W56KGY24R0002 Exhibit A_A001-A002 CDRLS - SVD AND SUM_ 06 November 2023.pdf

PDF 173 KB Posted

Attached to
RFP - Intelligence Application (Intel Apps) Information Collection Management (ICM) - W56KGY24R0002
Solicitation number
W56KGY24R0002
Issued by

About this file

This document contains two Contract Data Requirements Lists (CDRLs) for the federal contract opportunity titled "RFP - Intelligence Application (Intel Apps) Information Collection Management (ICM) - W56KGY24R0002." CDRL A001 requires the contractor to submit a Software Version Description on a monthly basis with each security patch or release delivery. CDRL A002 requires the contractor to deliver a Software User Manual with each major release, with the first delivery due 140 days after award. Both CDRLs must be submitted electronically in Microsoft Office formats and must address requirements in the Statement of Work. The contracting agency is the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. Responses are due to the requiring office of SFAE-IEW-DC.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A001 A TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Information Collection Management Application

W56KGY-24-R-0002 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Software Version Description (SVD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-IPSC-81442A SOW Paras: 3.1.6, 3.2.6, 3.4.1.1, 3.5.1.1 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT MTHLY 15 DAYS XDADO b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A N/A 30 DAYS XDARC

Reg

Repr o

BLOCK 4: In addition to the requirement of DI-IPSC-81442A, the contractor shall include all the information required by the SOW. Contractor format acceptable.

BLOCK 9: Distribution authorized to U.S. Government Agencies only.

BLOCK 10: A software version description (SVD) shall be submitted monthly with each monthly security patch/release delivery.

BLOCK 12:

Deliverables shall be complete, stand-alone, and address all the concerns in SOW paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.

SFAE-IEW-DC

ACC-APG (CCAP-CCC)

*ELECTRONIC SUBMITTAL

15. TOTAL 3

G. PREPARED BY

Erin Gardner PM IS&A – Procurement Coordinator

H. DATE

06 Nov 2023

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A002 A TDP TM OTHERIPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Information Collection Management Application

W56KGY-24-R-0002 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Software User Manual

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-IPSC-81443A SOW Para 3.4.1.1, 3.5.1.1 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT ASREQ 140 DAYS XDADO b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A N/A AS REQ

Reg

Repr o

16. REMARKS:

BLOCK 4: In addition to the requirement of DI-IPSC 81443A, the contractor shall include all the information required by the SOW. Contractor format acceptable.

BLOCK 12:

Deliverables shall be complete, stand-alone, and address all the concerns in PWS paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.

BLOCK 13: The contractor shall deliver documents with each major release.

SFAE-IEW-DC

ACC-APG (CCAP-CCC)

*ELECTRONIC SUBMITTAL

15. TOTAL 3

G. PREPARED BY

Erin Gardner PM IS&A – Procurement Coordinator

H. DATE

06 Nov 2023

I. APPROVED BY

J. DATE

File details come from the government source that posted it. Updated .