions and capabilities and provide a printed copy of final of final test print out by various
CCAD SME and the COR.
of FTM-1A functional and capable of meeting DMWR successfully demonstrate all machine functions and capabilities and provide a printed copy of final of final test print out by various
C.5.2.6
Full Verification Testing of
FTM-1B
Demonstration of full functionality of FTM to include capability testing of all combinations of gearboxes and
UUT.
Demonstration of change out procedure for “A” and “B” Gearboxes.
Contractor will perform a complete functionality test using all appropriate UUT and gearboxes and provide associated test reports for same.
Government witnessing of test runs and FTM functionality checks by various
CCAD SME and the COR. Review of final test reports by various
C.5.2.6
Full Verification Testing of
FTM-2B
of FTM to include capability testing of all combinations of
UUT.
Contractor will perform a complete functionality test using all appropriate UUT and provide associated test reports for same.
witnessing of test runs and FTM functionality checks by various CCAD SME and the COR. Review of final test reports by various
C.5.2.7
Complete installation and integration of the Test Management System (TMS).
of all TMS functions.
Demonstrate ability to control all FTM from any of work stations.
Demonstrate data storage and retrieval capabilities, UUT dress client capabilities.
100%. Full functionality is required in order to meet this requirement.
witnessing of demonstrations to support full functionality.
Review of TMS data products and hardware integration. This will be performed by various CCAD SME and COR.
C.5.2.8
Delivery of TDP for each
FTM.
Upon completion of commissioning or full verification testing, a TDP for each FTM shall be provided to the Government.
100%. A complete TDP for each FTM, as outlined in C.5.2.8 is required to meet this requirement.
review of Contractor provided TDP for each FTM by various CCAD
SME and the